THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 16301 - 16350 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
PROPOSED CONSTRUCTION OF A FLUORIDE REMOVAL PLANT AT LAASTEHOOP | PROPOSED CONSTRUCTION OF A FLUORIDE REMOVAL PLANT AT LAASTEHOOP REGIONAL WATER SCHEME: Ga-Maboi Village, POLOKWANE LOCAL MUNICIPALITY, CAPRICORN DISTRICT | Heritage Statement | 03/11/2015 | Frans Roodt | Phaki Phakanani | 04/11/2015 - 09:29 | ||
AIA_Lusikisiki_SAPS_Fourie_W_Dec11 | Proposed construction of a new Police Station in Lusikisik, Ingquza Local Municipality, O.R. Tambo District Municipality, Eastern Cape | AIA Phase 1 | 02/12/2011 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | 16/06/2012 - 14:47 | ||
Lusikisiki SAPS | Proposed construction of a new police station in Lusikisiki, Ingquza Local Municipality, O.R. Tambo District Municipality, Eastern Cape | AIA Phase 1 | 02/12/2011 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | Terreco Environmental | 17/07/2012 - 11:11 | |
Heinrich Avenue Stormwater infrastructure | PROPOSED CONSTRUCTION OF A STORMWATER NETWORK, FORMALISATION OF A NATURAL STREAM AND THE RELOCATION OF SERVICES AS NEEDED, IN KARENPARK, TSHWANE | Heritage Study | 28/02/2014 | Johnny Van Schalkwyk | National Cultural History Museum | Interdesign Landscape Architects | 23/04/2014 - 09:45 | |
APPLICATION FOR EXEMPTION FROM A PHASE 1 STUDY TELECOMMUNICATIONS MAST, LETAMO ESTATE | PROPOSED CONSTRUCTION OF A TELECOMMUNICATIONS MAST, LETAMO ESTATE, GAUTENG PROVINCE. APPLICATION FOR EXEMPTION FROM A PHASE 1 STUDY | HIA Letter of Exemption | 13/10/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Lokisa Environmental Consulting CC | 13/10/2015 - 13:55 | |
Proposed construction of access road, dam, shed and dwelling on Farm 560, Plettenberg Bay | Proposed construction of access road, dam, shed and dwelling on Farm 560, Plettenberg Bay, Bitou, Western Cape Province | Heritage Statement | 06/02/2012 | Peter Nilssen | Nilssen Archaeological Resources Management | bluepebble independent environmental agency | CTS_329725 | 09/09/2015 - 12:39 |
HIA Dwarsug 07-01-19 | Proposed Construction of an Access Road for the Dwarsrug Wind Farm, Near Loeriesfontein Phase 1 HIA | Heritage Impact Assessment Specialist Reports | 07/01/2019 | IIan Smeyatsky | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 04/04/2019 - 15:59 | |
MIDRAND LICENSING PROPOSED OFFICE BLOCK | PROPOSED CONSTRUCTION OF AN OFFICE BLOCK ON KAALFONTEIN FARM NO 23IR PORTION 6 IN MIDRAND WITHIN THE CITY OF JOHANNESBURG | HIA Letter of Exemption | 06/05/2022 | Leonie Marais-Botes | Gauteng - Department of Agriculture and Rural Development | GKM Consulting PTY LTD | 06/05/2022 - 13:21 | |
AIA_Balmoral-Florida_Sewerage_Van_Ryneveld_K_Jan11 | Proposed construction of Balmoral-Florida Collector Sewerage System near Uitenhage and Despatch, Eastern Cape, South Africa | AIA Phase 1 | 03/01/2011 | Karen Van Ryneveld | 16/06/2012 - 14:43 | |||
Integrated Heritage Impact Assessment for Construction of combined Dyasonsklip and Sirius Grid Connections | PROPOSED CONSTRUCTION OF COMBINED DYASONSKLIP AND SIRIUS GRID CONNECTIONS ON PORTIONS OF THE FARM DYASON’S KLIP 454/ REMAINDER, FARM 638/ REMAINDER AND AGRICULTURAL HOLDING 1080, SIYANDA DISTRICT, KHAI GARIB LOCAL MUNICIPALITY, NORTHERN CAPE | HIA Phase 2 | 18/09/2015 | Stefan de Kock | Perception Heritage Planning | 21/09/2015 - 20:56 | ||
Cosmo Lanseria HIA | PROPOSED CONSTRUCTION OF COSMO CITY/LANSERIA BULK SUPPLY PIPELINE, JOHANNESBURG, GAUTENG | Heritage Impact Assessment Specialist Reports | 19/12/2013 | Johnny Van Schalkwyk | CTS_158348 | 04/03/2014 - 10:18 | ||
Proposed Ezakheni AutoHub | Proposed Construction of Ezakheni AutoHub on Erf 1923 Ezakheni D Section, Emnambithi-Ladysmith Municipality, UThukela District, KwaZulu-Natal | Heritage Impact Assessment Specialist Reports | 27/05/2015 | Frans Prins | Active Heritage CC | Active Heritage CC | 08/06/2015 - 09:23 | |
PROPOSED CONSTRUCTION OF HUMAN SETTLEMENTS CLUSTER 1, BELLAIR SITES A & B | PROPOSED CONSTRUCTION OF HUMAN SETTLEMENTS CLUSTER 1, BELLAIR SITES A & B WITHIN THE ETHEKWINI MUNICIPALITY, KWAZULU-NATAL. | HIA Phase 1 | 15/09/2016 | Frans Prins | Active Heritage CC | Triplo4 Sustainable Solutions (Pty) Ltd | 17/08/2018 - 05:10 | |
Bellair Cluster 2 | PROPOSED CONSTRUCTION OF HUMAN SETTLEMENTS CLUSTER 2, BELLAIR SITES WITHIN THE ETHEKWINI MUNICIPALITY, KWAZULU-NATAL. | HIA Phase 1 | 17/12/2017 | Frans Prins | Triplo4 Sustainable Solutions (Pty) Ltd | Active Heritage CC | 11/01/2018 - 07:40 | |
Chansbury Layer Poultry Houses | Proposed construction of Layer Poultry Houses, Chansbury Farm, REM of Farm Vaalkranz, No. 140038, Winterton, KwaZulu-Natal | HIA Phase 1 | 13/05/2019 | Jean Beater | JLB Consulting | Sivest - PMB | 19/08/2019 - 09:14 | |
MANGETHE SUBSTATION | PROPOSED CONSTRUCTION OF MANGETHE SUBSTATION IN MANDENI LOCAL MUNICIPALITY ,KZN | Archaeological Specialist Reports | 01/06/2015 | McEdward Murimbika | Nzumbululo Heritage Solutions | Nzumbululo Heritage Solutions | 22/06/2015 - 14:03 | |
Marang B Substation and 400kV Powerline | Proposed construction of Marang B - a new 3 x 500MVA 400/132kV Main Transmission Substation east of Rustenburg, North West Province | PIA Desktop | 15/02/2014 | JF Durand | Skarab CC | Dynamic Integrated Geo-Environmental Services cc | 17/11/2014 - 22:04 | |
AIA_132_kV_Wilge_-_Bravo_Murimbika_M_May08 | Proposed Construction of New 132 kV Powerline from Wilge Substation to Bravo Substation, Telecommunications Tower and Wilge Substation in Emalahleni Local Municipality, Nkangala District, Mpumalanga Province | AIA Phase 1 | 01/05/2008 | McEdward Murimbika | Nzumbululo Heritage Solutions | 16/06/2012 - 14:43 | ||
off take 11D | PROPOSED CONSTRUCTION OF OFF TAKE 11D POTABLE WATER PIPELINE AS PART OF THE LOWER THUKELA BULK WATER SUPPLY AT MGIGIMBI / HANGUZA, ILEMBE DISTRICT MUNICIPALITY, KZN | AIA Phase 1 | 29/10/2014 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Triplo4 Sustainable Solutions (Pty) Ltd | 03/11/2014 - 09:17 | |
offtake 1b | PROPOSED CONSTRUCTION OF OFF TAKE 1B POTABLE WATER PIPELINE AS PART OF THE LOWER THUKELA BULK WATER SUPPLY AT SANS SOUCIS, ILEMBE DISTRICT MUNICIPALITY, KZN | HIA Phase 1 | 22/01/2015 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Triplo4 Sustainable Solutions (Pty) Ltd | 18/03/2015 - 17:01 | |
off take 5b | PROPOSED CONSTRUCTION OF OFF TAKE 5B POTABLE WATER PIPELINE AS PART OF THE LOWER THUKELA BULK WATER SUPPLY AT HYDE PARK, ILEMBE DISTRICT MUNICIPALITY, KZN | AIA Phase 1 | 09/12/2014 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Triplo4 Sustainable Solutions (Pty) Ltd | 07/02/2015 - 11:04 | |
Off take 6 | PROPOSED CONSTRUCTION OF OFF TAKE 6 POTABLE WATER PIPELINE AS PART OF THE LOWER THUKELA BULK WATER SUPPLY AT SHAKAVILLE/MZUMBE TO THE LINDELANI & SIYAPHAMBILI RESERVOIRS, ILEMBE DISTRICT MUNICIPALITY, KZ | AIA Phase 1 | 30/10/2014 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Triplo4 Sustainable Solutions (Pty) Ltd | 30/10/2014 - 09:54 | |
off take 6b | PROPOSED CONSTRUCTION OF OFF TAKE 6B POTABLE WATER PIPELINE AS PART OF THE LOWER THUKELA BULK WATER SUPPLY AT NEW GUELDERLAND TO NEW GUELDERLAND RESERVOIR ILEMBE DISTRICT MUNICIPALITY, KZN | AIA Phase 1 | 28/10/2014 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Triplo4 Sustainable Solutions (Pty) Ltd | 03/11/2014 - 09:00 | |
CONSTRUCTION OF PETRUSDAM 88KV SWITCHING STATION | PROPOSED CONSTRUCTION OF PETRUSDAM 88KV SWITCHING STATION, WITHIN THE RAMOTSHERE MOILOA LOCAL MUNICIPALITY, NORTH WEST PROVINCE | HIA Phase 1 | 22/09/2017 | Nkosinathi Godfrey Tomose | BAAGI ENVIRONMENTAL CONSULTANCY | 22/09/2017 - 15:38 | ||
ROPOSED CONSTRUCTION OF PETRUSDAM 88KV SWITCHING STATION | PROPOSED CONSTRUCTION OF PETRUSDAM 88KV SWITCHING STATION, WITHIN THE RAMOTSHERE MOILOA LOCAL MUNICIPALITY, NORTH WEST PROVINCE | HIA Phase 1 | 22/09/2017 | Nkosinathi Godfrey Tomose | BAAGI ENVIRONMENTAL CONSULTANCY | 02/10/2017 - 11:49 | ||
PROPOSED CONSTRUCTION OF PETRUSDAM 88KV SWITCHING STATION | PROPOSED CONSTRUCTION OF PETRUSDAM 88KV SWITCHING STATION, WITHIN THE RAMOTSHERE MOILOA LOCAL MUNICIPALITY, NORTH WEST PROVINCE. | HIA Phase 1 | 22/09/2017 | Nkosinathi Godfrey Tomose | BAAGI ENVIRONMENTAL CONSULTANCY | 02/10/2017 - 10:59 | ||
Construction of steel smelter | Proposed construction of steel smelter, Colenso, Alfred Duma Local Municipality, KwaZulu-Natal | HIA Phase 1 | 06/09/2019 | Jean Beater | JLB Consulting | Fuze Environmental Services | 13/10/2019 - 08:54 | |
9-2-021-0014-20041209-ACRM | Proposed Construction of the 132/66 kV Subdivision and Tie-In Powerlines in Romansrivier, Witzenberg Municipality | AIA Phase 1 | 09/12/2004 | Jonathan Kaplan | Agency for Cultural Resources Management | MAPID_02805 | 16/06/2012 - 14:34 | |
MURUNWA VODACOM TELEMAST, LIMPOPO PROVINCE. | PROPOSED CONSTRUCTION OF THE BONISWA SITE 2021, MURUNWA VODACOM TELEMAST, LIMPOPO PROVINCE. | Heritage Impact Assessment Specialist Reports | 16/03/2022 | Stephan Gaigher | Tekplan Environmental | 30/03/2022 - 12:30 | ||
Heuweltjies WEF Heritage Impact Assessment | PROPOSED CONSTRUCTION OF THE HEUWELTJIES WIND ENERGY FACILITY, NEAR BEAUFORT WEST, WESTERN CAPE PROVINCE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 14/12/2022 | Nikki Mann | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 10/01/2023 - 15:25 | |
Karee WEF&Grid Heritage Impact Assessment Report | PROPOSED CONSTRUCTION OF THE KAREE WIND ENERGY FACILITY, BATTERY ENERGY STORAGE SYSTEM (BESS) AND ASSOCIATED GRID INFRASTRUCTURE, NEAR TOUWSRIVIER, WESTERN CAPE PROVINCE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 23/11/2022 | John E. Almond | Natura Viva CC | SiVEST SA (Pty) Ltd | 07/12/2022 - 14:29 | |
Klipkraal WEF 4 Heritage Report | PROPOSED CONSTRUCTION OF THE KLIPKRAAL PHASE 4 WIND ENERGY FACILITY, NEAR FRASERBURG, NORTHERN CAPE PROVINCE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 13/09/2023 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 24/09/2023 - 15:35 | |
Klipkraal WEF 5 Heritage Report | PROPOSED CONSTRUCTION OF THE KLIPKRAAL PHASE 5 WIND ENERGY FACILITY, NEAR FRASERBURG, NORTHERN CAPE PROVINCE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 13/09/2023 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | SiVEST SA (Pty) Ltd | 24/09/2023 - 17:54 | |
Klipkraal 5 Heritage Report | PROPOSED CONSTRUCTION OF THE KLIPKRAAL PHASE 5 WIND ENERGY FACILITY, NEAR FRASERBURG, NORTHERN CAPE PROVINCE, SOUTH AFRICA Heritage Scoping Report | Heritage Scoping | 13/09/2023 | 24/10/2023 - 12:25 | ||||
Klipkraal 5 Heritage Report | PROPOSED CONSTRUCTION OF THE KLIPKRAAL PHASE 5 WIND ENERGY FACILITY, NEAR FRASERBURG, NORTHERN CAPE PROVINCE, SOUTH AFRICA Heritage Scoping Report | Heritage Scoping | 13/09/2023 | Wouter Fourie, Nikki Mann | 23/10/2023 - 14:30 | |||
Klipkraal WEF 1 Heritge Report | PROPOSED CONSTRUCTION OF THE KLIPKRAAL WIND ENERGY FACILITY 1, NEAR FRASERBURG, NORTHERN CAPE PROVINCE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 16/09/2022 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 16/09/2022 - 16:32 | |
Klipkraal WEF 2 Heritage Report | PROPOSED CONSTRUCTION OF THE KLIPKRAAL WIND ENERGY FACILITY 2, NEAR FRASERBURG, NORTHERN CAPE PROVINCE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 19/08/2022 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 16/09/2022 - 16:42 | |
Koup 1 Heritage Impact Assessment | PROPOSED CONSTRUCTION OF THE KOUP 1 WIND ENERGY FACILITY AND ASSOCIATED GRID INFRASTRUCTURE, NEAR BEAUFORT WEST, WESTERN CAPE PROVINCE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 23/04/2022 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 22/11/2021 - 13:30 | |
Koup 1 Grid HIA | PROPOSED CONSTRUCTION OF THE KOUP 1 WIND ENERGY FACILITY AND ASSOCIATED GRID INFRASTRUCTURE, NEAR BEAUFORT WEST, WESTERN CAPE PROVINCE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 23/04/2022 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 29/04/2022 - 10:49 | |
Koup 2 Heritage Impact Assessment | PROPOSED CONSTRUCTION OF THE KOUP 2 WIND ENERGY FACILITY AND ASSOCIATED GRID INFRASTRUCTURE, NEAR BEAUFORT WEST, WESTERN CAPE PROVINCE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 23/04/2022 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 22/11/2021 - 16:39 | |
Koup 2 Grid HIA | PROPOSED CONSTRUCTION OF THE KOUP 2 WIND ENERGY FACILITY AND ASSOCIATED GRID INFRASTRUCTURE, NEAR BEAUFORT WEST, WESTERN CAPE PROVINCE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 30/05/2022 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 29/04/2022 - 11:02 | |
Kraaltjies WEF Heritage Impact Assessment | PROPOSED CONSTRUCTION OF THE KRAALTJIES WIND ENERGY FACILITY, NEAR BEAUFORT WEST, WESTERN CAPE PROVINCE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 14/12/2022 | Nikki Mann | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 10/01/2023 - 15:37 | |
LEEUDORINGSTAD 132KV POWER LINE HIA | PROPOSED CONSTRUCTION OF THE LEEUDORINGSTAD 132KV POWERLINE, NORTH WEST PROVINCE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 08/11/2022 | Nikki Mann | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 15/12/2022 - 15:36 | |
Limestone 1 Heritage Report | Proposed Construction of the Limestone 1 - 132kV Power Line and the associated Switchyards on Portion 0 (remaining extent) of the Farm 267, Northern Cape Province | 03/12/2013 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | 16/05/2014 - 12:29 | |||
PIA | Proposed Construction of the New Eskom Rethabiseng North 132/11 kV Substation and Associated Loop-in and Loop-out Powerlines in Ekangala, within the City of Tshwane Metropolitan Municipality and Thembisile Hani Local Municipality. Palaeontological Impact Assessment: Phase 1 Field Study | PIA Phase 1 | 24/02/2017 | Dr. Heidi Fourie | Dr Heidi Fourie | JG AFRIKA | 02/03/2017 - 07:39 | |
Patatskloof WEF&Grid Heritage Impact Assessment | PROPOSED CONSTRUCTION OF THE PATATSKLOOF WIND ENERGY FACILITY AND ASSOCIATED GRID INFRASTRUCTURE, NEAR CERES, WESTERN CAPE PROVINCE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 23/11/2022 | Nikki Mann | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 07/12/2022 - 15:18 | |
Meyerton PIA | Proposed Construction of the R59 (P156/2) Pedestrian Bridge Located Close to Sicelo Township, Meyerton, within the Midvaal Local Municipality, in the Sedibeng District Municipality, Gauteng Province | PIA Desktop | 05/12/2021 | Roy Muroyi | Tsimba Archaeological Footprints (Pty) Ltd | Tsimba Archaeological Footprints (Pty) Ltd | 10/12/2021 - 07:25 | |
Palaeontological Impact Assessment: Phase 1: Field Study | Proposed Construction of the Ventilation Shaft Access Road Seriti Coal (Pty) Ltd.: New Denmark Colliery - Palaeontological Impact Assessment: Phase 1: Field Study | PIA Phase 1 | 11/08/2020 | Dr. Heidi Fourie | Dr Heidi Fourie | 19/06/2020 - 14:30 | ||
Wilger 132KV Power Line | Proposed Construction of the Wilger 132kV Power Line and the associated Switchyards on the Farm 267 Arriesfontein, Northern Cape Province | Heritage Impact Assessment Specialist Reports | 03/12/2013 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | 16/05/2014 - 12:15 | ||
Construction of trunk sewer at Gwala Farm | Proposed construction of trunk sewer at Gwala Farm, eThekwini Municipality, KwaZulu-Natal | HIA Phase 1 | 05/03/2021 | Jean Beater | JLB Consulting | ECA CONSULTING | 04/05/2021 - 15:00 |