THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 17801 - 17850 of 18975
ReportRef | ReportTitle | ReportType | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|
Lichtenburg 2 PV Amendment to Environmental Authorisation | Heritage screening assessment for the proposed amendment to the Lichtenburg 2 PV Facility, North West Province | Jenna Lavin | Savannah Environmental (Pty) Ltd | CTS Heritage | 16/10/2020 - 13:26 | |
364256045 - M Mr MASWANGANYI HLENGONI DANIEL | Heritage Study | 06/01/2021 - 09:20 | ||||
150 Buitengracht | Heritage Report Accompanying Revised Design Scheme | Built Environment and Cultural Landscapes | Rennie Scurr Adendorff | 04/06/2021 - 17:48 | ||
PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT | PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED MINING PERMIT APPLICATION ON PORTION OF PORTION 32 OF THE FARM BLESBOKLAAGTE 296 JS, SITUATED WITHIN EMALAHLENI LOCAL MUNICIPALITY UNDER THE MAGISTERIAL DISTRICT OF EMALAHLENI, MPUMALANGA PROVINCE. | HIA Phase 1 | 23/01/2023 - 12:07 | |||
Heritage Assessment for Newcasle to Ncandu River Project | 12/10/2023 - 09:30 | |||||
Palaeontological Repor - Watershed Solar Facility | Desktop Palaeontological Heritage Impact assessment Report on the Proposed Watershed (Phase I & II) Solar Energy Facilites to be Located on the Farm Houthaalbomen 31 Portion 1, 9 and 10, near Lichtenburg, North West Province | PIA Desktop | Barry Millsteed | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 26/06/2013 - 16:31 |
HIA for the proposed upgrade and increase in the scoping activities at the existing arbor railway siding, Delmas region. | Heritage Impact Assessment for the proposed upgrade and increase in the scoping activities at the existing arbor railway siding, Delmas region, Nkangala District Municipality, Mpumalanga province. | Heritage Impact Assessment Specialist Reports | J.A. van Schalkwyk | Gijima Supply Chain Management Services (Pty) Ltd | Myezo Environmental Management Services | 16/09/2021 - 11:00 |
SANDELLO SMALL MINING OPERATIONS (PTY) LTD | GRANTING OF THE ENVIRONMENTAL AUTHORISATION IN TERMS OF THE NATIONAL ENVIRONMENTAL MANAGEMENT ACT, 1998 (NEMA) AS AMENDED, AND THE ENVIRONMENTAL IMPACT ASSESSMENT (EIA) REGULATIONS, 2014 FOR THE MINING OF SAND (GENERAL) AND ASSOCIATED ACTIVITIES IN RESPECT OF THE REMAINING EXTENT OF THE FARM SANTEUR LANDGOED 562, SITUATED IN THE MAGISTERIAL DISTRICT OF WEPENER, SANDELLO SMALL MINING OPERATIONS (PTY) LTD. PROVINCE: FREE STATE | 12/03/2021 - 12:52 | ||||
d | 10/10/2016 - 15:49 | |||||
POLOKWANE EMERGENCY PHASE 1 HERITAGE IMPACT ASSESSMENT REPORT | POLOKWANE EMERGENCY PHASE 1 HERITAGE IMPACT ASSESSMENT REPORT | Tsimba Archaeological Footprints (Pty) Ltd | 09/06/2022 - 10:16 | |||
SOCIO-ECONOMIC IMPACT ASSESSMENT | INVEST IN PROPERTY 126 (PTY) LTD SOCIO-ECONOMIC IMPACT ASSESSMENT | Bruinbox Enterprise (Pty) Ltd | Biomental Services (Pty) Ltd | 21/09/2023 - 07:15 | ||
HIA | 19/05/2023 - 14:53 | |||||
Katlehong Vehicle Licensing Authority | Johnny Van Schalkwyk | Envirolution Consulting (Pty) Ltd | Envirolution Consulting (Pty) Ltd | 18/11/2013 - 08:02 | ||
Leslie 2 - Heritage Impact Assessment | Leslie 2 - Heritage Impact Assessment | HIA Phase 1 | Julius CC Pistorius | Dr Julius CC Pistorious Archaeologist and heritage Consultant | Shangoni Management Services | 03/02/2017 - 14:46 |
Dual filling station Olifantsvlei 327 IQ NID | Proposed development of a filling station complex on the R82, Olifantsvlei 327 IQ, Johannesburg, Gauteng | Heritage Impact Assessment Specialist Reports | Johan Nel | Die Erfenisstigting | Great Sites Investments (Pty) Ltd | 15/12/2017 - 13:39 |
Skeerhok | 01/03/2021 - 12:44 | |||||
Chamdor X4 Mixed Use Development - HIA | 31/08/2018 - 08:16 | |||||
HIA_KOMATI POWER STATION ASH DAM EXTENSION | HERITAGE SURVEY REPORT FOR THE KOMATI POWER STATION ASH DAM EXTENSION, MIDDELBURG MAGISTERIAL DISTRICT, MPUMALANGA PROVINCE | HIA Phase 1 | Johnny Van Schalkwyk | Synergistics Environmental Services | 12/02/2013 - 12:26 | |
Holgatfontein Cultural Heritage Study | 20/02/2014 - 11:42 | |||||
HIA Mbilane Bridge, KZN | HERITAGE IMPACT ASSESSMENT OF THE PROPOSED MBILANE RIVER BRIDGE AT ULUNDI, NORTHERN KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | Frans Prins | Active Heritage CC | Green Door Environmental | 02/07/2015 - 08:18 |
HIA | 08/05/2023 - 15:29 | |||||
Sunderland Ridge X33 Industral Township (Portion 87) - HIA | 07/03/2019 - 15:11 | |||||
Proposed SANSA Space Operations at portion 8 of Farm Matjiesfontein Western Cape | HIA: Proposed SANSA Space Operations at portion 8 of Farm Matjiesfontein Western Cape | HIA Phase 1 | Jenna Lavin | CTS Heritage | Coastal Environmental Services | 30/06/2022 - 14:23 |
Paleontological Study Sonbesie | Palaentological Heritage Assessment: Combined Desktop & Field- Based Study Proposed Sonbesie Solar Plant on the Remaining Extent of the Farm Retreat 671, near Vryburg, Naledi local municipality, North-West Province | Palaeontological Specialist Reports | John Edward Almond | 04/03/2016 - 10:45 | ||
Wonderwerk Cave 2019 | Report of Wonderwerk Cave 2019 Excavation | Archaeological Permit Report | Michael Chazan | Department of Anthropology, University of Toronto | 01/04/2022 - 19:51 | |
Castor PV PIA | 30/08/2022 - 08:30 | |||||
Borrow pit 1 D3232 | PROPOSED NEW BORROW PIT (1) ON THE ROAD D3232, ON THE FARM UITSPAN 172 LT, NEAR MOREBENG (SOEKMEKAAR), LIMPOPO PROVINCE | Heritage Scoping | 21/07/2017 - 15:10 | |||
HIA FOR A SCHOOL DEVELOPMENT | HIA Phase 1 | 23/01/2020 - 09:52 | ||||
HIA Boschendal Farmlands, Dwars River Valley (Appendices: Vol 1) | Heritae Impact Assessment for Boschendal Farmlands, Dwars River Valley: Heritage scoping study for the entire Boschendal Farmlands and HIA for the proposed Founders Estate development (Appendices: Vol 1) | HIA Phase 3 | Sarah Winter, Nicolas Baumann | 16/03/2021 - 12:05 | ||
Demolition to ERF 8410, 5 Renshaw Road, Congela | 12/08/2022 - 15:32 | |||||
HIA | 22/05/2023 - 18:38 | |||||
Heritage Impact Assessment - Tutuka | 24/03/2016 - 16:27 | |||||
HIA Zithende Road Upgrade DC23/0015/2013 | Phase 1 Heritage Impact Assessment Report-Zithende Road Upgrade Project, near Driefontein, KZN | HIA Phase 1 | Stephan Gaigher | G & A Heritage | 22/08/2013 - 16:07 | |
Phase 1 Heritage report for Camden I SEF 132kV Grid connection | 11/05/2023 - 12:04 | |||||
Heritage Impact Assessment Report 2015 | PROPOSED UNDERGROUND MINING ON THE FARM ZANDVOOT 10 IT, NEAR CAROLINA, ALBERT LUTHULI LOCAL MUNICIPALITY, GERT SIBANDE DISTRICT MUNICIPALITY, MPUMALANGA PROVINCE. | HIA Phase 1 | PGS Heritage (Pty) Ltd | 28/11/2017 - 08:10 | ||
HIA Hesketh Dr Extension | PHASE ONE CULTURAL HERITAGE IMPACT ASSESSMENT OF, HESKETH DRIVE AND ROGERS AVENUE EXTENSION, HAYFIELDS PIETERMARITZBURG. | Frans Prins | Active Heritage CC | Green Door Environmental | 06/12/2018 - 07:58 | |
Phase 1 Heritage report for Nooitgedacht Clay Quarry | 1st Phase CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR A PROPOSED MINING LICENCE ON THE FARM NOOITGEDACHT 436 JR PORTION 25. | HIA Phase 1 | Udo Kusel | Mpumalanga Department: Economic Development | Shangoni Management Services | 03/08/2015 - 11:37 |
Jersey SPP - PIA | 15/02/2023 - 10:13 | |||||
Zamazele Heritage Assessment | Phase 1 - Zamazele Heritage Assessment | HIA Phase 1 | Frans Prins | Active Heritage CC | Greenbelt Projects(Pty) Ltd | 10/06/2021 - 14:39 |
Phase I Cultural Heritage Impact Assessment of the Proposed Upgrading of Main Road P231 between the Nseleni Interchange (N2-29) and Richards Bay, KwaZulu-Natal | Phase I Cultural Heritage Impact Assessment of the Proposed Upgrading of Main Road P231 between the Nseleni Interchange (N2-29) and Richards Bay, KwaZulu-Natal | Mamoluoane Seliane | HENWOOD & NXUMALO CONSULTING ENGINEERS CC | HENWOOD & NXUMALO CONSULTING ENGINEERS CC | 28/05/2016 - 21:15 | |
HIA | 06/06/2023 - 09:51 | |||||
Semi Maseme TV Productions CC- FS 10073 MR | APPLICATION FOR A MINING RIGHT TO MINE FOR DIAMOND (GENERAL), DIAMOND (KIMBERLITE) AND STONE AGGREGATE SITUATED ON REMAINING EXTENT AND PORTION 1 OF THE FARM DAMPLAATS 319 IN THE MAGISTERIAL DISTRICT OF BOSHOF, FREE STATE PROVINCE. | 02/09/2022 - 11:23 | ||||
Heritage Impact Assessment - Copper | 25/07/2023 - 09:24 | |||||
Letter of motivation for 41 St Andrews Drive, Durban North | Derry Baker | 12/03/2014 - 12:48 | ||||
Mahlashana HIA | Phase 1 Heritage Impact Assessment report - Mahlashana Road Upgrade Project, near Pomeroy, KwaZulu-Natal Province | HIA Phase 1 | Stephan Gaigher | G&A Heritage Management Consultants | GBS Environmental Consulting | 04/05/2016 - 11:27 |
ARCHAEOLOGICAL SCOPING, PROPOSED EXTENSION OF AN EXISTING BORROW PIT ON PORTION 5 OF FARM HOL PADS LEEGTE NO. 32 NEAR BRANDVLEI, NORTHERN CAPE PROVINCE | Heritage Scoping | Jonathan Kaplan | Agency for Cultural Resources Management | Enviroafrica CC | 05/07/2017 - 11:51 | |
HIA; Proposed Borrow Pit, TR 2303 | 26/06/2018 - 11:21 | |||||
Songela Road Upgrade HIA report | Phase 1 - Heritage Impact Assessment Report - Songela Road Upgrade Project, near Vryheid, KwaZulu-Natal Province. | HIA Phase 1 | Stephan Gaigher | G & A Heritage | 18/06/2013 - 14:49 | |
BRIDGE ROAD BRIDGE UPGRADE SCREENER | Bridge Road Replacement and Upgrade of Culverts | Heritage Statement | Envirolution Consulting (Pty) Ltd | 30/11/2017 - 14:08 | ||
HIA, P57, KZN | PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED THE UPGRADE OF THE P57 ROAD FROM EZINQOLENI TO THE MTAMVUNA RIVER BRIDGE, WITHIN THE EZINQOLENI LOCAL AND UGU DISTRICT MUNICIPALITIES, KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | Frans Prins | Active Heritage CC | Green Door Environmental | 19/10/2015 - 11:59 |