FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDatesort descending Authors AuthoringBody CommissioningCompany Post date
AIA: Wag n Bietjie Infrastructure ARCHAEOLOGICAL SPECIALIST STUDY In terms of Section 38(8) of the NHRA for a Proposed Development of the Wag n Bietjie infrastructure associated with the authorised PV Facilities near De Aar AIA Phase 1 26/11/2021 Nicholas Wiltshire, Jenna Lavin CTS Heritage Landscape Dynamics Environmental Consultants 25/04/2022 - 15:19
Phase 1 Archaeological Assessment Report on a Phase 1 Archaeological Assessment for a proposed Prospecting Right (bulk sampling) in the name of Misabrite (Pty) Ltd at a portion of Portion 1, Vooruitzigt-81, Kimberley, Northern Cape. AIA Phase 1 26/11/2021 David Morris McGregor Museum misabrite Pty Ltd 19/04/2022 - 13:37
HIA NC30/5/1/1/2/12932PR HERITAGE IMPACT ASSESSMENT: PROPOSED PROSPECTING ON A PORTION OF PORTION 5 OF KAMAGGAS 200, NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 27/11/2021 Jayson Orton ASHA Consulting(Pty) Ltd ASHA Consulting(Pty) Ltd 05/01/2022 - 15:44
PIA (desktop) Oliphant Estate Township Development Desktop Study (Phase 1) Paleontology Impact Assessment for the proposed Oliphant Estate residential development, Kimberley, Northern Cape Province PIA Desktop 28/11/2021 Marion Bamford Prof Marion Bamford 24/05/2023 - 10:43
Phase 1 Heritage Ladybrand Bulk water Pipeline Phase 1 Heritage Impact Assessment of a proposed new bulk water gravity pipeline in Ladybrand, FS Province HIA Phase 1 29/11/2021 Lloyd Rossouw Paleo Field Services NSVT Consultants 11/02/2022 - 15:58
Phase II Heritage Assessment Agrizone 2, KZN - Updated Phase II Heritage Assessment of three heritage resources previously identified during the Heritage Impact Assessment (HIA) conducted for the development of the Dube Trade Port (DTP) AgriZone 2 development close to King Shaka International Airport in the Province of KwaZulu Natal. HIA Phase 2 29/11/2021 Wouter Fourie PGS Heritage (Pty) Ltd Raubex KZN (Pty) Ltd 29/11/2021 - 13:03
HERITAGE SPECIALIST OPINION FOR THE NEW INERNAL COMBUSTION ENGINE (ICE) DEVELOPMENTS ASSOCIATED WITH THE AFRIKAANS AND SOTHO PV PLANT FOR PROJECT DAO SPECIALIST OPINION FOR THE NEW INERNAL COMBUSTION ENGINE (ICE) DEVELOPMENTS ASSOCIATED WITH THE AFRIKAANS AND SOTHO PV PLANT FOR PROJECT DAO (FORMERLY BOKPOORT SOLAR PHOTOVOLTAIC (PV) ENERGY FACILITY) NEAR GROBLERSHOOP, !KHEIS LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE Heritage Statement 29/11/2021 J.A. van Schalkwyk ACWA Power Energy Africa (Pty) Ltd 29/04/2022 - 14:44
PIA Report Mohadin Sewer Palaeontological Impact Assessment for the proposed Mohadin sewer pipe replacement, Potchefstroom, North West Province Desktop Study (Phase 1) PIA Desktop 29/11/2021 Marion Bamford 03/02/2022 - 16:49
SPECIALIST OPINION FOR THE NEW INERNAL COMBUSTION ENGINE (ICE) DEVELOPMENTS ASSOCIATED WITH THE AFRIKAANS AND SOTHO PV PLANT FOR PROJECT DAO (FORMERLY BOKPOORT SOLAR PHOTOVOLTAIC (PV) ENERGY FACILITY) NEAR GROBLERSHOOP, !KHEIS LOCAL MUNICIPALITY, NORTHERN SPECIALIST OPINION FOR THE NEW INERNAL COMBUSTION ENGINE (ICE) DEVELOPMENTS ASSOCIATED WITH THE AFRIKAANS AND SOTHO PV PLANT FOR PROJECT DAO (FORMERLY BOKPOORT SOLAR PHOTOVOLTAIC (PV) ENERGY FACILITY) NEAR GROBLERSHOOP, !KHEIS LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE Heritage Statement 29/11/2021 Johnny van Schalkwyk JA van Schalkwyk Heritage Consultant ACWA Power Energy Africa (Pty) Ltd 19/01/2022 - 17:40
AIA FOR THE PROPOSED THINUS MARITZ DAM DEVELOPMENT PROJECT IN THE WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON A PORTION OF THE FARM GROENDRAAI 213KQ FOR THE PROPOSED THINUS MARITZ DAM DEVELOPMENT PROJECT IN THE WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE AIA Phase 1 29/11/2021 Neels Kruger Neels Kruger SPOOR Environmental Services (PTY) Ltd. 10/12/2021 - 15:33
Sizalo Bonsmara farm F PIA Proposed development for Tshwane Beef Value Chain Project at the Sizalo Bonsmara Farm in Rust de Winter area on farm Leeukraal 184-JR portion(s) 2,3,4,5,6,7,8,9,10 and 11 within the jurisdiction of Tshwane Metropolitan Municipality, Gauteng Province. PIA Phase 1 29/11/2021 Dr. Heidi Fourie Department of Agriculture, Land Reform and Rural Development 02/12/2021 - 12:19
Phase 1 Archaeological Assessment Report on a Phase 1 Archaeological Assessment for a proposed Prospecting Right (bulk sampling) in the name of Misabrite (Pty) Ltd at a portion of Portion 1, Vooruitzigt-81, Kimberley, Northern Cape. 30/11/2021 David Morris McGregor Museum misabrite Pty Ltd 19/04/2022 - 15:33
Liu Energy Solar PV - Springbok Development of 100MW Solar Photovoltaic Facility and Associated Infrastructure near Springbok in the Northern Cape HIA Phase 1 30/11/2021 Reetsang Mothibi 4 Degrees Consulting 4 Degrees Consulting 19/04/2021 - 22:27
HIA Report Mohadin Sewer Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED INSTALLATION OF A BULK SEWER PIPELINE IN THE MOHADIN REGION, WESTERN POTCHEFSTROOM REGION, NORTH WEST PROVINCE HIA Phase 1 30/11/2021 Johan van Schalkwyk 03/02/2022 - 16:38
BBC 2019 -2020 excavation report Report on the 2019-2020 archaeological excavations at Blombos Cave, southern Cape, South Africa and update on current research with regards to the Blombos site and materials. Archaeological Specialist Reports 30/11/2021 30/11/2021 - 14:56
Heritage Impact Assessment for the proposed Acorn City Mixed Use Township, Limpopo Province Heritage Impact Assessment for the proposed Acorn City Mixed Use Township, Limpopo Province HIA Phase 1 30/11/2021 Jaco van der Walt Beyond Heritage 26/05/2023 - 15:24
Heritage and Cultural Report Heritage and Cultural Report for the LIU Energy Solar Photovoltaic Facility near Springbok, Northern Cape HIA Phase 1 30/11/2021 Reetsang Mothibi 4 Degrees Consulting 4 Degrees Consulting 11/05/2022 - 01:34
HIA Wag 'n Bietjie electrical infrastructure HIA Wag 'n Bietjie electrical infrastructure HIA Phase 1 01/12/2021 Jenna Lavin 10/07/2022 - 11:18
Esizayo 132kV HIA HERITAGE IMPACT ASSESSMENT: PROPOSED ESIZAYO 132KV TRANSMISSION INTEGRATION PROJECT, ON FARMS STANDVASTIGHEID 210 REMAINDER AND AURORA 285, WESTERN AND NORTHERN CAPE HIA Phase 1 01/12/2021 John Gribble ACO Associates CC WSP Group Africa (Pty) Ltd 29/08/2022 - 09:13
Finfoot HIA Cultural Heritage Impact Assessment: Phase 1 Investigation of the Proposed Holiday Resort Development, Finfoot Lake Reserve, Vaalkop Dam, Rustenburg Local Municipality, Bojanala Platinum District Municipality, North West Province HIA Phase 1 01/12/2021 Francois Coetzee NuLeaf Planning & Environmental 21/07/2021 - 16:55
EIA 496 PIA_EButler December 2021 Percy PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED PROSPECTING RIGHT WITH BULK SAMPLING FOR THE PROSPECTING OF DIAMONDS ALLUVIAL, DIAMONDS GENERAL & DIAMONDS IN KIMBERLITE INCLUDING ASSOCIATED INFRASTRUCTURE, STRUCTURE AND EARTHWORKS ON THE REMAINING EXTENT, REMAINING EXTENT OF PORTION 1 (FIJNDOORNS), PORTION 9 (PORTION OF PORTION 2) OF THE FARM MARAETCHESFONTEIN 54 AND REMAINING EXTENT OF PORTION 4 OF THE FARM RIETPUT 60, REGISTRATION DIVISION: HO, NORTH WEST PROVINCE Palaeontological Specialist Reports 01/12/2021 Elize Butler, Johnny van Schalkwyk 27/01/2022 - 15:29
Meyerton HIA THE PROPOSED CONSTRUCTION OF THE R59 (P156/2) PEDESTRIAN BRIDGE LOCATED CLOSE TO SICELO TOWNSHIP, MEYERTON, WITHIN THE MIDVAAL LOCAL MUNICIPALITY, IN THE SEDIBENG DISTRICT MUNICIPALITY, GAUTENG PROVINCE HIA Phase 1 01/12/2021 Roy Muroyi Tsimba Archaeological Footprints (Pty) Ltd Tsimba Archaeological Footprints (Pty) Ltd 10/12/2021 - 07:21
Cultural Heritage Scoping Assessment: Cultural Heritage Scoping Assessment: THE PROPOSED PROSPECTING RIGHT APPLICATION FOR THE PROSPECTING OF DIAMONDS ALLUVIAL (DA) AND DIAMONDS GENERAL (D) NEAR WARRENTON ON PORTION 17 AND THE REMINING EXTENT OF THE FARM SLYPKLIP NORTH 32, REGISTRATION DIVISION: KIMBERLEY, NORTHERN CAPE PROVINCE Heritage Scoping 01/12/2021 Johnny van Schalkwyk 06/04/2022 - 08:54
HIA Desktop study for the Proposed Development for Tshwane Beef Value Chain Project at the Sizalo Bonsmara Farm. Heritage Impact Assessment; a Desktop Study. Proposed Development for the Tshwane Beef Value Chain Project at the Sizalo Bonsmara Farm in the Rust De Winter Area on the Farm Leeukraal 184 JR, Portions 2,3,4,5,6,7,8,9,10& 11 within the jurisdiction of Tshwane Metropolitan Municipality, Gauteng Province. Heritage Scoping 01/12/2021 Frans Roodt Department of Agriculture, Land Reform and Rural Development 02/12/2021 - 12:09
HIA screening for closure of four borrow pits Heritage Screening Report for the Proposed Rehabilitation of Four Borrow Pits for Sishen Mine, Gamagara Local Municipality, John Taolo Gaetsewe District, Northern Cape Province Heritage Study 01/12/2021 Nikki Mann PGS Heritage (Pty) Ltd Sishen Iron Ore Company (Pty) Ltd 28/02/2022 - 12:17
PALAEONTOLOGICAL IMPACT ASSESSMENT PALAEONTOLOGICAL IMPACT ASSESSMENT PROSPECTING RIGHT APPLICATION FOR PART OF FARM KAMAGGAS 200 PORTION 5 HBF PRODUCTS (PTY) LTD NAMA KHOI MUNICIPALITY, NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE Palaeontological Specialist Reports 02/12/2021 John Pether ASHA Consulting(Pty) Ltd ASHA Consulting(Pty) Ltd 05/01/2022 - 17:05
PIA 12932PR PALAEONTOLOGICAL IMPACT ASSESSMENT PROSPECTING RIGHT APPLICATION FOR PART OF FARM KAMAGGAS 200 PORTION 5 HBF PRODUCTS (PTY) LTD NAMA KHOI MUNICIPALITY, NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE Palaeontological Specialist Reports 02/12/2021 John Pether ASHA Consulting(Pty) Ltd ASHA Consulting(Pty) Ltd 05/01/2022 - 17:09
Fouriesburg HIA PHASE 1 HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED TOWNSHIP ESTABLISHMENT ON THE REMAINDER OF FOURIESBURG FARM NO. 228 RD IN THE DIHLABENG LOCAL MUNICIPALITY, OF THABO MOFUTSANYANA DISTRICT MUNICIPALITY, FREE STATE PROVINCE. HIA Phase 1 02/12/2021 jennifer Mokakabye KwaZulu-Natal Amafa and Research Institute Setjo Sesho Consultants 01/03/2022 - 06:51
PIA Exemption Letter Request for Exemption of any Palaeontological Impact Assessment for the proposed Kayingo low-water bridge, below Mokolo Dam, Farm Laurel 195, Limpopo Province. HIA Letter of Exemption 02/12/2021 Marion Bamford Palaeosciences Centre, University of the Witwatersrand 09/12/2021 - 13:43
Revised Heritage Report:PROPOSED GRID CONNECTION AND SWITCHING STATION FOR THE DE AAR 2 SOUTH WIND ENERGY FACILITY, DE AAR, NORTHERN CAPE Heritage, Archaeology and Palaeontology Impact Assessment Report: PROPOSED GRID CONNECTION AND SWITCHING STATION FOR THE DE AAR 2 SOUTH WIND ENERGY FACILITY, DE AAR, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 02/12/2021 John Gribble ACO Associates CC Arcus Consulting 22/04/2021 - 10:36
1469_HIA HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED KAREERAND PIPELINES PROJECT FOR HARMONY MINE, BETWEEN KLERKSDORP AND POTCHEFSTROOM, NORTH WEST PROVINCE. Heritage Impact Assessment Specialist Reports 02/12/2021 Nikki Mann PGS Heritage (Pty) Ltd Environmental Impact Management Services (Pty) Ltd 04/02/2022 - 12:19
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT - Sontule Citrus A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF 144 HA OF CITRUS ORCHARDS AND ASSOCIATED INFRASTRUCTURE AS WELL AS THE CONSTRUCTION OF A DAM ON THE REMAINDER OF FARM 632 NEAR SUNLANDS, SUNDAYS RIVER VALLEY MUNICIPALITY, EASTERN CAPE PROVINCE AIA Phase 1 03/12/2021 Kobus Reichert, Johan Binneman Eastern Cape Heritage Consultants Public Process Consultants 31/10/2022 - 09:38
Heritage Screener: Becrux Solar PV Desktop Heritage Screening Assessment for the Proposed development of the Becrux 1 PV facility near Secunda, Mpumalanga Province Heritage Scoping 03/12/2021 Nicholas Wiltshire CTS Heritage Savannah Environmental (Pty) Ltd 21/01/2022 - 10:37
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT - Sontule Citrus A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF 144 HA OF CITRUS ORCHARDS AND ASSOCIATED INFRASTRUCTURE AS WELL AS THE CONSTRUCTION OF A DAM ON THE REMAINDER OF FARM 632 NEAR SUNLANDS, SUNDAYS RIVER VALLEY MUNICIPALITY, EASTERN CAPE PROVINCE AIA Phase 1 03/12/2021 Kobus Reichert, Johan Binneman Eastern Cape Heritage Consultants Public Process Consultants 08/09/2022 - 11:30
PALAEONTOLOGICAL DESKTOP ASSESSMENT PALAEONTOLOGICAL DESKTOP ASSESSMENT OF THE THE PROPOSED PROSPECTING RIGHT APPLICATION FOR THE PROSPECTING OF DIAMONDS ALLUVIAL (DA) AND DIAMONDS GENERAL (D) NEAR WARRENTON ON PORTION 7 (DE VALERA), PORTION 16, THE REMAINING EXTENT OF PORTION 5 (GELUK), PORTION 17 AND THE REMAINING EXTENT OF THE FARM SLYPKLIP NORTH 32, REGISTRATION DIVISION: KIMBERLEY, NORTHERN CAPE PROVINCE PIA Desktop 03/12/2021 Elize Butler Banzai Environmental (Pty) Ltd 06/04/2022 - 08:50
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT - Sontule Citrus A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF 144 HA OF CITRUS ORCHARDS AND ASSOCIATED INFRASTRUCTURE AS WELL AS THE CONSTRUCTION OF A DAM ON THE REMAINDER OF FARM 632 NEAR SUNLANDS, SUNDAYS RIVER VALLEY MUNICIPALITY, EASTERN CAPE PROVINCE AIA Phase 1 03/12/2021 Kobus Reichert, Johan Binneman Eastern Cape Heritage Consultants Public Process Consultants 28/10/2022 - 14:55
PIA Wag 'n Bietjie electrical infrastructure PIA Wag 'n Bietjie electrical infrastructure PIA Desktop 04/12/2021 Marion Bamford 10/07/2022 - 11:25
Proposed residential township development on Portion 183 of the Farm Zandfontein 317-JR, City of Tshwane Metropolitan Municipality, Gauteng Province Proposed residential township development on Portion 183 of the Farm Zandfontein 317-JR, City of Tshwane Metropolitan Municipality, Gauteng Province HIA Phase 1 04/12/2021 Jaco van der Walt Beyond Heritage Isquare Environmental Planning and GIS 31/03/2022 - 17:08
PIA: Vetlaagte and Wag n Bietjie Infrastructure Palaeontological Impact Assessment for the proposed development of the Vetlaagte and Wag ‘n Bietjie infrastructure associated with the authorised PV Facilities near De Aar, Northern Cape Province PIA Desktop 04/12/2021 marion Bamford Landscape Dynamics Environmental Consultants 25/04/2022 - 15:23
PIA: Proposed development of a cement factory, Middelburg, Eastern Cape Palaeontological Impact Assessment for the proposed development of a cement factory, Middelburg, Eastern Cape Province PIA Desktop 05/12/2021 Marion Bamford Amathemba Environmental Management Consulting CC 17/01/2022 - 15:16
Meyerton PIA Proposed Construction of the R59 (P156/2) Pedestrian Bridge Located Close to Sicelo Township, Meyerton, within the Midvaal Local Municipality, in the Sedibeng District Municipality, Gauteng Province PIA Desktop 05/12/2021 Roy Muroyi Tsimba Archaeological Footprints (Pty) Ltd Tsimba Archaeological Footprints (Pty) Ltd 10/12/2021 - 07:25
Caledon sewer pipeline project Caledon sewer pipeline project, Compensation, KwaDukuza Municipality, KwaZulu-Natal HIA Phase 1 06/12/2021 Jean Beater JLB Consulting EnviroPro 28/12/2021 - 11:46
Application for exemption from a Heritage Impact Assessment for a service station on farm 751-IQ Baragwanath Extension 5, Gauteng Application for exemption from a Heritage Impact Assessment for a service station on farm 751-IQ Baragwanath Extension 5, Gauteng HIA Letter of Exemption 07/12/2021 Jaco van der Walt Beyond Heritage Environmental Resources Management 20/04/2022 - 12:31
Design Update: Boschendal Cellar Building Design Update: Boschendal Cellar Building, HWC Ref: 21090305 Heritage Report submitted in terms of Section 27 of the NHRA (1999) Alterations and Additions to the Cellar Building, Boschendal Farm, 10/1674 BE & CL Phase 1 07/12/2021 Mike Scurr, Sarah Winter, Katie Smuts, Wendy Wilson Rennie Scurr Adendorff Boschendal (Pty) Ltd 16/02/2022 - 10:28
PHASE 1 FIELD REPORT SUMMARY FOR THE HISTORICAL ASSESSMENT OF MOSALA HOUSE DINGLETON ASSESSMENT OF SIGNIFICANCE OF THE “MOSALA HOUSE” SITUATED ON THE FARM GAMAGARA NO 541 PORTION 2 RESTANT 12, DINGLETON, KHUMBA IRON ORE MINE, IN THE GAMAGARA LOCAL MUNICIPALITY, JOHN TAOLO GAETSEWE DISTRICT MUNICIPALITY, NORTHERN CAPE. Site Inspection Report 07/12/2021 Heidi Fivaz UBIQUE HERITAGE CONSULTANTS Kumba Iron Ore 04/01/2022 - 14:04
PIA: Great Karoo REF Palaeontological Heritage Specialist Reports: Combined Desktop and Field-Based Study - Combined Project Area for the Great Karoo Renewable Energy Cluster near Richmond, Northern Cape Province PIA Phase 1 08/12/2021 John Almond Natura Viva CC Savannah Environmental (Pty) Ltd 17/05/2022 - 12:33
AIA: Great Karoo REF ARCHAEOLOGICAL SPECIALIST STUDY In terms of Section 38(8) of the NHRA for a Proposed Great Karoo Renewable Energy Facility development near Richmond in the Northern Cape AIA Phase 1 08/12/2021 Jenna Lavin, Nicholas Wiltshire CTS Heritage Savannah Environmental (Pty) Ltd 17/05/2022 - 12:34
CMP Voortrekker Monument A BASIC CULTURAL HERITAGE MANAGEMENT PLAN FOR THE VOORTREKKER MONUMENT AND NATURE RESERVE, PRETORIA Conservation Management Plan 09/12/2021 Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants Voortrekker Monument and Nature Reserve 15/11/2021 - 12:47
PHASE 1 HIA & REPORT FOR THE PROPOSED RIETVLEI EXTENSION 24 TOWNSHIP DEVELOPMENT A PHASE 1 HIA & REPORT FOR THE PROPOSED RIETVLEI EXTENSION 24 TOWNSHIP DEVELOPMENT LOCATED ON PORTION 712 OF THE FARM DOORNKLOOF 391JR TSHWANE METROPOLITAN AREA, GAUTENG HIA Phase 1 09/12/2021 04/01/2022 - 09:41
PHASE 1 HIA & REPORT FOR THE PROPOSED RIETVLEI EXTENSION 24 TOWNSHIP DEVELOPMENT A PHASE 1 HIA & REPORT FOR THE PROPOSED RIETVLEI EXTENSION 24 TOWNSHIP DEVELOPMENT LOCATED ON PORTION 712 OF THE FARM DOORNKLOOF 391JR TSHWANE METROPOLITAN AREA, GAUTENG HIA Phase 1 09/12/2021 04/01/2022 - 09:45

Pages

CSV
 
 

Search form