THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 14951 - 15000 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
AIA_ERF_2021_RIEBEEK_KASTEEL_Kaplan_J_Aug08 | Archaeological Impact Assessment: Proposed Development of Erf 2021, Riebeek Kasteel, Western Cape Province | AIA Phase 1 | 04/08/2008 | Jonathan Kaplan | Agency for Cultural Resources Management | MAPID_02589 | 16/06/2012 - 14:44 | |
AIA_Vensterklip_ptn_37_Bonteheuwel_1_Kaplan_J_Jun08 | Archaeological Impact Assessment: Proposed Development at Vensterklip Resort (Portion 37 of the Farm Bonteheuwel No.1) Elands Bay, Clanwilliam Division | AIA Phase 1 | 13/06/2008 | Jonathan Kaplan | Agency for Cultural Resources Management | MAPID_02611 | 16/06/2012 - 14:51 | |
AIA:PROPOSED DEVELOPMENT AT BOSCHENDAL WESTERN, EASTERN, CENTRAL AND PRECINCTS, STELLENBOSCH | ARCHAEOLOGICAL IMPACT ASSESSMENT: PROPOSED DEVELOPMENT AT BOSCHENDAL WESTERN, EASTERN, CENTRAL AND PRECINCTS, STELLENBOSCH DISTRICT, WESTERN CAPE | AIA Phase 1 | 01/06/2009 | Timothy Hart, Lita Webley | ACO Associates CC | 04/09/2016 - 20:08 | ||
AIA: Proposed Dalskroon Development | Archaeological Impact Assessment: Proposed Dalskroon Development | AIA Phase 1 | 01/05/2010 | Timothy Hart | ACO Associates CC | CTS_406224 | 27/07/2017 - 12:56 | |
AIA_Paarl_Erven_16161_&_17680_Webley_L_Sep09 | Archaeological Impact Assessment: Proposed Dal Josafat Development: The Subdivision of Erf 16161 and Remainder of Erf 17680, Paarl, Western Cape | AIA Phase 1 | 01/09/2009 | Lita Webley, Jayson Orton | ACO Associates CC | MAPID_02725 | 16/06/2012 - 14:48 | |
AIA Construction Yards and Substation for De Aar WEF | Archaeological Impact Assessment: Proposed Construction Yards and Sub Station, Longyuan Mulilo De Aar Wind Energy Facility, Northern Cape. | Archaeological Specialist Reports | 28/02/2014 | Jonathan Kaplan | Agency for Cultural Resources Management | Longyuan Mulilo De Aar Wind Power (Pty) Ltd | 12/06/2014 - 11:26 | |
AIA: Koekedouw Dam Pipeline Erf 1001 Ceres | Archaeological Impact Assessment: Proposed Construction of the Koekedouw Dam Pipeline on Erf 1001, Ceres | AIA Phase 1 | 01/11/2009 | Jonathan Kaplan | Agency for Cultural Resources Management | Enviroafrica CC | CTS_406093 | 25/07/2017 - 08:35 |
Archaeology Impact Assessment - Hotazel Solar | ARCHAEOLOGICAL IMPACT ASSESSMENT: PROPOSED CONSTRUCTION OF THE HOTAZEL SOLAR FACILITY (100 MW) ON REMAINDER FARM YORK A 279 AND 132 kV GRID CONNECTION ON REMAINDER OF FARM HOTAZEL 280 AND PORTION 11 OF FARM YORK A 279, JOHN TAOLO GAETSEWE DISTRICT MUNICIPALITY, NORTHERN CAPE | AIA Phase 1 | 30/11/2018 | Lita Webley | Cape Environmental Assessment Practitioners | 05/02/2019 - 12:45 | ||
Archaeological Impact Assessment for Humansrus PV Energy Facility 2 | Archaeological Impact Assessment: Proposed Construction of Humansrus Solar PV Energy Facility 2 (previously named RE Capital 14 Solar Development) on the Remainder of the Farm Humansrus 147 near Copperton, Northern Cape (Assessment conducted under Section 38 (8) of the National Heritage Resources Act No 25 of 1999) | AIA Phase 1 | 30/11/2014 | Lita Webley | ACO Associates CC | Humansrus Solar PV Energy Facility 2 (Pty) Ltd. | 03/02/2015 - 15:58 | |
Archaeological Impact Assessment for Humansrus Solar PV Energy Facility 1 | Archaeological Impact Assessment: Proposed Construction of Humansrus Solar PV Energy Facility 1 (previously named RE Capital 13 Solar Development) on the Remainder of the Farm Humansrus 147 near Copperton, Northern Cape (Assessment conducted under Section 38 (8) of the National Heritage Resources Act No 25 of 1999). | AIA Phase 1 | 30/11/2014 | Lita Webley | ACO Associates CC | Humansrus Solar PV Energy Facility 1 (Pty) Ltd. | 03/02/2015 - 14:07 | |
Archaeological Impact Assessment for Humansrus PV 2 Grid Connection | Archaeological Impact Assessment: Proposed Construction of Humansrus PV 2 Grid Connection (associated with the Humansrus PV Energy Facility, previously named RE Capital 14 Solar Development) on the Remainder of the Farm Humansrus 147 near Copperton, Northern Cape (Assessment conducted under Section 38 (8) of the National Heritage Resources Act No 25 of 1999) | AIA Phase 1 | 30/11/2014 | Lita Webley | ACO Associates CC | Humansrus Solar PV Energy Facility 2 (Pty) Ltd. | 03/02/2015 - 16:33 | |
Archaeological Impact Assessment for Humansrus PV 1 Grid Connection | Archaeological Impact Assessment: Proposed Construction of Humansrus PV 1 Grid Connection (associated with Humansrus Solar PV Energy Facility 1, previously named RE Capital 13 Solar Development) on the Remainder of the Farm Humansrus 147 near Copperton, Northern Cape (Assessment conducted under Section 38 (8) of the National Heritage Resources Act No 25 of 1999) | AIA Phase 1 | 30/11/2014 | Lita Webley | ACO Associates CC | Humansrus Solar PV Energy Facility 1 (Pty) Ltd. | 03/02/2015 - 15:09 | |
AIA PROPOSED CONSTRUCTION OF HOUSES ON ERVEN 9666-96670 PLETTENBERG BAY WESTERN CAPE PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT: PROPOSED CONSTRUCTION OF HOUSES ON ERVEN 9666-96670 PLETTENBERG BAY WESTERN CAPE PROVINCE | AIA Phase 1 | 17/04/2009 | Jonathan Kaplan | Agency for Cultural Resources Management | Hilland Associates | CTS_329598 | 04/09/2015 - 10:19 |
AIA_Witels_775_Kaplan_J_Oct07 | Archaeological Impact Assessment: Proposed Construction of Chicken Houses on the Farm Witels 775/R, Worcester, Western Cape Province | AIA Phase 1 | 29/10/2007 | Jonathan Kaplan | Agency for Cultural Resources Management | MAPID_02601 | 16/06/2012 - 14:51 | |
AIA Oorlogskloof | ARCHAEOLOGICAL IMPACT ASSESSMENT: PROPOSED CONSTRUCTION OF CHALETS AND ASSOCIATED INFRASTRUCTURE ON EXISTING CAMP SITES IN THE OORLOGSKLOOF NATURE RESERVE, NIEUWOUDTVILLE, NORTHERN CAPE PROVINCE | AIA Phase 1 | 01/10/2012 | Lita Webley, Jayson Orton | ACO Associates CC | IKAMVA Consulting | 18/10/2012 - 10:12 | |
AIA: Sewerage Pipeline on Farms 1440, 1441, 334/17, 1022, 321 & ERF 3953, Stellenbosch | ARCHAEOLOGICAL IMPACT ASSESSMENT: PROPOSED CONSTRUCTION OF A SEWERAGE PIPELINE ON FARMS 1440, 1441, 334/17, 1022, 321 AND ERF 3953 STELLENBOSCH, CAPE WINELANDS | AIA Phase 1 | 13/01/2010 | Jonathan Kaplan | Agency for Cultural Resources Management | Uhambo Property Investments (Pty) Ltd | CTS_386727 | 13/02/2017 - 13:47 |
AIA_Gansevallei_444_Ptn_38_Nilssen_PJ_Mar09 | Archaeological Impact Assessment: Proposed Construction of a Hotel on Gansevallei 444/38 (Plettenberg Bay), District Knysna, Western Cape Province | AIA Phase 1 | 30/03/2009 | Peter Nilssen | Centre for Heritage and Archaeological Resource Management cc | MAPID_01908 | 16/06/2012 - 14:45 | |
AIA_Citrusdal_Peters_Filed_455_Kaplan_JM_Sep09 | Archaeological Impact Assessment: Proposed Citrusdal Low Cost Housing Development (Portion of the Farm Peters Field No. 455 Citrusdal) | AIA Phase 1 | 01/09/2009 | Jonathan Kaplan | Agency for Cultural Resources Management | MAPID_02724 | 16/06/2012 - 14:44 | |
9-2-110-0075-20080328-CA | Archaeological Impact Assessment: Proposed Breede Valley De Doorns Housing Project | AIA Phase 1 | 28/03/2008 | Hilary Deacon | MAPID_02735 | 16/06/2012 - 14:37 | ||
AIA_Braemer_Residential_-_Klapmuts_Kaplan_JM_Sep09 | Archaeological Impact Assessment: Proposed Braemer Residential Development on Portion 2 of the Farm Klapmuts Rivier No. 742 & Portion 2 of the Farm Bronkhorst No. 748 Klapmuts | AIA Phase 1 | 01/09/2009 | Jonathan Kaplan | Agency for Cultural Resources Management | MAPID_02722 | 16/06/2012 - 14:43 | |
9-2-258-0005-20080204-MARM | Archaeological Impact Assessment: Proposed Bird & Game Hide at the Roodeplaat Nature Reserve, Pretoria, Gauteng | AIA Phase 1 | 04/02/2008 | Jaco van der Walt | Matakoma Heritage Consultants (Pty) Ltd | MAPID_02248 | 16/06/2012 - 14:40 | |
AIA_hilland_bergplaas_airstrip_Kaplan_JM_Jul09 | Archaeological Impact Assessment: Proposed Airstrip on Portion 4 of Bergplaats 296 Beaufort West Central Karoo | AIA Phase 1 | 20/07/2009 | Jonathan Kaplan | Agency for Cultural Resources Management | MAPID_02677 | 16/06/2012 - 14:46 | |
AIA_Erf_1_&_937_Montagu_Kaplan_JM_May08 | Archaeological Impact Assessment: Proposed Affordable Housing Development Portion of Erf 1 and Portion of Erf 937, Montagu, Western Cape Province | AIA Phase 1 | 16/06/2012 | Jonathan Kaplan | Agency for Cultural Resources Management | MAPID_02695 | 16/06/2012 - 14:44 | |
AIA_Erven_968-994_Mcgregor_Kaplan_JM_May08 | Archaeological Impact Assessment: Proposed Affordable Housing Development on Erven 968 - 994, McGregor, Western Cape Province | AIA Phase 1 | 28/05/2008 | Jonathan Kaplan | Agency for Cultural Resources Management | MAPID_02708 | 16/06/2012 - 14:45 | |
AIA_Ashton_low_cost_housing_Kaplan_JM_May08 | Archaeological Impact Assessment: Proposed Affordable Housing Development on Erven 1118 -1126 and Portion 50 of Farm 158 Zolani, Ashton, Western Cape Province | AIA Phase 1 | 28/05/2008 | Jonathan Kaplan | Agency for Cultural Resources Management | MAPID_02705 | 16/06/2012 - 14:43 | |
AIA_Bonnievale_erven_Kaplan_JM_May08 | Archaeological Impact Assessment: Proposed Affordable Housing Development Erven 701, 719, 720, 721 and 733, Bonnievale, Western Cape Province | AIA Phase 1 | 28/05/2008 | Jonathan Kaplan | Agency for Cultural Resources Management | MAPID_02683 | 16/06/2012 - 14:43 | |
AIA_Erf_283_Hermanus_Kaplan_JM_Aug09 | Archaeological Impact Assessment: Proposed Access Road Erf 283 Hermanus | AIA Phase 1 | 22/08/2009 | Jonathan Kaplan | Agency for Cultural Resources Management | MAPID_02675 | 16/06/2012 - 14:44 | |
AIA_clanwilliam_reservoir_and_pipeline_Kaplan_J_Dec08 | Archaeological Impact Assessment: Proposed 1.5 Ml Reservoir and 315 Mm Gravity Water Main Pipeline Clanwilliam, Western Cape Province | AIA Phase 1 | 15/12/2008 | Jonathan Kaplan | Agency for Cultural Resources Management | MAPID_02604 | 16/06/2012 - 14:44 | |
AIA_HELDERBERG_INTERNATIONAL_SCHOOL_Webley_LE_Oct07 | ARCHAEOLOGICAL IMPACT ASSESSMENT: PROPOSED HELDERBERG INTERNATIONAL SCHOOL ON GUSTROUW 918/82, STELLENBOSCH DISTRICT, WESTERN CAPE. | AIA Phase 1 | 01/07/2009 | Lita Webley | ACO Associates CC | MAPID_03294 | 16/06/2012 - 14:46 | |
AIA_Rabe_Farm_Colenso_Deacon_HJ_Jul09 | Archaeological Impact Assessment: Project JS Rabe Free Ranching Chicken Farm | AIA Phase 1 | 29/07/2009 | Hilary Deacon | MAPID_02607 | 16/06/2012 - 14:49 | ||
AIA_Port_Nolloth_Borrow_Pits_Webley_LE_Feb09 | Archaeological Impact Assessment: Port Nolloth Borrow Pits, Richtersveld Municipality, Northern Cape | AIA Phase 1 | 01/02/2009 | Lita Webley | ACO Associates CC | MAPID_03226 | 16/06/2012 - 14:49 | |
AIA_Gabrielsburg_14_&_Rusplaas_Van_der_Walt_J_Aug08 | Archaeological Impact Assessment: On Portion 1 of the Farm Gabrielsburg 14 and Portion 15 of Rusplaas, District Oranjeville, Free-State Province | AIA Phase 1 | 15/08/2008 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | MAPID_03032 | 16/06/2012 - 14:45 | |
AIA_Northern_Coal_Fourie_W_Jul08 | Archaeological Impact Assessment: Northern Coal Portion 15 and 16 of the Farm Weltevreden 381 JT, Belfast, Mpumalanga | AIA Phase 1 | 22/07/2008 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | MAPID_01663 | 16/06/2012 - 14:48 | |
AIA_Northern_Coal_Fourie_W_Jul08 | Archaeological Impact Assessment: Northern Coal Portion 15 and 16 of the farm Weltevreden 381 JT, Belfast, Mpumalanga | AIA Phase 1 | Wouter Fourie | Digby Wells Environmental | 24/04/2014 - 10:53 | |||
9-2-259-0020-20080223-MARM | Archaeological Impact Assessment: Noordwyk Extension 92, Holding 114 ER and AH, Midrand, Gauteng Province | AIA Phase 1 | 23/02/2008 | Jaco van der Walt | Matakoma Heritage Consultants (Pty) Ltd | MAPID_03262 | 16/06/2012 - 14:40 | |
LAN4605 - AIA | Archaeological Impact Assessment: National Heritage Resources Act, 1999 (Act No. 25 of 1999) Section 35 Archaeological Investigations, Lanxess Chrome Mine, North-West Province | AIA Phase 2 | 31/08/2017 | Justin du Piesanie | Digby Wells Environmental | Lanxess Chrome Mine (Pty) Ltd | 29/09/2017 - 09:52 | |
AIA_Heidelberg_Deacon_HJ_May09 | Archaeological Impact Assessment: Municipal Housing Project, Heidelberg | AIA Phase 1 | 26/05/2009 | Hilary Deacon | MAPID_02623 | 16/06/2012 - 14:46 | ||
AIA_Arniston_Evren_376_&_373_Deacon_HJ_Jan09 | Archaeological Impact Assessment: Municipal Housing Project, Arniston | AIA Phase 1 | 05/01/2009 | Hilary Deacon | MAPID_02713 | 16/06/2012 - 14:43 | ||
9-2-258-0005-20080223-MARM | Archaeological Impact Assessment: Montana Park Extension 150, Holding 67 & 68 Montana AH, Pretoria, Gauteng Province | AIA Phase 1 | 23/02/2008 | Jaco van der Walt | Matakoma Heritage Consultants (Pty) Ltd | MAPID_01096 | 16/06/2012 - 14:40 | |
AIA_Melkhoutfontein_Deacon_HJ_May09 | Archaeological Impact Assessment: Melkhoutfontein Housing Project | AIA Phase 1 | 27/05/2009 | Hilary Deacon | MAPID_02625 | 16/06/2012 - 14:47 | ||
AIA_Farm_88_Melkbos_school_Deacon_HJ_Jan09 | Archaeological Impact Assessment: Melkbos Private School Expansion | AIA Phase 1 | 06/01/2009 | Hilary Deacon | MAPID_01774 | 16/06/2012 - 14:45 | ||
9-2-259-0020-20071205-MARM | Archaeological Impact Assessment: Link Northern Waterline Project at the Suikerbosrand Nature Reserve | AIA Phase 1 | 05/12/2007 | Jaco van der Walt | Matakoma Heritage Consultants (Pty) Ltd | MAPID_01262 | 16/06/2012 - 14:40 | |
AIA: LANGHOOGTE WIND FARM, WESTERN CAPE | Archaeological Impact Assessment: LANGHOOGTE WIND FARM, WESTERN CAPE | AIA Phase 1 | 01/09/2012 | Lita Webley | ACO Associates CC | Arcus Gibb (Pty) Ltd | CTS_406473 | 01/08/2017 - 10:13 |
AIA_Koert_Louw_Zyn_Pan_Fourie_W_Aug09 | Archaeological Impact Assessment: Koert Louw Zyn Pan Project for Resources Generation on the Farm Koert Louw Zyn Pan 234 LQ and Portions of the Farm Klaarwater 231 LQ, District Lephalale, Limpopo | AIA Phase 1 | 10/03/2009 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | MAPID_03208 | 16/06/2012 - 14:47 | |
AIA_Keurkloof_(Prima_Klipbrekers)_Quarry_Deacon_HJ_Mar07 | Archaeological Impact Assessment: Keurkloof (Prima Klipbrekers) Quarry, Robertson | AIA Phase 1 | 06/03/2007 | Hilary Deacon | MAPID_02942 | 16/06/2012 - 14:46 | ||
AIA_Joalid_Wine_Centre_Deacon_HJ_Jul08 | Archaeological Impact Assessment: Joalid Wine Centre (Rem No.357, Stellenbosch, Western Cape) | AIA Phase 1 | 22/07/2008 | Hilary Deacon | MAPID_02697 | 16/06/2012 - 14:46 | ||
9-2-228-0001-20061204-MPL | Archaeological Impact assessment: Holding 117, Chartwell Agricultural Holdings. Johannesburg | AIA Phase 1 | 04/12/2006 | Jaco van der Walt | Matakoma Heritage Consultants (Pty) Ltd | MAPID_03079 | 16/06/2012 - 14:38 | |
9-2-225-0003-20070903-MPL | Archaeological Impact Assessment: Hoeksteen Park - Portion 845, Loskop Noord 12 JS, Marble Hall, Northern Province | AIA Phase 1 | 03/09/2007 | Jaco van der Walt | Matakoma Heritage Consultants (Pty) Ltd | MAPID_01075 | 16/06/2012 - 14:38 | |
9-2-052-0020-20071029-CARMCC | Archaeological Impact Assessment: High water and littoral dune zone east to south east of Portion 1 of the Farm Walkers Point 215, Magisterial District Knysna, Western Cape Province: Proposed dune protection via extension of existing retaining wall and ad | AIA Phase 1 | 29/10/2007 | Peter Nilssen | Centre for Archaeological Resource Management cc | MAPID_01906 | 16/06/2012 - 14:35 | |
AIA_Helderwyk_Van_der_Walt_J_Oct09 | Archaeological Impact Assessment: Helderwyk Township development on the remainder of Portion 62 of the Farm Witpoortjie 117IR, Brakpan, Ekurhuleni, Gauteng Province0 | AIA Phase 1 | 21/10/2009 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | MAPID_03388 | 16/06/2012 - 14:46 |