THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 16201 - 16250 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Woodhouse Road Pedestrian Report | Woodhouse Road Pedestrian Bridge | HIA Phase 1 | 03/07/2014 | Frans Prins | Active Heritage CC | Terratest (Pty) Ltd | 07/07/2014 - 09:03 |
Farm Vischgat 467 IR, Vereeniging, Gauteng | Cultural Heritage Assessment of a Portion of Portion 1 of the Farm Vischgat 467IR, Sedibeng District Municipality, Midvaal Local Municipality, Gauteng | HIA Phase 1 | 17/09/2013 | Francois P Coetzee | Umhlaba Environmental Consulting CC | 17/09/2013 - 13:18 | |
HIA for Khobab Switching station | HERITAGE IMPACT ASSESSMENT: PROPOSED GRID CONNECTION INFRASTRUCTURE TO SUPPORT THE KOKERBOOM 4 WIND ENERGY FACILITY, CALVINIA MAGISTERIAL DISTRICT, ORTHERN CAPE | Jayson Orton | ASHA Consulting(Pty) Ltd | 09/07/2021 - 16:56 | |||
Heritage Impact Assessment | HERITAGE IMPACT ASSESSMENT FOR COAL MINING RIGHT APPLICATION, INTEGRATED WATER USE LICENSE APPLICATION AND ENVIRONMENTAL AUTHORISATION, ON DIFFERENT PORTIONS OF THREE FARMS: MOOIHOEK 168 HT, KLIPSPRUIT 136 HT, KLIPSPRUIT 137 & KLIPSPRUIT 138 HT LOCATED IN THE MAGISTERIAL DISTRICT OF PIET RETIEF, MPUMALANGA | HIA Phase 1 | 10/11/2022 | 15/12/2022 - 08:03 | |||
LoE ATC SA Base Station: Roodekuil Bela-Bela, Limpopo Province | LoE ATC SA Base Station: Roodekuil Bela-Bela, Limpopo Province | HIA Letter of Exemption | 13/04/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Tekplan Environmental | 13/04/2016 - 09:13 |
Swazi Rail Graves Relocation Bloemkrans Portion 1 | THE SWAZI RAIL LINK PROJECT – EXHUMATION AND RELOCATION OF GRAVES ON THE FARM BLOEMKRANS PORTION 1 NEAR LOTHAIR IN THE MSUKALIGWA LOCAL MUNICIPALITY, MPUMALANGA PROVINCE | Burial Grounds and Graves Specialist Reports | 15/09/2018 | Edward Matenga | Edward Matenga | Edward Matenga | 11/10/2018 - 12:27 |
PIA for the Padloper Solar PV Facility 1, NC | PALAEONTOLOGICAL IMPACT ASSESSMENT: PROPOSED PADLOPER (PROJECTS 1, 2, 3 and 4) SOLAR PHOTOVOLTAIC (PV) FACILITIES AND THE ASSOCIATED 132 kV OVERHEAD POWER LINES AND ASSOCIATED INFRASTRUCTURE NEAR MURRAYSBURG, WESTERN CAPE AND NORTHERN CAPE PROVINCES | Palaeontological Specialist Reports | 14/06/2023 | Elize Butler | Banzai Environmental (Pty) Ltd | African Clean Energy Developments (Pty) Ltd | 27/09/2023 - 14:08 |
Morris Point Stillbay | Morris Point Stillbay | AIA Phase 1 | 16/06/2012 | Timothy Hart, Dave Halkett | ACO Associates CC | 16/06/2012 - 08:54 | |
Aroams HIA | Heritage Impact Assessment for the proposed Mining Right Application on a portion of Portion 2 (remaining extent) of the farm Aroams 57, Registration Division of Namaqualand RD, Northern Cape. | HIA Phase 1 | 20/11/2019 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Greenmined Environmental | 20/11/2019 - 15:00 |
Talicron (Pty) Ltd- FS 10068 MR | SCOPING REPORT FOR THE APPLICATION OF A MINING RIGHT SITUATED ON PORTIONS 03, 08, 13 AND 14 OF THE FARM ZANDFONTEIN 259 AND PORTIONS 07, 11, 12, 17 AND 18 OF THE FARM BANKFONTEIN 09 IN THE MAGISTERIAL DISTRICT OF HEILBRON | 02/09/2021 - 10:38 | |||||
HIA-ZENWEF | Heritage Impact Assessment for the Proposed ZEN Wind Energy Facility, Tulbach Magisterial District, Western Cape Province | Heritage Impact Assessment Specialist Reports | 09/11/2012 | Jayson Orton | ACO Associates CC | Savannah Environmental (Pty) Ltd | 04/03/2015 - 13:56 |
Hia Warden - Vrede 88kV Powerline | PROPOSED ESKOM WARDEN RURAL-VREDE MUNIC 88kV POWER LINE, PHUMELELA LOCAL MUNICIPALITY, FREE STATE PROVINCE | HIA Phase 1 | 28/03/2014 | Anton van Vollenhoven | SAHRA Council | Wandima Environmental Services cc | 07/07/2014 - 10:23 |
HIA for Prospecting Right application on the Farm Gamolilo 72 near Kuruman, Northern Cape Province | Phase 1 Heritage Impact Assessment Requested in Terms of Section 38 of the National Heritage Resources Act No 25/1999 for the Proposed Prospecting and Mining Right on the Farm Gamolilo 72 near Kuruman, Northern Cape Province | HIA Phase 1 | 28/02/2022 | Edward Matenga | Thaya Trading Enterprise | (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd | 28/02/2022 - 19:51 |
P2AIA[Final Report]-Test Excavations, Samy's Wholesalers, Erf 44500, KBY, NC | Final Report - Samy's Wholesalers Test Excavations | AIA Phase 2 | 25/05/2015 | Anton Pelser | Samy's Wholesalers | 25/05/2015 - 13:34 | |
LAN4605 - Permit Report | Permit Report: National Heritage Resources Act, 1999 (Act No. 25 of 1999) Section 35 Archaeological Investigations, Lanxess Chrome Mine, North-West Province | Archaeological Permit Report | 31/08/2017 | Timothy Robin Forssman, Matt Geoffrey Lotter | Digby Wells Environmental | Lanxess Chrome Mine (Pty) Ltd | 29/09/2017 - 09:57 |
HIA Olien SEF | Archaeological & Cultural Heritage Impact Assessment Phase 1: Proposed Olien Solar Project development on Portion 4 of Farm 300, Barkly West, near Limeacres, Northern Cape | HIA Phase 1 | 01/08/2012 | David Morris | McGregor Museum | Cape Environmental Assessment Practitioners | 28/09/2012 - 11:12 |
PIA desktop report | Palaeontological Impact Assessment for the proposed Paradise-Fondwe 132kV powerline, Limpopo Province | PIA Desktop | 24/02/2023 | Prof Marion Bamford | Prof Marion Bamford | Setala Environmental | 26/02/2023 - 18:50 |
Twinsaver Kliprivier Paper Mill Expansion Heritage Report | Heritage Impact Assessment Report for the Proposed Expansion of the Tissue Manufacturing Capacity at the Twinsaver Klipriver Operations Base near Henley on Klip, Gauteng Province. | Heritage Impact Assessment Specialist Reports | 20/05/2016 | Stephan Gaigher | G&A Heritage Management Consultants | Sivest - Gauteng | 23/06/2016 - 07:24 |
Reiger Park Extension WULA HIA Report | 08/12/2017 - 09:04 | ||||||
Paleomagnetic sampling from Rose Cottage cave | Paleomagnetic sampling from Rose Cottage cave | Export Permit Report | 12/03/2020 | 12/03/2020 - 15:02 | |||
HIA: Middelvlei Solar | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed development of the Middelvlei Solar, 120MW Solar PV Project, Gauteng Province | HIA Phase 1 | 15/01/2023 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 25/04/2023 - 11:15 |
Milly's South Township | Phase 1 Archaeological Impact Assessment on a Portion of the Remaining Extent of Portion 8 of the farm De Kroon 363-JT (to be known as Portion 20 of the farm De Kroon 363-JT) in respect of the proposed Milly’s South Development/ Township near Machadodorp, Mpumalanga Province. | AIA Phase 1 | 27/08/2016 | Jean-Pierre Celliers | Kudzala Antiquity | Enpact Environmental Consultants CC | 08/09/2016 - 08:27 |
HERITAGE REPORT POPO MOLEFE | HERITAGE REPORT POPO MOLEFE | HIA Phase 1 | 25/08/2020 | Museum Africa | //Khara Hais Municipality | 27/07/2020 - 12:19 | |
HERITAGE SPECIALIST OPINION FOR THE NEW INERNAL COMBUSTION ENGINE (ICE) DEVELOPMENTS ASSOCIATED WITH THE AFRIKAANS AND SOTHO PV PLANT FOR PROJECT DAO | SPECIALIST OPINION FOR THE NEW INERNAL COMBUSTION ENGINE (ICE) DEVELOPMENTS ASSOCIATED WITH THE AFRIKAANS AND SOTHO PV PLANT FOR PROJECT DAO (FORMERLY BOKPOORT SOLAR PHOTOVOLTAIC (PV) ENERGY FACILITY) NEAR GROBLERSHOOP, !KHEIS LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE | Heritage Statement | 29/11/2021 | J.A. van Schalkwyk | ACWA Power Energy Africa (Pty) Ltd | 29/04/2022 - 14:44 | |
KZN Palaeotechnical Report | PALAEONTOLOGICAL TECHNICAL REPORT FOR KWAZULU-NATAL | Palaeontological Specialist Reports | 31/10/2012 | Gideon Groenewald | Metsi Metseng Geological Services CC | KwaZulu-Natal Amafa and Research Institute | 12/11/2013 - 16:08 |
AIA FOR THE PROPOSED KRANSKLOOF DAM AND AGRICULTURAL LANDS DEVELOPMENT ON THE FARM KRANSKLOOF 218 KR, LIMPOPO PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED KRANSKLOOF DAM AND AGRICULTURAL LANDS DEVELOPMENT ON PORTION 1 OF THE FARM KRANSKLOOF 218 KR, WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | AIA Phase 1 | 28/07/2016 | Neels Kruger | Exigo Sustainability | Ecolead Environmental Solutions | 25/01/2017 - 10:40 |
Palaeontology Report for Gilmer Solar Energy Facility 735 | Proposed Gilmer Solar Energy Facility, Noupoort, Northern Cape Province. Basic Assessment Report Palaeontology | PIA Phase 1 | 30/10/2012 | JF Durand | 31/01/2013 - 14:12 | ||
Heritage Impact Exemption and 2014 HIA | LETTER FOR HIA EXEMPTION REQUEST: THE PROPOSED ESKOM MATIMBA POWER STATION ASH DISPOSAL FACILITY POLLUTION CONTROL DAMS, CLOSE TO LEPHALALE, LIMPOPO PROVINCE | HIA Letter of Exemption | 12/01/2022 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | WSP Group Africa (Pty) Ltd | 30/06/2022 - 10:44 |
Tronox Mitigation Report | ARCHAEOLOGICAL MITIGATION AT THE TRONOX NAMAKWA SANDS MINE, VREDENDAL MAGISTERIAL DISTRICT, WESTERN CAPE | AIA Phase 2 | 17/04/2017 | Jayson Orton | ASHA Consulting(Pty) Ltd | Tronox Namakwa Sands | 19/03/2018 - 13:22 |
HERITAGE SURVEY OF THE TETYANA TO SITEBE KOMKULU ROAD UPGRADE, EASTERN CAPE | Archaeological Specialist Reports | 13/04/2013 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | South African National Roads Agency - Southern Region | 12/04/2013 - 12:40 | |
SANRAL Matatiele Road Upgrade PIA 2016 | PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED ROAD UPGRADE DEVELOPMENT MATATIELE TO STRYDFONTEIN, MATATIELE LOCAL MUNICIPALITY, ALFRED NZO DISTRICT MUNICIPALTY, EASTERN CAPE PROVINCE | PIA Desktop | 28/05/2016 | Gideon Groenewald | PGS Heritage and Grave Relocation Consultants | EOH Coastal and Environmental Services | 05/06/2023 - 09:06 |
Umqeku river bridge HIA desktop | DESKTOP SURVEY OF THE UMQEKU LOW LEVEL BRIDGE: | HIA Letter of Exemption | 22/09/2016 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Jeffares & Green - Pietermaritzburg | 27/10/2016 - 15:07 |
HIA; Borrow Pit - DR1650, Uniondale | Heritage Impact Assessment for a Expansion of an Existing Borrow Pit Located Along Divisional Road 1650 Approximately 40 km Southwest of Uniondale in Eden District Municipality, Western Cape | HIA Phase 1 | 25/04/2012 | John Almond | Vidamemoria Heritage Consultants | Aurecon South Africa (Pty) Ltd | 21/05/2018 - 08:47 |
Application for Exemption: Raw Water Pipeline: Medupi Power Station | Application for Exemption from further Heritage Mitigation Raw Water Pipeline at Medupi Power Station Lephalale Municipality, Waterberg District, Limpopo Province | HIA Letter of Exemption | 22/04/2019 | Len van Schalkwyk | eThembeni Cultural Heritage | WSP Environmental Pty Ltd - Johannesburg | 07/05/2019 - 14:30 |
Proposed establishment of Rooibos Plantation on 150ha of Portion 1 of Farm 537, Wupperthal | HIA: Proposed establishment of Rooibos Plantation on 150ha of Portion 1 of Farm 537, Wupperthal | HIA Phase 1 | 07/10/2019 | Jenna Lavin | CTS Heritage | FOOTPRINT Environmental Services | 30/09/2020 - 16:43 |
PHASE 1 EXPANSION AND UPGRADE OF PABALLELO JUPITER CEMETERY, UPINGTON | PHASE 1 HIA FOR THE PROPOSED UPGRADE AND EXPANSION OF THE PABALLELO JUPITER CEMETERY, UPINGTON, DAWID KRUIPER LOCAL MUNICIPALITY, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE. | HIA Phase 1 | Sky-Lee Fairhurst, Jan Engelbrecht, Elize Butler, Heidi Fivaz | UBIQUE HERITAGE CONSULTANTS | Enviroafrica CC | 17/07/2023 - 14:38 | |
AIA_Melkvlei_PV_Webley_LE_Feb12 | HERITAGE IMPACT ASSESSMENT: PROPOSED CONSTRUCTION OF THE MELKVLEI PHOTOVOLTAIC SOLAR ENERGY FACILITY, FRANCES BAARD DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | AIA Phase 1 | 28/02/2012 | Lita Webley, Jayson Orton | ACO Associates CC | 16/06/2012 - 14:47 | |
Construction of an irrigation dam on the farm Esperado | Phase 1 AIA / HIA for the proposed Low's Creek Dam Project: construction of an irrigation dam on portions of the remaining extent of the farm Esperado 253JU and portions 1 & 2 of the farm Esperado Annex 222JU, Lows Creek, Kaapmuiden, Mpumalanga Province | AIA Phase 1 | 23/11/2020 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Rhengu Environmental Services | 23/11/2020 - 13:25 |
PROPOSED CONSTRUCTION OF FURTHER EDUCATION TRAINING (FET) COLLEGE IN GREYTOWN, KWAZULU NATAL PROVINCE. | APPLICATION FOR EXEMPTION ON THE PROPOSED CONSTRUCTION OF FURTHER EDUCATION TRAINING (FET) COLLEGE IN GREYTOWN, KWAZULU NATAL PROVINCE. | HIA Letter of Exemption | 13/02/2014 | Makhosazana Mngomezulu | 13/02/2014 - 09:00 | ||
PIA Report 44 Finaalspan | Paleontological Impact Assessment for the Potential Housing Development on Remainder of Portion 44 of the Farm Finaalspan 114 IR, Gauteng Province | PIA Desktop | 19/02/2017 | Marion Bamford | 16/03/2017 - 15:19 | ||
PALEONTOLOGICAL IMPACT ASSESSMENT REPORT APPLICATION FOR ENVIRONMENTAL AUTHORISATION | THE PROPOSED UPGRADING OF OLIFANTSPOORT AND EBENEZER WATER SUPPLY SCHEMES, PHASE 1 WITHIN THE JURISDICTION OF CAPRICORN AND MOPANI DISTRICT MUNICIPALITIES, LIMPOPO PROVINCE. | Palaeontological Specialist Reports | 27/07/2022 | Marion Bamford | Tsimba Archaeological Footprints (Pty) Ltd | Tsimba Archaeological Footprints (Pty) Ltd | 24/08/2022 - 13:25 |
AIA-BloemsmondPV1 | Archaeological Impact Assessment for the Proposed AEP Bloemsmond Solar 1 PV, Keimoes, Northern Cape Province | Archaeological Specialist Reports | 21/10/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 09/11/2015 - 09:27 |
Vaalkrans | Report on the 2002-2005 excavations at Vaalkrans Shelter, De Hoop Nature Reserve, southern Cape | Archaeological Permit Report | 19/01/2006 | Christopher Henshilwood | African Heritage Research Institute | 01/04/2014 - 12:21 | |
Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. | HIA Phase 1 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:37 | |
Heritage Statement: 3 Haraldene Road | Heritage Significance Report for 3 Haraldene Road lot 5341 Durban | Heritage Statement | 25/06/2013 | Sean Simons | Nu Plan | 25/06/2013 - 12:49 | |
Heritage Impact Assessment for the Proposed Sagewood Filling Station (Erven 1323 and 1324 Sagewood Ext 6), Gauteng Province | Heritage Impact Assessment for the Proposed Sagewood Filling Station (Erven 1323 and 1324 Sagewood Ext 6), Gauteng Province | HIA Phase 1 | 25/05/2021 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Lokisa Environmental Consulting CC | 03/05/2021 - 09:16 |
Field-based PIA: Pixley Park | PALAEONTOLOGICAL FIELD-BASED SPECIALIST STUDY In terms of Section 38(8) of the NHRA for a Proposed Development of the Pixley Park REF and associated infrastructure near De Aar | PIA Phase 1 | 19/10/2022 | Elize Butler | Banzai Environmental (Pty) Ltd | Savannah Environmental (Pty) Ltd | 19/10/2022 - 09:27 |
Duduza Palaeontological Report | Duduza Palaeontological Report | PIA Desktop | 15/01/2016 | 20/01/2016 - 10:59 | |||
Heritage Impact Assessment | Heritage Impact Assessment of a proposed mining site on Farm 350, Longlands, near Barkly West, Northern Cape. | Archaeological Specialist Reports | 26/01/2018 | David Morris | McGregor Museum | Thaya Trading Enterprise | 05/07/2018 - 16:12 |
CTS Heritage Screener: Tyolomnqa Farm 1163 | Mining permit application for Tyolomnqa (Keiskamma), Farm 1163, Eastern Cape | Heritage Scoping | 01/05/2019 | Jenna Lavin | CTS Heritage | 30/07/2019 - 11:34 |