FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
Survey of Buildings in Strand An annotated Survey of Buildings of Architectural, Historical and Environmental Importance in Strand, Cape Province Heritage Study 01/01/1991 Jalmar Rudner, Ione Rudner 03/03/2021 - 10:24
Palaeontological Desktop Study Dikpens, Calvinia Northern Cape Province DESKTOP PALAEONTOLOGICAL HERITAGE IMPACT ASSESSEMENT REPORT ON THE SITE OF A PROPOSED EXTENSION OF THE BUSHMANLAND GYPSUM MINE TO BE LOCATED ON THE FARM DIKPENS 182 PORTION 2 AND PORTION 4, CALVINIA DISTRICT, NORTHERN CAPE PROVINCE PIA Desktop 14/06/2013 Barry Millsteed BM Geological Services Site Plan Consulting 19/08/2013 - 16:35
10429PR HERITAGE IMPACT ASSESSMENT HERITAGE IMPACT ASSESSMENT: PROPOSED PROSPECTING ON PORTION 1 & REMAINDER OF KAROETJIES KOP 150, VREDENDAL MAGISTERIAL DISTRICT, WESTERN CAPE (10429PR) Heritage Impact Assessment Specialist Reports 01/07/2023 Jayson Orton ASHA Consulting(Pty) Ltd ASHA Consulting(Pty) Ltd 12/07/2023 - 10:59
Leeuwvallei excavation report A report on the archaeological investigation of a poorly defined late iron age stone wall located on the remainder of portion 58 of the farm leeuwvallei 297KT to be impacted upon by residential development: Site LB/3, Burgesrfort, Limpopo Province AIA Phase 2 27/11/2014 Christine Van Wyk Rowe Adansonia Heritage Consultants Afrika Enviro & Biology 27/11/2014 - 12:46
Madibogo-pan borrow pit THE ASSESSMENT OF A KNOWN GRAVE SITE Heritage Impact Assessment Specialist Reports 20/04/2018 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING APELSER ARCHAEOLOGICAL CONSULTING 12/04/2018 - 12:23
CTS16_010 Terreco Bengal Heights East London CTS16_010 Terreco Bengal Heights East London 11/02/2016 Mariagrazia Galimberti, Kyla Bluff, Nicholas Wiltshire CTS Heritage Terreco Environmental, SKG Properties 12/02/2016 - 16:27
HIA; Expansion of Existing Borrow Pits, DR 2262, Clanwilliam Heritage Impact Assessment for the Expansion of Existing Borrow Pits Located Along DR 2262 Approximately 31 km east of Clanwilliam in the West Coast District Municipality, Western Cape. HIA Phase 1 29/08/2012 Quahnita Samie, John Almond, Madelon Tusenius Vidamemoria Heritage Consultants, Natura Viva CC Nadeson Consulting Services 04/06/2018 - 10:03
Historical Artefacts Valuation Methodology Report Municipality of Walter Sisulu, Joe Gqabi District Aliwal North, Jamestown Historical Artefacts1 Valuation Methodology Report Municipality of Walter Sisulu, Joe Gqabi District Aliwal North, Jamestown and Burgersdorp Heritage Impact Assessment Specialist Reports 25/08/2022 Sibusiso Mnyanda The Moon Rises Productions, Thompson Property Specialists Thompson Property Specialists 19/08/2022 - 10:24
AIA FOR THE PROPOSED TIDIMALO TOWNSHIP ESTABLISHMENT AT TIDIMALO, DELPORTSHOOP, NORTHERN CAPE PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT OF AREAS DEMARACTED FOR THE PROPOSED TIDIMALO TOWNSHIP ESTABLISHMENT ON A PORTION OF ERF 696 TIDIMALO, DELPORTSHOOP, FRANCES BAARD DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE AIA Phase 1 31/03/2016 Neels Kruger Exigo Sustainability Frances Baard District Municipality 08/04/2016 - 08:40
HIA Vergenoeg Mine 132kV line and substation A REPORT ON AN ARCHAEOLOGICAL AND BUILT ENVIRONMENT IMPACT ASSESSMENT FOR THE PROPOSED VERGENOEG MINE 132KV POWER LINE, GAUTENG PROVINCE HIA Phase 1 16/10/2019 Prof. Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants Setala Environmental 16/11/2019 - 11:52
ADDENDUM 10 1st phase H.I.A. of a proposed extension and upgrading, also known as THE SISHEN IRON ORE MINE EXPANSION PROJECT For Sishen Mine HIA Phase 1 01/08/2022 Siegwalt Udo Kusel Sidney Miller Sidney Miller 13/10/2022 - 10:06
HIA & PIA SPECIALIST REPORT FOR SQUBUDU ROAD EXTENSION PHASE ONE HERITAGE IMPACT ASSESSMENT & PALAEONTOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED SQUBUDU ROAD EXTENSION NEAR NQUTHU, KWAZULU-NATAL HIA Phase 1 26/04/2017 Frans Prins Active Heritage CC Active Heritage CC 02/05/2017 - 16:07
PIA: DESKTOP STUDY BOKPOORT II SOLAR PV FACILITY PALAEONTOLOGICAL IMPACT ASSESSMENT: DESKTOP STUDY Proposed Bokpoort II Solar Power Facility on the Remaining Extent of Farm Bokpoort 390 near Groblershoop, Northern Cape Province AIA Desktop 10/02/2020 John E. Almond Natura Viva CC Royal Haskoning DHV 06/03/2020 - 08:45
PHASE 1 HIA REPORT PHASE 1 HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED TOWNSHIP ESTABLISHMENT IN KHOMBO VILLAGE WITHIN COLLINS CHABANE LOCAL MUNICIPALITY OF VHEMBE DISTRICT, LIMPOPO PROVINCE. HIA Phase 1 28/02/2020 Richard Munyai Vhufa Hashu Heritage Consultancy CC 22/04/2021 - 11:00
PIA: Vierfontein Coal Mine DESKTOP PALAEONTOLOGICAL HERITAGE IMPACT ASSESSEMENT REPORT ON THE SITE OF THE VIERFONTEIN COAL MINE LOCATED ON PORTION 44 AND THE REMAINING EXTENT OF PORTION 31 THE FARM VIERFONTEIN 61 IS, MPUMALANGA PROVINCE PIA Desktop 08/10/2013 Barry Millsteed Cabanga Concepts 24/10/2013 - 14:41
Phase One Heritage Impact Assessment of the proposed Ulundi 19 Service Station Phase One Heritage Impact Assessment of the proposed Ulundi 19 Service Station on Farm Dorsfontein, 526, GU, Ulundi, Ulundi Local Municipality, KwaZulu - Natal Heritage Impact Assessment Specialist Reports 25/05/2021 Frans Prins Active Heritage CC Khobo Investment Properties (Pty( Ltd 19/06/2021 - 12:24
AIA Report Bestwood Kathu FIRST PHASE ARCHAEOLOGICAL AND CULTURAL HERITAGE ASSESSMENT OF THE PROPOSED RESIDENTIAL DEVELOPMENTS AT A PORTION OF THE REMAINDER OF THE FARM BESTWOOD 459RD, KATHU, NORTHERN CAPE AIA Phase 1 11/08/2008 Cobus Dreyer Rock Environmental Consulting (Pty) Ltd 18/12/2013 - 09:21
Proposed Malelane Safari Lodge HIA Heritage impact assessment for the Proposed Hotel Development, Malelane Gate, Kruger National Park, Mpumalanga Province Heritage Impact Assessment Specialist Reports 06/02/2015 Johann van Schalkwyk JA van Schalkwyk Heritage Consultant Malelane Safari Resort Investment (Pty) Ltd 04/03/2015 - 10:39
AIA[P1]-Mixed Use development, Jupiter Ext 8, Elandsfontein, EMM, Gauteng Phase 1 Archaeological Impact Assessment - Proposed Mixed-Use Development (Jupiter Ext 8) on Portion 2 of Farm Elandsfontein 90-IR, Ekurhuleni Metropolitan Municipality, Gauteng AIA Phase 1 25/05/2015 Karen Van Ryneveld Strategic Environmental Focus (Pty) Ltd - Pretoria 25/05/2015 - 08:35
CTS18_111_BioRemediation Black Mountain Mine Heritage Screening Assessment for the proposed Bioremediation site for Black Mountain Mining, Farm Aggeneys 56/1, Aggeneys Northern Cape. AIA Desktop 20/07/2018 Jenna Lavin Cedar Tower Services Enviroafrica CC 02/08/2018 - 10:25
Kleinkopje Colliery 2012 HIA for pipelne and two dams A REPORT ON A PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) FOR A PROPOSED PIPELINE AND TWO DAMS TO BE CONSTRUCTED AT KLEINKOPJE COLLIERY CLOSE TO EMALAHLENI AIA Phase 1 01/01/2012 A.C. van Vollenhoven A.C. van Vollenhoven WSP Environmental Pty Ltd - Johannesburg 22/06/2016 - 05:43
Phase 1 HIA - Portion 55 of the Farm No. 123, Kimberley Phase 1 HIA for the Development of a new Lattice Telecommunication Mast with Base Station on Portion 55 of the Farm No. 123, Kimberley, Northern Cape Province HIA Phase 1 18/10/2018 Lloyd Rossouw Enviroworks Enviroworks 22/10/2018 - 09:20
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT For The Proposed Township Development on Portions 814, 815 and 816 of the Farm Knopjeslaagte 385 JR, Gauteng PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT For The Proposed Township Development on Portions 814, 815 and 816 of the Farm Knopjeslaagte 385 JR, Gauteng AIA Phase 1 Tobias Coetzee 10/11/2021 - 10:00
Old Creamery Winburg First Phase Archaeological and Heritage Investigation of the proposed Liquid and Solid Fertiliser Production Facililty at the Old Creamery, Winburg, Free State. AIA Phase 1 16/04/2012 Cobus Dreyer Pr. Aracheologist/Heritage Specialist 30/07/2012 - 15:20
SSV-PIA-Ikhephu Feedlot, Erf 1 Eliot, SLM, CHDM, Eastern Cape SSV-PIA-Ikhephu Feedlot, Erf 1 Eliot, SLM, CHDM, Eastern Cape PIA Desktop 26/11/2022 Elize Butler 26/11/2022 - 22:22
H19 Pipeline Phase 1 Heritage Impact Assessment for the proposed maintenance works (repair of valve chambers and meter chambers) on the Rand Water H19 potable water pipeline at Kosmosdal in the Gauteng Province. HIA Phase 1 28/06/2017 Makhosazana Mngomezulu 28/06/2017 - 18:08
Heritage & Paleontologist Impact Assessment HERITAGE & PALEONTOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED UPGRADE OF LOCAL ROAD 3494 (DONSAMEHLO) TO GRAVEL (KM0.00 – KM5.288) HIA Phase 1 08/04/2020 Roy Muroyi Tsimba Archaeological Footprints (Pty) Ltd Hanslab (Pty) Ltd 24/07/2020 - 08:40
40900 Lutzburg Cemetery Phase 1 Heritage Impact Assessment for proposed new Lutzburg Cemetery, Kakamas NC Province. HIA Phase 1 07/05/2021 26/01/2022 - 12:24
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE FOR TSHILAMBA 132KV POWERLINE PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF 132 KV LOOP IN LOOP OUT POWERLINE FROM MAKONDE T-OFF POINT TO THE PROPOSED MUTSHIKILI SUBSTATION AT THENGWE WITHIN THULAMELA LOCAL MUNICIPALITY, VHEMBE DISTRICT MUNICIPALITY AIA Phase 1 07/07/2023 Munyadziwa Magoma, Marion Bamford Vhubvo Archaeo-Heritage Consultants , Prof Marion Bamford DIGES Group 14/09/2023 - 10:02
FINAL REPORT ON LIA & BURIALS FAIRVIEW MINE FINAL REPORT ON THE ARCHAEOLOGICAL INVESTIGATION OF A LATE IRON AGE STONE WALLED SITE AND POSSIBLE BURIALS IMPACTED ON BY THE FAIRVIEW TAILINGS FACILITY REWORKING PROGRAM AT THE FAIRVIEW MINE NEAR BARBERTON, MPUMALANGA AE01254P Archaeological Permit Report 01/10/2012 Anton Pelser A Pelser Archaeological Consulting Synergistics Environmental Services 04/12/2012 - 22:53
Amafa Report 37 Kelvin Place Amafa Report for 37 Kelvin Place. Built Environment and Cultural Landscapes 06/02/2023 06/02/2023 - 12:18
P50-1 HIA P50-1 HIA HIA Phase 1 23/08/2017 Frans Prins Active Heritage CC Royal Haskoning DHV 23/08/2017 - 08:12
ARCHAEOLOGICAL DESKTOP STUDY ARCHAEOLOGICAL DESKTOP STUDY for the Application of a Prospecting Right on Portions 4 & 5 of the Farm Klipfontein 459 and Portion 1 and the RE of the FarmEnkeldoorn 605, Bothaville, Free State. AIA Desktop 09/07/2021 Tobias Coetzee 09/08/2021 - 10:12
11 SEROWE ROAD ADDITIONS & ALTERATIONS TO EXISTING DWELLING AT 11 SEROWE ROAD Site Inspection Report 26/10/2023 Ashen Budhoo Architectural Design Studio Architectural Design Studio 26/10/2023 - 15:00
PHASE I CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE REMAINDER OF PORTION 89 OF THE FARM NOOITGEDACHT 268 IT ERMELO MPUMALANGA PROVINCE HIA Phase 1 24/02/2014 Udo Kusel African Heritage Consultants CC African Heritage Consultants CC 14/05/2014 - 15:47
Phase 1 Cultural HIA of the Proposed Carisbrooke Quarry PHASE ONE CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED CARISBROOKE QUARRY, WITHIN THE UBUHLEBEZWE LOCAL AND HARRY GWALA DISTRICT MUNICIPALITIES. HIA Phase 1 17/01/2017 Frans Prins Active Heritage CC EnviroPro 24/01/2017 - 11:28
Zilvermyn at Simonsberg, Groot Drakenstein: First Phase: General visual assessment of the Silver mine industrial complex Zilvermyn at Simonsberg, Groot Drakenstein: First Phase: General visual assessment of the Silver mine industrial complex 01/01/2004 Hennie Vos ArCape 16/06/2012 - 14:33
La Motte cemetery Motivation for construction of a perimeter wall around La Motte cemnetery Burial Grounds and Graves Specialist Reports 07/09/2015 Timothy Hart ACO Associates CC Malherbe Rust Architects 07/09/2015 - 16:02
Archaeology Impact Assessment Report - Mogara Solar Phase 1a Archaeological Impact Assessment for the Proposed Mogara Solar and Grid Connection on Portions 1 and 2 of the Farm Legoko No 460 and Sekgame 461, District of Kuruman Rd, Gamagara Local Municipality, Northern Cape Province Conducted in terms of Section 38(8) of the National Heritage Resource Act (No. 25 of 1999) AIA Phase 1 30/11/2018 Peter Nilssen Cape Environmental Assessment Practitioners 04/02/2019 - 14:45
Bletterman slave quarters site: archaeotectural and archaeological investigations of a late 18th century structure and its contextual features Bletterman slave quarters site: archaeotectural and archaeological investigations of a late 18th century structure and its contextual features AIA Phase 1 01/01/1990 Hennie Vos Stellenbosch Museum 16/06/2012 - 08:54
P483 Road Upgrade Newcastle to Madedeni KZN Proposed Upgrade of the P483 Between Newcastle and Madadeni, Kwa Zulu-Natal Province Heritage Impact Assessment Specialist Reports 15/09/2015 Afzelia Environmental Consultants Pty Ltd 26/10/2016 - 11:05
KwaKopi Water Supply Scheme Heritage Impact Assessment PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED KWA KOPI WATER WORKS, MSINGA LOCAL AND MZINYATHI REGIONAL MUNICIPALITIES, KZN HIA Phase 1 11/04/2019 EnviroPro Active Heritage CC 02/05/2019 - 07:49
Proposed establishment of Rooibos Plantation on 350ha of Achterfontein, Remainder of Welbedacht Farm 537, Wupperthal HERITAGE IMPACT ASSESSMENT: Proposed establishment of Rooibos Plantation on 350ha of Achterfontein, Remainder of Welbedacht Farm 537, Wupperthal HIA Phase 1 01/10/2019 Jenna Lavin CTS Heritage FOOTPRINT Environmental Services 25/09/2020 - 14:18
Heritage Screening Assessment: Mercury Solar PV Desktop Heritage Screening Assessment for the Proposed development of the Mercury Solar PV Cluster near Orkney in the Free State Heritage Scoping 07/04/2022 Jenna Lavin CTS Heritage Landscape Dynamics - Cape Town 07/04/2022 - 18:11
Ndabakazi AIA AIA Phase 1 06/03/2013 - 10:12
PIA 03/04/2023 - 13:10
KwaMhlanga HIA ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED INTERGRATED SUSTAINABLE HUMAN SETTLEMENT TOWNSHIP ESTABLISHMENT ON THE REMAINDER OF THE FARM KWAMHLANGA 617 JR WITHIN THEMBISILE HANI LOCAL MUNICIPALITY, NKANGALA DISTRICT, MPUMALANGA PROVINCE . HIA Phase 1 31/07/2020 McEdward Murimbika 19/11/2020 - 20:31
Form A, 71 Florida Road Historical: Nil Architectural: The site accommodates a typical Berea cottage of the era. It is listed in Professor Kearney’s work. A copy of same is attached as “A”. The Applicant’s proposed works are internal and minor and will not effect the items referred to in the listing in any manner. We record that Applicant maintains this building in a very good state of repair; Wood – strip floors have recently been repaired and sealed, windows and other joinery are in a very good state of repair and the property has recently been re – decorated. Urban Setting: To the right of the property is a somewhat modern (Age approximately 50 years), 5/6 storey apartment block. To the left is a former double storey house, restored and converted to offices some 5 or so years ago. Street opposite is a service station known as Windermere Garage. Significance Report 24/05/2013 24/05/2013 - 17:44
Good Hope OHPL PDA Good Hope OHPL Palaeontological Palaoentological desktop Assessment to assess the 132 kV Good Hope overhead power line (OHPL) west of Dealsville in the Free State PIA Desktop 19/05/2023 Elize Butler Banzai Environmental (Pty) Ltd PGS Heritage (Pty) Ltd 22/05/2023 - 11:53
West Riding Reservoir Pipeline Application for Exemption from a Phase 1 Heritage Impact Assessment of Proposed West Riding Reservoir Water Pipeline, eThekwini Metropolitan Municipality, KwaZulu-Natal, South Africa HIA Letter of Exemption 05/08/2014 Elizabeth Wahl eThembeni Cultural Heritage GIBB Engineering & Science - Durban 05/08/2014 - 11:31