Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 16251 - 16300 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
lombardskop HIA | LOMBARD’S KOP BULK WATER PIPELINE, KWAZULU-NATAL | HIA Phase 1 | 17/05/2015 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Jeffares & Green - Pietermaritzburg | 23/06/2015 - 15:18 |
AIA FOR THE PROPOSED PLATINUM PHOTOVOLTAIC POWER PLANT DEVELOPMENT, THABAZIMBI LOCAL MUNICIPALITY, LIMPOPO PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF A DEMARCATED SURFACE PORTION ON THE FARM GROOTKUIL 409KQ FOR THE PROPOSED PLATINUM PHOTOVOLTAIC POWER PLANT DEVELOPMENT, THABAZIMBI LOCAL MUNICIPALITY, WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | AIA Phase 1 | 19/05/2014 | Neels Kruger | Exigo3 Sustainability | Firefly Investments 224 (RF) (Pty) Ltd | 28/07/2015 - 09:27 |
Brandfort HIA | HIA Phase 1 | 29/07/2016 - 15:42 | |||||
Archarological Desktop Study | ARCHAEOLOGICAL DESKTOP STUDY for the application of a on portions 36, 37, 38, 3 9p,r o40s paencdt i4n1g orifg thhte Farm Boekenhoutkloof 315 JR, Pretoria North, Gauteng | AIA Desktop | 01/10/2017 | Tobias Coetzee | Klei Minerale (Pty) Ltd | 06/02/2018 - 15:07 | |
PHASE 1 HIA REPORT FOR A PROPOSED RESIDENTIAL AND MIXED USE TOWNSHIP DEVELOPMENT AND RELATED INFRASTRUCTURE | PHASE 1 HIA REPORT FOR A PROPOSED RESIDENTIAL AND MIXED USE TOWNSHIP DEVELOPMENT AND RELATED INFRASTRUCTURE ON VARIOUS PORTIONS OF THE FARMS BOSCHOEK 385IR & BOSCHFONTEIN 386IR NEAR HEIDELBERG IN THE LESEDI LOCAL MUNICIPALITY OF GAUTENG APAC019/45 | HIA Phase 1 | 03/05/2019 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | AB Enviro Consult CC | 22/05/2019 - 19:48 |
Archaeological Impact Assessment - Draft EIA | 31/08/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 23/09/2016 - 16:51 | ||
PIA_PV Facility_Farm Struisbult | PALAEONTOLOGICAL DESKTOP STUDY FOR THE PROPOSED PHOTOVOLTAIC ENERGY PLANT ON FARM STRUISBULT (PORTION 1 OF FARM 104) NEAR COPPERTON, NORTHERN CAPE | PIA Desktop | 01/02/2012 | John E Almond | Natura Viva CC | Aurecon - Head Office | 30/01/2013 - 15:23 |
VGRWSS-II: Upgrade of Existing Scheme - Heritage Impact Assessment | Heritage Impact Assessment for the proposed Upgrade of the Vaal Gamagara Regional Water Supply Scheme Phase 2 | Heritage Impact Assessment Specialist Reports | David Morris, Abenicia Henderson | McGregor Museum | 21/08/2019 - 10:07 | ||
ERG6028 - HIA | City Deep 4L2 Mine Dump Heritage Management: Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 11/12/2020 | Justin du Piesanie, Shannon Hardwick | Digby Wells Environmental | Ergo Mining (Pty) Ltd | 11/12/2020 - 10:03 |
Tranquility Park | HIA FOR THE TRANQUILITY MEMORIAL PARK, INANDA, KZN | HIA Phase 1 | 27/03/2022 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Wallace and Green | 24/06/2022 - 12:22 |
Kromdraai Mine | Kromdraai Mine | AIA Phase 1 | 16/06/2012 | Anton van Vollenhoven | Archaetnos CC | 16/06/2012 - 08:54 | |
Heritage Assessment Kwagga North | Heritage Assessment The Kwagga North Project, Optimum Coal, Arnot, Mpumalanga | HIA Phase 1 | 02/10/2009 | Wouter Fourie | Professional Grave Solutions (Pty) Limited | Concession Creek Consulting | 12/04/2013 - 11:33 |
Application for Exemption from a Phase 1 Heritage Impact Assessment | Application for Exemption from a Phase 1 Heritage Impact Assessment of REM of ERF 1740 Kloof at 1 Everton Road, Kloof, Outer West Municipality, eThekwini, KwaZulu-Natal., KwaZulu-Natal, South Africa | HIA Letter of Exemption | 07/04/2014 | Len van Schalkwyk | 07/04/2014 - 12:29 | ||
SuperChicks HIA | HIA for the Proposed SuperChicks Poultry Farm on Portion 68 of the Farm Kameelzynkraal No 547 in Pretoria East Within the City of Tshwane Metropolitan Municipality, Gauteng Province, South Africa | HIA Phase 1 | 02/03/2021 | Nkosinathi Godfrey Tomose | MOKGOPE CONSULTING CC | 03/03/2021 - 13:04 | |
PIA | Palaeontological Confirming Statement | PIA Phase 1 | 25/05/2023 | Anton van Vollenhoven | 02/06/2023 - 16:15 | ||
Drimolen annual report 2014 | Drimolen Hominin Site – Annual Report to SAHRA (July 2014) | Archaeological Permit Report | 16/06/2014 | Colin Menter, Stephanie Baker, Thea de Wet | 16/06/2014 - 15:45 | ||
Riverview Poultry Project | Application for Exemption from a Phase 1 Heritage Impact Assessment Proposed Poultry Project Kevin Lawrie Family Trust, Portion A of the Farm Pasina 17671, Riverview Mtubatuba LM, Umkhanyakude District DM, KwaZulu-Natal. | HIA Letter of Exemption | 23/01/2017 | Len van Schalkwyk | eThembeni Cultural Heritage | ACER (Africa) Environmental Management Consultants | 18/02/2017 - 17:08 |
UNDERWATER HERITAGE IMPACT ASSESSMENT | UNDERWATER HERITAGE IMPACT ASSESSMENT, PROSPECTING APPLICATION FOR WC10429PR WITHIN CONCESSION 11A, WESTERN CAPE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 27/06/2023 | Vanessa Maitland | 12/07/2023 - 11:32 | ||
HIA report for Ventersdorp North West PROVINCE | ort for Ventersdorp North West PROVINCE | Heritage Study | 11/04/2018 | Thilivhali Meregi | Lesekha Consulting | Lesekha Consulting | 12/04/2018 - 16:17 |
Archaeological Impact Assessment for proposed Magalies Cemetery and waste transfer station | Archaeological Impact Assessment for proposed development of Magalies Cemetery and Waste Transfer Station, Portion 22 of the farm Rietpoort 395JQ, Mogale City Local Municipality, Gauteng Province | AIA Phase 1 | 04/03/2015 | Eric Ndivhuho Mathoho | Naledzi Environmental Consultants | Naledzi Environmental Consultants | 29/09/2015 - 09:54 |
Tekwane Grave site at Kanyamazane | Report on grave site found on portion 7 of the farm Tekwane 537JU in the way of an amended bulk sewer pipeline route, Kanyamazane, Mpumalanga Province | Burial Grounds and Graves Specialist Reports | 04/04/2017 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Wandima Environmental Services cc | 04/04/2017 - 21:35 |
AIA_Struisbult_PV_2502_Orton_J_Feb12 | HERITAGE IMPACT ASSESSMENT FOR A PROPOSED PHOTOVOLTAIC ENERGY PLANT ON THE FARM VOGELSTRUISBULT NEAR COPPERTON, NORTHERN CAPE | AIA Phase 1 | 09/02/2012 | Jayson Orton | ACO Associates CC | 16/06/2012 - 14:50 | |
Ptn 71 Knopjeslaagte 385 JR Residential Development | Heritage Impact Assessment Ptn 71 Knopjeslaagte 385 JR Residential Development | HIA Phase 1 | 26/02/2018 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Prism Environmental Management Services cc | 05/06/2018 - 20:55 |
Ndwedwe Licencing and Testing Centre | Ndwedwe Licencing and Testing Centre, Ndwedwe Local Municipality | HIA Phase 1 | 21/10/2016 | Sasheq | 04/11/2016 - 16:30 | ||
Phase 1 Heritage and Palaeontological Impact Assessment for Plot 32 Shannon Valley, Bfn, Free State Province | Phase 1 Heritage and Palaeontological Impact Assessment for Plot 32 Shannon Valley, Bfn, Free State Province | HIA Phase 1 | 14/02/2019 | Lloyd Rossouw | National Museum Bloemfontein | Manie van Wyk Environmental Consultants, Bloemfontein | 18/11/2019 - 07:48 |
14_App C5 Palaeontological Screening Report | PALAEONTOLOGICAL HERITAGE SCREENING INPUT: PROPOSED KHAUTA SOLAR PV CLUSTER NEAR WELKOM, FREE STATE PROVINCE | PIA Desktop | 01/07/2021 | John E. Almond | Natura Viva CC | Enviroworks | 19/08/2022 - 11:48 |
Sidwadeni River Heritage Impact Assessment | Sidwadeni River, Mthatha and Mngazi River Access Roads and Bridges | HIA Phase 1 | 28/02/2013 | Jenny Bennie | Jenny Bennie | 24/06/2013 - 10:06 | |
Integrated Heritage Impact Assessment | An Integrated Assessment from all other specialist reports focus on the potential heritage impacts. | Heritage Impact Assessment Specialist Reports | 28/02/2020 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | Bateleur Environmental & Monitoring Services (Pty) Ltd | 09/03/2020 - 08:31 |
Proposed extension of Piet Retief Extension 6 | HASE 1 ARCHAEOLOGICAL / HERITAGE IMPACT ASSESSMENT FOR A PROPOSED EXTENSION OF PIET RETIEF EXTENSION 6, ON THE REMAINDER OF PORTION 1 OF PIET RETIEF TOWN AND TOWNLANDS 149HT, MKHONDO LOCAL MUNICIPALITY | HIA Phase 1 | 24/02/2021 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | 22/04/2021 - 11:58 | |
Addendum 10 | 1st phase H.I.A. of a proposed extension and upgrading, also known as THE SISHEN IRON ORE MINE EXPANSION PROJECT | HIA Phase 1 | 01/08/2022 | Siegwalt Udo Kusel | Sidney Miller | Sidney Miller | 13/10/2022 - 10:14 |
2013 Report Ngqura 1 and 3 | Phase 1 Heritage Impact Assessment Hotazel to Kimberley and De Aar to Port of Ngqura | HIA Phase 1 | 20/02/2013 | Elize Becker | Hatch | Transnet SOC Ltd | 29/08/2013 - 15:53 |
Palaeontological Report for Kudumane Mine | Palaeontological Impact Assessment Report for a Manganese Mine (Farms Kipling, Hotazel, Devon, Perth) near Hotazel Town in the John Taolo Gaetsewe District Municipality, Northern Cape | Palaeontological Specialist Reports | 09/07/2014 | Gideon Groenewald | GSPD Consulting | SLR Consulting (Africa) | 16/09/2014 - 14:24 |
Protea Addition Heritage Impact Assessment | HIA: THE PROPOSED ADDITION TO THE PROTEA SOLAR POWER PLANT NEAR VRYBURG, NORTH WEST PROVINCE | Heritage Impact Assessment Specialist Reports | 01/04/2021 | Johnny Van Schalkwyk | Environamics | 21/06/2021 - 13:12 | |
Sobho HIA report | Phase 1 Heritage Impact Assessment Report- Sobho Road Upgrade Project, near Pomeroy, Kwazulu-Natal, Province | HIA Phase 1 | 18/11/2014 | Stephan Gaigher | G & A Heritage | GBS Environmental Consulting | 06/01/2015 - 13:05 |
Brookdale Assessment Centre Housing Heritage Impact Assessment Report | Brookdale Assessment Centre Housing Heritage Impact Assessment Report | Heritage Impact Assessment Specialist Reports | 28/06/2011 | eThembeni Cultural Heritage | 19/05/2017 - 14:18 | ||
Heritage Imact Assessment for ALS Mining | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR A PROPOSED MINING RIGHT APPLICATION ON THE FARMS FOLMINK 331, KLOOFFONTEIN 332, MIDDELWATER 18 AND FARM 597, CLOSE TO PRIESKA, NORTHERN CAPE PROVINCE | HIA Phase 1 | 26/06/2018 | Anton van Vollenhoven | 03/08/2018 - 09:41 | ||
Cultural Heritage Impact Assessment | Cultural Heritage Impact Assessment: Phase 1 Investigation for a Prospecting Right Application of Diamonds Alluvial & Diamonds General, near Barkly West on the Remaining Extent and Portion 6 of the Farm Nooitgedacht 66, Sol Plaatjie Local Municipality, Frances Baard District Municipality, Northern Cape Province | Francois Coetzee | 28/07/2017 - 09:11 | ||||
HIA - Namas Wind Farm (26.09.18) | Heritage Impact Assessment: Proposed Namas Wind Farm Near Kleinsee, Namakwaland Magisterial District, Northern Cape | Heritage Impact Assessment Specialist Reports | 26/09/2018 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 22/10/2018 - 16:09 |
Palaeontological Impact Assessment for the proposed residential development on Griffiths Road, Equestria Ext 283, Gauteng Province | Palaeontological Impact Assessment for the proposed residential development on Griffiths Road, Equestria Ext 283, Gauteng Province | PIA Desktop | 09/08/2021 | Marion Bamford | Prof Marion Bamford | Exigent Environmental | 10/11/2021 - 11:00 |
Palaeontological Report - Gihon Solar Energy Facility | Palaeontological studies for the proposed development of the Gihon Solar Energy Facility near Bela-Bela, Waterberg District Municipality, Limpopo Province | Palaeontological Specialist Reports | 01/08/2013 | John E Almond | Natura Viva CC | Savannah Environmental (Pty) Ltd | 30/08/2013 - 09:45 |
L3296: HIA and PIA | Heritage and Paleontological Impact Assessment for the proposed construction of new local road 3296 (Mathunzaneni) | Heritage Impact Assessment Specialist Reports | 15/05/2020 | Roy Muroyi, Dr. Heidi Fourie | Tsimba Archaeological Footprints (Pty) Ltd | Hanslab (Pty) Ltd | 24/07/2020 - 09:17 |
Phase I Heritage Impact Assessment: THE PROSPECTING RIGHT OF DIAMONDS ALLUVIAL (DA) AND DIAMONDS GENERAL (D) AND DIAMONDS IN KIMBERLITE (DK) | THE PROSPECTING RIGHT OF DIAMONDS ALLUVIAL (DA) AND DIAMONDS GENERAL (D) AND DIAMONDS IN KIMBERLITE (DK) ON THE REMAINING EXTENT, REMAINING EXTENT OF PORTION 1 (FIJNDOORNS), PORTION 9 (PORTION OF PORTION 2) OF THE FARM MARAETCHESFONTEIN 54 AND REMAINING EXTENT OF PORTION 4 OF THE FARM RIETPUT 60, REGISTRATION DIVISION: HO, SCHWEIZER-RENEKE REGION, NORTH WEST PROVINCE | HIA Phase 1 | 21/01/2022 | J.A. van Schalkwyk | JH DELWERY (PTY) LTD | Milnex 189 CC | 27/01/2022 - 15:24 |
Desktop PIA, Application for Exemption Phase 1 PIA Kendal Power Station | Application letter for exemption from Phase 1 site visit PROPOSED DEVELOPMENT OF A LOW PRESSURE SYSTEM (LPS) PIPELINE AND 11KV POWERLINE IN ASSOCIATION WITH AN EXISTING AUTHORISED (EA DATED 28 JULY 2015) ASH DISPOSAL FACILITY (ADF) AT THE KENDAL POWER STATION, EMALAHLENI AND DELMAS LOCAL MUNICIPALITIES, NKANGALA DISTRICT MUNICIPALITY, MPUMALANGA PROVINCE. | PIA Desktop | 22/11/2022 | Gideon Groenewald | Vungandze Projects | 29/11/2022 - 10:17 | |
Seelo Beta PV Project_Palaeontological Impact Assessment Report | Palaeontological Impact Assessment Report_Seelo Beta 240MW Solar PV and BESS Project near Carletonville, North West Province. | PIA Phase 1 | 31/08/2023 | Elize Butler | Banzai Environmental (Pty) Ltd | Nemai Consulting | 14/09/2023 - 10:29 |
Sun Valley Heritage Report | HIA Phase 1 | Anton Pelser | North West - Department of Economic Development, Environment, Conservation and Tourism | Fouries Poultry Farms (Pty) Ltd. | 05/11/2013 - 07:05 | ||
HIA Baseline Proposed Tawana Hotazel Mine | BASELINE REPORT FOR THE HERITAGE IMPACT ASSESSMENT RELATED TO THE PROPOSED TAWANE HOTAZEL MINE, NORTHERN CAPE PROVINCE | Heritage Scoping | 08/12/2020 | Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | Prime Resources (Pty) Ltd | 10/08/2021 - 13:52 |
Bojanala HIA | Cultural Heritage Impact Assessment: THE DEVELOPMENT OF THE PROPOSED BOJANALA SEZ AND ASSOCIATED POWER LINE AND WATER PIPELINE IN THE BOJANALA DISTRICT MUNICIPALITY OF NORTH WEST PROVINCE | HIA Phase 1 | 15/12/2022 | J A van Schalkwyk | 06/02/2023 - 15:47 | ||
Belgrade Heritage Impact Assessment | Belgrade Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 16/12/2021 | 27/10/2023 - 08:34 | |||
Palaeontological Heritage Impact Assessment for Okhahlamba Landfill Site | Desktop Palaeontological Heritage Impact Assessment Report On The Site Of The Proposed Okhahlamba Landfill Project To Be Located On A Portion Of The Farm Riet Vallei No 3285, KwaZulu Natal Province | PIA Desktop | 04/12/2014 | Barry Millsteed | BM Geological Services | Pravin Amar Development Planners (PADP) | 13/03/2015 - 13:29 |
KING WILLIAMS TOWN bypass | HERITAGE SURVEY OF THE N2-R61 ROAD REHABILITATION, KING WILLIAMS TOWN, EASTERN CAPE | HIA Phase 1 | 24/03/2015 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Coastal & Environmental Services - East London | 05/06/2015 - 11:38 |