THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 16851 - 16900 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Desktop Paleontological Study | PALAEONTOLOGICAL ASSESSMENT OF SUNNY SOUTH HOUSING FACILITY, BUFFALO CITY METROPOLITAN MUNICIPALITY, EASTERN CAPE | PIA Desktop | 16/05/2013 | Gideon Groenewald | Private | 05/06/2013 - 08:28 | |
AIA FOR THE PROPOSED JOE KLOPPER DAM DEVELOPMENT PROJECT IN THE WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON A PORTION OF THE FARM DOORNSPRUIT 215KQ FOR THE PROPOSED JOE KLOPPER DAM DEVELOPMENT PROJECT IN THE WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | AIA Phase 1 | 20/10/2020 | Neels Kruger | Neels Kruger | SPOOR Environmental Services (PTY) Ltd. | 29/03/2021 - 14:44 |
Isandlwana road upgrades | HERITAGE SURVEY OF THE UPGRADING OF THE D2286, P372, L1190, P148, L1333, L1351, D897, AND D30 | HIA Phase 1 | 07/11/2022 | Umlando: Archaeological Surveys & Heritage Management | Afzelia Environmental Consultants Pty Ltd | 29/06/2023 - 09:32 | |
HIA - Construction of 2 Dams, Sunnymead | THE CONSTRUCTION OF TWO DAMS ON,PORTION 3 OF THE FARM SUNNYMEAD 600JT IN BARBERTON, UMJINDI LOCAL MUNICIPALITY,MPUMALANGA PROVINCE | HIA Phase 1 | 18/08/2014 | Ria Wilken | SAHRA Council | Wandima Environmental Services cc | 20/08/2014 - 08:39 |
PIA Reports for the Northern Alignment Projects | PALAEONTOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED PERSEUS-KRONOS 765KV TRANSMISSION POWER LINE AND SUBSTATIONS UPGRADE, NORTHERN CAPE AND FREE STATE PROVINCES; PALAEONTOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED KRONOS-ARIES 765KV TRANSMISSION POWER LINE AND SUBSTATIONS UPGRADE, NORTHERN CAPE PROVINCE; PALAEONTOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED ARIES-HELIOS 765KV TRANSMISSION POWER LINE AND SUBSTATIONS UPGRADE, NORTHERN CAPE PROVINCE; PALAEONTOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED HELIOS-JUNO 765KV TRANSMISSION POWER LINE AND SUBSTATIONS UPGRADE, NORTHERN CAPE AND WESTERN CAPE PROVINCES. | PIA Desktop | 23/04/2016 | Marion Bamford | 25/03/2017 - 23:13 | ||
PIA-Drip Irrigation and Spekboom development, Pokjesfontein, EC | PIA-Drip Irrigation and Spekboom development, Pokjesfontein, EC | PIA Desktop | 29/08/2023 | Elize Butler | 29/08/2023 - 09:51 | ||
Heritage - Richards Bay Gas to Power | Heritage Screening report for the Proposed Gas to Power Plant within the Richards Bay IDZ, KwaZulu-Natal Province | Heritage Impact Assessment Specialist Reports | 24/04/2015 | Mariagrazia Galimberti | CTS Heritage | Savannah Environmental (Pty) Ltd | 13/11/2015 - 16:20 |
Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. | HIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:42 |
PHASE I HIA FOR DUTCH AND BHEKABEZAYO RURAL HOUSING, KWAZULU-NATAL | PHASE I CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED DUTCH AND BHEKABEZAYO RURAL HOUSING, KWAZULU-NATAL | HIA Phase 1 | 29/01/2018 | Mamoluoane Seliane | MABALENGWE ENGINEERS | MABALENGWE ENGINEERS | 28/05/2018 - 10:27 |
HIA: La Reys Prospecting | Phase 1 Cultural Heritage Assessment: Application of Prospecting with Bulk Sampling of diamonds on portion 2 of the farm La Reys 530IO, Lichtenburg Region, Ditsobotla Local Municipality, North West Province. | HIA Phase 1 | 01/05/2018 | J.A. van Schalkwyk | Archean Resources | 13/07/2018 - 15:11 | |
Dordrecht Sports Field | A LETTER OF RECOMMENDATION FOR EXEMPTION FOR DORDRECHT SPORTS FIELD UPGRADE | HIA Letter of Exemption | 04/02/2020 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Indwe Environmental Consulting | 06/02/2020 - 12:37 |
Samancor Tweefontein | Phase 1 AIA Report for Sylvania Tweefontein Section | Archaeological Specialist Reports | 17/09/2020 | Anton Pelser | Samancor Chrome - Eastern Chrome Mines | 14/10/2021 - 08:01 | |
Soyuz 2 (Pty) Ltd Heritage Scoping Study | SOYUZ 2 (PTY) LTD: SOYUZ 2 WIND ENERGY FACILITY PROJECT, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | Heritage Scoping | Nelius Kruger | Exigo3 Sustainability | EOH Coastal and Environmental Services | 23/09/2022 - 11:23 | |
Replacement of the J8 pipeline | THE PROPOSED REPLACEMENT OF J8 SHAMROCK ROAD-LEEUWPOORT PIPELINE | HIA Phase 1 | 05/08/2013 | Makhosazana Mngomezulu | 05/08/2013 - 12:18 | ||
HIA Desktop study for the proposed shopping complex and a filling station in Mseleni area | Proposed Shopping Complex and a Filling Station in Mseleni Area on the Portion 13 of the Farm Reserve No. 14 of No. 15834 HV within Umhlabuyalingana Local Municipality within the Umkhanyakude District Municipality, Kwazulu-Natal Province. | 28/05/2021 | Frans Roodt | Phaki Phakanani | 28/05/2021 - 15:46 | ||
Portion 15 of Tweefontein 360KT Phase 1 HIA | A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE PROPOSED SOLAR & WASTE WATER TREATMENT WORKS DEVELOPMENT ON PORTIONS OF PORTION 15 OF THE FARM TWEEFONTEIN 360KT NEAR STEELPOORT IN THE LIMPOPO PROVINCE - APAC022/98 | HIA Phase 1 | 01/10/2022 | Anton Pelser | APELSER ARCHAELOGICAL CONSULTING | Eco8 Environmental Planners | 14/11/2022 - 15:50 |
Marang B Substation and 400kV Powerline | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT SPECIALIST STUDY REPORT FOR THE PROPOSED RUSTENBURG STRENGTHENING PROJECT WITHIN RUSTENBURG LOCAL MUNICIPALITY OF BOJANALA MUNICIPALITY. NORTH WEST PROVINCE. | Archaeological Specialist Reports | 18/01/2016 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | Dynamic Integrated Geo-Environmental Services cc | 17/11/2014 - 21:58 |
AIA_Noupoort_wind_energy_facility_2319_Van_Schalkwyk_JA_Feb12 | Heritage impact assessment for the PROPOSED ESTABLISHMENT OF A WIND FARM BY MAINSTREAM RENEWABLE POWER IN THE NOUPOORT REGION, NORTHERN CAPE PROVINCE | AIA Phase 1 | 19/02/2012 | Johnny Van Schalkwyk | 16/06/2012 - 14:48 | ||
Rock Art Specialist Report Springfield | ARCHAEOLOGICAL IMPACT ASSESSMENT REPORT ON THE REDAN ENGRAVING SITE: SPRINGFIELD COAL MINING PROJECT SITUATED BETWEEN VEREENIGING AND MEYERTON, IN THE SEDIBENG DISTRICT MUNICIPALITY, GAUTENG PROVINCE | Archaeological Specialist Reports | 21/09/2020 | Jeremy Hollmann | PGS Heritage (Pty) Ltd | 27/07/2021 - 15:38 | |
Sterkspruit WWTW - PIA | Phase 1 Heritage Impact Assessment of the proposed new construction of a new Waste Water Treatment Works (WWTW) and associated pipe line infrastructure in the town of Sterkspruit, EC Province | PIA Phase 1 | 28/11/2014 | Lloyd Rossouw | Eko Environmental | 16/02/2015 - 11:03 | |
CMP Platreef Project | Conservation Management Plan Platreef Project | Conservation Management Plan | 29/01/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Platreef Resources (Pty) Ltd | 01/02/2016 - 11:19 |
HIA Carter-Brown Proposed Dam | CULTURAL HERITAGE IMPACT ASSESSMENT OF A DAM (250 000 CUBIC METRES) NEAR CREIGHTON, INGWE LOCAL MUNICIPALITY. | 14/07/2017 - 14:58 | |||||
Gemsbok Solar PV6 HIA | HERITAGE IMPACT ASSESSMENT Environmental Impact Assessment for the Proposed Development of a 75 MW Solar Photovoltaic Facility (Gemsbok Solar PV6) on Gemsbok Bult 120/8, northeast of Kenhardt, Northern Cape Province | HIA Phase 1 | 08/02/2016 | Jayson Orton | ASHA Consulting(Pty) Ltd | Council for Scientific and Industrial Research | 24/03/2016 - 15:22 |
Pluto-Mahikeng Line and Mahikeng Substation PIA | Palaeontological Impact Assessment for Proposed construction of the Mahikeng Main Transmission Substation and 400KV Pluto-Mahikeng powerline, North West Province | PIA Phase 1 | 15/07/2018 | JF Durand | 26/09/2018 - 11:07 | ||
Emathendeni Sportsfield, Ladysmith | Proposed Emathendeni Sportsfield, Ward 29, Ladysmith, KwaZulu-Natal | HIA Phase 1 | 12/11/2018 | Jean Beater | JLB Consulting | Fuze Environmental Services | 07/01/2019 - 11:25 |
HIA for Kappa Solar PV | Heritage Impact Assessment for Kappa Solar PV | Heritage Impact Assessment Specialist Reports | J.A. van Schalkwyk | Subsolar Energy | 26/06/2020 - 04:00 | ||
PALAEONTOLOGICAL IMPACT ASSESSMENT | PALAEONTOLOGICAL IMPACT ASSESSMENT PROSPECTING RIGHT APPLICATION FOR PART OF FARM KAMAGGAS 200 PORTION 5 HBF PRODUCTS (PTY) LTD NAMA KHOI MUNICIPALITY, NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE | Palaeontological Specialist Reports | 02/12/2021 | John Pether | ASHA Consulting(Pty) Ltd | ASHA Consulting(Pty) Ltd | 05/01/2022 - 17:05 |
Doornrandje Prospecting | Archaeological Assessment Report for the Proposed Prospecting for Aggregate and Sand for Carocode (Pty) Ltd on Portion 1, 17, 117, 119 and 120 of the Farm Doornrandje 386 JR in the vicinity of Greater Tshwane Municipality, Gauteng Province | AIA Phase 1 | 14/06/2012 | Tobias Coetzee | Envass | Envass | 23/07/2012 - 12:20 |
Forbes Coal Haul Road | Phase 1 Heritage Impact Assessment Report - Forbes Coal Pty Ltd Haulage Road Project, near Dundee, KwaZulu-Natal Provice | HIA Phase 1 | 10/10/2013 | Stephan Gaigher | G & A Heritage | 14/10/2013 - 13:51 | |
Sirius Solar PV Project Two | Sirius Solar PV Project Two Part 2 Amendment, Northern Cape | Palaeontological Specialist Reports | 06/09/2020 | Elize Butler | Banzai Environmental (Pty) Ltd | 11/09/2020 - 10:43 | |
PROPOSED FARMING ACTIVITIES, PORTION 39 & 40 OF THE FARM BLAAUWBANK 241 JQ | PROPOSED FARMING ACTIVITIES, PORTION 39 & 40 OF THE FARM BLAAUWBANK 241 JQ, LETHLABILE, MADIBENG LOCAL MUNICIPALITY, NORTHWEST PROVINCE | HIA Phase 1 | 27/09/2021 | Wouter Fourie | PGS Heritage (Pty) Ltd | PGS Heritage (Pty) Ltd | 16/03/2022 - 15:31 |
Heritage Report Fife 44KU | Phase 1 Archaeological and Heritage Impact Assessment on Portion 4 of the farm Fife 44 KU in respect of the proposed construction of an aircraft runway in the Klaserie Private Nature Reserve, Mpumalanga Province. | HIA Phase 1 | 05/12/2022 | Jean-Pierre Celliers | Kudzala Antiquity | Henwood Environmental Services | 19/01/2023 - 11:40 |
Paleo - Boshof | Recommended Examption from Further Palaeontological Studies: Proposed Boshof - Les Marais / Buitenfontein Solar Energy Facility, Farm Les Marais 137 near Boshof, Free State Province | Palaeontological Specialist Reports | 30/11/2013 | John E Almond | Natura Viva CC | Savannah Environmental (Pty) Ltd | 09/12/2013 - 11:45 |
Request for Exemption of any Palaeontological Impact Assessment Dorado 1 Solar Park | Request for Exemption of any Palaeontological Impact Assessment for the proposed Dorado 1 Solar Park project north of Northam, Limpopo Province. | HIA Letter of Exemption | 28/04/2023 | Marion Bamford | Prof Marion Bamford | AGES (PTY) Ltd - Limpopo | 18/10/2023 - 07:53 |
Soyuz 2 Paleontological IA | Soyuz 2 WEF Paleontological Impact Assessment for draft EIR | Palaeontological Specialist Reports | 01/02/2023 | Elize Butler | Banzai Environmental (Pty) Ltd | EOH Coastal and Environmental Services | 14/03/2023 - 16:07 |
HIA-Bende Bulk Water Supply Scheme, ADM, Eastern Cape | HIA-Bende Bulk Water Supply Scheme, Amathole District Municipality, Eastern Cape | HIA Phase 1 | 11/05/2015 | Karen Van Ryneveld, John Almond | Aurecon - Port Elizabeth | 11/05/2015 - 08:13 | |
Heritage Screener: Proposed Development on Driefontein 179/90 | Heritage Screener: Proposed Development on Driefontein 179/90 | 25/08/2017 | Jenna Lavin | CTS Heritage | GKM Environmental Consultants | 13/09/2017 - 12:12 | |
2015 P5 Project Field Report | 2015 Annual Report of Field Excavations in Eastern Pondoland, ECPHRA Permit No. 2/2APM-PERMIT/15/03/001- | Archaeological Permit Report | 01/04/2016 | Erich Fisher | 09/06/2016 - 08:25 | ||
kwaggafontein Palaeo Deskop Study 2017 | PALAEONTOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED DEVELOPMENT OF THE NEW OPEN CAST MINING OPERATIONS ON THE REMAINING PORTIONS OF 6, 7, 8 AND 10 OF THE FARM KWAGGAFONTEIN 8 IN THE CAROLINA MAGISTERIAL DISTRICT, MPUMALANGA PROVINCE. | PIA Desktop | PGS Heritage (Pty) Ltd | 28/11/2017 - 09:43 | |||
Bruintjieslaagte 465 JT Mitigation Project | The Archaeological documentation of a Late Iron Age stone-walled complex located on the farm Bruintjieslaagte 465 JT, Mpumalanga. | 19/03/2019 | Jean-Pierre Celliers | Kudzala Antiquity | Joubert en Seuns Citrus (Pty) Ltd | 27/03/2019 - 15:58 | |
SITE SENSITIVY REPORT | SITE SENSITITY REPORT FOR ELANDSKRAAL | Visual Impact Assessment | 10/03/2021 | 16/03/2022 - 22:23 | |||
HIA Erf 5041 | CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT OF ERF 5041 (PORTION OF ERF 1) KURUMAN MUNICIPALITY GA-SEGONYANA ADMINISTRATIVE DISTRICT NORTHERN CAPE PROVINCE | HIA Phase 1 | 02/06/2011 | Udo Kusel | African Heritage Consultants CC | AB Enviro Consult CC | 15/11/2012 - 13:52 |
Stellenbosch Municipal Heritage Survey - Phase 2 | HERITAGE INVENTORY OF, AND MANAGEMENT PLAN FOR, THE TANGIBLE RESOURCES IN THE STELLENBOSCH MUNICIPALITY - PHASE 2 | Heritage Study | 01/01/2017 | Liana Jansen, Fabio Todeschini | Cape Winelands Professional Practices in Association | Stellenbosch Municipality | 25/06/2019 - 11:54 |
Phase 2 HIA on the Meyer and Du Toit Farmsteads | Phase 2 Heritage Impact Assessment on the Meyer and Du Toit Farmsteads | HIA Phase 2 | 27/05/2020 | Polke Birkholtz, Cherene de Bruyn | PGS Heritage (Pty) Ltd | Glencore Operations South Africa (Pty) Ltd | 04/11/2020 - 03:42 |
Park Management Offices HIA & PIA | Heritage and Palaeontological Impact Assessment for the Park Management Office Complex Development | Heritage Impact Assessment Specialist Reports | 21/01/2020 | South African National Parks | South African National Parks | 21/05/2022 - 17:44 | |
New Lighthouse on ERF 335 | HERITAGE SPECIALIST REPORT CONDUCTED AS PART OF A BASIC ASSESSMENT FOR A PROPOSED NEW LIGHTHOUSE ON ERF 335, BEACH STREET, PORT NOLLOTH. | Heritage Impact Assessment Specialist Reports | 01/02/2013 | Timothy Hart | ACO Associates CC | Council for Scientific and Industrial Research | 20/02/2013 - 16:52 |
Kagiso PIA (2016) | 26/01/2021 - 08:51 | ||||||
HIA Camden I WEF 132kV Grid Connection | Heritage Impact Assessment for the proposed Camden I Wind Grid Connection, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 02/05/2022 | Jaco van der Walt | Beyond Heritage | WSP Group Africa (Pty) Ltd | 11/05/2023 - 14:01 |
Palaeotechnic Report for North West | SAHRA PALAEOTECHNICAL REPORT: PALAEONTOLOGICAL HERITAGE OF NORTH WEST | Palaeontological Specialist Reports | 31/03/2014 | Gideon Groenewald | SAHRA Council | 05/05/2014 - 15:31 | |
April_2016_ECPHRA_Report | April_2016_ECPHRA_Report | Archaeological Permit Report | 01/04/2016 | Erich Fisher | 11/01/2017 - 22:12 |