THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 15651 - 15700 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
Phase 2a - Archaeological Site Documentation / Sketch Plan: Sensitive Area 1 - Cluster 9 Phase 5 and Cluster 8 Linkage, Water Supply and Access Road, Nxamagele and Catshile, near Tsomo, CHDM, EC | Phase 2a - Archaeological Site Documentation / Sketch Plan: Sensitive Area 1 - Cluster 9 Phase 5 and Cluster 8 Linkage, Water Supply and Access Road, Nxamagele and Catshile, near Tsomo, CHDM, EC | AIA Phase 2 | 10/01/2023 | Karen Van Ryneveld | 10/01/2023 - 09:54 | |||
P2AM-Kouga Wind Farm, Oyster Bay, EC | Phase 2a Archaeological Monitoring (Final Report) - The Kouga Wind Farm (Red Cap Kouga Wind Farm, Central Cluster), Oyster Bay, Eastern Cape, South Africa | AIA Phase 2 | 01/10/2014 | Karen Van Ryneveld | 01/10/2014 - 08:36 | |||
Phase 2a Heritage Monitoring (Interim Report 1) - Impofu North Wind Farm, Impofu West Wind Farm, and Impofu East Wind Farm, near Oyster Bay, Kouga Local Municipality, Sarah Baartman District Municipality, Eastern Cape | Phase 2a Heritage Monitoring (Interim Report 1) - Impofu North Wind Farm, Impofu West Wind Farm, and Impofu East Wind Farm, near Oyster Bay, Kouga Local Municipality, Sarah Baartman District Municipality, Eastern Cape | Archaeological Monitoring | 02/09/2023 | Karen Van Ryneveld | 02/09/2023 - 07:22 | |||
Phase 2a Heritage Monitoring (Interim Report 1) - Umoyilanga-Dassiesridge WEF | Phase 2a Heritage Monitoring (Interim Report 1) - Umoyilanga-Dassiesridge WEF | AIA Phase 2 | 12/10/2023 | Karen Van Ryneveld | 12/10/2023 - 21:05 | |||
AM[P2]-Samy's Wholesalers, Erf 44500, KBY, SPM, NC | Phase 2b Archaeological Monitoring - Samy's Wholesalers Extension Development, Erf 44500, c/o Quinn & Lawrence Streets, Kimberley, Sol Plaatjie Municipality, Northern Cape, South Africa [SAHRIS Case ID #6899; SAHRA BGG Unit Permit ID #2016] | AIA Phase 2 | 01/09/2015 | Karen Van Ryneveld | Samy's Wholesalers | 01/09/2015 - 07:08 | ||
Phase 2 HIA Middelplaas Development | Phase @ Heritage Impact Assessment, Proposed Middelplaas Development, Farm La Terra da Luc 1075 and Farm 1070, Franschhoek | HIA Phase 2 | 22/03/2013 | Ron Martin | Ron Martin Heritage Consultancy | Sharples Environmental Services cc | 06/05/2013 - 13:22 | |
Kaalfontein 44 IQ Application 3 | Phase AIA for proposed prospecting right application with bulk sampling on Ptn 2,9,12,14,27,29,30,37,38,39 of the farm Kaalfontein 44IQ and Ptn 1, 3-6,9,13,19,20,25,30-32, ,35,37-39,45of the farm Koesterfontein 45 IQ situated in the Magisterial District of Krugersdorp in Gauteng Province. | AIA Phase 1 | 23/08/2018 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Joan Construction and Projects (Pty) Ltd | 22/02/2019 - 14:13 | |
HIA for Prospecting Right Application (KZN30/5/1/1/2/11351PR) | Phase Heritage Impact Assessment for Prospecting Right Application for Lithium, Feldspar, Tin, Tantalum, Zinc, and Dimension Stone (general) on Various Farms, Situated in the Magisterial District of Port Shepstone, Kwazulu NataL Province. | Heritage Impact Assessment Specialist Reports | 30/04/2023 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Integrated Specialist Services | 11/06/2023 - 16:09 | |
HIA for the Proposed SuperChicks Poultry Farm on Portion 68 of the Farm Kameelzynkraal No 547 | Phase HIA for the proposed SuperChicks Poultry Farm on Portion 68 of the Farm Kameelzynkraal No 547 | HIA Phase 1 | 30/06/2021 | Nkosinathi Tomose | MOKGOPE CONSULTING CC | 30/06/2021 - 18:29 | ||
Phase I Heritage Assessment for Heuningkranz and Langverwacht Farms | Phase I AIA report on archaeological contexts and heritage resources on the farms Heuningkranz 364 and Langverwacht 432 in the Postmasburg District Municipality of the Northern Cape Province | AIA Phase 1 | 10/09/2013 | Udo Kusel | African Heritage Consultants CC | Sibelo Resources Development (Pty) Ltd | CTS_135624 | 17/10/2013 - 09:26 |
Letso Investments Heritage Impact Assessment | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR PROSPECTING RIGHT APPLICATION ON THE FARM TWEED 362 IL WITHIN JOE MOROLONG LOCAL MUNICIPALITY OF JOHN TAOLO GAETSEWE DISTRICT MUNICIPALITY (FORMERLY KGALAGADI), NORTHERN CAPE PROVINCE. | HIA Phase 1 | 10/03/2023 | Alvord Nhundu | Biomental Services (Pty) Ltd | 12/04/2023 - 21:06 | ||
AIA proposed deviation of Eskom Juno Gromis 400kV transmission line | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED 400KV POWER LINE FROM THE EXISTING ESKOM JUNO SUBSTATION TO THE EXISTING ESKOM GROMIS SUBSTATION IN THE WESTERN AND NORTHERN CAPE PROVINCES RESPECTIVELY. | AIA Phase 1 | 15/08/2016 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | Nsovo Environmental Consulting | 02/11/2016 - 12:25 | |
Acaciaville Housing development HIA | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED ACACIAVALE HOUSING PROJECT ON PORTION OF THE REMAINDER OF ERF 1, LADYSMITH NO. 5695 WITHIN ALFRED DUMA LOCAL MUNICIPALITY OF UTHUKELA DISTRICT, KWAZULU-NATAL | AIA Phase 1 | 17/09/2020 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | NDG-AFRICA | 02/11/2020 - 14:32 | |
Acaciaville Housing development HIA | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED ACACIAVALE HOUSING PROJECT ON PORTION OF THE REMAINDER OF ERF 1, LADYSMITH NO. 5695 WITHIN ALFRED DUMA LOCAL MUNICIPALITY OF UTHUKELA DISTRICT, KWAZULU-NATAL | AIA Phase 1 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | NDG-AFRICA | 03/11/2020 - 08:31 | ||
Phase 1 HIA Report for Vryheid Substation and Associated 2 X 88kV Power Lines | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED AUTHORISATION OF ERMELO-RICHARDS BAY COAL LINK UPGRADE PROJECT: DEVELOPMENT OF THE VRYHEID TRACTION STATION AND THE ASSOCIATED TURN-IN POWER LINES WITHIN THE ABAQULUSI LOCAL MUNICIPALITY OF ZULULAND DISTRICT IN KWAZULU PROVINCE | HIA Phase 1 | 01/07/2019 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | Ecosolve (Pty) Ltd | 25/02/2020 - 21:07 | |
Phase 1 HIA Report for Vryheid Substation and Associated 2 X 88kV Power Lines | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED AUTHORISATION OF ERMELO-RICHARDS BAY COAL LINK UPGRADE PROJECT: DEVELOPMENT OF THE VRYHEID TRACTION STATION AND THE ASSOCIATED TURN-IN POWER LINES WITHIN THE ABAQULUSI LOCAL MUNICIPALITY OF ZULULAND DISTRICT IN KWAZULU PROVINCE | HIA Phase 1 | 01/07/2019 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | Ecosolve (Pty) Ltd | 25/02/2020 - 21:18 | |
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE FROM MAPHUTHA SUBSTATION TO WITKOP SUBSTATION WITHIN THE SEKHUKHUNE AND CAPRICON DISTRICT MUNICIPALITIES OF LIMPOPO PROVINCE | HIA Phase 1 | 30/11/2017 | Munyadziwa Magoma | Nsovo Environmental Consulting | Nsovo Environmental Consulting | 09/02/2018 - 12:18 | |
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE FROM MAPHUTHA SUBSTATION TO WITKOP SUBSTATION WITHIN THE SEKHUKHUNE AND CAPRICON DISTRICT MUNICIPALITIES OF LIMPOPO PROVINCE | HIA Phase 1 | 28/02/2019 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | Nsovo Environmental Consulting | 09/02/2018 - 12:25 | |
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE FROM MAPHUTHA SUBSTATION TO WITKOP SUBSTATION | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE FROM MAPHUTHA SUBSTATION TO WITKOP SUBSTATION WITHIN THE SEKHUKHUNE AND CAPRICON DISTRICT MUNICIPALITIES OF LIMPOPO PROVINCE | Archaeological Specialist Reports | Nsovo Environmental Consulting | Vhubvo Archaeo-Heritage Consultants | 17/09/2018 - 13:40 | |||
PHASE 1 ARCHAELOGICAL AND CULTURAL HERITAGE ASSESSMENT FOR HYDRA-KRONOS POWERLINE | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF ARIES – KRONOS – HYDRA 400 kV POWER LINE AND ASSOCIATED INFRASTRUCTURE WITHIN PIXLEY KA SEME DISTRICT MUNICIPALITY OF NORTHERN CAPE PROVINCE. | AIA Phase 1 | 12/06/2023 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultance Cc | DIGES Group | 03/10/2023 - 19:24 | |
PHASE I AHIA FOR THE HYPERAMA PIPELINE | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF HYPERAMA PIPELINE LOCATED ON REIGER PARK WITHIN CITY OF EKURHULENI MUNICIPALITY IN GAUTENG PROVINCE SOUTH AFRICA. | AIA Phase 1 | 22/03/2019 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | DIGES Group | 11/04/2019 - 18:36 | |
ISolendalo Environmental Consulting | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF IFIDI VEHICULAR BRIDGE LOCATED IN THE AREA OF BERGVILLE WITHIN THE JURISDICTION OF OKHAHLAMBA LOCAL MUNICIPALITY, UTHUKELA DISTRICT. KWAZULU NATAL PROVINCE. | AIA Phase 1 | 20/05/2015 | Munyadziwa Magoma | KwaZulu-Natal Amafa and Research Institute | Vhubvo Archaeo-Heritage Consultants | 20/05/2015 - 13:38 | |
IFIDI Bridge HIA for ISolendalo Environmental Consulting | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF IFIDI VEHICULAR BRIDGE LOCATED IN THE AREA OF BERGVILLE WITHIN THE JURISDICTION OF OKHAHLAMBA LOCAL MUNICIPALITY, UTHUKELA DISTRICT. KWAZULU NATAL PROVINCE. | AIA Phase 1 | 20/05/2015 | Munyadziwa Magoma | KwaZulu-Natal Amafa and Research Institute | Vhubvo Archaeo-Heritage Consultants | 20/05/2015 - 13:38 | |
ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT FOR LETHABO 132KV POWERLINE | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF THE ±4,5 KM 132KV LETHABO POWERLINE WITHIN METSIMAHOLO LOCAL MUNICIPALITY OF FEZILE DABI DISTRICT MUNICIPALITY, FREE STATE PROVINCE | AIA Phase 1 | 30/03/2023 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultance Cc | Dynamic Integrated Geo-Environmental Services cc | 18/07/2023 - 10:46 | |
KHOMFINI VEHICULAR BRIDGE | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF TUGELA (KHOMFINI) RIVER VEHICULAR BRIDGE LOCATED IN THE AREA OF MSINGA WHICH IS WITHIN THE JURISDICTION OF MSINGA LOCAL MUNICIPALITY, UMZINYATHI DISTRICT. KWAZULU NATAL PROVINCE. | AIA Phase 1 | 29/10/2015 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | Isolendalo Environmental Consulting | 02/11/2015 - 11:06 | |
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF VRYHEID NETWORK STRENGTHENING PROJECT WITHIN SWELLENDAM LOCAL MUNICIPALITY | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF VRYHEID NETWORK STRENGTHENING PROJECT WITHIN SWELLENDAM LOCAL MUNICIPALITY | AIA Phase 1 | 01/12/2016 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | Nsovo Environmental Consulting | 01/11/2016 - 10:25 | |
Belle Ombre Phase 2 - Car Parking and Associated Infrastructure | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED DESIGN REVIEW, SERVICES RELOCATION AND CONSTRUCTION MONITORING OF BELLE OMBRE-PHASE 2 (OVERFLOW CAR PARK, ELECTRICAL FENCING ETC) WITHIN THE CITY OF TSWANE METROPOLITAN MUNICIPALITY IN GAUTENG PROVINCE. | HIA Phase 1 | 25/11/2022 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultance Cc | Vhubvo Archaeo-Heritage Consultance Cc | 16/11/2022 - 13:51 | |
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED DEVELOPMENT OF ESKOM INYANINGA 2 x 500 MVA 400/132 kV SUBSTATION, AND INYANINGA – MBEWU 400KV POWERLINE AND ASSOCIATED INFRASTRUCTURE WITHIN THE JURISDICTION OF ETHEKWINI METROPOLITAN, ILEMBE AND UTHUNGULU DISTRICT MUNICIPALITIES OF ETHEKWINI METROPOLITAN OF KWAZULU NATAL PROVINCE | AIA Phase 1 | 04/04/2018 | Munyadziwa Magoma | Nsovo Environmental Consulting | Nsovo Environmental Consulting | 03/08/2018 - 12:24 | |
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED DEVELOPMENT OF ESKOM INYANINGA 2 x 500 MVA 400/132 kV SUBSTATION, AND INYANINGA – MBEWU 400KV POWERLINE AND ASSOCIATED INFRASTRUCTURE WITHIN THE JURISDICTION OF ETHEKWINI METROPOLITAN, ILEMBE AND UTHUNGULU DISTRICT MUNICIPALITIES OF ETHEKWINI METROPOLITAN OF KWAZULU NATAL PROVINCE | AIA Phase 1 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | Nsovo Environmental Consulting | 03/08/2018 - 12:33 | ||
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT REPORT | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED DEVELOPMENT OF ESKOM INYANINGA 2 x 500 MVA 400/132 kV SUBSTATION, AND INYANINGA – MBEWU 400KV POWERLINE AND ASSOCIATED INFRASTRUCTURE WITHIN THE JURISDICTION OF ETHEKWINI METROPOLITAN, ILEMBE AND UTHUNGULU DISTRICT MUNICIPALITIES OF ETHEKWINI METROPOLITAN OF KWAZULU NATAL PROVINCE | AIA Phase 1 | Vhubvo Archaeo-Heritage Consultants | Nsovo Environmental Consulting | 03/08/2018 - 15:55 | |||
ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED DEVELOPMENT OF EXXARO DORSTFONTEIN WEST DISCARD DUMP FACILITY AND TRANSPORTATION OF COAL FROM DCM WEST TO DCM EAST WITHIN EMALAHLENI LOCAL MUNICIPALITY OF NKANGALA DISTRICT IN MPUMALANGA PROVINCE. | AIA Phase 1 | 10/03/2020 | Munyadziwa Magoma | Nsovo Environmental Consulting | 09/09/2020 - 13:03 | ||
Phase I AHIA for Vryburg Agrihub | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED DEVELOPMENT OF VRYBURG AGRI HUB IN NALEDI LOCAL MUNICIPALITY OF DR RUTH SEGOMOTSE MOMPATI DISTRICT WITHIN NORTH WEST PROVINCE | AIA Phase 1 | 01/08/2018 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | DIGES Group CC | 19/11/2019 - 10:43 | |
Mathulini AIA | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED MATHULINI HOUSING DEVELOPMENT PROJECT AT MATHULINI VILLAGE IN UMSHWATHI LOCAL MUNICIPALITY OF UMGUNGUNDLOVU DISTRICT WITHIN KWAZULU NATAL PROVINCE | AIA Phase 1 | 11/01/2019 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | Vhubvo Archaeo-Heritage Consultants | 10/04/2019 - 08:31 | |
Mukope HIA | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED MINING OF LIMESTONE AT GRIQUA TOWN WITHIN SIYANCUMA LOCAL MUNICIPALITY OF PIXLEY KA SEME DISTRICT IN THE NORTHERN CAPE PROVINCE. | Heritage Impact Assessment Specialist Reports | 21/09/2017 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | 21/04/2019 - 07:46 | ||
HIA for Matai Mining Right Application | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED MINING RIGHT APPLICATION FOR VANADIUM, TITUNIUM AND IRON ORE ON PORTION (S) OF THE FARM (S) WILDEBEESTKUIL 7 JQ, AND PORTION OF FARM MAGAZYNSKRAAL 3 JQ, HAAKDOORN 6 JQ, SYFERKUIL 9 JQ AND MIDDELKUIL 8 JQ WITHIN MOSES KOTANE LOCAL MUNICIPALITY OF BOJANALA DISTRICT MUNICIPALITY IN THE NORTH WEST PROVINCE | HIA Phase 1 | 17/04/2019 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | Vhubvo Archaeo-Heritage Consultants | 17/10/2018 - 16:07 | |
Proposed University of Venda upgrade of a 1.6km access gravel road and a new bridge within Thulamela Local Municipality | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED UNIVERSITY OF VENDA ACCESS ROAD AND A BRIDGE IN THULAMELA LOCAL MUNICIPALITY OF VHEMBE DISTRICT MUNICIPALITY IN THE LIMPOPO PROVINCE | AIA Phase 1 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultance Cc | 04/09/2023 - 07:25 | |||
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE FOR TSHILAMBA 132KV POWERLINE | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF 132 KV LOOP IN LOOP OUT POWERLINE FROM MAKONDE T-OFF POINT TO THE PROPOSED MUTSHIKILI SUBSTATION AT THENGWE WITHIN THULAMELA LOCAL MUNICIPALITY, VHEMBE DISTRICT MUNICIPALITY | AIA Phase 1 | 07/07/2023 | Munyadziwa Magoma, Marion Bamford | Vhubvo Archaeo-Heritage Consultants , Prof Marion Bamford | DIGES Group | 14/09/2023 - 10:02 | |
PHASE 1 ARCHAEOLOGICAL AND CULTURAL REPORT FOR LIMPOPO EAST CORRIDOR STRENGTHENING | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF 400KV POWERLINE FROM FOSKOR SUBSTATION TO SPENCER SUBSTATION WITHIN THE JURISDICTION OF THE LOCAL MUNICIPALITIES OF GREATER LETABA, MARULENG, GREATER TZANEEN AND BA-PHALABORWA OF MOPANI DISTRICT MUNICIPALITY IN LIMPOPO PROVINCE. | AIA Phase 1 | 13/02/2018 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | DIGES Group | 13/03/2018 - 19:40 | |
ARCHAEOLOGICAL AND CULTURAL ASSESSMENT FOR LEC | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF 400KV POWERLINE FROM FOSKOR SUBSTATION TO SPENCER SUBSTATION WITHIN THE JURISDICTION OF THE LOCAL MUNICIPALITIES OF GREATER LETABA, MARULENG, GREATER TZANEEN AND BA-PHALABORWA OF MOPANI DISTRICT MUNICIPALITY IN LIMPOPO PROVINCE. | AIA Phase 1 | 12/02/2018 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | DIGES Group | 14/03/2018 - 09:20 | |
invest in Property Heritage Impact Assessment Phase I | PHASE I ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED MINING RIGHT ON THE FARM VILJOENSHOF 1655 IN BOSHOF WITHIN THE JURISDICTION OF TOKOLOGO LOCAL MUNICIPALITY OF LEJWELEPUTSWA DISTRICT MUNICIPALITY, FREE STATE PROVINCE | HIA Phase 1 | 10/11/2022 | Alvord Nhundu | Biomental Services (Pty) Ltd | 12/04/2023 - 20:54 | ||
HIA-Invest in Property126 (Pty) Ltd | PHASE I ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED MINING RIGHT ON THE FARM VILJOENSHOF 1655 IN BOSHOF WITHIN THE JURISDICTION OF TOKOLOGO LOCAL MUNICIPALITY OF LEJWELEPUTSWA DISTRICT MUNICIPALITY, FREE STATE PROVINCE | HIA Phase 1 | 10/11/2022 | Alvord Nhundu | Biomental Services (Pty) Ltd | Biomental Services (Pty) Ltd | 20/09/2023 - 20:44 | |
HIA | PHASE I ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED PROSPECTING RIGHT AND BULK SAMPLING ACTIVITIES INCLUDINGTRENCHING ON THE REMAINDER OF THE FARM ST CLAIR NO: 148 DOUGLAS IN THE NORTHERN CAPE PROVINCE | AIA Phase 1 | 11/10/2018 | Trust Mlilo | SAHRA Council | Phuka Tsa Nong (Pty) Ltd | 26/11/2018 - 17:32 | |
Phuka Tsa Nong (Pty) Ltd | PHASE I ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED MINING RIGHT APPLICATION ALLUVIAL DIAMOND IN RESPECT OF PORTION 1 AND 8 OF THE FARM AVOCA 85 NEAR DOUGLAS IN THE NORTHERN CAPE PROVINCE | AIA Phase 1 | 20/11/2018 | Trust Mlilo | Phuka Tsa Nong (Pty) Ltd | 19/12/2018 - 17:38 | ||
Phase 1 AIA - Madibong | PHASE I ARCHAEOLOGICAL IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED ELECTRIFICATION OF 45 HOSEHOLDS IN MADIBONG, LONGANENG WITHIN THE JURISDICTION OF RATLOU LOCAL MUNICIPALITY OF NGAKA MODIRI MOLEMOLE DISTRICT IN NORTH WEST PROVINCE | AIA Phase 1 | 01/07/2022 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultance Cc | 26/07/2022 - 09:41 | ||
AIA_Ptn_4_Jacobz-Berg_150_Van_Ryneveld_K_Jan08 | Phase I Archaeological Impact Assessment: The De Witteberg Mountain Resort Development, Portion 4 of the Farm Jacobz-Berg 150, Rosendal, Ficksburg District, Free State, South Africa | AIA Phase 1 | 11/01/2008 | Karen Van Ryneveld | MAPID_02043 | 16/06/2012 - 14:49 | ||
Survey of Mandela Museum at Mvezo in the EC | Phase I Archaeological Survey Report and Assessment of the Area Designated as the Mandela Museum at Mvezo in the Eastern Cape, South Africa (Site 3128DC1) | Heritage Study | 01/07/2000 | MH Alex Schoeman | 05/03/2021 - 11:17 | |||
Boshoek Smelter | Phase I Base Line Heritage study for the proposed Glencore Merafe Venture Operation - Boshoek Operations near Boshoek in the North-West Province of South Africa | HIA Phase 1 | 06/05/2014 | Julius CC Pistorius | JMA Consulting (Pty) Ltd | 06/05/2014 - 15:34 | ||
PHASE I HIA FOR DUTCH AND BHEKABEZAYO RURAL HOUSING, KWAZULU-NATAL | PHASE I CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED DUTCH AND BHEKABEZAYO RURAL HOUSING, KWAZULU-NATAL | HIA Phase 1 | 29/01/2018 | Mamoluoane Seliane | MABALENGWE ENGINEERS | MABALENGWE ENGINEERS | 28/05/2018 - 10:27 | |
Phase I Cultural Heritage Impact Assessment for the Proposed Upgrading of Road 231 Richards Bay, Kwazulu-Natal | Phase I Cultural Heritage Impact Assessment for the Proposed Upgrading of Road 231 Richards Bay, Kwazulu-Natal | Heritage Impact Assessment Specialist Reports | 06/04/2016 | Mamoluoane Seliane | HENWOOD & NXUMALO CONSULTING ENGINEERS CC | 10/08/2016 - 12:13 | ||
AIA_Ulco_Solar_2575_Seliane_M_Nov11 | PHASE I CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED FARM 217 SOLAR ENERGY PLANT, NEAR ULCO, NORTHERN CAPE PROVINCE | AIA Phase 1 | 03/11/2011 | Mamoluoane Seliane | 16/06/2012 - 14:51 |