FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
Heritage Impact Assessment PHASE I HERITAGE IMPACT ASSESSMENT REQUESTED IN TERMS OF SECTION 38 OF THE NATIONAL HERITAGE RESOURCES ACT NO 25/1999 FOR THE PROPOSED PROSPECTING AND MINING RIGHTS ON THE FARM JAKHALSFONTEIN (PORTION 1 OF THE FARM SCHIMDTSDRIFT 248) NEAR SCHMIDTSDRIFT, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 11/07/2019 Edward Matenga Archaeological and Heritage Services Africa (Pty) Ltd Nyezi Holdings (Pty) Ltd 26/11/2018 - 20:05
HIA for the Proposed Prospecting Right Application on the Farms Titanic 773 and Gasesa 272, near Kuruman, Northern Cape. PHASE I HERITAGE IMPACT ASSESSMENT (INCLUDING PALAEONTOGICAL DESK ASSESSMENT) IN TERMS OF SECTION 38 OF THE NATIONAL HERITAGE RESOURCES ACT NO 25/1999 FOR THE PROPOSED PROSPECTING AND MINING RIGHT ON THE FARMS TITANIC 773 AND GASESA 272 NEAR KURUMAN, NORTHERN CAPE PROVINCE HIA Phase 1 27/03/2020 Edward Matenga (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd Thaya Trading Enterprise 28/02/2022 - 20:13
METISS Terrestrial Fibre Optic Cable System Application for Heritage Impact Assessment Letter of Exemption for the METISS Terrestrial Fibre Optic Cable System, Amanzimtoti, Ethekwini Municipality, Kwazulu-Natal HIA Letter of Exemption 04/03/2019 John Gribble ACO Associates CC Environmental Resources Management 04/03/2019 - 13:48
Paul Roux Sewer Pipeline and Bridge HIA Phase 1 Heritage Impact Assessment for proposed new 1.5 km-long underground sewerage pipeline in Paul Roux, Thabo Mofutsanyane District Municipality, Free State Province. HIA Phase 1 16/02/2020 Lloyd Rossouw Paleo Field Services NSVT Consultants 21/08/2020 - 14:20
2ND DRAFT REPORT ON A HIA PROPOSED RESIDENTIAL DEVELOPMENT - ERVEN 1483, 1299 & R/E ERF 453, IN ARCADIA, PRETORIA HIA FOR PROPOSED RESIDENTIAL DEVELOPMENT ON ERVEN 1483, 1299 AND THE REMAINING EXTENT OF ERF 453, IN ARCADIA, PRETORIA Heritage Impact Assessment Specialist Reports 04/02/2013 Anton Pelser A Pelser Archaeological Consulting Urban Nest 05/08/2013 - 17:34
HIA Pelzvale Water and Sewer Line Heritage Impact Assessment for the Pelzvale Bulk Water and Sewer lines Heritage Impact Assessment Specialist Reports 01/09/2020 Leonie Marais Leonie Marais Heritage Practitioner Leonie Marais Heritage Practitioner 19/10/2020 - 11:09
Paleontological Exemption letter PROSPECTING RIGHT COMBINED WITH A WASTE LICENCE APPLICATION TO PROSPECT FOR CHROME ORE (CR), LG & MG SEAMS TOGETHER WITH PLATINUM GROUP METALS (PGM), NEAR RUSTENBURG ON A CERTAIN PORTION OF THE REMAINING EXTENT, A CERTAIN PORTION OF PORTION 1 & A CERTAIN PORTION OF PORTION 2 OF THE FARM UITVALGROND 105, REGISTRATION DIVISION JQ, NORTH WEST PROVINCE. THE PROPERTY IS LOCATED APPROXIMATELY 18KM NORTH WEST OF RUSTENBURG. NW30/5/1/3/3/2/1/13418PR Palaeontological Specialist Reports 15/12/2022 Elize Butler BANZAI ENVIRONMENTAL (PTY) LTD. Milnex 189 CC 26/02/2023 - 18:54
Bayside Aluminium Smelter Landfills Decommissioning Application for Exemption from a Phase 1 Heritage Impact Assessment of Proposed Decommissioning of the Legacy Landfills at The Bayside Aluminium Smelter, Richards Bay, KwaZulu-Natal, South Africa HIA Letter of Exemption 18/11/2014 Elizabeth Wahl eThembeni Cultural Heritage Aluminium South Africa 18/11/2014 - 13:35
PHASE 1 HIA & REPORT FOR PROPOSED DEVELOPMENT ON PORTION 39 OF ERF 493 OF THE FARM KALKHEUWEL 493JQ, GAUTENG A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR PROPOSED DEVELOPMENT ON PORTION 39 OF ERF 493 OF THE FARM KALKHEUWEL 493JQ, GAUTENG - APAC023/18 HIA Phase 1 01/03/2023 Anton Pelser APELSER ARCHAELOGICAL CONSULTING Nali Sustainability Solutions (Pty) Ltd 26/04/2023 - 08:44
PIA Scoping - Boulders WEF (Feb'18) Palaeontological Scoping Report for the Proposed Boulders Wind Farm in Saldanha Bay Local Municipality, Vredenburg District, Western Cape 06/11/2017 J Pether Savannah Environmental (Pty) Ltd 28/02/2018 - 13:54
Maloutswa Archaeological Permit Report University of Pretoria - Archaic Heritage Project Management University of Pretoria - Archaic Heritage Project Management 26/09/2021 - 13:42
Umqeku river bridge HIA desktop DESKTOP SURVEY OF THE UMQEKU LOW LEVEL BRIDGE: HIA Letter of Exemption 22/09/2016 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Jeffares & Green - Pietermaritzburg 27/10/2016 - 15:09
Rietvlei Silica Mine Heritage Report Heritage Assessment - Rietvle Silica Mine on Portions of the Farm Rietvlei 271 JQ, Rustenburg, North West Province Heritage Impact Assessment Specialist Reports 01/01/2015 Wouter Fourie Matakoma Heritage Consultants (Pty) Ltd Department of Archaeology, University of the Witwatersrand 04/09/2018 - 10:14
A LETTER OF RECOMMENDATION FOR EXEMPTION A LETTER OF RECOMMENDATION FOR EXEMPTION FOR UMPHEME HOUSING SCHEME HIA Letter of Exemption 05/11/2019 Gavin Afzelia Environmental Consultants Pty Ltd 15/01/2020 - 16:16
New 7 ha pivot site on the farm Eenboom 208, Colesberg, NC Province. Phase 1 Heritage Impact Assessment for proposed new 7 ha pivot site on the farm Eenboom 208, Colesberg, NC Province. HIA Phase 1 10/02/2018 Lloyd Rossouw Manie van Wyk Environmental Consultants, Bloemfontein 19/04/2018 - 10:48
Heritage Survey of the Proposed Greytown Landfill Site HERITAGE SURVEY OF THE PROPOSED GREYTOWN LANDFILL SITE, KWA-ZULU NATAL FOR LOMBARD AND ASSOCIATES DATE: 21 JULY 2012 By Gavin Anderson Umlando: Archaeological Tourism and Resource Management HIA Phase 1 21/07/2012 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Lombard & Associates 15/03/2013 - 11:56
CONTINUOUS ASH DUMP FOR THE KENDAL POWER STATION PROPOSED EXTENSION OF THE CONTINUOUS ASH FACILITY AND EMERGENCY ASH DUMP FOR THE KENDAL POWER STATION AIA Phase 1 26/05/2019 Wouter Fourie 01/11/2022 - 19:48
HIA for the proposed development of a chicken broiler facility Heritage Impact Assessment for the proposed development of a chicken broiler facility on Portion 40 of the Farm Jonathan 175- JQ, Brits, North West. Heritage Impact Assessment Specialist Reports Reinett Mogotshi CSIR ASHA Consulting(Pty) Ltd 08/05/2020 - 14:06
AIA Proposed Boundary Fence at SAPS Slagboom Training Facility PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED CLEARING OF INDIGENOUS VEGETATION FOR THE CONSTRUCTION OF A BOUNDARY FENCE AROUND THE SOUTH AFRICAN POLICE SERVICE'S TRAINING FACILITY AT SLAGBOOM, NEAR ADDO, SUNDAYS RIVER VALLEY MUNICIPALITY, EASTERN CAPE PROVINCE AIA Phase 1 23/09/2013 Johan Binneman Eastern Cape Heritage Consultants 26/05/2014 - 20:31
Kenhardt PV4-6 pre-con survey KENHARDT PV4-6: COMPLIANCE WITH PRE-CONSTRUCTION CONDITION, HERITAGE SURVEY Archaeological Specialist Reports 09/07/2021 Jayson Orton ASHA Consulting(Pty) Ltd Scatec Solar SA (Pty) Ltd 12/07/2021 - 12:06
LEEUDORINGSTAD 132KV POWER LINE HIA PROPOSED CONSTRUCTION OF THE LEEUDORINGSTAD 132KV POWERLINE, NORTH WEST PROVINCE, SOUTH AFRICA Heritage Impact Assessment Specialist Reports 08/11/2022 Nikki Mann PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 15/12/2022 - 15:36
Heritage Screener - KwaZuluNatal Nongoma Borrow Pit 33 Heritage Screening Report for KwaZuluNatal Nongoma Borrow Pit 33 AIA Desktop 27/10/2015 Mariagrazia Galimberti Cedar Tower Services Green Door Environmental 27/03/2017 - 16:39
Heritage Impact Assessment for the proposed Varkenskraal Vodacom Mast, Ventersdorp,North West Province Heritage Impact Assessment for the proposed Varkenskraal Vodacom Mast, Ventersdorp,North West Province HIA Phase 1 25/08/2021 Jaco van der Walt Beyond Heritage Tekplan Environmental 02/09/2021 - 16:06
PIA, Ptn 52 of Rondebosch 403 JS, Middelburg Palaeontological Desktop Impact Assessment, Protocol for Finds. Report for a Proposed Residential Development. Portion 52 Rondebosch 403 JS, Mpumalanga Province. PIA Desktop 03/02/2015 Dr. Heidi Fourie Dr Heidi Fourie Clean Stream Environmental Services 16/11/2015 - 10:46
Heritage Report 1993 Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. HIA Phase 1 01/01/2014 Anton van Vollenhoven A.C. van Vollenhoven A.C. van Vollenhoven 08/05/2017 - 12:43
Palaeontological Impact Assessment for the proposed Eskom Ararat-Bafokeng 88 kV powerline Palaeontological Impact Assessment for the proposed Eskom Ararat-Bafokeng 88 kV powerline, Distribution Gemma Cluster, Northwest Province PIA Desktop 31/08/2021 Marion Bamford Prof Marion Bamford HUMBA ENVIRONMENTAL CONSULTANCY 29/11/2021 - 11:22
Archaelogical and HIA - Tiergerpoort Lodge and Wedding Venue Phase 1 Archaeological and Heritage Impact Assessment on the Remainder of Portion 186 of the farm Tiegerpoort 371 JR in respect of a proposed hospitality development, City of Tshwane, Gauteng Province. HIA Phase 1 06/11/2018 Jean-Pierre Celliers Kudzala Antiquity 28/11/2018 - 09:20
Report 06/06/2013 - 16:07
Heritage Crime: Zindzi Mandela, Sterkfontein Tweet, 13 June 2019, Sterkfontein, COHWHS, a UNESCO World Heritage Site Heritage Crime: Zindzi Mandela, Sterkfontein Tweet, 13 June 2019, Sterkfontein, COHWHS, a UNESCO World Heritage Site 24/08/2020 - 21:40
Klipdrift Shelter 2018 excavation report Report on the 2018 archaeological excavations at Klipdrift Shelter, southern Cape, South Africa – 18 February to 2 April 2018 Archaeological Specialist Reports 12/12/2021 Christopher Henshilwood, Karen van Niekerk, Samantha Mienies, Jenny Maccali Centre for Early Sapiens Behaviour University of Bergen, Norway Centre for Early Sapiens Behaviour University of Bergen, Norway 01/03/2022 - 09:27
132kv John Dube HIA Report Phase1 Heritage Impact Assessment Report for proposed 132kv ±4km powerline for John Dube Ext 1 Development within City of Ekurhuleni Metropolitan Municipality, Gauteng Heritage Impact Assessment Specialist Reports 13/11/2018 Trust Mlilo Integrated Specialist Services (Pty) Ltd 06/03/2019 - 11:11
PHASE 1 HIA PLOT 2386 KAKAMAS-SOUTH NORTHERN CAPE PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED AGRICULTURAL DEVELOPMENT PLOT 2386, (PORTION OF PLOT 2189), KAKAMAS-SOUTH SETTLEMENT, KAI !GARIB LOCAL MUNICIPALITY, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE. HIA Phase 1 Heidi Fivaz, Jan Engelbrecht, Elize Butler UBIQUE HERITAGE CONSULTANTS ECO Balance Planning Co 28/09/2023 - 13:22
13/IDC/Dube Memorial Phase 1 Heritage Impact Assessment Report: Proposed Developments at JL Dube Memorial Site, eThekwini Metropolitan Municipality, KwaZulu-Natal, South Africa HIA Phase 1 26/07/2013 Elizabeth Wahl eThembeni Cultural Heritage IDC Consultants Group 06/08/2013 - 16:36
HIA Melkspruit Rouxville THE PROPOSED DEVELOPMENT OF THE ESKOM MELKSPRUIT TO ROUXVILLE 132 KV OVERHEADPOWERLINE, FREE STATE PROVINCE Heritage Impact Assessment PGS Heritage, 2020 HIA Phase 1 30/09/2020 Wouter Fourie PGS Heritage (Pty) Ltd GA Environment (Pty) Ltd 20/10/2020 - 08:13
Varkenslaagte - PIA 27/02/2023 - 10:49
AIA K97 Road Upgrade Archaeological Impact Assessment For the proposed K97 Road in Bon Accord, Pretoria North, Gauteng Province. AIA Phase 1 19/11/2014 Jaco van der Walt Heritage Contracts and Archaeological Consulting Envirolution Consulting (Pty) Ltd 20/11/2014 - 05:50
CULTURAL HERITAGE IMPACT ASSESSMENT DONE FOR PROPOSED QUARRIES ON THE FARM HARRIET’S WISH 393 LR A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT DONE FOR PROPOSED QUARRIES ON THE FARM HARRIET’S WISH 393 LR, PORTIONS 12 AND 13, FORMING PART OF THE PLATINUM GROUP METALS WATERBERG PROSPECTING AREA, LIMPOPO PROVINCE Heritage Impact Assessment Specialist Reports 28/09/2022 Prof. Anton van Vollenhoven Archaetnos CC 26/04/2023 - 09:53
AIA - Iziduli SS & PL A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENTS OF THE PROPOSED SUBSTATION, SWITCHING STATION AND POWER LINE GRID CONNECTION FOR THE IZIDULI EMOYENI WIND FARM, BLUE CRANE ROUTE LOCAL MUNICIPALITY, SARAH BAARTMAN DISTRICT, EASTERN CAPE PROVINCE. AIA Phase 1 31/07/2014 Johan Binneman Eastern Cape Heritage Consultants Savannah Environmental (Pty) Ltd 25/02/2015 - 15:13
Heritage Screener CTS15_015a EOH Rietkloof Wind Energy Facility Heritage Screener CTS15_015a EOH Rietkloof Wind Energy Facility 01/02/2016 Mariagrazia Galimberti, Kyla Bluff, Nicholas Wiltshire CTS Heritage EOH Coastal & Environmental Services (CES) - Cape Town 08/02/2016 - 17:12
Kokerboom 1 Heritage Heritage Impact Assessment for the proposed Kokerboom 1 Wind Energy Facility on Farm 227/REM and Farm 1163, north of Loeriesfontein, Calvinia Magisterial District, Northern Cape Heritage Impact Assessment Specialist Reports 31/01/2017 Jayson Orton ASHA Consulting(Pty) Ltd Aurecon South Africa (Pty) Ltd 18/07/2017 - 10:34
IXI3002_HIA Heritage Impact Assessment Report: Environmental Authorisation for the Proposed Imvula Coal Mine Heritage Impact Assessment Specialist Reports 29/02/2016 Justin du Piesanie, Johan Nel Digby Wells Environmental Ixia Coal (Pty) Ltd 30/03/2016 - 09:32
HIA - BOSCHENDAL VILLAGE NODE HERITAGE IMPACT ASSESSMENT Prepared in terms of Section 38 (8) of the National Heritage Resources Act (Act 25 of 1999) BOSCHENDAL VILLAGE NODE Portion 7 of Farm 1674 and Portion 10 of Farm 1674, Boschendal, Stellenbosch Municipality HIA Phase 1 01/08/2017 Nicolas Baumann, Sarah Winter, Dave Dewar , Piet Louw Boschendal (Pty) Ltd 17/08/2017 - 10:40
PALAEONTOLOGICAL DESKTOP ASSESSMENT PALAEONTOLOGICAL DESKTOP ASSESSMENT for THE PROSPECTING RIGHT APPLICATION FOR DIAMONDS ALLUVIAL ON THE FARM AANSLUIT 250, REGISTRATION DIVISION: HOPETOWN, NORTHERN CAPE PROVINCE PIA Desktop 11/05/2022 Elize Butler Banzai Environmental (Pty) Ltd 03/05/2022 - 14:54
NALEDI SEWER HIA Phase 1 Cultural Heritage Impact Assessment: THE REPLACEMENT OF A SEWER PIPELINE IN NALEDI, GREATER SOWETO REGION, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports 15/05/2019 J.A. van Schalkwyk 30/05/2019 - 10:06
Plan8 Wind Energy Facility Grahamstown Palaeontology Palaeontological Heritage Impact assessment for a proposed 80MW windfarm, 30km east of Grahamstown. PIA Phase 1 01/12/2011 Robert Gess Rob Gess Consulting Coastal & Environmental Services - East London 25/07/2012 - 12:16
PIA-Lowlands Hydropower and Distribution, near Cradock, CHDM, EC PIA-Lowlands Hydropower and Distribution, near Cradock, CHDM, EC PIA Phase 1 22/12/2020 Elize Butler 22/12/2020 - 08:51
ARCHAEOLOGICAL DESKTOP STUDY ARCHAEOLOGICAL DESKTOP STUDY for the Proposed Tsebeblox Prospecting Right Application on Portion 25 and the Remaining Extent of the Farm Bankpan 225 IS and Portion 1 and the Remaining Extent of the Farm Killowen 465 IS, Bethal, Mpumalanga AIA Desktop 30/05/2022 Tobias Coetzee Tobias Coetzee 04/07/2022 - 14:26
Thabo Mbeki Township Development Thabo Mbeki Amended Heritage Report HIA Phase 1 13/11/2013 Liesl Stegmann South African Heritage Resources Agency AGES (PTY) Ltd - Pretoria 10/12/2013 - 10:41
Heritage Impact Assessment for the the proposed Nseleni Independent Floating Power Plant (NIFPP) and associated infrastructure, Port of Richards Bay, Kwazulu-Natal Heritage Impact Assessment for the the proposed Nseleni Independent Floating Power Plant (NIFPP) and associated infrastructure, Port of Richards Bay, Kwazulu-Natal HIA Phase 1 08/02/2021 Jaco van der Walt Heritage Contracts and Archaeological Consulting SE Solutions 04/03/2021 - 22:12
HIA: Ruspoort 1 PV HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the PROPOSED RUSPOORT 1 SOLAR PV FACILITY NEAR PETRUSVILLE, DE AAR & PHILLIPSTOWN IN THE NORTHERN CAPE HIA Phase 1 24/04/2023 Jenna Lavin, Nicholas Wiltshire, Kimberley Chapelle CTS Heritage Savannah Environmental (Pty) Ltd 05/06/2023 - 10:44