FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
Umsobomvu 1 Wind Energy Facility HIA 2018 HERITAGE SURVEY OF THE UMSOBOMVU 1 WIND ENERGY FACILITY, EASTERN AND NORTHERN CAPE Archaeological Specialist Reports 13/10/2018 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management EOH Coastal and Environmental Services 17/05/2022 - 16:10
HIA Euphorbia PV Facility North West Province HIA Euphorbia PV Facility North West Province HIA Phase 1 30/06/2022 Jaco van der Walt Beyond Heritage Cape Environmental Assessment Practitioners 06/08/2022 - 14:36
Phase 1 HIA Report Macengeni to Macijo Access Road Phase 1 Heritage Impact Assessment Report : Proposed construction of the Macengeni to Macijo Access Road HIA Phase 1 09/11/2015 Stephan Gaigher G&A Heritage Management Consultants Nzingwe Consultancy 14/11/2015 - 11:27
Heritage Report 1993 Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. HIA Phase 1 01/01/2014 Anton van Vollenhoven A.C. van Vollenhoven A.C. van Vollenhoven 08/05/2017 - 12:42
PIA; Proposed Eskom Phanton Substation, Rheenendal. PALAEONTOLOGICAL ASSESSMENT (Desktop Study) PROPOSED ESKOM PHANTOM SUBSTATION, RHEENENDAL AREA, KNYSNA, WESTERN CAPE PIA Desktop 07/10/2031 John Pether Geological and Palaeontological Consultant Landscape Dynamics Environmental Consultants 28/05/2018 - 11:55
Tshipi Borwa Phase 1 – Heritage Impact Assessment PROPOSED WASTE ROCK DUMP PROJECT AT TSHIPI BORWA MINE, NEAR HOTAZEL, NORTHERN CAPE PROVINCE. Phase 1 – Heritage Impact Assessment HIA Phase 1 25/05/2018 Ilan Smeyatsky PGS Heritage (Pty) Ltd SLR Consulting (Africa) 19/03/2019 - 14:59
Baviaanspoort Field assessment PIA _EButler 14 December 2020 FIN Baviaanspoort Field assessment PIA _EButler 14 December 2020 FIN PIA Phase 1 14/12/2020 Elize Butler Banzai Environmental (Pty) Ltd 20/01/2021 - 13:50
HIA; Prestwich Precinct Revitilisation, Green Point PRESTWICH PRECINCT REVITALISATION ERVEN 738, 734, 564, 202, 566 GREEN POINT. STAGE 1 HERITAGE ASSESSMENT – THE IDENTIFICATION OF INDICATORS AND CONSTRAINTS HIA Phase 1 01/01/2018 Harriet Clift, Liesbet Schietecatte, Andrew Berman, Trevor Thorold, Timothy Hart ACO Associates CC Citythinkspace 16/07/2018 - 08:49
HIA for the eMondlo Bulk Water Supply Scheme HERITAGE IMPACT ASSESSMENT (INCLUDING PHASE ONE PALEONTOLOGY DESKTOP ASSESSMENT) OF THE PROPOSED PROPOSED REFURBISHMENT AND ADDITIONS TO THE EMONDLO BULK WATER SUPPLY SCHEME LOCATED AT EMONDLO TOWN IN THE ABAQULUSI LOCAL AND ZULULAND DISTRICT MUNICIPALITY, KWAZULU-NATAL. HIA Phase 1 06/04/2019 Frans Prins Active Heritage CC Green Door Environmental 11/06/2019 - 08:22
Assessment of firearms in Mpumalanga - 9 July destruction Assessment of 5600 firearms in Mpumalanga SAHRA HOU SAHRA HOU 05/08/2013 - 13:20
A report on a heritage impact assessment for the taung Central Business District Extension, Taung, North West Province A report on a heritage impact assessment for the taung Central Business District Extension, Taung, North West Province HIA Phase 1 03/01/2010 Anton Pelser, Anton van Vollenhoven Archaetnos CC 16/06/2012 - 08:54
Umlabu Relocation of Plant Palaeontological Impact Assessment Phase 1 Palaeontological Impact Assessment for the Proposed Relocation of the Umlabu Coal Handling and Preparation Plant and Tailings Storage Facility to Portions 5 and 10 of the Farm Voorslag 274 IS. PIA Phase 1 23/09/2014 Heidi Fourie 18/11/2014 - 09:33
HIA Seville Heritage Impact Assessment for the proposed bulk sites demarcation of Erven in Seville (Extension 1), Mpumalanga Province HIA Phase 1 04/08/2022 Jaco van der Walt Beyond Heritage 26/09/2022 - 08:30
HIA Rand en Dal Ext 13 THE RAND EN DAL EXT13 PROPOSED DEVELOPMENT ON PORTION 29 OF THE FARM PAARDEPLAATS 177 IQ, KRUGERSDORP, MOGALE CITY DISTRICT, GAUTENG PROVINCE HIA Phase 1 26/01/2015 Wouter Fourie PGS Heritage and Grave Relocation Consultants Singisa Environmental CC 17/02/2015 - 16:24
Phase 1 PIA, Verkykerskop Phase 1 PIA, Verkykerskop, Free State Province PIA Phase 1 02/02/2016 Lloyd Rossouw 02/02/2016 - 10:21
Walk Down Report Helios ARCHAEOLOGICAL WALK-DOWN SURVEY FOR THE PROPOSED HELIOS 50KV POWER LINE NEAR LOERIESFONTEIN, HANTAM LOCAL MUNICIPALITY OF THE NAMAKWA DISTRICT, NORTHERN CAPE AIA Phase 1B 11/07/2017 Jaco van der Walt Heritage Contracts and Archaeological Consulting AECOM SA - Head Office 17/07/2017 - 08:10
Clocolan Raw Water Pipeline HIA Phase 1 Heritage Impact Assessment for upgrading of a Water Treatment Works and associated infrastructure, including replacing a 550 m - long gravity feed pipeline in Clocolan, FS Province. HIA Phase 1 19/02/2021 Lloyd Rossouw Paleo Field Services NSVT Consultants 16/03/2021 - 02:24
Heritage Report for the Proposed Loxton Wind Energy Facility 1 HERITAGE IMPACT ASSESSMENT: PROPOSED LOXTON WIND ENERGY FACILITY 1, CARNARVON AND VICTORIA WEST MAGISTERIAL DISTRICTS, NORTHERN CAPE Heritage Scoping 07/11/2022 Jayson Orton (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd 15/11/2022 - 11:07
Heritage Impact Assessment - Majuba 24/03/2016 - 16:16
Shongweni North permit report Shongweni North permit report Archaeological Permit Report 26/09/2018 Gerrit Leendert Dusseldorp, Geeske Langejans 26/09/2018 - 11:26
Pearly Beach Abalone Farm VIA Visual Impact Assessment Report: Proposed Abalone Farm and Abalone Processing Facility, on Portion of Remainder of Farm 385 near Pearly Beach, Overstrand, Western Cape Visual Impact Assessment 04/06/2019 Bernard Oberholzer,, Quinton Lawson 15/09/2019 - 12:59
HIA 28/06/2023 - 16:45
giyani aia PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT for the Proposed Kusile Invest 133 Giyani Gold Mine Project on the demarcated portions of Un-Surveyed State Land of Greater Giyani 891 LT, Giyani, Limpopo AIA Phase 1 20/04/2021 Tobias Coetzee Tobias Coetzee 12/05/2021 - 17:47
PIA_Inca_Sutherland_Solar_Almond_JE_Jun11 Proposed photovoltaic solar energy facility on the farm Jakhals Valley (RE/99) near Sutherland, Karoo Hoogland Municipality, Eastern Cape Province PIA Phase 1 26/06/2011 John E Almond Natura Viva CC 16/06/2012 - 14:54
Heritage Statement for Sibudu Cave Heritage Statement for Sibudu Cave HIA Phase 1 01/11/2018 Len van Schalkwyk eThembeni Cultural Heritage Enviroedge 08/01/2019 - 12:24
UMPHEME HOUSING SCHEME A LETTER OF RECOMMENDATION FOR EXEMPTION FOR UMPHEME HOUSING SCHEME Heritage Statement 25/11/2019 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Afzelia Environmental Consultants Pty Ltd 15/12/2019 - 10:55
HIA Vlakkeland PROPOSED DEVELOPMENT: ERVEN 8359, 8378, 8399, Rem 8370, 8400, 12628, 12633 & 33027 PAARL HERITAGE IMPACT ASSESSMENT REPORT HIA Phase 2 14/10/2013 Cindy Postlethwayt Guillaume Nel Environmental Consultancy 14/10/2013 - 16:00
Lushaba Road Heritage Assessment Lushaba Road Heritage Assessment, Nkandla Municipality HIA Phase 1 01/06/2023 Phillipa Harrison Land Matters Environmental Consulting Greenbelt Projects(Pty) Ltd 22/08/2023 - 22:12
Solaire APIA Desktop Heritage Assessment of the Solaire Direct Solar Photovoltaic Facility of 10MW near Reddersburg, Free State Province AIA Desktop 16/05/2012 Lloyd Rossouw Council for Scientific and Industrial Research 23/07/2012 - 15:54
Draft Scoping Report 09/12/2013 Tougheeda Aspeling Environmental Resources Management Environmental Resources Management 09/12/2013 - 12:38
AIA FOR THE PROPOSED ESKOM MHINGA ROUTE DEVIATION PROJECT, VHEMBE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON MAHINGAS 258MT, MAHINGA'S EXTENSION 259MT, TSHIKUNDU 262MT, PAGELEE 274MT AND KLUSTER 293MT FOR THE PROPOSED ESKOM MHINGA ROUTE DEVIATION PROJECT, VHEMBE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE AIA Phase 1 20/01/2021 Neels Kruger Exigo Sustainability Kantey & Templer Consulting Engineers 20/09/2021 - 10:51
Ntsika Mining Advisory CONSULTATION IN TERMS OF SECTION 40 OF THE MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 2002, (ACT 28 OF 2002) IN RESPECT OF PROSPECTING OF STRONTIUM (SR), RUTILE (HEAVY MINERAL) (RT), MONAZITE (HEAVY MINERAL) (MZ), HEAVY MINERALS (GENERAL) (HM), LEUCOXENE (HEAVY MINERAL) (LX), URANIUM ORE (U), CHRYSOBERYL (GEMSTONE) (GCB), DIAMOND (DIA), COAL (C), STONE AGGREGATE; GRAVEL (ST), SULPHUR (IN PYRITE) (SPY), FLUORSPAR (F), PLATINUM GROUP METALS (PGM), GOLD ORE (AU), SILVER ORE (AG), CHROME ORE (CR), COPPER ORE (CU), COBALT (CO), NICKEL ORE (NI), VANADIUM ORE (V) AND IRON ORE (FE) ON THE FARM KLIPFONTEIN 268 JR (EXCLUDING PORTION 1), THE FARM HONINGNESTKRANS 269 JR, THE FARM HAAKDOORNBOOM 267 JR, PORTION 3, 5, 6 AND THE REMAINING EXTENT OF THE FARM WESTZELRUST 223 JR, THE FARM DE ONDERSTEPOORT 300 JR (EXCLUDING 10, 45, 73, 75, 76, 77, 78, 82, 83, 86, 87, 88, 100, 101, 102, 103, 104, 105, 138, 139, 140, 142 AND 100 OF THE FARM DE ONDERSTEPOORT 300 JR) SITUATED IN THE MAGISTERIAL DISTRICT OF PRETORIA, GAUTENG PROVINCE. Heritage Impact Assessment Specialist Reports 11/05/2015 Plaatjie Khonziwe 12/05/2015 - 09:33
CTS16_048 Savannah Olifantshoek Substation NC Heritage Screening Assessment for the proposed Eskom Substation, Olifantshoek, Northern Cape Heritage Scoping 14/09/2017 Kyla Bluff, Jenna Lavin Cedar Tower Services Savannah Environmental (Pty) Ltd 14/09/2017 - 18:19
HIA report Sandveld 22 kV powerline re-build HIA report Sandveld 22 kV powerline re-build HIA Phase 1 01/09/2021 Jaco van der Walt Beyond Heritage Environmental Impact Management Services (Pty) Ltd 24/11/2021 - 14:21
HIA Report For EA for High-level Bridge and Culvert on D1724 PHASE 1 HERITAGE IMPACT ASSESSMENT REPORT APPLICATION FOR ENVIRONMENTAL AUTHORISATION THE PROPOSED CONSTRUCTION OF A HIGH-LEVEL BRIDGE AND CULVERT OVER THE VUNGU RIVER, ON ROAD D1724, KWACEZA, KZN Heritage Impact Assessment Specialist Reports Roy Muroyi Tsimba Archaeological Footprints (Pty) Ltd Hanslab (Pty) Ltd 23/01/2023 - 12:49
2015 P5 Project Field Report 2015 Annual Report of Field Excavations in Eastern Pondoland, ECPHRA Permit No. 2/2APM-PERMIT/15/03/001- Archaeological Permit Report 01/04/2016 Erich Fisher 09/06/2016 - 08:25
Palaeontological impact assessment Zandvoort 2017 PALAEONTOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED MINING OF THE FARM ZANDVOORT 10 IN THE ALBERT LUTHULI LOCAL MUNICIPALITY, GERT SIBANDE DISTRICT MUNICIPALITY, MPUMALANGA PROVINCE PIA Desktop PGS Heritage (Pty) Ltd 28/11/2017 - 11:10
HIA Ipelegeng REPORT ON A PHASE 1 HIA FOR THE PROPOSED IPELEGENG EXTENSION 12 TOWNSHIP ESTABLISHMENT AT SCHWEIZER-RENEKE IN THE MAMUSA LOCAL MUNICIPALITY OF THE NORTHWEST PROVINCE HIA Phase 1 10/11/2020 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Maxim Planning Solutions 09/07/2021 - 14:01
Ga-Rankuwa Unit 23 Stand 1719 and Unit 25 Stand 1427 PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT FOR PROPOSED GA RANKUWA UNIT 23 STAND 1719 AND UNIT 25 NUMBER 1427 RESIDENTIAL DEVELOPMENT PROJECT IN THE CITY OF TSHWANE METROPOLITAN MUNICIPALITY IN THE GAUTENG PROVINCE AIA Phase 1 13/12/2022 Trust Mlilo Integrated Specialist Services (Pty) Ltd Setala Environmental 15/03/2023 - 10:42
Desktop Heritage Impact Assessment & PIA Exemption Letter: Blaauwbosch BWSS Desktop Heritage Impact Assessment for the Proposed Blaauwbosch Bulk Water Supply Pipeline, Newcastle Local Municipality, KZN. AIA Desktop 05/04/2020 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Hanslab (Pty) Ltd 16/04/2020 - 13:07
Heritage Impact Assessment Heritage Impact Assessment and Palaeontological Desktop Assessment for a Mining Permit Application on a Portion of Erf 687 and a Portion of the Remainder of Erf 1526, Barkly West in the Dikgatlong Local Municipality, Northern Cape Province Heritage Impact Assessment Specialist Reports 30/08/2021 Edward Matenga Archaeological and Heritage Services Africa (Pty) Ltd Thaya Trading Enterprise 30/08/2021 - 18:13
Renosterberg - RWEC - PV Facility - Heritage Scoping Heritage Scoping Report for the Proposed Solar PV Facility for Renosterberg Wind Energy Company (RWEC) near Petrusville, Northern Cape Province Heritage Scoping 10/10/2012 Wouter Fourie PGS Heritage and Grave Relocation Consultants Sivest - Gauteng 21/11/2012 - 16:07
HIA San Solar v.3 HERITAGE IMPACT ASSESSMENT REPORT ENVIRONMENTAL IMPACT ASSESSMENT PHASE Proposed establishment of the San Solar Energy Facility located south of Kathu on a Portion of the Farm Wincanton 472, Northern Cape Province HIA Phase 1 01/02/2013 Stephan Gaigher G & A Heritage Savannah Environmental (Pty) Ltd 25/02/2013 - 11:45
Thabong Solar Farm HIA PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT. THE THABONG SOLAR FARM, UITKYK 509, WELKOM, FREE STATE, SOUTH AFRICA Heritage Impact Assessment Specialist Reports 19/10/2013 Karen Van Ryneveld ArchaeoMaps Archaeological Consultancy Enviroworks 04/03/2014 - 15:27
HIA FOR ERF 186, COFIMVABA, EASTERN CAPE FIRST PHASE HERITAGE IMPACT ASSESSMENT FOR ERF 186, COFIMVABA, EASTERN CAPE HIA Phase 1 06/05/2014 Frans Prins Active Heritage CC USK Consulting 05/05/2014 - 23:12
AIA and HIA for the proposed realignment of the water pipeline, Khanyisa Power Station Phase 1 Archaeological and Heritage Impact Assessment of the Farm Groenfontein 331 JS in respect of the proposed realignment of a water pipeline connecting the Khanyisa Power Station with the eMalahleni Water Reclamation Plant, Witbank, Mpumalanga Province Heritage Impact Assessment Specialist Reports 16/07/2015 Jean-Pierre Celliers Kudzala Antiquity ACWA Power Khanyisa Thermal Power Station (RF) (Pty) Ltd 12/01/2017 - 11:23
Mpolweni and Thokozani Palaeontological Impact Assessment Palaeontological Impact Assessment for the proposed Mpolweni and Thokozani Water Supply, near Albert Falls, KwaZulu Natal Province PIA Phase 1 27/04/2020 Marion Bamford Prof Marion Bamford 19/08/2020 - 15:50
Mphambo HIA PHASE 1 HIA’S FOR PROPOSED TOWNSHIP ESTABLISHMENTS ON A PORTION OF NATORP 227LT (MPHAMBO VILLAGE), PORTIONS OF NATORP 227LT & MCKHENIE 228LT (RIKAKA VILLAGE) AND THE REMAINING EXTENT OF ALTEIN 222LT IN THE MALAMULELE REGION OF THE COLLINS CHABANE LOCAL MUNICIPALITY IN THE LIMPOPO PROVINCE HIA Phase 1 02/02/2022 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING 24/02/2022 - 11:12
HIA Report of the Farm Doornfontein No. 12 PRA A HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED PROSPEC A HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED PROSPECTING RIGHTS ON FARM DOORNFONTEIN NO.12 PRA, WARRENTON DISTRICT, NORTHERN CAPE,SOUTH AFRICA TING RIGHTS ON FARM DOORNFONTEIN NO.12 PRA, WARRENTON DISTRICT, NORTHERN CAPE,SOUTH AFRICA HIA Phase 1 30/09/2015 Nkosinathi Godfrey Tomose Abraham Tshabuse 01/09/2015 - 12:41
The Nieuwe Haarlem Project. Technical report The Nieuwe Haarlem Project. Technical report on the reconnaissance magnetic survey (permit case ID 7166, shipwreck ID 2114) Archaeological Permit Report 09/03/2017 Broadband Geophysical (Pty) Ltd African Institute for Marine and Underwater Research, Exploration and Education (AIMURE) 10/03/2017 - 12:51

Pages

CSV
 
 

Search form