Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 18001 - 18050 of 18975
ReportRef |
ReportTitle![]() |
ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
Heritage Impact Assessment - DBAR | Specialist input for the impact assessment phase of the environmental impact assessment for the Paulputs CSP Project and Road Realignment of the MN73 road Near Pofadder | 30/06/2016 | David Morris | McGregor Museum | Savannah Environmental (Pty) Ltd | 25/01/2017 - 12:44 | ||
Heritage Impact Assessment - DBAR | Specialist input for the impact assessment phase of the environmental impact assessment for the Paulputs CSP Project and Road Realignment of the MN73 road Near Pofadder | 30/06/2016 | David Morris | McGregor Museum | Savannah Environmental (Pty) Ltd | 25/01/2017 - 12:44 | ||
Heritage Impact Assessment - DBAR | Specialist input for the impact assessment phase of the environmental impact assessment for the Paulputs CSP Project and Road Realignment of the MN73 road Near Pofadder | 30/06/2016 | David Morris | McGregor Museum | Savannah Environmental (Pty) Ltd | 25/01/2017 - 12:44 | ||
Heritage Impact Assessment - DBAR | Specialist input for the impact assessment phase of the environmental impact assessment for the Paulputs CSP Project and Road Realignment of the MN73 road Near Pofadder | 30/06/2016 | David Morris | McGregor Museum | Savannah Environmental (Pty) Ltd | 25/01/2017 - 12:44 | ||
Heritage Impact Assessment - DBAR | Specialist input for the impact assessment phase of the environmental impact assessment for the Paulputs CSP Project and Road Realignment of the MN73 road Near Pofadder | 30/06/2016 | David Morris | McGregor Museum | Savannah Environmental (Pty) Ltd | 25/01/2017 - 12:44 | ||
Heritage Impact Assessment - DBAR | Specialist input for the impact assessment phase of the environmental impact assessment for the Paulputs CSP Project and Road Realignment of the MN73 road Near Pofadder | 30/06/2016 | David Morris | McGregor Museum | Savannah Environmental (Pty) Ltd | 25/01/2017 - 12:44 | ||
Heritage Impact Assessment - DBAR | Specialist input for the impact assessment phase of the environmental impact assessment for the Paulputs CSP Project and Road Realignment of the MN73 road Near Pofadder | 30/06/2016 | David Morris | McGregor Museum | Savannah Environmental (Pty) Ltd | 25/01/2017 - 12:44 | ||
Heritage Impact Assessment - DBAR | Specialist input for the impact assessment phase of the environmental impact assessment for the Paulputs CSP Project and Road Realignment of the MN73 road Near Pofadder | 30/06/2016 | David Morris | McGregor Museum | Savannah Environmental (Pty) Ltd | 25/01/2017 - 12:45 | ||
Zandspruit Sewer HIA | SPECIALIST OPINION FOR THE CHANGE OF THE ALIGNMENT FOR THE PROPOSED BULK SEWER LINE ON PORTIONS OF THE FARM ZANDSPRUIT 191iq, GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 19/07/2022 | J A van Schalkwyk | 23/01/2023 - 14:34 | |||
Specialist Opinion | SPECIALIST OPINION FOR THE CHANGE OF THE ALIGNMENT FOR THE PROPOSED BULK SEWER LINE ON PORTIONS OF THE FARM ZANDSPRUIT 191iq, GAUTENG PROVINCE | JA VAN SCHALKWYK | J A van Schalkwyk | 24/01/2023 - 08:37 | ||||
HERITAGE SPECIALIST OPINION FOR THE NEW INERNAL COMBUSTION ENGINE (ICE) DEVELOPMENTS ASSOCIATED WITH THE AFRIKAANS AND SOTHO PV PLANT FOR PROJECT DAO | SPECIALIST OPINION FOR THE NEW INERNAL COMBUSTION ENGINE (ICE) DEVELOPMENTS ASSOCIATED WITH THE AFRIKAANS AND SOTHO PV PLANT FOR PROJECT DAO (FORMERLY BOKPOORT SOLAR PHOTOVOLTAIC (PV) ENERGY FACILITY) NEAR GROBLERSHOOP, !KHEIS LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE | Heritage Statement | 29/11/2021 | J.A. van Schalkwyk | ACWA Power Energy Africa (Pty) Ltd | 29/04/2022 - 14:44 | ||
SPECIALIST OPINION FOR THE NEW INERNAL COMBUSTION ENGINE (ICE) DEVELOPMENTS ASSOCIATED WITH THE AFRIKAANS AND SOTHO PV PLANT FOR PROJECT DAO (FORMERLY BOKPOORT SOLAR PHOTOVOLTAIC (PV) ENERGY FACILITY) NEAR GROBLERSHOOP, !KHEIS LOCAL MUNICIPALITY, NORTHERN | SPECIALIST OPINION FOR THE NEW INERNAL COMBUSTION ENGINE (ICE) DEVELOPMENTS ASSOCIATED WITH THE AFRIKAANS AND SOTHO PV PLANT FOR PROJECT DAO (FORMERLY BOKPOORT SOLAR PHOTOVOLTAIC (PV) ENERGY FACILITY) NEAR GROBLERSHOOP, !KHEIS LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE | Heritage Statement | 29/11/2021 | Johnny van Schalkwyk | JA van Schalkwyk Heritage Consultant | ACWA Power Energy Africa (Pty) Ltd | 19/01/2022 - 17:40 | |
Township development on portion 36 of the farm Vlaklaagte | Specialist report 2: Phase 1 Archaeological and Heritage Impact assessment on portion 36 of the farm Vlaklaagte 221JR, Mpumalanga Province | AIA Phase 1 | 24/11/2014 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Enpact Environmental Consultants CC | 24/11/2014 - 12:53 | |
Rooidraai Lydenburg Mall development Lydenburg | Specialist report and management guidelines of the Rooidraai rock engraving which will be impacted upon by the Lydenburg Mall development, remainder of portion 7 Rooidraai 34JT , Lydenburg Mpumalanga | HIA Phase 1 | 18/08/2013 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Afrika Enviro & Biology | 20/08/2013 - 11:35 | |
HIA Berlin Kaapsehoop Survey | SPECIALIST REPORT FOR PHASE 1 ARCHAEOLOGICAL / HERITAGE IMPACT ASSESSMENT, SURVEY AND MANAGEMENT GUIDELINES FOR MAJUBA 1 ROCK ART SITE: BERLIN PLANTATION, KAAPSEHOOP, MPUMALANGA. | AIA Phase 1 | 01/08/2012 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Komatiland Forests | 14/11/2012 - 14:35 | |
Residential Township Kameelrivier 160JR | SPECIALIST REPORT FOR PHASE 1 ARCHEOLOGICAL / HERITAGE IMPACT ASSESSMENT: PROPOSED RESIDENTIAL TOWNSHIP (MORIPE GARDEN): REMAINING EXTENT OF PORTION 7 OF THE FARM KAMEELRIVIER 160JR, SIYABUSWA MPUMALANGA | AIA Phase 1 | 01/07/2012 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Afrika Enviro & Biology | 14/11/2012 - 11:21 | |
Falls Fish Farms_Mooiland 294JT | Specialist report for proposed building sites on the farm Mooiland 294 JT, (Falls Fish Farms) Schoemankloof. | Archaeological Specialist Reports | 03/07/2012 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Falls Fish Farms | 16/10/2012 - 11:47 | |
9-2-066-0001-20040422-CA | Specialist Report Heritage Impact Assessment Kornavlei Prospecting, near Komaggas, Northern Cape | AIA Phase 1 | 22/04/2004 | Hilary Deacon | MAPID_01798 | 16/06/2012 - 14:36 | ||
Specialist report on Stone Age heritage resources, Kolomela | Specialist report on the Stone Age and other heritage resources at Kolomela, Postmasburg, Northern Cape | Archaeological Monitoring | 14/11/2011 | Maria Van der Ryst | University of South Africa - Anthropology and Archaeology | African Heritage Consultants CC | 09/04/2013 - 08:51 | |
SPECIALIST STONE AGE REPORT | Specialist report on the Stone Age occurrences documented for the proposed exploration camp on the farm Demaneng 546, near Kathu, Gamagara Local Municipality, John Taolo Gaetsewe District Municipality, Northern Cape Province | AIA Phase 1B | 20/08/2021 | Maria Van der Ryst | PGS Heritage (Pty) Ltd | PGS Heritage (Pty) Ltd | 23/08/2021 - 16:22 | |
Phase 1 Archaeological / Heritage Impact Assessment for the God's Window Skywalk Project | SPECIALIST REPORT PHASE 1 ARCHAEOLOGICAL / HERITAGE IMPACT ASSESSMENT FOR THE GOD’S WINDOW SKYWALK PROJECT ON PORTION 2 OF THE FARM LISBON 531KT & THE FARM DE HOUTBOSCH 503KT, GRASKOP, MPUMALANGA | HIA Phase 1 | 01/03/2022 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Zutari (Pty) Ltd | 19/08/2022 - 16:47 | |
HIA_Leliefontein_Mining_Deacon_HJ_Apr04 | Specialist Report, Heritage Impact Assessment, Proposed Mining/Prospecting Activities near Leliefontein, Northern Cape | HIA Phase 1 | 08/04/2004 | Hilary Deacon | MAPID_02351 | 16/06/2012 - 14:52 | ||
9-2-284-0009-20071217-CCC | Specialist Report: Heritage Impact Assessment Report in Connection with Two Alternative Routes for a Proposed Raw Water Pipeline Between Vlaklaagte 330 JS and Waterpan 8 IS Servicing the Goedgevonden Colliery near Ogies, Mpumalanga | HIA Phase 1 | 17/12/2007 | Robert de Jong | Cultmatrix CC | MAPID_01128 | 16/06/2012 - 14:41 | |
Other_Braamhoek_Shelter_2_Review_Van_Schalkwyk_LO_Apr06 | Specialist Review of the Archaeological Excavations at Braamhoek Shelter 2, Braamhoek Pumped Storage Scheme, Free State Province, South Africa | Heritage Study | 24/04/2006 | Len van Schalkwyk, Elizabeth Wahl | eThembeni Cultural Heritage | 16/06/2012 - 14:52 | ||
9-2-013-0002-19990301-HYCA | Specialist Study on the Current Conservation Status of Archaeological Sites near Struispunt, Waenhuiskrans Nature Reserve | AIA Phase 1 | 01/03/1999 | Royden Yates | Henshilwood and Yates Consulting Archaeologists | MAPID_01836 | 16/06/2012 - 14:34 | |
Permit_N3_TOLL_ROAD_Anderson_G_Jan99 | SPECIALIST STUDY REPORT POTENTIAL IMPACT ON THE ARCHAEOLOGICAL SITES ALONG THE PROPOSED N3 TOLL ROAD | Archaeological Permit Report | 05/01/1999 | Gavin Anderson | KwaZulu Natal Museum | 16/06/2012 - 14:53 | ||
Permit_N3_TOLL_ROAD_REPORT_Anderson_G_Oct96 | SPECIALIST STUDY REPORT POTENTIAL IMPACT ON THE ARCHAEOLOGICAL SITES ALONG THE PROPOSED N3 TOLL ROAD | Archaeological Permit Report | 30/10/1996 | Gavin Anderson | KwaZulu Natal Museum | 16/06/2012 - 14:53 | ||
Permit_N3_TOLL_ROAD_REPORT(ii)_Anderson_G_Oct96 | SPECIALIST STUDY REPORT POTENTIAL IMPACT ON THE ARCHAEOLOGICAL SITES ALONG THE PROPOSED N3 TOLL ROAD (ii) | Archaeological Permit Report | 30/10/1996 | Gavin Anderson | KwaZulu Natal Museum | 16/06/2012 - 14:53 | ||
Fibre Optic Cable JOhannesburg-Yzerfontein | SPECIALIST STUDY: HERITAGE IMPACT ASSESSMENT FOR THE INSTALLATION OF THE SIRIUS FIBRE OPTIC CABLE BETWEEN JOHANNESBURG AND YZERFONTEIN, GAUTENG, FREE STATE, EASTERN AND WESTERN CAPE PROVINCES | Heritage Impact Assessment Specialist Reports | 08/03/2015 | Dr J de Jongh | JG AFRIKA | 27/08/2015 - 13:19 | ||
Kuyasa IPP Power | SPECIALIST STUDY: HERITAGE SCOPING (BASIC ASSESSMENT) REPORT: INPUT INTO EIA, IWWMP AND IWULA FOR THE PROPOSED KUYASA IPP POWER GENERATION PLANT ON PORTIONS OF THE FARMS HAVERGLEN 269 IR AND HAVERKLIP 265 IR NEAR DELMAS, MPUMALANGA PROVINCE | Heritage Impact Assessment Specialist Reports | 21/07/2012 | Robert de Jong | Cultmatrix CC | Zitholele Consulting | 28/06/2012 - 16:41 | |
Spier farm: A survey of its early history | Spier farm: A survey of its early history | AIA Phase 1 | 01/01/1998 | Hennie Vos | ArCape | CTS_3695 | 16/06/2012 - 14:33 | |
Spier farm: Documentation of Buildings I (1778) and II (1817) | Spier farm: Documentation of Buildings I (1778) and II (1817) | 01/01/1994 | Hennie Vos | Stellenbosch Museum | CTS_3696 | 16/06/2012 - 14:33 | ||
Spier farm: Historical and structural investigation of the Main Building 1822 | Spier farm: Historical and structural investigation of the Main Building 1822 | 01/01/1994 | Hennie Vos | Stellenbosch Museum | CTS_3697 | 16/06/2012 - 14:33 | ||
Spier Wine Estate: Archaeological survey of the Craft Village site, Conference Hotel site, Resort Hotel (Ritz-Carltom) and Summary Recommendations | Spier Wine Estate: Archaeological survey of the Craft Village site, Conference Hotel site, Resort Hotel (Ritz-Carltom) and Summary Recommendations | AIA Phase 1 | 01/01/1999 | Hennie Vos | ArCape | CTS_3698 | 16/06/2012 - 14:33 | |
Spioenkop Nature Reserve Management Plan and Survey | Spioenkop Nature Reserve Management Plan and Survey | Conservation Management Plan | 20/02/2020 | Celeste Rossouw | KwaZulu-Natal Amafa and Research Institute | KwaZulu-Natal Amafa and Research Institute | 07/10/2022 - 14:29 | |
Spitskop Platinum Phase 1 HIA | Spitskop Platinum Phase 1 HIA | HIA Phase 1 | 03/07/2007 | Dr Julius CC Pistorious Archaeologist and heritage Consultant | 07/03/2017 - 11:23 | |||
Addendum to HIA, Springbok Wind Farm | SPRINGBOK WIND ENERGY FACILITY Portions 17 and 19 of Farm No. 134; Portion 0 (Remaining Extent) and Portion 1 (Remaining Extent) of Farm No. 132;Portion 0 (Remaining Extent) of Farm No. 946; Portion 0 (Remaining Extent) of Farm No. 215;Portion 0 of Farm No. 635; and Portion 9 (Remaining Extent) of Farm No. 133 NAMAQUALAND MAGISTERIAL DISTRICT | HIA Phase 2 | 23/11/2017 | Ron Martin | Ron Martin Heritage Consultancy | Longyuan Mulilo Wind Power (Pty) Ltd | 22/11/2017 - 12:47 | |
Springhaas Collector Substation B Heritage Impact Assessment | Springhaas Collector Substation B Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 09:21 | |
Springhaas Collector Substation B Heritage Impact Assessment | Springhaas Collector Substation B Heritage Impact Assessment | PIA Desktop | 07/06/2022 | Marion Bamford | Prof Marion Bamford | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 09:24 | |
Springhaas Collector Substation B Heritage Impact Assessment | Springhaas Collector Substation B Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 10:22 | |
Springhaas Collector Substation B Palaeontological Impact Assessment | Springhaas Collector Substation B Palaeontological Impact Assessment | PIA Desktop | 07/07/2022 | Marion Bamford | Prof Marion Bamford | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 09:27 | |
Springhaas Collector Substation B Palaeontological Impact Assessment | Springhaas Collector Substation B Palaeontological Impact Assessment | PIA Desktop | 07/07/2022 | Marion Bamford | Prof Marion Bamford | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 10:27 | |
SRPM PV Heritage Scoping Report (Draft) | SRPM PV Heritage Scoping Report (Draft) | Heritage Scoping | Dr Julius CC Pistorius | Savannah Environmental (Pty) Ltd | 20/06/2022 - 14:51 | |||
Karin Shipwreck Report 2010 | SS Karin Shipwreck Report 2010 | Archaeological Permit Report | 01/06/2010 | Vanessa Maitland | Transnet National Ports Authority - Saldanha | 25/07/2013 - 21:07 | ||
SSV-PIA-Ikhephu Feedlot, Erf 1 Eliot, SLM, CHDM, Eastern Cape | SSV-PIA-Ikhephu Feedlot, Erf 1 Eliot, SLM, CHDM, Eastern Cape | PIA Desktop | 26/11/2022 | Elize Butler | 26/11/2022 - 22:22 | |||
St Anne’s Convent, Umzinto Revision of Erven and proposed land use | St Anne’s Convent, Umzinto Revision of Erven and proposed land use Proposed Subdivision of the Remainder of Erf 328 Umzinto Umdoni Local Municipality, Ugu DM, KwaZulu-Natal | Site Inspection Report | 28/02/2018 | Len van Schalkwyk | eThembeni Cultural Heritage | Stott Milton and Conway Professional Land Surveyors | 26/06/2018 - 07:03 | |
HIA | St Chads Heritage Impact Assessment | Heritage Study | 26/10/2023 - 12:56 | |||||
St Chads Preliminary Heritage Impact Assessment | St Chads Preliminary Heritage Impact Assessment | Heritage Study | 17/10/2023 | 26/10/2023 - 12:37 | ||||
St Chads Subsidised Housing project Preliminary Heritage Assessment | St Chads Subsidised Housing project Preliminary Heritage Assessment | Heritage Study | 17/10/2023 | 26/10/2023 - 11:41 | ||||
Permit_St_Francis_Links_Progress_Nilssen_PJ_Jul09 | St Francis Links - Golf Estate. Phase 2 - Mitigation of Archaeological Heritage Resources | Archaeological Permit Report | 06/07/2009 | Peter Nilssen | Centre for Heritage and Archaeological Resource Management cc | 16/06/2012 - 14:53 |