Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 18051 - 18100 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
MEMORANDUM IN TERMS OF HERITAGE ASPECTS ON PORTIONS OF TURFSPRUIT 241 KR FOR THE DEVELOPMENT OF THE IVANPLATS PLATREEF SOLAR PROJECT, THE WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | MEMORANDUM IN TERMS OF HERITAGE ASPECTS ON PORTIONS OF TURFSPRUIT 241 KR FOR THE DEVELOPMENT OF THE IVANPLATS PLATREEF SOLAR PROJECT, THE WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | Heritage Statement | 04/08/2022 | Neels Kruger | Neels Kruger | OMI Solutions (Pty) Ltd | 10/11/2022 - 20:27 |
Fairbreeze Mine | HERITAGE SURVEY OF THE PROPOSED FAIRBREEZE MINE | HIA Phase 1 | 05/03/2010 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Exxaro Resources | 07/08/2015 - 11:06 |
HIA Mnini | Heritage Impact Assessment of Mnini Water Supply Scheme, KwaZulu-Natal (Date 20 April 2009) | HIA Phase 1 | 20/04/2010 | Elizabeth Wahl | eThembeni Cultural Heritage | WSP Environmental Pty Ltd - Johannesburg | 01/08/2013 - 11:16 |
Northern Cape palaeotechnical report | Palaeontological heritage of the Northern Cape | Non Impact Assessment Related Reports | 01/03/2009 | John E Almond, John Pether | South African Heritage Resources Agency | 08/01/2013 - 16:39 | |
HIA township establishment | PHASE 1 HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED TOWNSHIP ESTABLISHMENT OF 300 SITES ON REMAINDER OF PORTION 1 OF THE FARM NATURALLE LOKSASIEW 272 LS WITHIN MAKHADO LOCAL MUNICIPALITY OF VHEMBE DISTRICT, LIMPOPO PROVINCE. | HIA Phase 1 | 28/05/2021 | Richard Munyai | Vhufa Hashu Heritage Consultancy CC | 22/07/2021 - 11:35 | |
AIA_Kees_Zyn_Doorns_Celliers_JP_Apr11 | Phase 1 Archaeological Impact Assessment for Eco 8 Environmental Planners concerning the proposed development concerning the Cradle of Life and Safari Park on various portions of the farm Kees Zyn Doorns 708 JT, Mpumalanga Province | AIA Phase 1 | 08/04/2011 | Jean-Pierre Celliers | Kudzala Antiquity | 16/06/2012 - 14:46 | |
Harties VIA | Harties VIA | Visual Impact Assessment | 17/04/2018 | 18/09/2018 - 16:18 | |||
PROPOSED CONSTRUCTION OF FURTHER EDUCATION TRAINING (FET) COLLEGE IN GREYTOWN, KWAZULU NATAL PROVINCE. | APPLICATION FOR EXEMPTION ON THE PROPOSED CONSTRUCTION OF FURTHER EDUCATION TRAINING (FET) COLLEGE IN GREYTOWN, KWAZULU NATAL PROVINCE. | HIA Letter of Exemption | 13/02/2014 | Makhosazana Mngomezulu | 13/02/2014 - 09:00 | ||
Exemption from an Archaeological Impact Study | Request for Exemption from an Archaeological Impact Study: Prevention of Water Ingress into Mined out Areas of the Witwatersrand Mining Basin, Gauteng Province | HIA Letter of Exemption | 25/03/2014 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | Zitholele Consulting | 09/04/2014 - 08:19 |
Brandkop 702 | Phase 1 Heritage Impact Assessment of a proposed new residential development on the Farm Brandkop 702 near Bloemfontein, FS Province. | HIA Phase 1 | 09/06/2016 | Lloyd Rossouw | National Museum Bloemfontein | Combined Developers | 10/02/2017 - 12:17 |
Heritage Scoping report for the Proposed Kranspan Colliery, Mpumalanga Province | Heritage Scoping report for the Proposed Kranspan Colliery, Mpumalanga Province | Heritage Scoping | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | ABS Africa | 10/12/2018 - 13:26 | |
Meyerton PIA | Proposed Construction of the R59 (P156/2) Pedestrian Bridge Located Close to Sicelo Township, Meyerton, within the Midvaal Local Municipality, in the Sedibeng District Municipality, Gauteng Province | PIA Desktop | 05/12/2021 | Roy Muroyi | Tsimba Archaeological Footprints (Pty) Ltd | Tsimba Archaeological Footprints (Pty) Ltd | 10/12/2021 - 07:25 |
Vaalkrans | Report on the 2002-2005 excavations at Vaalkrans Shelter, De Hoop Nature Reserve, southern Cape | Archaeological Permit Report | 19/01/2006 | Christopher Henshilwood | African Heritage Research Institute | 01/04/2014 - 12:21 | |
Phase 1 Heritage study - Meletse | 1st PHASE CULTURAL HERITAGE IMPACT ASESSEMENT FOR THE FARMS DONKERPOORT 448 KQ, RANDSTEPHNE 455 KQ AND WATERVAL 443 KQ, THABAZIMBI, LIMPOPO PROVINCE. | HIA Phase 1 | 01/05/2014 | Sidney Miller | African Heritage Consultants CC | 24/06/2014 - 11:47 | |
Palaeo HIA-Buffels1 | Palaeontological Heritage Impact Assessment Report on the Site of a Proposed Solar Power Production Facility known as the Buffels Solar 1 PV Energy Facility to be located approximately 20 km north East of Orkney, NW Province | PIA Desktop | 21/06/2015 | Barry Millsteed | BM Geological Services | Savannah Environmental (Pty) Ltd | 07/08/2015 - 11:23 |
Heritage Screener - KwaZuluNatal Nongoma Borrow Pit 36 | Heritage Screening Assessment for KwaZuluNatal Nongoma Borrow Pit 36 | AIA Desktop | 27/10/2015 | Mariagrazia Galimberti | Cedar Tower Services | Green Door Environmental | 03/04/2017 - 13:06 |
HIA Riet Puts | Phase 1 Heritage Impact Assessment of Farm Rietputs 15 near Windsorton, Northern Cape Province. | HIA Phase 1 | Lloyd Rossouw | 05/11/2016 - 16:14 | |||
Heritage Report For Popo Molefe | Heritage Report : Popo Molefe | HIA Phase 1 | 25/08/2020 | A Stone | Bobo Productions | Maropeng 'a Afrika | 04/09/2020 - 16:02 |
Eskom Duvha Stormwater Ditch Exemption letter | ESKOM DUVHA POWER STATION: STORMWATER V-DITCH -Exemption from a Phase 1 Heritage Assessment | HIA Letter of Exemption | 13/03/2022 | Jaco van der Walt | Beyond Heritage | Setala Environmental | 13/03/2022 - 09:34 |
Heritage Screener: Amper Daar Solar PV | DESKTOP HERITAGE SCREENING ASSESSMENT FOR THE PROPOSED AMPER DAAR SOLAR PV FACILITY NEAR PETRUSVILLE, DE AAR & PHILLIPSTOWN IN THE NORTHERN CAPE | Heritage Scoping | 24/08/2022 | Nicholas Wiltshire | CTS Heritage | Savannah Environmental (Pty) Ltd | 17/01/2023 - 08:49 |
MIXED-USE DEVELOPMENT BRANDKOP 702 | FIRST PHASE ARCHAEOLOGICAL AND HERITAGE ASSESSMENT OF THE PROPOSED MIXED-USE DEVELOPMENT ON PORTION 5 OF BRANDKOP 702, BLOEMFONTEIN, FREE STATE | Heritage Impact Assessment Specialist Reports | 11/06/2015 | Cobus Dreyer | Nemai Consulting | Nemai Consulting | 05/10/2015 - 21:10 |
Report of a Monitoring Brief at 29 Chiappini Street Erf 741 | Report of a Monitoring Brief at 29 Chiappini Street Erf 741 | Archaeological Monitoring | 01/01/2004 | Mary Patrick, Harriet Clift | Cape Archaeological Survey CC | 16/06/2012 - 14:33 | |
Hoedspruit Heritage Assessment for National Route R40 and R527 Project | 12/10/2023 - 10:52 | ||||||
PIA for Nkomati Anthracite Madadeni Extension, Mpumalannga | Phase 1 Palaeontological Impact Assessment for the Proposed N’komati Anthracite Opencast Mine Northern Extension, in the Barberton Magisterial District, Mpumalanga Province | PIA Phase 1 | 30/08/2020 | Elize Butler | Banzai Environmental (Pty) Ltd | PGS Heritage (Pty) Ltd | 29/10/2020 - 15:06 |
HIA for Ptn 329& RePtn7 Rietfontein 189_Greengate100&101 | Heritage Impact Assessment required under Section 38 (1) of the NHRA, 1999 for the proposed Greengate Extension 100 and 101 Development on Portion 329 and the Remainder of Portion 7 of the Farm Rietfontein 189 IQ, Mogale City Local Municipality | HIA Phase 1 | 01/11/2022 | Jaco van der Walt | Beyond Heritage | Prism Environmental Management Services cc | 09/03/2023 - 08:25 |
Makhado Colliery | Phase 1 Heritage Impact Assessment Report: Proposed Makhado Colliery | AIA Phase 1 | 11/06/2012 | R & R Cultural Resource Consultants | Jacana Environmental cc | 11/06/2012 - 16:11 | |
Lebaleng Extennsion 6 HIA | Report on a Phase 1 Heritage Assessment for the proposed Lebaleng Extension 6 township establishment on the Remaining Extent of Poriton 8 of the farm Oersonskraal 207HO in Maquassi, North West Province | HIA Phase 1 | 14/07/2017 | Anton Pelser | A Pelser Archaeological Consulting | Maxim Planning Solutions | 24/11/2017 - 20:39 |
Updated Graskoppies Grid Heritage Impact Assessment Report | Graskoppies Wind Energy Facility (WEF) – 132kV Grid connection and substation: Heritage Impact Report | Heritage Impact Assessment Specialist Reports | 20/02/2018 | Wouter Fourie | PGS Heritage (Pty) Ltd | Sivest - Gauteng | 27/02/2018 - 09:53 |
Updated Phase I heritage report for Hernic Bokfontein | An updated Phase I heriiage report for the upgrading of Base Line Information and for the amendment of the EMP for Bokfontein Hernic Chrome Mine near Madibeng in the North West | AIA Phase 1 | 31/03/2018 | Julius CC Pistorius | JMA Consulting (Pty) Ltd | 19/03/2019 - 08:08 | |
BYPASS WATER PIPELINE BLOEMFONTEIN | FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE PROPOSED BYPASS WATER PIPELINE DEVELOPMENT AT BLOEMFONTEIN | Heritage Impact Assessment Specialist Reports | 04/07/2014 | Cobus Dreyer | Nemai Consulting | Nemai Consulting | 20/09/2014 - 15:24 |
Rehabilitation of two bridge structures in Gautentg | Notification of Intent to Develop: REHABILITATION OF TWO BRIDGE STRUCTURES IN THE TSHWANE REGION OF GAUTENG PROVINCE | Built Environment and Cultural Landscapes | 12/04/2017 | Johnny Van Schalkwyk | Chameleon Environmental | 15/05/2017 - 11:21 | |
VTM Wagon Laager Wall Maintenance: Needs assessment and technical report | Maintenance of the Voortrekker Monument Wagon Laager Wall. Needs assessment and technical report. | Non Impact Assessment Related Reports | 29/05/2019 | Johan Nel, Cecilia Kruger | Die Erfenisstigting | 10/06/2019 - 13:39 | |
CULTURAL HERITAGE ASSESSMENT OF THE FARM THANDISIZWE, UMGUNGUNDLOVU DISTRICT, KWAZULU-NATAL | CULTURAL HERITAGE ASSESSMENT OF THE FARM THANDISIZWE, UMGUNGUNDLOVU DISTRICT, KWAZULU-NATAL | HIA Phase 1 | 30/11/2008 | Natal Museum | 29/10/2020 - 17:18 | ||
Phase 1 Heritage Impact Assessment for the Frankenwald Development Johannesburg North | Phase 1 Heritage Impact Assessment for the Frankenwald Development Johannesburg North Magisterial District, City of Johannesburg Metropolitan Municipality, Gauteng Province | Heritage Impact Assessment Specialist Reports | 31/07/2021 | Udo Kusel, Siegwalt Udo Kusel | African Heritage Consultants CC | LEAP -Landscape Architectural and Environmental Planning | 17/05/2022 - 08:14 |
Desktop PIA Gemsbok Solar PV2 | PROPOSED GEMSBOK SOLAR PV2 SOLAR ENERGY FACILITY NEAR KENHARDT, NORTHERN CAPE PROVINCE | PIA Desktop | 19/09/2014 | John E Almond | Natura Viva CC | Mulilo Renewable Project Developments (Pty) Ltd | 13/01/2015 - 15:55 |
AIA FOR THE PROPOSED RAYTON CEMETERY DEVELOPMENT, GAUTENG PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED RAYTON CEMETERY DEVELOPMENT, GAUTENG PROVINCE | AIA Phase 1 | 30/11/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | LEAP - Lanscape Architect Environmental Planner | 02/12/2015 - 21:48 |
PHASE 1 HIA - K50 ROAD UPGRADE APAC02085 | PHASE 1 HIA - K50 ROAD UPGRADE APAC02085 | HIA Phase 1 | 01/10/2020 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | 20/01/2021 - 13:13 | |
PIA Slovo Lendz | PIA Slovo Lendz | JF Durand | 16/07/2022 - 15:05 | ||||
PHASE 1 HIA REPORT FOR THE SYLVANIA LESEDI WATER SUPPLY PIPELINE PROJECT | PHASE 1 HIA REPORT FOR THE SYLVANIA LESEDI WATER SUPPLY PIPELINE PROJECT ON PORTIONS OF THE FARM HARTEBEESTPOORT B 410JQ, TURFFONTEIN 462JQ & BUFFELSFONTEIN 465JQ NEAR MOOINOOI, BOJANALA DISTRICT MUNICIPALITY NORTH WEST PROVINCE | AIA Phase 1 | 15/07/2022 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Prescali Environmental Consultants (pty) Ltd | 08/05/2023 - 14:52 |
Heritage Register Appendix 1 | Heritage Register Appendix 1 | HIA Phase 1 | Jaco van der Walt | Beyond Heritage | WSP Group Africa (Pty) Ltd | 09/06/2023 - 12:26 | |
Updated Hartebeest Leegte Grid Heritage Impact Assessment Report | Hartebeest Leegte Wind Energy Facility (WEF) – 132kV Grid connection and substation; Heritage Impact Report | Heritage Impact Assessment Specialist Reports | 20/02/2018 | Wouter Fourie | PGS Heritage (Pty) Ltd | Sivest - Gauteng | 27/02/2018 - 11:04 |
HIA for the Proposed Ash Dam Seepage Drains at Duvha Power Station, Emalahleni Municipality, Mpumalanga | Heritage Impact Assessment for the Proposed Ash Dam Seepage Drains at Duvha Power Station, Emalahleni Municipality, Mpumalanga | HIA Phase 1 | 31/05/2019 | Jennifer Kitto, Wouter Fourie | PGS Heritage (Pty) Ltd | Nemai Consulting | 13/09/2019 - 09:46 |
ASR-LethaboSolar | Archaeological Scoping Report for the Proposed Establishment of the Lethabo Solar PV Facility, Mpumalanga Province | Archaeological Specialist Reports | 28/11/2014 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 17/03/2015 - 14:25 |
Pampoennek watching brief | REPORT ON A WATCHING BRIEF DURING THE DEMOLUTION OF AN ANGLO-BOER WAR (1899-1902) BLOCHOUSE AT PAMPOENNEK, NORTHWEST PROVINCE | Archaeological Monitoring | 26/09/2017 | Anton van Vollenhoven | Archaetnos CC | SANRAL | 01/10/2017 - 13:21 |
Archaeological Impact Assessment Report - Ilanga CSP 9 (Jun2016) | Ilanga CSP9 and Associated Infrastructure Within Karoshoek Solar Valley Development Near Upington, Northern Cape Province | Archaeological Specialist Reports | 14/06/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 08/07/2016 - 10:44 |
Mpungose WSS PIA | Field-Work Palaeontological Assessment Report: Mpungoze Water Supply Scheme, Empangeni Municipality, KwaZulu-Natal | PIA Phase 1 | 01/10/2019 | Alan Smith | Alan Smith Consulting | EnviroPro | 12/12/2019 - 10:55 |
KwaCele Sand Mining | PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED KWACELE QUARRY NEAR STANGER, KWADUKUZA MUNICIPALITY, KZN. | HIA Phase 1 | 15/03/2021 | Frans Prins | Active Heritage CC | Sand and Stone Resources. Pty (Ltd) | 15/03/2021 - 13:15 |
SITE SENSITIVITY VERIFICATION REPORT | PROPOSED DEVELOPMENT OF A 400 MW SOLAR PHOTOVOLTAIC FACILITY ON THE REMAINDER OF FARM GOEDE HOOP 26C AND PORTION 3 OF FARM GOEDE HOOP 26C, BETWEEN DE AAR & HANOVER, EMTHANJENI LOCAL MUNICIPALITY, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE, SOUTH AFRICA | Site Inspection Report | 31/05/2022 | John E Almond | 06/09/2022 - 09:42 | ||
AIA for Walmer Housing Development, Erf 11305, Port Elizabeth | A Phase ! Archaeological Impact Assessment for the proposed Walmer Gqebera low-cost housing development on ERf 11305, Walmer, Port Elizabeth, Nelson Mandela Bay Municipality, Eastern Cape Province | AIA Phase 1 | 01/09/2014 | Celeste Booth | Booth Heritage Consulting | SRK Consulting (South Africa) (Pty) Ltd - PLZ | 09/06/2015 - 10:28 |
Boschendal Homestead Heritage Report | BOSCHENDAL HOMESTEAD FARM 10/1674 DRAKENSTEIN HERITAGE REPORT in terms of section 27 of NHRA | Heritage Statement | 18/04/2016 | Stuart Hermansen | Boschendal (Pty) Ltd | Boschendal (Pty) Ltd | 26/04/2016 - 12:11 |