THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 16101 - 16150 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
AIA_GFC_Compost_Dreyer_C_May11 | Archaeological and Cultural Heritage Assessment for the proposed GFC Compost Developments at Reitz, Free State | AIA Phase 1 | 20/05/2011 | Cobus Dreyer | 16/06/2012 - 14:45 | |||
ARCHAEOLOGICAL AND CULTURAL HERITAGE ASSESSMENT SPECIALIST STUDY | ARCHAEOLOGICAL AND CULTURAL HERITAGE ASSESSMENT SPECIALIST STUDY | Heritage Impact Assessment Specialist Reports | 22/07/2022 | Eric Ndivhuho Mathoho | Vhufa Hashu Heritage Consultancy CC | Vhufa Hashu Heritage Consultancy CC | 04/11/2022 - 14:13 | |
AIA_Cattle_Leland_Dreyer_C_Jan12 | Archaeological and Cultural Assessment of the proposed Cattle Feedlot Developments at Leland 575, Reitz, Free State | AIA Phase 1 | 11/01/2012 | Cobus Dreyer | 16/06/2012 - 14:43 | |||
9-2-236-0032-20031001-AHCC | Archaeological and Cultural Assessment of the New Residential Development at the Farm Spitskop 333 KT, Steelpoort | AIA Phase 1 | 01/10/2003 | Udo Kusel, Cobus Dreyer | African Heritage Consultants CC | MAPID_01117 | 16/06/2012 - 14:39 | |
AIA_exempt_Nooitgedacht_Trout_Lodge_Van_Wyk_C_Oct07 | Archaeological and Cultural assessment of proposed extention of the exicting Nooitgedacht Trout Lodge and the subdivision of 5 plots for lodge development on Nooitgedacht farm 153 JT | AIA Phase 1 | 01/11/2004 | Calvin van Wijk, R Maguire | Adansonia Heritage Consultants | MAPID_03416 | 16/06/2012 - 14:45 | |
9-2-252-0001-20041029-AHC | Archaeological and Cultural Assessment of Lodges and Associated Infrastructure Development on Portion 4 (Remainder) and Portion 5 of the Farm Rietvley 28 KU, Phalaborwa Magisterial District, Limpopo | AIA Phase 1 | 29/10/2004 | R Maguire, Calvin van Wijk | Adansonia Heritage Consultants | MAPID_00268 | 16/06/2012 - 14:39 | |
AIA_Zandkopsdrift_537_Garies_Webley_LE_Oct10 | ARCHAEOLOGICAL (INCL HERITAGE) IMPACT ASSESSMENT: PROPOSED PROSPECTING ON PORTION 2 AND REMAINDER PORTION OF THE FARM ZANDKOPSDRIFT 537, GARIES, NORTHERN CAPE | AIA Phase 1 | 11/10/2010 | Lita Webley, Dave Halkett | ACO Associates CC | 16/06/2012 - 14:51 | ||
Archaeological & Paleontological Reports | Archaeological & Paleontological Reports for Glencore Eastern Mines Residue Facility Extension project | Archaeological Specialist Reports | 01/12/2019 | Nelius Kruger | Exigo | Coastal Environmental Services | 30/06/2022 - 15:07 | |
9-2-018-0035-19990401-ISAM | Archaeological & Palaeontological Assessment of Farm 229, Rietvlei (3318 DC) | AIA Phase 1 | 01/04/1999 | Graham Avery | Iziko: South African Museum | 16/06/2012 - 14:34 | ||
HIA, upgrading of N7 Section 3 route, between Citrusdal and Cederberg intersection | ARCHAEOLOGICAL & HISTORICAL INVESTIGATION OF THE PROPOSED UPGRADING OF THE N7 SECTION 3 ROUTE, BETWEEN CITRUSDAL & CEDERBERG INTERSECTION, SOUTH WESTERN CAPE | AIA Phase 1 | 11/04/2011 | Cobus Dreyer | CTS_503752 | 18/04/2018 - 15:49 | ||
AIA; PROPOSED UPGRADING OF THE N7 SECTION 3 ROUTE, CITRUSDAL & CEDERBERG INTERSECTION | ARCHAEOLOGICAL & HISTORICAL INVESTIGATION OF THE PROPOSED UPGRADING OF THE N7 SECTION 3 ROUTE, BETWEEN CITRUSDAL & CEDERBERG INTERSECTION, SOUTH WESTERN CAPE | AIA Phase 1 | 11/04/2011 | Cobus Dreyer | Cobus Dreyer | Heritage Western Cape | 04/06/2018 - 09:05 | |
BREEKKIERIE KENHARDT VAN WYKSVLEI | ARCHAEOLOGICAL & HERITAGE INVESTIGATION OF THE PROPOSED MTN CELL PHONE MAST AT BREEKKIERIE NEAR KENHARDT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 14/04/2011 | Cobus Dreyer | MTN (Pty) Ltd | MTN (Pty) Ltd | 18/10/2015 - 12:24 | |
HIA Olien SEF | Archaeological & Cultural Heritage Impact Assessment Phase 1: Proposed Olien Solar Project development on Portion 4 of Farm 300, Barkly West, near Limeacres, Northern Cape | HIA Phase 1 | 01/08/2012 | David Morris | McGregor Museum | Cape Environmental Assessment Practitioners | 28/09/2012 - 11:12 | |
AIA Krone-Endora Mining Right Application Areas | Archaeological Impact Assessment of the proposed Krone-Endora Diamond Mine (Mining Rights Applications 10011MR & 10017MR) on portions of farms Krone 104MS and Endora 66MS near Alldays, Musina, Limpopo Province | AIA Phase 1 | 24/04/2014 | Shadreck Chirikure, Foreman Bandama | Department of Mineral Resources | EcoPartners | 25/04/2014 - 14:35 | |
CTIIC East AIA | ARCHAEOLOGICAL ASSESSMENT OF THE PROPOSED CAPE TOWN INTERNATIONAL CONVENTION CENTRE 2 ON ERWEN 192, 245, 246 AND THE REMAINDER OF ERF 192, “SALAZAR SQUARE”, ROGGEBAAI, CAPE TOWN FORESHORE | Archaeological Specialist Reports | 25/10/2012 | Dave Halkett | Heritage Western Cape | Vidamemoria Heritage Consultants | 03/12/2012 - 18:28 | |
AIA_Maanhaarberge_&_Kombuisfonteinberge_Kaplan_JM_Apr10 | ARCHAEOLOGICAL SCOPING STUDY OF A PROPOSED WIND ENERGY FACILITY ON THE MAANHAARBERGE & KOMBUISFONTEINBERGE DE AAR NORTHERN CAPE | AIA Desktop | 08/04/2010 | Jonathan Kaplan | Agency for Cultural Resources Management | 16/06/2012 - 14:47 | ||
ARCHAEOLOGICAL SCOPING REPORT | ARCHAEOLOGICAL SCOPING REPORT for the Application of a Prospecting Right on Several Portions of the Farms Krokodilkraal 426 JQ, Voorspoed 421 JQ and Mamagalieskraal 420 JQ, Brits, North West | Heritage Scoping | 20/12/2021 | Tobias Coetzee | 26/01/2022 - 09:20 | |||
HIA Northern Lights | ARCHAEOLOGICAL SCOPING REPORT for Eco Elementum (Pty) Ltd on various farm portions near Welkom, Free State Province | Heritage Scoping | 25/04/2017 | Tobias Coetzee | 15/05/2017 - 10:34 | |||
ARCHAEOLOGICAL DESKTOP STUDY | ARCHAEOLOGICAL DESKTOP STUDY for the Proposed Tsebeblox Prospecting Right Application on Portion 25 and the Remaining Extent of the Farm Bankpan 225 IS and Portion 1 and the Remaining Extent of the Farm Killowen 465 IS, Bethal, Mpumalanga | AIA Desktop | 30/05/2022 | Tobias Coetzee | Tobias Coetzee | 04/07/2022 - 14:26 | ||
ARCHAEOLOGICAL DESKTOP STUDY | ARCHAEOLOGICAL DESKTOP STUDY for the Proposed Okavango 17449 Prospecting Right Application near Balfour, Mpumalanga | AIA Desktop | 21/03/2023 | Tobias Coetzee | 21/04/2023 - 09:53 | |||
ARCHAEOLOGICAL DESKTOP STUDY | ARCHAEOLOGICAL DESKTOP STUDY for the Proposed National Treasure Minerals Prospecting Right Application on Several Portions of the Farms Elandsfontein 102 JQ and Boschhoek 103 JQ, Rustenburg, North West | AIA Desktop | 21/06/2022 | Tobias Coetzee | Tobias Coetzee | 09/08/2022 - 17:34 | ||
ARCHAEOLOGICAL DESKTOP STUDY | ARCHAEOLOGICAL DESKTOP STUDY for the Proposed Elengabadi Construction & Projects Prospecting Right Application on Portion 1 and the Remaining Extent of the Farm Lymington 423, Kathu, Northern Cape | AIA Desktop | 11/01/2023 | Tobias Coetzee | 16/01/2023 - 13:32 | |||
ARCHAEOLOGICAL DESKTOP STUDY for the Proposed Diepsoils Prospecting Right Application | ARCHAEOLOGICAL DESKTOP STUDY for the Proposed Diepsoils Prospecting Right Application on the Remaining Extent of Portion 8 of the Farm Bankpan 225 IS, Bethal, Mpumalanga | AIA Desktop | 12/04/2022 | Tobias Coetzee | 24/05/2022 - 14:33 | |||
ARCHAEOLOGICAL DESKTOP STUDY | ARCHAEOLOGICAL DESKTOP STUDY for the Application of a Prospecting Right on several Portions of the Farms Golden Valley 621 IQ, Kaalfontein 44 IQ, Koestersfontein 45 IQ, Migalsoord 152 IQ, Rietpoort 395 JQ, Sluis 46 IQ, Vaalbank 512 JQ and Zuikerboschfontein 151 IQ, Magaliesburg, Gauteng | AIA Desktop | 18/04/2021 | Tobias Coetzee | 13/05/2021 - 13:02 | |||
ARCHAEOLOGICAL DESKTOP STUDY | ARCHAEOLOGICAL DESKTOP STUDY for the Application of a Prospecting Right on several Portions of the Farms Blaauwbank 505 JQ, Delarey 164 IQ, Delarey 168 IQ, Delarey 171 IQ, Greenway 715 IQ, Malonys Eye 169 IQ, Steenekoppie 153 IQ, Vlakplaats 160 IQ, Wallis Haven 154 IQ, Wolvekrans 156 IQ and Zuikerboschfontein 151 IQ, Magaliesburg, Gauteng | 18/04/2021 | Tobias Coetzee | 13/05/2021 - 13:07 | ||||
ARCHAEOLOGICAL DESKTOP STUDY | ARCHAEOLOGICAL DESKTOP STUDY for the Application of a Prospecting Right on Several Portions of the Farm Roodepoort 504 JR, Bronkhorstspruit, Gauteng | AIA Desktop | 26/10/2021 | Tobias Coetzee | 03/11/2021 - 07:33 | |||
Archarological Desktop Study | ARCHAEOLOGICAL DESKTOP STUDY for the application of a on portions 36, 37, 38, 3 9p,r o40s paencdt i4n1g orifg thhte Farm Boekenhoutkloof 315 JR, Pretoria North, Gauteng | AIA Desktop | 01/10/2017 | Tobias Coetzee | Klei Minerale (Pty) Ltd | 06/02/2018 - 15:07 | ||
Permit_SITE_UMV1_-_GLENDALE_Anderson_G_Jan96 | ARCHAEOLOGIC AL EXCAVATIONS AT THE SITE UMV1 - GLENDALE | Archaeological Permit Report | 01/01/1996 | Gavin Anderson | KwaZulu Natal Museum | 16/06/2012 - 14:53 | ||
AIA-N10Realignment | Archaeologgical Impact Assessment for the Proposed Realignment of the N10 to Facilitate Access to the Ilanga CSP Facility Site, East of Upington, NC Province | Archaeological Specialist Reports | 13/03/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 21/04/2015 - 15:00 | |
AIA_Grootvlei-Balfour_Powerline_Van_der_Walt_J_Nov10 | Archaeolgocal Impact Assessment. Amendment to the existing report for the Grootvlei-Balfour Powerline, Burnstone Gold Mine Project, Balfour, Mpumalanga | AIA Phase 1 | 11/11/2010 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | 16/06/2012 - 14:45 | ||
9-2-060-0038-20070318-CA | Archaeolgical Impact Assessment Report: Uilenkraal Chicken Farm (10 km North of Darling, Swartland 'B' Municipality, West Coast District 'C' Municipality, Malmesbury Magisterial District, Western Cape) | AIA Phase 1 | 18/03/2007 | Hilary Deacon | MAPID_01950 | 16/06/2012 - 14:36 | ||
AIA_Kai_Kai_Morris_D_Nov05 | Archaeolgical Impact Assessent at the Kai Kai Coastal Estate Development South of Port Nolloth, Northern Cape | AIA Phase 1 | 01/11/2005 | David Morris | McGregor Museum | MAPID_00923 | 16/06/2012 - 14:46 | |
Archaeological Scoping Report | Archaeoilogical Scoping Report for the proposed RE Capital 11 Solar Development | AIA Desktop | 28/08/2014 | Lita Webley | ACO Associates CC | Cape Environmental Assessment Practitioners | 03/09/2014 - 13:37 | |
Permit_Project_Lion_Phase_II_Huffman_TN_May05 | Archaelogical Mitigation for Project Lion: A Phase II Report Prepared for Xstrata Alloys | AIA Phase 2 | 01/05/2005 | Thomas Huffman | University of the Witwatersrand - Archaeological Resources Management | MAPID_02899 | 16/06/2012 - 14:53 | |
9-2-273-0001-20030201-NCHM | Arch Survey Mantserre-Kraalhoek-Mopyane Water Scheme, NW Province | AIA Phase 1 | 01/02/2003 | Johnny Van Schalkwyk | National Cultural History Museum | MAPID_00774 | 16/06/2012 - 14:41 | |
PIA Arcelor Mittal LPG Facility | ARCELOR-MITTAL SA PROPOSED SALDANHA BAY LPG FACILITY SITE SELECTION - Vredenburg District, Saldanha Bay Municipality, Western Cape | PIA Phase 1 | 21/09/2010 | John Pether | ERM Cape Town | CTS_343908 | 17/11/2015 - 09:09 | |
AIA_Keboes_37_Van_Schalkwyk_JA_Apr10 | Arcaheological Impact Survey Report for The land use change on sections of the farm Keboes 37, Gordonia District, Northern Cape Province | AIA Phase 1 | 04/04/2010 | Johnny Van Schalkwyk | Cultmatrix CC | 16/06/2012 - 14:46 | ||
AIA for Grootkop Energy Facility 515 | Arcaheological Impact Assessment for the proposed Grootkop Solar Energy Facility, Free State Province | AIA Phase 1 | 30/08/2013 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 22/05/2014 - 11:40 | |
PIA_Arcadia_139_Almond_JE_Oct10 | Arcadia 139: Residential Development of Erf 709 and Erf 710 Kruisfontein, Humansdorp, Kouga Municipality, Eastern Cape Province | PIA Phase 1 | 11/10/2010 | John E Almond | Natura Viva CC | 16/06/2012 - 14:53 | ||
Villa Liza Amended | Arahcaeological Investigation Study for the proposed 3MW Solar Power farm on Portion 12 & 13 of Farm Villa Liza 675 IR Mapleton, Ekurhuleni Metropolitan Municipality, Gauteng Province | AIA Phase 1 | 06/03/2013 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | Phaki Phakanani | 06/03/2013 - 08:30 | |
EverestSolar Energy Facility - Heritage Report | Aracheological Impact Assessment report for the Proposed Everest Solar Energy Facility | Archaeological Specialist Reports | 30/08/2013 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 28/05/2013 - 09:01 | |
Heritage Report for TSE Distribution Substation 732 | Aracheological Impact Assessment for the Proposed Establishment of the Tse Distribution Substation on Portion 8 of the Farm Damfontein 114, near Nourpoort, Umsombomvu Local Municipality, Northern Cape Province | HIA Phase 1 | 31/10/2012 | Celeste Booth, Sholeen Shanker | Albany Museum - Archaeology | CTS_11079 | 08/02/2013 - 11:03 | |
April_2016_ECPHRA_Report | April_2016_ECPHRA_Report | Archaeological Permit Report | 01/04/2016 | Erich Fisher | 11/01/2017 - 22:12 | |||
Application-form-A-Structures (AMAFA) Picture Report | Application-form-A-Structures (AMAFA) Picture Report | 24/01/2023 | Darren Gregory Scott Clifton | DGSC Designs | DGSC Designs | 07/02/2023 - 16:29 | ||
Permit application for graves relocation in Labore | Application to the South African Heritage Resources Agency for Permit to exhume and relocate ten graves found in Labore, Brakpan, Gauteng Province. | BGG Phase 1 | 24/06/2021 | Makhosazana Mngomezulu | Vungandze Projects | 24/06/2021 - 23:05 | ||
Application for Demolition | Application to KwaZulu-Natal AMAFA & Research Institute for the Demolition of existing buildings at 23/25 Highlands Road, Hillcrest on ERF 2909, Hillcrest. | Built Environment and Cultural Landscapes | 30/05/2022 | 21/06/2022 - 13:20 | ||||
141 Florida Road | Application to KwaZulu-Natal AMAFA & Research Institute for the Additions and Alterations of existing 60 year old buildings at 141 Florida Road on Erf 913, Durban. | 27/05/2022 | Frank Reitz | Frank Reitz Architect | 28/06/2022 - 10:04 | |||
Application for Demolition of the Old Railway Building on the Farm Driehoekspan 435 near Glosam, Northern Cape | Application submitted to the South African Heritage Resources Agency (SAHRA) in terms Section 34 and Section 38 of the National Heritage Resources Act (No 25 of 1999) for the demolition of an Old Railway Building on the Farm Driehoekspan 435 near Glosam in the Tsantsabane Local Municipality, Northern cape | HIA Phase 1 | 11/07/2022 | Edward Matenga | (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd | (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd | 14/07/2022 - 13:20 | |
Heritage Impact Assessment for the Demolition of the Old Railway Building on the Farm Driehoekspan 435, Glosam Northern Cape | Application submitted to the South African Heritage Resources Agency (SAHRA) in terms Section 34 and Section 38 of the National Heritage Resources Act (No 25 of 1999) for the demolition of an Old Railway Building on the Farm Driehoekspan 435 near Glosam in the Tsantsabane Local Municipality, Northern Cape | Heritage Impact Assessment Specialist Reports | 11/07/2022 | Edward Matenga | (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd | (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd | 14/07/2022 - 14:09 | |
Desktop PIA, Application for Exemption Phase 1 PIA Kendal Power Station | Application letter for exemption from Phase 1 site visit PROPOSED DEVELOPMENT OF A LOW PRESSURE SYSTEM (LPS) PIPELINE AND 11KV POWERLINE IN ASSOCIATION WITH AN EXISTING AUTHORISED (EA DATED 28 JULY 2015) ASH DISPOSAL FACILITY (ADF) AT THE KENDAL POWER STATION, EMALAHLENI AND DELMAS LOCAL MUNICIPALITIES, NKANGALA DISTRICT MUNICIPALITY, MPUMALANGA PROVINCE. | PIA Desktop | 22/11/2022 | Gideon Groenewald | Vungandze Projects | 29/11/2022 - 10:17 |