Displaying 17901 - 17950 of 18975
ReportRef | ReportTitle | ReportType |
ReportDate![]() |
Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Heritage Draft Scoping Report Loxton WEF 2 | HERITAGE IMPACT ASSESSMENT: PROPOSED LOXTON WIND ENERGY FACILITY 2, CARNARVON AND VICTORIA WEST MAGISTERIAL DISTRICTS, NORTHERN CAPE | Heritage Scoping | 19/10/2022 | 15/11/2022 - 12:02 | |||
Heritage Draft Scoping Report Loxton WEF 2 | HERITAGE IMPACT ASSESSMENT: PROPOSED LOXTON WIND ENERGY FACILITY 2, CARNARVON AND VICTORIA WEST MAGISTERIAL DISTRICTS, NORTHERN CAPE | Heritage Scoping | 19/10/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | Loxton Wind Facility 2 (Pty) Ltd | 15/11/2022 - 12:07 |
SECTION 34 DEMOLITION APPLICATION FOR CERTAIN STRUCTURES AT THE BLACK ROCK KOPPIE, WITHIN THE ASSMANG BLACK ROCK MINING OPERATIONS (BRMO), NORTHERN CAPE PROVINCE | SECTION 34 DEMOLITION APPLICATION FOR CERTAIN STRUCTURES AT THE BLACK ROCK KOPPIE, WITHIN THE ASSMANG BLACK ROCK MINING OPERATIONS (BRMO), NORTHERN CAPE PROVINCE | BE & CL Phase 1 | 19/10/2022 | Anton van Vollenhoven | Archaetnos CC | EScience | 31/10/2022 - 17:21 |
HIA Final Report Oct 2022 | Heritage Impact Assessment Specialist Reports | 19/10/2022 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Umlando: Archaeological Surveys & Heritage Management | 20/10/2022 - 08:36 | |
Heritage Draft Scoping Report Loxton WEF 3 | HERITAGE IMPACT ASSESSMENT: PROPOSED LOXTON WIND ENERGY FACILITY 3, VICTORIA WEST MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Scoping | 19/10/2022 | Jayson Orton | 15/11/2022 - 12:14 | ||
Application for Exemption from a Heritage Impact Assessment for expansion of the existing Blastrite Site | Application for exemption from a Heritage Impact Assessment for the expansion of the existing operations at the Blastrite site, Rustenburg, North West Province. | HIA Letter of Exemption | 19/10/2022 | Jaco van der Walt | Beyond Heritage | Zitholele Consulting (Pty) Ltd | 26/06/2023 - 14:56 |
Elandheuvel Small Holdings | REPORT ON A HERITAGE DESKTOP STUDY & MOTIVATION FOR EXEMPTION FORM FULL PHASE 1 HIA FOR THE PROPOSED SUBDIVISON OF A PORTION OF THE REMAINING EXTENT OF PORTIONS 337 & 338 OF ELANDSHEUVEL 402IP IN THE CITY OF MATLOSANA LOCAL MUNICIPALITY KLERKSDORP, NORTHWEST PROVINCE | HIA Letter of Exemption | 20/10/2022 | Anton Pelser | A Pelser Archaeological Consulting | AB Enviro Consult CC | 19/12/2022 - 15:58 |
Heritage Impact Assessment for the proposed re continuance of construction for residential Township Development on Erf 25268 Protea Glen Ext 1, Gauteng Province | Heritage Impact Assessment for the proposed re continuance of construction for residential Township Development on Erf 25268 Protea Glen Ext 1, Gauteng Province | HIA Phase 1 | 20/10/2022 | Jaco van der Walt | Beyond Heritage | Isquare Environmental Planning and GIS | 03/11/2022 - 21:45 |
Hempire | HIA FOR THE HEMPIRE CORPORATION FARM, EMPANGENI, KZN | HIA Phase 1 | 20/10/2022 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | ENPROCON (Pty) Ltd | 25/10/2022 - 12:03 |
ENHLALAKAHLE PHASE 2 | HIA FOR THE ENHLALAKAHLE PHASE 2 SUBSIDISED HOUSING DEVELOPMENT | HIA Phase 1 | 20/10/2022 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | K2M Environmental | 08/12/2022 - 13:39 |
HIA FOR THE ENHLALAKAHLE PHASE 2 SUBSIDISED HOUSING DEVELOPMENT | HIA FOR THE ENHLALAKAHLE PHASE 2 SUBSIDISED HOUSING DEVELOPMENT | Heritage Impact Assessment Specialist Reports | 20/10/2022 | Gavin Anderson | Umlando: Archaeological Surveys and Heritage Management | 05/04/2023 - 15:48 | |
Heritage Impact Assessment for the eNhlalakahle Phase 2 housing development | HIA FOR THE ENHLALAKAHLE PHASE 2 SUBSIDISED HOUSING DEVELOPMENT | HIA Phase 1 | 20/10/2022 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | K2M Environmental | 06/04/2023 - 08:04 |
Phase I Heritage Assessment of Princess Mkabayi Mixed Use Development. Erf 6018, Vryheid. | Phase I Heritage Assessment of Princess Mkabayi Mixed Use Development. Erf 6018, Vryheid. Province: KwaZulu-Natal District Municipality: Zululand District Municipality Local Municipality: AbaQulusi Local Municipality Implementing Agent: Moolman Group Developments / Indiflora Environmental Consultants For: Indiflora Environmental Consultants | HIA Phase 1 | 22/10/2022 | Sian Hall, Gavin Anderson | Ancient Places Pty. Heritage Consultancy, Umlando | Princess Mkabayi City (Pty) Ltd | 10/11/2022 - 14:57 |
Phase I Heritage Assessment of Princess Mkabayi Mixed Use Development. Erf 6018, Vryheid. | Phase I Heritage Assessment of Princess Mkabayi Mixed Use Development. Erf 6018, Vryheid. Province: KwaZulu-Natal District Municipality: Zululand District Municipality Local Municipality: AbaQulisi Local Municipality Implementing Agent: Moolman Group Developments / Indiflora Environmental Consultants For: Indiflora Ennvironmental Consultants | HIA Phase 1 | 22/10/2022 | Sian Hall, Gavin Anderson | Ancient Places Pty. Heritage Consultancy, Umlando: Archaeological Surveys and Heritage Management | Princess Mkabayi City (Pty) Ltd , Umlando: Archaeological Surveys and Heritage Management | 10/11/2022 - 15:49 |
Palaeontological Impact Assessment for the proposed Protea Glen Ext 1 Township on Erf 25268, Gauteng Province | Palaeontological Impact Assessment for the proposed Protea Glen Ext 1 Township on Erf 25268, Gauteng Province | PIA Phase 1 | 22/10/2022 | Marion Bamford | Prof Marion Bamford | Isquare Environmental Planning and GIS | 03/11/2022 - 21:47 |
Nyala mitigation | RE-ASSESSMENT OF POSSIBLE GRAVE FOR NYALA FARM BROILERS | HIA Phase 2 | 23/10/2022 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Exigent Engineering Consultants | 24/10/2022 - 18:57 |
Nyala Rev 3 | HIA FOR THE RPOPOSED NYALA FARM CC BROILERS Rev. 3 | HIA Phase 1 | 24/10/2022 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Exigent Engineering Consultants | 24/10/2022 - 18:55 |
Application for Partial Demolition of Structures | RE-SUBMISSION OF A SECTION 37 APPLICATION: PARTIAL DEMOLITION OF STRUCTURES ON PORTION 3, 4, 5 AND 68 OF ERF 498, SCOTTSVILLE, PIETERMARITZBURG (ADOWA STUDENT HOUSING) | Heritage Statement | 24/10/2022 | Tony Danev | SVA International | ADOWA Property Developers | 16/11/2022 - 09:06 |
Nkambeni Paleontology letter | Paleontology site verification letter | PIA Desktop | 24/10/2022 | Dr. Heidi Fourie | 12/05/2023 - 11:52 | ||
PIA Exemption - Grootwitpan | BASIC PALAEONTOLOGICAL ASSESSMENT Letter of Recommendation for Exemption from further Palaeontological Studies CONSOLIDATION OF SALT PAN MINING RIGHTS ON GROOT WITPAN 327 INDUSTRIAL SALT (PTY) LTD. Portions 10, 13, 18 & 20 of Groot Witpan 327, Gordonia District, Northern Cape | HIA Letter of Exemption | 24/10/2022 | John Pether | Geological and Palaeontological Consultant | Site Plan Consulting | 26/10/2022 - 14:17 |
Phase 1 HIA: THE PROPOSED ALTINA 120MW SOLAR PHOTOVOLTAIC PROJECT NEAR THE TOWN OF ORKNEY, FREE STATE PROVINCE | Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED ALTINA 120MW SOLAR PHOTOVOLTAIC PROJECT NEAR THE TOWN OF ORKNEY, FREE STATE PROVINCE | HIA Phase 1 | 25/10/2022 | J A van Schalkwyk | J A van Schalkwyk | Nemai Consulting | 11/11/2022 - 09:31 |
Desktop PIA ALTINA 120 MW SOLAR PHOTOVOLTAIC PROJECT NEAR ORKNEY IN THE FREE STATE | Desktop PIA: ALTINA 120 MW SOLAR PHOTOVOLTAIC PROJECT NEAR ORKNEY IN THE FREE STATE | PIA Desktop | 25/10/2022 | Elize Butler | Banzai Environmental (Pty) Ltd | Nemai Consulting | 11/11/2022 - 09:48 |
RECOMMENDED EXEMPTION FROM FURTHER ARCHAEOLOGICAL STUDIES | RECOMMENDED EXEMPTION FROM FURTHER ARCHAEOLOGICAL STUDIES, CONSOLIDATION OF SALT MINING RIGHTS UNDER ONE MINING RIGHT: PORTIONS 10, 13 18 & 20 OF THE FARM GROOT WITPAN NO. 327, GORDONIA RD, DAWID KRUIPER LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE | HIA Letter of Exemption | 25/10/2022 | Jonathan Kaplan | Agency for Cultural Resources Management | Site Plan Consulting | 26/10/2022 - 14:13 |
HDBR Visual Assessment | HERITAGE IMPACT ASSESSMENT: FOR THE PROPOSED CONSTRUCTION OF THE 2 KM LONG HOLSDAM BARKLEY RIVER FARMERS 11KV POWERLINE | Visual Impact Assessment | 26/10/2022 | Karsten Drescher | Terralogix | EkoInfo CC | 03/11/2022 - 16:18 |
PROPOSED IVY PARK EXT. 24 TOWNSHIP ESTABLISHMENT LOCATED ON PORTIONS 392, 393, 395 AND THE REMAINDER OF PORTION 220 OF THE FARM STERKLOOP 688-LS IN THE POLOKWANE LOCAL- AND CAPRICORN DISTRICT MUNICIPALITIES OF THE LIMPOPO PROVINCE. | PROPOSED IVY PARK EXT. 24 TOWNSHIP ESTABLISHMENT LOCATED ON PORTIONS 392, 393, 395 AND THE REMAINDER OF PORTION 220 OF THE FARM STERKLOOP 688-LS IN THE POLOKWANE LOCAL- AND CAPRICORN DISTRICT MUNICIPALITIES OF THE LIMPOPO PROVINCE. | HIA Phase 1 | 26/10/2022 | Stephan Gaigher | Tekplan Environmental | 08/11/2022 - 09:43 | |
Dominion 1 PV HIA | Heritage Impact Assessment for the proposed Dominion 1 Solar Park On the remaining extent of Portion 18 of the farm Wolwerand 425 IR, City of Matlosana, North West Province | Heritage Impact Assessment Specialist Reports | 26/10/2022 | Wouter Fourie | PGS Heritage (Pty) Ltd | Terramanzi Group (Pty) Ltd | 23/11/2022 - 16:37 |
Dominion 2 PV HIA | Heritage Impact Assessment for the proposed Dominion 2 Solar Park On the remaining extent of Portion 8 of the farm Wolwerand 425 IR, City of Matlosana, North West Province | HIA Phase 1 | 26/10/2022 | Wouter Fourie | PGS Heritage (Pty) Ltd | Terramanzi Group (Pty) Ltd | 23/11/2022 - 17:07 |
Dominion 3 PV HIA | Heritage Impact Assessment for the proposed Dominion 3 Solar Park On the remaining extent of Portion 8 of the farm Wolwerand 425 IR, City of Matlosana, North West Province | HIA Phase 1 | 26/10/2022 | Wouter Fourie | PGS Heritage (Pty) Ltd | Terramanzi Group (Pty) Ltd | 23/11/2022 - 17:24 |
UHIA for PetroSA Mossel Bay | UNDERWATER HERITAGE IMPACT ASSESSMENT - PETROSA – PROPOSED BYPASS PIPELINES AND REPOSITIONING OF SINGLE-POINT MOORING (SPM) BUOY, MOSSEL BAY, SOUTH AFRICA, | Heritage Impact Assessment Specialist Reports | 26/10/2022 | Vanessa Maitland | Vanessa Maitland | SRK Consulting (Pty) Ltd - Western Cape | 27/10/2022 - 11:19 |
Underwater Heritage Impact Assessment | Underwater Heritage Impact Assessment, Prospecting Application for Sea Concession 12C, West Coast, South Africa | Heritage Impact Assessment Specialist Reports | 27/10/2022 | Vanessa Maitland | Vanessa Maitland | Vanessa Maitland | 31/10/2022 - 13:11 |
Cape Institute of Architecture Comment | 27/10/2022 | 28/10/2022 - 10:01 | |||||
HIA report Southern Gateway residential development Polokwane | Phase 1 Cultural Heritage Impact Assessment Report. Proposed Southern Gateway Residential Development Polokwane Local Municipality Capricorn District Limpopo Province | Heritage Impact Assessment Specialist Reports | 28/10/2022 | Frans Roodt | EScience Associates (Pty) Ltd | 28/10/2022 - 14:44 | |
HIA report Buchom Filling Station – Blouberg. | Phase 1 Heritage Impact Assessment Report. Proposed Buchom Filling Station, Blouberg Local Municipality, Capricorn District, Limpopo Province. | Heritage Impact Assessment Specialist Reports | 28/10/2022 | Frans Roodt | Envirosana Environmental Consultants | 28/10/2022 - 14:56 | |
Palaeontological Impact Assessment for the proposed residential township in Vanderbijl Park South West No 8, Extension 1, Gauteng Province | Palaeontological Impact Assessment for the proposed residential township in Vanderbijl Park South West No 8, Extension 1, Gauteng Province | PIA Desktop | 30/10/2022 | Marion Bamford | Prof Marion Bamford | Isquare Environmental Planning and GIS | 20/12/2022 - 13:54 |
Taaibos South WEF PIA | PIA Phase 1 | 31/10/2022 | John Almond | Natura Viva CC | Coastal & Environmental Services - East London | 25/01/2023 - 10:55 | |
Greenbushes Erf 77 Solar AIA Letter | A LETTER OF RECOMMENDATION (WITH CONDITIONS) FOR THE EXEMPTION OF A FULL PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF A SOLAR PHOTOVOLTAIC (PV) FACILITY ON ERF 77 IN GREENBUSHES, GQEBERHA (PORT ELIZABETH), NELSON MANDELA BAY MUNICIPALITY, EASTERN CAPE PROVINCE | AIA Phase 1 | 31/10/2022 | Kobus Reichert | Eastern Cape Heritage Consultants | Rent-A-Store (Pty) Ltd | 12/04/2023 - 15:57 |
PHASE 1 HIA AGRI-INDUSTRIAL FACILITY VAAL KOPPIES UPINGTON | PHASE 1 HIA FOR THE PROPOSED CONSTRUCTION OF AN AGRI-INDUSTRIAL FACILITY ON PORTION 64 OF VAAL KOPPIES NO 40, UPINGTON, KENHARDT, DAWID KRUIPER LOCAL MUNICIPALITY, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE. | AIA Phase 1 | 31/10/2022 | Sky-Lee Fairhurst, Heidi Fivaz, Elize Butler | UBIQUE HERITAGE CONSULTANTS | ECO Balance Planning Co | 14/12/2022 - 17:01 |
Prospecting Right Application | EIA for Prospecting Right | Heritage Study | 31/10/2022 | 13/10/2022 - 07:12 | |||
Ngxwabangu WEF HIA | Ngxwabangu Wind Energy Facility Heritage Impact Assessment | HIA Phase 1 | 31/10/2022 | Nelius Kruger | Exigo3 Sustainability | EDF Renewables (Pty) Ltd | 16/11/2022 - 14:43 |
Soutrivier North WEF PIA | PIA Phase 1 | 31/10/2022 | John Almond | Natura Viva CC | Coastal & Environmental Services - East London | 25/01/2023 - 09:47 | |
Ngxwabangu WEF PIA | Ngxwabangu Wind Energy Facility Paleontological Impact Assessment | PIA Phase 1 | 31/10/2022 | John Almond | Natura Viva CC | EDF Renewables (Pty) Ltd | 16/11/2022 - 14:45 |
Taaibos North WEF HIA | AIA Phase 1 | 31/10/2022 | Nelius Kruger | Coastal & Environmental Services - Grahamstown | Coastal & Environmental Services - East London | 25/01/2023 - 10:06 | |
Taaibos North WEF PIA | PIA Phase 1 | 31/10/2022 | 25/01/2023 - 10:18 | ||||
Soutrivier South WEF HIA | AIA Phase 1 | 31/10/2022 | Nelius Kruger | Coastal & Environmental Services - Grahamstown | Coastal & Environmental Services - East London | 25/01/2023 - 10:29 | |
Salvokop Bulk Water Supply Pipeline Phase 1 Heritage Impact Assessment | THE PROPOSED CONSTRUCTION OF BULK WATER SUPPLY PIPELINE FOR SALVOKOP EXTENSION 5, CITY OF TSHWANE, GAUTENG PROVINCE | AIA Phase 1 | 31/10/2022 | Johnny van Schalkwyk | SPOOR Environmental Services (PTY) Ltd. | 10/10/2022 - 10:14 | |
Soutrivier South WEF PIA | PIA Phase 1 | 31/10/2022 | John Almond | Natura Viva CC | Coastal & Environmental Services - East London | 25/01/2023 - 10:33 | |
Phase 1 Cultural Heritage Impact Assessment: | THE PROSPECTING RIGHT APPLICATION COMBINED WITH A WASTE LICENCE APPLICATION FOR THE PROSPECTING OF DIAMONDS (ALLUVIAL, GENERAL & IN KIMBERLITE) & DIAMONDS NEAR DOUGLAS ON PORTION 1 OF THE FARMS VALS PAN 26, PORTION 2 & 3 OF THE FARM VRAAI PLAATS 27, PORTION 1 OF THE FARM ANNEX DIAMOND VALLEY, REGISTRATION DIVISION: HOPETOWN, NORTHERN CAPE PROVINCE | HIA Phase 1 | 31/10/2022 | J A van Schalkwyk | J A van Schalkwyk | Milnex 189 CC | 19/10/2022 - 07:46 |
Soutrivier Central WEF HIA | AIA Phase 1 | 31/10/2022 | Nelius Kruger | Coastal & Environmental Services - Grahamstown | Coastal & Environmental Services - East London | 25/01/2023 - 10:45 | |
Updated Heritage Glenover | REPORT ON A PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE GLENOVER PHOSPHATE MINE PROJECT ON PORTION 1 OF GLENOVER 371LQ, NEAR STEENBOKPAN, LIMPOPO PROVINCE | HIA Phase 1 | 31/10/2022 | Anton Pelser | 31/10/2022 - 11:18 | ||
Soutrivier Central WEF PIA | PIA Phase 1 | 31/10/2022 | John Almond | Natura Viva CC | Coastal & Environmental Services - East London | 25/01/2023 - 10:47 |