THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 1601 - 1650 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
HIA - Eskom Delareyville | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR ESKOM’S PROPOSED CONSTRUCTION OF 132KV POWER LINES BETWEEN THE DELAREYVILLE SUBSTATION AND THE PROPOSED NEW KOPELA AND PHAHAMENG SUBSTATIONS IN THE NORTH WEST PROVINCE | Heritage Impact Assessment Specialist Reports | 01/07/2014 | Julius CC Pistorius | SRK Consulting (Pty) Ltd - Pretoria | 28/07/2014 - 12:16 | ||
HIA - Eskom Delareyville | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR ESKOM’S PROPOSED CONSTRUCTION OF 132KV POWER LINES BETWEEN THE DELAREYVILLE SUBSTATION AND THE PROPOSED NEW KOPELA AND PHAHAMENG SUBSTATIONS IN THE NORTH WEST PROVINCE | Heritage Statement | 01/07/2014 | Julius CC Pistorius | SRK Consulting (Pty) Ltd - Pretoria | 28/07/2014 - 12:30 | ||
AKANANI POWER LINE | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR ESKOM’S PROPOSED CONSTRUCTION OF 2X132kV POWER LINES FROM BORUTHO MAIN TRANSMISSION SUBSTATION TO THE PROPOSED AKANANI SUBSTATION IN THE LIMPOPO PROVINCE | HIA Phase 1 | 18/11/2015 | Julius Pistorius | DIGES Group | 17/01/2017 - 12:44 | ||
Establishment of 30km 66kV power line between Chloe and Gilead | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR ESKOM’S PROPOSED NEW 66kV POWER LINES RUNNING BETWEEN THE POLOKWANE AND CHLOE SUBSTATIONS AND BETWEEN THE CHLOE AND GILEAD SUBSTATIONS AS WELL AS A T-OFF TO THE MOLETSI SUBSTATION IN THE LIMPOPO PROVINCE OF SOUTH AFRICA | HIA Phase 1 | 26/04/2013 | Julius CC Pistorius | 26/04/2013 - 11:45 | |||
VICTOR SWITCHING STATION AND 132kV POWER LINE | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR ESKOM’S PROPOSED NEW VICTOR SWITCHING STATION AND 132kV POWER LINE IN THE GREATER TUBATSE LOCAL MUNICIPALITY IN THE STEELPOORT VALLEY IN THE LIMPOPO PROVINCE | Archaeological Specialist Reports | 12/07/2013 | Julius CC Pistorius | Nzumbululo Heritage Solutions | Nzumbululo Heritage Solutions | 12/07/2013 - 15:43 | |
VICTOR SWITCHING STATION AND 132kV POWER LINE | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR ESKOM’S PROPOSED NEW VICTOR SWITCHING STATION AND 132kV POWER LINE IN THE GREATER TUBATSE LOCAL MUNICIPALITY IN THE STEELPOORT VALLEY IN THE LIMPOPO PROVINCE | HIA Phase 1 | 16/07/2013 | Julius CC Pistorius | Nzumbululo Heritage Solutions | Nzumbululo Heritage Solutions | 16/07/2013 - 11:14 | |
Nkwe_HIA Phase 1 | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR ESKOM’S PROPOSED NKWE PROJECT IN THE STEELPOORT VALLEY IN THE LIMPOPO PROVINCE | HIA Phase 1 | 01/06/2015 | Julius CC Pistorius | 29/04/2016 - 09:50 | |||
HIA_132kv from Mamatshekele and Uitkyk to Naledi | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR ESKOM’S PROPOSED UITKYK SUBSTATION AND FOR THE PROPOSED 132kV POWER LINES BETWEEN THE MAMATSHEKELE AND PROPOSED UITKYK SUBSTATIONS AND BETWEEN THE PROPOSED UITKYK SUBSTATION AND THE NALEDI SUBSTATION IN THE LIMPOPO PROVINCE OF SOUTH AFRICA | HIA Phase 1 | 01/11/2012 | Julius CC Pistorius | Eskom - NOU | 12/02/2013 - 09:19 | ||
AIA_Impala_tailings_and_pit_AIA_Pistorius_JCC_Apr11 | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR IMPALA PLATINUM LIMITED'S (IMPALA) PROPOSED NEW TAILINGS FACILITY AND OPEN Cape Archaeological Survey CCT MINING AREAS IN THE RUSTENBURG (BAFOKENG) DISTRICT OF THE NORTH-WEST PROVINCE | AIA Phase 1 | 30/04/2011 | Julius CC Pistorius | 16/06/2012 - 14:46 | |||
Shaft 16 Waste Rock Dump Expansion Project | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR IMPALA PLATINUM LIMITED’S (IMPALA) PROPOSED OPEN CAST PIT8C AND THE EXPANSION OF THE SHAFT 16 WASTE ROCK DUMP IN THE NORTH-WEST PROVINCE | HIA Phase 1 | 01/07/2012 | Julius CC Pistorius | Impala Platinum Limited | 25/03/2013 - 09:53 | ||
A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR MARULA PLATINUM’S PROPOSED NEW MINE INFRASTRUCTURE IN THE STEELPOORT VALLLEY LIMPOPO PROVINCE | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR MARULA PLATINUM’S PROPOSED NEW MINE INFRASTRUCTURE IN THE STEELPOORT VALLLEY LIMPOPO PROVINCE | Heritage Impact Assessment Specialist Reports | Dr Julius CC Pistorius | 26/04/2022 - 09:48 | ||||
HIA_Schietfontein_437JQ_Eland_Platinum_Mines_Pistorius_JCC_Mar10 | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR PORTIONS 13 AND 14 OF THE FARM SCHIETFONTEIN 437JQ FOR ELAND PLATINUM MINES (PTY) LTD (ELAND MINES) NEAR MADIBENG IN THE NORTH-WEST PROVINCE | HIA Phase 1 | 01/03/2010 | Julius CC Pistorius | 16/06/2012 - 14:52 | |||
HIA_Sasol Borrow Pits | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR SASOL MINING’S PROPOSED BORROW PITS ON THE EASTERN HIGHVELD IN THE MPUMALANGA PROVINCE | HIA Phase 1 | 01/02/2013 | Julius CC Pistorius | JMA Consulting (Pty) Ltd | 14/03/2013 - 08:25 | ||
HIA_Sasol Shondoni Project | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR SASOL MINING’S PROPOSED SHONDONI PROJECT AND FOR BLOCK 8 ON THE EASTERN HIGHVELD IN THE MPUMALANGA PROVINCE OF SOUTH AFRICA | HIA Phase 1 | 01/08/2010 | Julius CC Pistorius | JMA Consulting (Pty) Ltd | 11/02/2013 - 10:48 | ||
HIA for the Proposed Extension of the Klipfontein Section of Middelburg Mine | A Phase I Heritage Impact Assessment (HIA) Study for South32 SA Coal Holdings (Pty) Limited’s (South32 CSA) Proposed Extension of Opencast Operations and Associated Closure of a Section of the D253 Provincial Road at The Klipfontein Section of the Middelburg Mine on the Eastern Highveld in the Mpumalanga Province | HIA Phase 1 | 27/02/2015 | Julius CC Pistorius | Dr Julius CC Pistorious Archaeologist and heritage Consultant | Jones & Wagener Engineering and Environmental Consultants | 03/03/2016 - 10:12 | |
PHASE I (HIA) PROPOSED CONSTRUCTION OF DEWATERING INFRASTRUCTURE AND A DECANT WATER PIPELINE | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR TAUNG GOLD (SECUNDA) (PROPRIETARY) LIMITED (TAUNG GOLD’S) PROPOSED CONSTRUCTION OF DEWATERING INFRASTRUCTURE AND A DECANT WATER PIPELINE NEAR SECUNDA ON THE EASTERN HIGHVELD IN THE MPUMALANGA PROVINCE | HIA Phase 1 | 30/04/2014 | Julius CC Pistorius | 03/09/2014 - 12:52 | |||
A PHASE I HERITAGE IMPACT ASSESSMENT | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED LANDAU COLLIERY NAVIGATION SECTION UMLALAZI SOUTH BLOCK EXTENSION PROJECT NEAR EMAHLALENI (WITBANK) ON THE EASTERN HIGHVELD IN THE MPUMALANGA PROVINCE | HIA Phase 1 | 15/05/2015 | 08/06/2015 - 14:27 | ||||
Pase 1 HIA study for proposed Mafube Road Realignment | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED MAFUBE LIFE X ROAD REALIGNMENT PROJECT NEAR BELFAST IN THE MPUMALANGA PROVINCE | Heritage Study | 13/11/2017 | Dr Julius CC Pistorious Archaeologist and heritage Consultant | Golder Associates Africa (Pty) Ltd | 19/03/2018 - 10:08 | ||
AIA_Grootboom_335_KT_Pistorius_JCC_Mar06 | A Phase I Heritage Impact Assessment (HIA) Study For the Annex Conservation Open Cape Archaeological Survey CCt Mine on the Farm Annex Grootboom 335 KT in the Mpumalanga Province of South Africa | AIA Phase 1 | 01/03/2006 | Julius CC Pistorius | MAPID_01149 | 16/06/2012 - 14:45 | ||
EVRAZ Vametco | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE EVRAZ VAMETCO OPERATION NEAR MMAKAU AND MADIBENG IN THE BANKEVELD IN THE NORTH-WEST PROVINCE. & Palaeontological Scoping Report – Proposed EVRAZ Vametco Operation - May 2014 | HIA Phase 1 | 20/08/2012 | Julius CC Pistorius | 08/07/2014 - 16:28 | |||
9-2-236-0002-20060301-ACHMC | A Phase I Heritage Impact Assessment (HIA) Study For the Lannex North Open Cape Archaeological Survey CCt Mine on the Farm Grootboom 336 KT in the Mpumalanga Province of South Africa | AIA Phase 1 | 01/03/2006 | Julius CC Pistorius | MAPID_01151 | 16/06/2012 - 14:39 | ||
Heritage Impact Assessment- Akanani Mining | A Phase I Heritage Impact Assessment (HIA) Study for the proposed Akanani Mining (Pty) Ltd project near Mokopane in the Limpopo Province | HIA Phase 1 | 01/03/2020 | Dr Julius CC Pistorius | 11/05/2021 - 15:40 | |||
Middelburg R575 Re-alignment | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED DEVIATION OF ROAD 575 (P127-2) NEAR MIDDELBURG) ON THE EASTERN HIGHVELD IN THE MPUMALANGA PROVINCE | Heritage Impact Assessment Specialist Reports | 13/09/2013 | Julius CC Pistorius | 28/11/2013 - 09:37 | |||
Proposed KiPower 400kV loop-in and loop-out transmission lines to connect the KiPower IPP to the national grid | A phase I Heritage Impact Assessment (HIA) study for the proposed KiPower 400kV loop-in and loop-out transmission lines to connect the KiPower IPP to the national grid on the eastern Highveld in the Mpumalanga province | HIA Phase 1 | 12/05/2016 | Julius CC Pistorius | Dr Julius CC Pistorious Archaeologist and heritage Consultant | Jones & Wagener Engineering and Environmental Consultants | 19/05/2016 - 15:03 | |
Phase 1 Heritage study | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED LAKE UMUZI SOUTH BANK EXTENSION IN SECUNDA IN THE MPUMALANGA PROVINCE | HIA Phase 1 | 12/05/2015 | Julius CC Pistorius | Dr Julius CC Pistorious Archaeologist and heritage Consultant | 19/05/2015 - 10:20 | ||
Landau Colliery Lifex HIA - 2013 (applicable to Blaauwkrans Co-disposal's existing location) | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED LANDAU COLLIERY LIFE EXTENSION PROJECT NEAR EMAHLALENI (WITBANK) ON THE EASTERN HIGHVELD IN THE MPUMALANGA PROVINCE | AIA Phase 1 | 01/05/2014 | Julius CC Pistorius | Dr Julius CC Pistorious Archaeologist and heritage Consultant | Clean Stream Environmental Services | 09/05/2017 - 09:47 | |
HIA_Lusthof Colliery | A Phase I Heritage Impact Assessment (HIA) study for the proposed Lusthof Colliery near Carolina on the Eastern Highveld in the Mpumalanga Province of South Africa | HIA Phase 1 | 18/04/2013 | Julius CC Pistorius | JMA Consulting (Pty) Ltd | 18/04/2013 - 09:33 | ||
HIA Mafikeng Cement | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED MAFIKENG CEMENT PROJECT NEAR ITSOSENG IN THE NORTH-WEST PROVINCE OF SOUTH AFRICA | HIA Phase 1 | 01/06/2011 | Julius CC Pistorius | Myezo Environmental Management Services | 14/02/2013 - 14:20 | ||
AIA_Mafikeng_Cement_Pistorius_JCC_Apr11 | A Phase I Heritage Impact Assessment (HIA) Study For The Proposed Mafikeng Cement Project Near Itsotseng In The North-West Province Of South Africa | AIA Phase 1 | 01/04/2011 | Julius CC Pistorius | 16/06/2012 - 14:47 | |||
A Phase I Heritage Impact Assessment (HIA) Study for the proposed new equestrian development on part of the farm De Rust 478JQ near the Hartebeespoort Dam in the Central Bankeveld of the North West Province. | A Phase I Heritage Impact Assessment (HIA) Study for the proposed new equestrian development on part of the farm De Rust 478JQ near the Hartebeespoort Dam in the Central Bankeveld of the North West Province. | HIA Phase 1 | 12/01/2005 | Julius CC Pistorius | 16/06/2012 - 08:54 | |||
9-2-269-0001-20070701-ACHMC | A Phase I Heritage Impact Assessment (HIA) Study for the Proposed New Nesengani Substation on the Farm Weltevreden 23 in the Limpopo Province of South Africa | AIA Phase 1 | 01/07/2007 | Julius CC Pistorius | MAPID_01078 | 16/06/2012 - 14:40 | ||
Delmas Super Centre | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED SUPER CENTRE COMPLEX ON THE FARM LEEUWPOORT 205IR IN THE DELMAS INDUSTRIAL TOWNSHIP ON THE EASTERN HIGHVELD IN THE MPUMALANGA PROVINCE OF SOUTH AFRICA | AIA Phase 1 | 01/04/2012 | Julius CC Pistorius | Michael M Payne and Associates and Architects | 04/10/2012 - 09:31 | ||
HIA Study for VDDC mining and infrastructure development | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED VANDYKSDRIFT CENTRAL (VDDC) MINING AND INFRASTRUCTURAL DEVELOPMENT IN THE MPUMALANGA PROVINCE | HIA Phase 1 | 31/07/2019 | Julius Pistorius | South32 SA Coal Holdings (Pty) Limited | 29/11/2019 - 07:45 | ||
Phase I HIA study for the proposed VDDC mining infrastructure development | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED VANDYKSDRIFT CENTRAL (VDDC) MINING INFRASTRUCTURAL DEVELOPMENT IN THE MPUMALANGA PROVINCE | HIA Phase 1 | 11/08/2018 | Julius CC Pistorius | 26/02/2019 - 14:41 | |||
Wonderfontein Colliery | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED WONDERFONTEIN COLLIERY NEAR BELFAST IN THE MPUMALANGA PROVINCE OF SOUTH AFRICA | HIA Phase 1 | 01/08/2008 | Julius CC Pistorius | Zyntha Consulting (Pty) Ltd | 04/02/2013 - 16:02 | ||
HIA_SASOL SHONDONI CONVEYER AMENDMENT PROJECT | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE SASOL SHONDONI CONVEYER AMENDMENT PROJECT ON THE EASTERN HIGHVELD IN THE MPUMALANGA PROVINCE | HIA Phase 1 | 01/11/2011 | Julius CC Pistorius | Sasol (Pty) Ltd | 06/02/2013 - 12:40 | ||
9-2-214-0007-20070501-ACHMC | A Phase I Heritage Impact Assessment (HIA) Study for the Upgrading of Eskom's Nooitgedacht Substation on the Farm Wintershoek 451 near Carolina in the Mpumalanga Province of South Africa | AIA Phase 1 | 01/05/2007 | Julius CC Pistorius | MAPID_01146 | 16/06/2012 - 14:38 | ||
Tubatse HH Facility Hertiage Report | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR TUBATSE CHROME (PTY) LTD: EXPANSION OF A SLAG DUMP AND THE DEVELOPMENT OF A NEW HAZARDOUS WASTE SITE IN THE STEELPOORT VALLEY IN THE LIMPOPO PROVINCE OF SOUTH AFRICA | HIA Phase 1 | 01/07/2012 | Julius CC Pistorius | Dr Julius CC Pistorious Archaeologist and heritage Consultant | Golder Associates Africa (Pty) Ltd | 11/01/2019 - 11:44 | |
A Phase I heritage Impact Assessment (HIA) Study for X Strata Alloy's Kroondal Mine on the farm Kroondal 304JQ near Rustenburg in the Central Bankeveld of the North-West Province | A Phase I heritage Impact Assessment (HIA) Study for X Strata Alloy's Kroondal Mine on the farm Kroondal 304JQ near Rustenburg in the Central Bankeveld of the North-West Province | HIA Phase 1 | 08/01/2010 | Julius CC Pistorius | 16/06/2012 - 08:54 | |||
HIA: West Ridge Shopping Mall, Matlosana | A Phase I heritage Impact Assessment - proposed development of the West Ridge Shopping Mall, Klerksdorp, Matlosana Municipality, North West Province | HIA Phase 1 | 03/01/2008 | Polke Birkholtz | Archaeology Africa CC | 16/06/2012 - 08:54 | ||
A Phase I Heritage Impact Assessment - proposed Rand Water Pipeline between South Reservoir and Chashan Reservoir, Rustenburg, North West Province | A Phase I Heritage Impact Assessment - proposed Rand Water Pipeline between South Reservoir and Chashan Reservoir, Rustenburg, North West Province | HIA Phase 1 | 11/01/2010 | Polke Birkholtz | PGS Heritage and Grave Relocation Consultants | 16/06/2012 - 08:54 | ||
Phase 1 Heritage study | A PHASE I HERITAGE IMPACT ASSESSMENT FOR A PROPOSED NEW RAILWAY LINE FOR THARISA PLATINUM MINE NEAR MARIKANA IN THE NORTH-WEST PROVINCE | HIA Phase 1 | 30/06/2015 | Julius CC Pistorius | Dr Julius CC Pistorious Archaeologist and heritage Consultant | 17/08/2015 - 09:41 | ||
A Phase I Heritage Impact Assessment for Eskom's proposed construction of the Ngwedi Network Development Plan consisting of sevn 132kv power lines from the Ngwedi MTS to various substations in the Sun City area in the North-West Province | A Phase I Heritage Impact Assessment for Eskom's proposed construction of the Ngwedi Network Development Plan consisting of sevn 132kv power lines from the Ngwedi MTS to various substations in the Sun City area in the North-West Province | HIA Phase 1 | 05/01/2011 | Julius CC Pistorius | 16/06/2012 - 08:54 | |||
HIA Inkosi Platinum | A PHASE I HERITAGE IMPACT ASSESSMENT FOR FLEASE’S PROPOSED PROSPECTING AREAS ON THE FARM HARTBEESPOORT B 410JQ TO THE WEST OF MADIBENG IN THE NORTH-WEST PROVINCE | HIA Phase 1 | 01/06/2012 | Julius CC Pistorius | SLR Consulting (Africa) | 11/07/2012 - 16:21 | ||
HIA for Impala 18 Shaft Complex | A PHASE I HERITAGE IMPACT ASSESSMENT FOR IMPALA PLATINUM LIMITED (IMPLATS) PROPOSED NEW SHAFT 18 COMPLEX IN THE RUSTENBURG (BAFOKENG) DISTRICT IN THE NORTH-WEST PROVINCE ( WITH AMENDMENTS TO THE SHAFT 18 COMPLEX IN ORDER TO AVOID SITES LIA03 AND SITE LIA04) | AIA Phase 1 | 01/05/2013 | Julius CC Pistorius | Dr Julius CC Pistorious Archaeologist and heritage Consultant | Dr Julius CC Pistorious Archaeologist and heritage Consultant | 01/06/2016 - 08:58 | |
Heritage Impact Assessment for the Proposed Commissiekraal Coal Mine | A PHASE I HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED COMMISSIEKRAAL COAL MINE ON THE FARM COMMISSIEKRAAL 90HT TO THE EAST OF WAKKERSTROOM IN THE KWA ZULU/NATAL PROVINCE OF SOUTH AFRICA | HIA Phase 1 | 03/10/2015 | 30/10/2015 - 11:38 | ||||
Heritage Impact Assessment for the Proposed Commissiekraal Coal Mine | A PHASE I HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED COMMISSIEKRAAL COAL MINE ON THE FARM COMMISSIEKRAAL 90HT TO THE EAST OF WAKKERSTROOM IN THE KWA ZULU/NATAL PROVINCE OF SOUTH AFRICA | HIA Phase 1 | 03/10/2015 | 30/10/2015 - 11:39 | ||||
HIA Magazynskraal | A PHASE I HERITAGE IMPACT ASSESSMENT FOR THE FARM MAGAZYNSKRAAL 3JQ NEAR THE PILANESBERG IN THE NORTH-WEST PROVINCE OF SOUTH AFRICA | HIA Phase 1 | 01/08/2010 | Julius CC Pistorius | SLR Consulting (Africa) | 29/10/2012 - 11:57 | ||
Phase I HIA Mapoch | A Phase I Heritage Impact Assessment for the Proposed Dream Resources Prospecting Right Application and Environmental Authorisation on Various Portions of the Farm Mapochsgronde in Elias Motsoaledi Local Municipality within Sekhukhune District Municipality, Limpopo Province, South Africa | HIA Phase 1 | 21/09/2021 | Nkosinathi Godfrey Tomose | IRL South Africa | 27/09/2021 - 12:00 | ||
Eskom Boynton Project | A PHASE I HERITAGE IMPACT ASSESSMENT STUDY FOR ESKOM’S PROPOSED NEW 132KV POWER LINE BETWEEN THE LEBOWA SUBSTATION AND THE PROPOSED NEW DWAALKOP SUBSTATION IN LEBOWAKGOMO AND CHUNIESPOORT IN THE LIMPOPO PROVINCE | AIA Phase 1 | 01/04/2012 | Julius CC Pistorius | Texture Environmental Consultants | 23/01/2013 - 12:15 |