- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 16901 - 16950 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
AIA: Wag n Bietjie Infrastructure | ARCHAEOLOGICAL SPECIALIST STUDY In terms of Section 38(8) of the NHRA for a Proposed Development of the Wag n Bietjie infrastructure associated with the authorised PV Facilities near De Aar | AIA Phase 1 | 26/11/2021 | Nicholas Wiltshire, Jenna Lavin | CTS Heritage | Landscape Dynamics Environmental Consultants | 25/04/2022 - 15:19 |
Phase 1 Archaeological Assessment | Report on a Phase 1 Archaeological Assessment for a proposed Prospecting Right (bulk sampling) in the name of Misabrite (Pty) Ltd at a portion of Portion 1, Vooruitzigt-81, Kimberley, Northern Cape. | AIA Phase 1 | 26/11/2021 | David Morris | McGregor Museum | misabrite Pty Ltd | 19/04/2022 - 13:37 |
HIA NC30/5/1/1/2/12932PR | HERITAGE IMPACT ASSESSMENT: PROPOSED PROSPECTING ON A PORTION OF PORTION 5 OF KAMAGGAS 200, NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 27/11/2021 | Jayson Orton | ASHA Consulting(Pty) Ltd | ASHA Consulting(Pty) Ltd | 05/01/2022 - 15:44 |
PIA (desktop) Oliphant Estate Township Development | Desktop Study (Phase 1) Paleontology Impact Assessment for the proposed Oliphant Estate residential development, Kimberley, Northern Cape Province | PIA Desktop | 28/11/2021 | Marion Bamford | Prof Marion Bamford | 24/05/2023 - 10:43 | |
Phase 1 Heritage Ladybrand Bulk water Pipeline | Phase 1 Heritage Impact Assessment of a proposed new bulk water gravity pipeline in Ladybrand, FS Province | HIA Phase 1 | 29/11/2021 | Lloyd Rossouw | Paleo Field Services | NSVT Consultants | 11/02/2022 - 15:58 |
Phase II Heritage Assessment Agrizone 2, KZN - Updated | Phase II Heritage Assessment of three heritage resources previously identified during the Heritage Impact Assessment (HIA) conducted for the development of the Dube Trade Port (DTP) AgriZone 2 development close to King Shaka International Airport in the Province of KwaZulu Natal. | HIA Phase 2 | 29/11/2021 | Wouter Fourie | PGS Heritage (Pty) Ltd | Raubex KZN (Pty) Ltd | 29/11/2021 - 13:03 |
HERITAGE SPECIALIST OPINION FOR THE NEW INERNAL COMBUSTION ENGINE (ICE) DEVELOPMENTS ASSOCIATED WITH THE AFRIKAANS AND SOTHO PV PLANT FOR PROJECT DAO | SPECIALIST OPINION FOR THE NEW INERNAL COMBUSTION ENGINE (ICE) DEVELOPMENTS ASSOCIATED WITH THE AFRIKAANS AND SOTHO PV PLANT FOR PROJECT DAO (FORMERLY BOKPOORT SOLAR PHOTOVOLTAIC (PV) ENERGY FACILITY) NEAR GROBLERSHOOP, !KHEIS LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE | Heritage Statement | 29/11/2021 | J.A. van Schalkwyk | ACWA Power Energy Africa (Pty) Ltd | 29/04/2022 - 14:44 | |
PIA Report Mohadin Sewer | Palaeontological Impact Assessment for the proposed Mohadin sewer pipe replacement, Potchefstroom, North West Province Desktop Study (Phase 1) | PIA Desktop | 29/11/2021 | Marion Bamford | 03/02/2022 - 16:49 | ||
SPECIALIST OPINION FOR THE NEW INERNAL COMBUSTION ENGINE (ICE) DEVELOPMENTS ASSOCIATED WITH THE AFRIKAANS AND SOTHO PV PLANT FOR PROJECT DAO (FORMERLY BOKPOORT SOLAR PHOTOVOLTAIC (PV) ENERGY FACILITY) NEAR GROBLERSHOOP, !KHEIS LOCAL MUNICIPALITY, NORTHERN | SPECIALIST OPINION FOR THE NEW INERNAL COMBUSTION ENGINE (ICE) DEVELOPMENTS ASSOCIATED WITH THE AFRIKAANS AND SOTHO PV PLANT FOR PROJECT DAO (FORMERLY BOKPOORT SOLAR PHOTOVOLTAIC (PV) ENERGY FACILITY) NEAR GROBLERSHOOP, !KHEIS LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE | Heritage Statement | 29/11/2021 | Johnny van Schalkwyk | JA van Schalkwyk Heritage Consultant | ACWA Power Energy Africa (Pty) Ltd | 19/01/2022 - 17:40 |
AIA FOR THE PROPOSED THINUS MARITZ DAM DEVELOPMENT PROJECT IN THE WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON A PORTION OF THE FARM GROENDRAAI 213KQ FOR THE PROPOSED THINUS MARITZ DAM DEVELOPMENT PROJECT IN THE WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | AIA Phase 1 | 29/11/2021 | Neels Kruger | Neels Kruger | SPOOR Environmental Services (PTY) Ltd. | 10/12/2021 - 15:33 |
Sizalo Bonsmara farm F PIA | Proposed development for Tshwane Beef Value Chain Project at the Sizalo Bonsmara Farm in Rust de Winter area on farm Leeukraal 184-JR portion(s) 2,3,4,5,6,7,8,9,10 and 11 within the jurisdiction of Tshwane Metropolitan Municipality, Gauteng Province. | PIA Phase 1 | 29/11/2021 | Dr. Heidi Fourie | Department of Agriculture, Land Reform and Rural Development | 02/12/2021 - 12:19 | |
Phase 1 Archaeological Assessment | Report on a Phase 1 Archaeological Assessment for a proposed Prospecting Right (bulk sampling) in the name of Misabrite (Pty) Ltd at a portion of Portion 1, Vooruitzigt-81, Kimberley, Northern Cape. | 30/11/2021 | David Morris | McGregor Museum | misabrite Pty Ltd | 19/04/2022 - 15:33 | |
Liu Energy Solar PV - Springbok | Development of 100MW Solar Photovoltaic Facility and Associated Infrastructure near Springbok in the Northern Cape | HIA Phase 1 | 30/11/2021 | Reetsang Mothibi | 4 Degrees Consulting | 4 Degrees Consulting | 19/04/2021 - 22:27 |
HIA Report Mohadin Sewer | Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED INSTALLATION OF A BULK SEWER PIPELINE IN THE MOHADIN REGION, WESTERN POTCHEFSTROOM REGION, NORTH WEST PROVINCE | HIA Phase 1 | 30/11/2021 | Johan van Schalkwyk | 03/02/2022 - 16:38 | ||
BBC 2019 -2020 excavation report | Report on the 2019-2020 archaeological excavations at Blombos Cave, southern Cape, South Africa and update on current research with regards to the Blombos site and materials. | Archaeological Specialist Reports | 30/11/2021 | 30/11/2021 - 14:56 | |||
Heritage Impact Assessment for the proposed Acorn City Mixed Use Township, Limpopo Province | Heritage Impact Assessment for the proposed Acorn City Mixed Use Township, Limpopo Province | HIA Phase 1 | 30/11/2021 | Jaco van der Walt | Beyond Heritage | 26/05/2023 - 15:24 | |
Heritage and Cultural Report | Heritage and Cultural Report for the LIU Energy Solar Photovoltaic Facility near Springbok, Northern Cape | HIA Phase 1 | 30/11/2021 | Reetsang Mothibi | 4 Degrees Consulting | 4 Degrees Consulting | 11/05/2022 - 01:34 |
HIA Wag 'n Bietjie electrical infrastructure | HIA Wag 'n Bietjie electrical infrastructure | HIA Phase 1 | 01/12/2021 | Jenna Lavin | 10/07/2022 - 11:18 | ||
Esizayo 132kV HIA | HERITAGE IMPACT ASSESSMENT: PROPOSED ESIZAYO 132KV TRANSMISSION INTEGRATION PROJECT, ON FARMS STANDVASTIGHEID 210 REMAINDER AND AURORA 285, WESTERN AND NORTHERN CAPE | HIA Phase 1 | 01/12/2021 | John Gribble | ACO Associates CC | WSP Group Africa (Pty) Ltd | 29/08/2022 - 09:13 |
Finfoot HIA | Cultural Heritage Impact Assessment: Phase 1 Investigation of the Proposed Holiday Resort Development, Finfoot Lake Reserve, Vaalkop Dam, Rustenburg Local Municipality, Bojanala Platinum District Municipality, North West Province | HIA Phase 1 | 01/12/2021 | Francois Coetzee | NuLeaf Planning & Environmental | 21/07/2021 - 16:55 | |
EIA 496 PIA_EButler December 2021 Percy | PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED PROSPECTING RIGHT WITH BULK SAMPLING FOR THE PROSPECTING OF DIAMONDS ALLUVIAL, DIAMONDS GENERAL & DIAMONDS IN KIMBERLITE INCLUDING ASSOCIATED INFRASTRUCTURE, STRUCTURE AND EARTHWORKS ON THE REMAINING EXTENT, REMAINING EXTENT OF PORTION 1 (FIJNDOORNS), PORTION 9 (PORTION OF PORTION 2) OF THE FARM MARAETCHESFONTEIN 54 AND REMAINING EXTENT OF PORTION 4 OF THE FARM RIETPUT 60, REGISTRATION DIVISION: HO, NORTH WEST PROVINCE | Palaeontological Specialist Reports | 01/12/2021 | Elize Butler, Johnny van Schalkwyk | 27/01/2022 - 15:29 | ||
Meyerton HIA | THE PROPOSED CONSTRUCTION OF THE R59 (P156/2) PEDESTRIAN BRIDGE LOCATED CLOSE TO SICELO TOWNSHIP, MEYERTON, WITHIN THE MIDVAAL LOCAL MUNICIPALITY, IN THE SEDIBENG DISTRICT MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 01/12/2021 | Roy Muroyi | Tsimba Archaeological Footprints (Pty) Ltd | Tsimba Archaeological Footprints (Pty) Ltd | 10/12/2021 - 07:21 |
Cultural Heritage Scoping Assessment: | Cultural Heritage Scoping Assessment: THE PROPOSED PROSPECTING RIGHT APPLICATION FOR THE PROSPECTING OF DIAMONDS ALLUVIAL (DA) AND DIAMONDS GENERAL (D) NEAR WARRENTON ON PORTION 17 AND THE REMINING EXTENT OF THE FARM SLYPKLIP NORTH 32, REGISTRATION DIVISION: KIMBERLEY, NORTHERN CAPE PROVINCE | Heritage Scoping | 01/12/2021 | Johnny van Schalkwyk | 06/04/2022 - 08:54 | ||
HIA Desktop study for the Proposed Development for Tshwane Beef Value Chain Project at the Sizalo Bonsmara Farm. | Heritage Impact Assessment; a Desktop Study. Proposed Development for the Tshwane Beef Value Chain Project at the Sizalo Bonsmara Farm in the Rust De Winter Area on the Farm Leeukraal 184 JR, Portions 2,3,4,5,6,7,8,9,10& 11 within the jurisdiction of Tshwane Metropolitan Municipality, Gauteng Province. | Heritage Scoping | 01/12/2021 | Frans Roodt | Department of Agriculture, Land Reform and Rural Development | 02/12/2021 - 12:09 | |
HIA screening for closure of four borrow pits | Heritage Screening Report for the Proposed Rehabilitation of Four Borrow Pits for Sishen Mine, Gamagara Local Municipality, John Taolo Gaetsewe District, Northern Cape Province | Heritage Study | 01/12/2021 | Nikki Mann | PGS Heritage (Pty) Ltd | Sishen Iron Ore Company (Pty) Ltd | 28/02/2022 - 12:17 |
PALAEONTOLOGICAL IMPACT ASSESSMENT | PALAEONTOLOGICAL IMPACT ASSESSMENT PROSPECTING RIGHT APPLICATION FOR PART OF FARM KAMAGGAS 200 PORTION 5 HBF PRODUCTS (PTY) LTD NAMA KHOI MUNICIPALITY, NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE | Palaeontological Specialist Reports | 02/12/2021 | John Pether | ASHA Consulting(Pty) Ltd | ASHA Consulting(Pty) Ltd | 05/01/2022 - 17:05 |
PIA 12932PR | PALAEONTOLOGICAL IMPACT ASSESSMENT PROSPECTING RIGHT APPLICATION FOR PART OF FARM KAMAGGAS 200 PORTION 5 HBF PRODUCTS (PTY) LTD NAMA KHOI MUNICIPALITY, NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE | Palaeontological Specialist Reports | 02/12/2021 | John Pether | ASHA Consulting(Pty) Ltd | ASHA Consulting(Pty) Ltd | 05/01/2022 - 17:09 |
Fouriesburg HIA | PHASE 1 HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED TOWNSHIP ESTABLISHMENT ON THE REMAINDER OF FOURIESBURG FARM NO. 228 RD IN THE DIHLABENG LOCAL MUNICIPALITY, OF THABO MOFUTSANYANA DISTRICT MUNICIPALITY, FREE STATE PROVINCE. | HIA Phase 1 | 02/12/2021 | jennifer Mokakabye | KwaZulu-Natal Amafa and Research Institute | Setjo Sesho Consultants | 01/03/2022 - 06:51 |
PIA Exemption Letter | Request for Exemption of any Palaeontological Impact Assessment for the proposed Kayingo low-water bridge, below Mokolo Dam, Farm Laurel 195, Limpopo Province. | HIA Letter of Exemption | 02/12/2021 | Marion Bamford | Palaeosciences Centre, University of the Witwatersrand | 09/12/2021 - 13:43 | |
Revised Heritage Report:PROPOSED GRID CONNECTION AND SWITCHING STATION FOR THE DE AAR 2 SOUTH WIND ENERGY FACILITY, DE AAR, NORTHERN CAPE | Heritage, Archaeology and Palaeontology Impact Assessment Report: PROPOSED GRID CONNECTION AND SWITCHING STATION FOR THE DE AAR 2 SOUTH WIND ENERGY FACILITY, DE AAR, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 02/12/2021 | John Gribble | ACO Associates CC | Arcus Consulting | 22/04/2021 - 10:36 |
1469_HIA | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED KAREERAND PIPELINES PROJECT FOR HARMONY MINE, BETWEEN KLERKSDORP AND POTCHEFSTROOM, NORTH WEST PROVINCE. | Heritage Impact Assessment Specialist Reports | 02/12/2021 | Nikki Mann | PGS Heritage (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 04/02/2022 - 12:19 |
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT - Sontule Citrus | A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF 144 HA OF CITRUS ORCHARDS AND ASSOCIATED INFRASTRUCTURE AS WELL AS THE CONSTRUCTION OF A DAM ON THE REMAINDER OF FARM 632 NEAR SUNLANDS, SUNDAYS RIVER VALLEY MUNICIPALITY, EASTERN CAPE PROVINCE | AIA Phase 1 | 03/12/2021 | Kobus Reichert, Johan Binneman | Eastern Cape Heritage Consultants | Public Process Consultants | 31/10/2022 - 09:38 |
Heritage Screener: Becrux Solar PV | Desktop Heritage Screening Assessment for the Proposed development of the Becrux 1 PV facility near Secunda, Mpumalanga Province | Heritage Scoping | 03/12/2021 | Nicholas Wiltshire | CTS Heritage | Savannah Environmental (Pty) Ltd | 21/01/2022 - 10:37 |
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT - Sontule Citrus | A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF 144 HA OF CITRUS ORCHARDS AND ASSOCIATED INFRASTRUCTURE AS WELL AS THE CONSTRUCTION OF A DAM ON THE REMAINDER OF FARM 632 NEAR SUNLANDS, SUNDAYS RIVER VALLEY MUNICIPALITY, EASTERN CAPE PROVINCE | AIA Phase 1 | 03/12/2021 | Kobus Reichert, Johan Binneman | Eastern Cape Heritage Consultants | Public Process Consultants | 08/09/2022 - 11:30 |
PALAEONTOLOGICAL DESKTOP ASSESSMENT | PALAEONTOLOGICAL DESKTOP ASSESSMENT OF THE THE PROPOSED PROSPECTING RIGHT APPLICATION FOR THE PROSPECTING OF DIAMONDS ALLUVIAL (DA) AND DIAMONDS GENERAL (D) NEAR WARRENTON ON PORTION 7 (DE VALERA), PORTION 16, THE REMAINING EXTENT OF PORTION 5 (GELUK), PORTION 17 AND THE REMAINING EXTENT OF THE FARM SLYPKLIP NORTH 32, REGISTRATION DIVISION: KIMBERLEY, NORTHERN CAPE PROVINCE | PIA Desktop | 03/12/2021 | Elize Butler | Banzai Environmental (Pty) Ltd | 06/04/2022 - 08:50 | |
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT - Sontule Citrus | A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF 144 HA OF CITRUS ORCHARDS AND ASSOCIATED INFRASTRUCTURE AS WELL AS THE CONSTRUCTION OF A DAM ON THE REMAINDER OF FARM 632 NEAR SUNLANDS, SUNDAYS RIVER VALLEY MUNICIPALITY, EASTERN CAPE PROVINCE | AIA Phase 1 | 03/12/2021 | Kobus Reichert, Johan Binneman | Eastern Cape Heritage Consultants | Public Process Consultants | 28/10/2022 - 14:55 |
PIA Wag 'n Bietjie electrical infrastructure | PIA Wag 'n Bietjie electrical infrastructure | PIA Desktop | 04/12/2021 | Marion Bamford | 10/07/2022 - 11:25 | ||
Proposed residential township development on Portion 183 of the Farm Zandfontein 317-JR, City of Tshwane Metropolitan Municipality, Gauteng Province | Proposed residential township development on Portion 183 of the Farm Zandfontein 317-JR, City of Tshwane Metropolitan Municipality, Gauteng Province | HIA Phase 1 | 04/12/2021 | Jaco van der Walt | Beyond Heritage | Isquare Environmental Planning and GIS | 31/03/2022 - 17:08 |
PIA: Vetlaagte and Wag n Bietjie Infrastructure | Palaeontological Impact Assessment for the proposed development of the Vetlaagte and Wag ‘n Bietjie infrastructure associated with the authorised PV Facilities near De Aar, Northern Cape Province | PIA Desktop | 04/12/2021 | marion Bamford | Landscape Dynamics Environmental Consultants | 25/04/2022 - 15:23 | |
PIA: Proposed development of a cement factory, Middelburg, Eastern Cape | Palaeontological Impact Assessment for the proposed development of a cement factory, Middelburg, Eastern Cape Province | PIA Desktop | 05/12/2021 | Marion Bamford | Amathemba Environmental Management Consulting CC | 17/01/2022 - 15:16 | |
Meyerton PIA | Proposed Construction of the R59 (P156/2) Pedestrian Bridge Located Close to Sicelo Township, Meyerton, within the Midvaal Local Municipality, in the Sedibeng District Municipality, Gauteng Province | PIA Desktop | 05/12/2021 | Roy Muroyi | Tsimba Archaeological Footprints (Pty) Ltd | Tsimba Archaeological Footprints (Pty) Ltd | 10/12/2021 - 07:25 |
Caledon sewer pipeline project | Caledon sewer pipeline project, Compensation, KwaDukuza Municipality, KwaZulu-Natal | HIA Phase 1 | 06/12/2021 | Jean Beater | JLB Consulting | EnviroPro | 28/12/2021 - 11:46 |
Application for exemption from a Heritage Impact Assessment for a service station on farm 751-IQ Baragwanath Extension 5, Gauteng | Application for exemption from a Heritage Impact Assessment for a service station on farm 751-IQ Baragwanath Extension 5, Gauteng | HIA Letter of Exemption | 07/12/2021 | Jaco van der Walt | Beyond Heritage | Environmental Resources Management | 20/04/2022 - 12:31 |
Design Update: Boschendal Cellar Building | Design Update: Boschendal Cellar Building, HWC Ref: 21090305 Heritage Report submitted in terms of Section 27 of the NHRA (1999) Alterations and Additions to the Cellar Building, Boschendal Farm, 10/1674 | BE & CL Phase 1 | 07/12/2021 | Mike Scurr, Sarah Winter, Katie Smuts, Wendy Wilson | Rennie Scurr Adendorff | Boschendal (Pty) Ltd | 16/02/2022 - 10:28 |
PHASE 1 FIELD REPORT SUMMARY FOR THE HISTORICAL ASSESSMENT OF MOSALA HOUSE DINGLETON | ASSESSMENT OF SIGNIFICANCE OF THE “MOSALA HOUSE” SITUATED ON THE FARM GAMAGARA NO 541 PORTION 2 RESTANT 12, DINGLETON, KHUMBA IRON ORE MINE, IN THE GAMAGARA LOCAL MUNICIPALITY, JOHN TAOLO GAETSEWE DISTRICT MUNICIPALITY, NORTHERN CAPE. | Site Inspection Report | 07/12/2021 | Heidi Fivaz | UBIQUE HERITAGE CONSULTANTS | Kumba Iron Ore | 04/01/2022 - 14:04 |
PIA: Great Karoo REF | Palaeontological Heritage Specialist Reports: Combined Desktop and Field-Based Study - Combined Project Area for the Great Karoo Renewable Energy Cluster near Richmond, Northern Cape Province | PIA Phase 1 | 08/12/2021 | John Almond | Natura Viva CC | Savannah Environmental (Pty) Ltd | 17/05/2022 - 12:33 |
AIA: Great Karoo REF | ARCHAEOLOGICAL SPECIALIST STUDY In terms of Section 38(8) of the NHRA for a Proposed Great Karoo Renewable Energy Facility development near Richmond in the Northern Cape | AIA Phase 1 | 08/12/2021 | Jenna Lavin, Nicholas Wiltshire | CTS Heritage | Savannah Environmental (Pty) Ltd | 17/05/2022 - 12:34 |
CMP Voortrekker Monument | A BASIC CULTURAL HERITAGE MANAGEMENT PLAN FOR THE VOORTREKKER MONUMENT AND NATURE RESERVE, PRETORIA | Conservation Management Plan | 09/12/2021 | Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | Voortrekker Monument and Nature Reserve | 15/11/2021 - 12:47 |
PHASE 1 HIA & REPORT FOR THE PROPOSED RIETVLEI EXTENSION 24 TOWNSHIP DEVELOPMENT | A PHASE 1 HIA & REPORT FOR THE PROPOSED RIETVLEI EXTENSION 24 TOWNSHIP DEVELOPMENT LOCATED ON PORTION 712 OF THE FARM DOORNKLOOF 391JR TSHWANE METROPOLITAN AREA, GAUTENG | HIA Phase 1 | 09/12/2021 | 04/01/2022 - 09:41 | |||
PHASE 1 HIA & REPORT FOR THE PROPOSED RIETVLEI EXTENSION 24 TOWNSHIP DEVELOPMENT | A PHASE 1 HIA & REPORT FOR THE PROPOSED RIETVLEI EXTENSION 24 TOWNSHIP DEVELOPMENT LOCATED ON PORTION 712 OF THE FARM DOORNKLOOF 391JR TSHWANE METROPOLITAN AREA, GAUTENG | HIA Phase 1 | 09/12/2021 | 04/01/2022 - 09:45 |