FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitlesort ascending ReportType ReportDate Authors AuthoringBody CommissioningCompany MapID < 2009 Post date
A PHASE 1 HIA & REPORT FOR THE WOOD FAMILY TRUST DAM PROJECTS ON VARIOUS FARMS AND FARM PORTIONS NEAR WARDEN IN THE FREESTATE PROVINCE A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE WOOD FAMILY TRUST DAM PROJECTS ON VARIOUS FARMS AND FARM PORTIONS NEAR WARDEN IN THE FREESTATE PROVINCE - APAC023/30 HIA Phase 1 17/04/2023 Anton Pelser APELSER ARCHAELOGICAL CONSULTING AquaStrat Solutions Pty Ltd 22/07/2023 - 10:45
Phase 1 Heritage Impact Assessment & Report for the Walt Landgoed (Pty) Ltd A Phase 1 Heritage Impact Assessment & Report for the Walt Landgoed (Pty) Ltd Development on Portion 15 of the Farm Hartbeesfontein 638 IR near Villiers, Mpumalanga Province Heritage Impact Assessment Specialist Reports 17/09/2020 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING 22/09/2020 - 11:05
A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE VANADIUM RESOURCES: STEELPOORTDRIFT MINING DEVELOPMENT A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE VANADIUM RESOURCES: STEELPOORTDRIFT MINING DEVELOPMENT ON PORTIONS 1 TO 6 OF THE FARM STEELPOORTDRIFT 365KT NEAR STEELPOORT IN THE LIMPOPO PROVINCE AIA Phase 1 01/10/2022 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Red Kite Environmental Solutions (Pty) Ltd 31/10/2022 - 14:24
A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE VANADIUM RESOURCES SALT ROAST LEACH PLANT A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE VANADIUM RESOURCES SALT ROAST LEACH PLANT ON A PORTION OF PORTIONS 3 & 13 OF THE FARM TWEEFONTEIN 360KT NEAR STEELPOORT IN THE LIMPOPO PROVINCE AIA Phase 1 01/04/2022 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Red Kite Environmental Solutions (Pty) Ltd 15/11/2022 - 21:25
Portion 15 of Tweefontein 360KT Phase 1 HIA A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE PROPOSED SOLAR & WASTE WATER TREATMENT WORKS DEVELOPMENT ON PORTIONS OF PORTION 15 OF THE FARM TWEEFONTEIN 360KT NEAR STEELPOORT IN THE LIMPOPO PROVINCE - APAC022/98 HIA Phase 1 01/10/2022 Anton Pelser APELSER ARCHAELOGICAL CONSULTING Eco8 Environmental Planners 14/11/2022 - 15:50
Onderstepoort Extension 45 A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE PROPOSED ONDERSTEPOORT EXTENSION 45 TOWNSHIP DEVELOPMENT ON PORTIONS 71-73 & PORTIONS 77-78 OF THE FARM HAAKDOORNBOOM 267JR NEAR SOSHANGUVE IN THE TSHWANE METROLPOLITAN MUNICIPALITY OF GAUTENG - APAC021/14 HIA Phase 1 11/02/2021 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Envirovision Consulting CC 16/02/2021 - 08:41
A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE PROPOSED KLERKSOORD FILLING STATION A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE PROPOSED KLERKSOORD FILLING STATION DEVELOPMENT ON PORTION 355 OF THE FARM WITFONTEIN 301JR TSHWANE METROPOLITAN AREA, GAUTENG HIA Phase 1 06/01/2021 12/01/2022 - 15:36
PHASE 1 HIA FRO KLERKSOORD FILLING STATION A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE PROPOSED KLERKSOORD FILLING STATION DEVELOPMENT ON PORTION 355 OF THE FARM WITFONTEIN 301JR TSHWANE METROPOLITAN AREA, GAUTENG HIA Phase 1 06/01/2021 12/01/2022 - 15:56
Davel HIA A Phase 1 Heritage Impact Assessment & Report for the Proposed Formalization of the Msukaligwa Informal Settlement near Davel/Kwadela Msukaligwa Local Municipality, Mpumalanga HIA Phase 1 11/04/2023 Anton Apelser APELSER ARCHAEOLOGICAL CONSULTING APELSER ARCHAEOLOGICAL CONSULTING 06/06/2023 - 13:10
A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE KOOFONTEIN MINING RIGHTS APPLICATION A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE KOOFONTEIN MINING RIGHTS APPLICATION ON VARIOUS PORTIONS OF THE FARMS KOOFONTEIN 265JQ & BOSCHFONTEIN 268JQ NEAR RUSTENBURG, NORTHWEST PROVINCE AIA Phase 1 01/04/2021 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Red Kite Environmental Solutions (Pty) Ltd 17/02/2022 - 13:39
PHASE 1 HIA - DOVHENI DEMARCATION OF SITES A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE DEMARCATION OF SITES AS PART OF TOWNSHIP ESTABLISHMENT ON THE REMAINDER OF THE FARM GOEDVERWACHTING 19LT MAKHADO LOCAL MUNICIPALITY, LIMPOPO PROVINCE HIA Phase 1 06/09/2021 Anton Pelser ASSOCIATION OF SOUTH AFRICAN PROFESSIONAL ARCHEAOLOGISTS APELSER ARCHAEOLOGICAL CONSULTING 13/09/2021 - 11:11
PHASE 1 HIA - DOVHENI DEMARCATION OF SITES A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE DEMARCATION OF SITES AS PART OF TOWNSHIP ESTABLISHMENT ON THE REMAINDER OF THE FARM GOEDVERWACHTING 19LT MAKHADO LOCAL MUNICIPALITY, LIMPOPO PROVINCE HIA Phase 1 06/09/2021 Anton Pelser ASSOCIATION OF SOUTH AFRICAN PROFESSIONAL ARCHEAOLOGISTS APELSER ARCHAEOLOGICAL CONSULTING 13/09/2021 - 10:57
A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE BOKONI PLATINUM MINE COMMUNITY BRIDGE PROJECT A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE BOKONI PLATINUM MINE COMMUNITY BRIDGE PROJECT ON A PORTION OF THE FARM MIDDELPUNT 420KS NORTH OF LEBOWAKGOMO IN THE LIMPOPO PROVINCE AIA Phase 1 15/06/2022 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Red Kite Environmental Solutions (Pty) Ltd 28/07/2022 - 16:23
Zandspruit Sewer Pipeline A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE ZANDSPRUIT BULK SEWERLINE WULA ON PORTIONS OF THE FARM ZANDSPRUIT 191IQ, GAUTENG HIA Phase 1 13/04/2022 APELSER ARCHAEOLOGICAL CONSULTING APELSER ARCHAEOLOGICAL CONSULTING 23/01/2023 - 14:24
Zanspruit Sewer A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE ZANDSPRUIT BULK SEWERLINE WULA ON PORTIONS OF THE FARM ZANDSPRUIT 191IQ, GAUTENG HIA Phase 1 13/04/2022 APELSER ARCHAEOLOGICAL CONSULTING 24/01/2023 - 08:27
HIA for Kenleaf x 35 A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE PROPOSED KENLEAF EXTENSION 35 TOWNSHIP DEVELOPMENT ON PORTIONS 196 & 197 OF RAND COLLIERIES AGRICULTURAL HOLDINGS NEAR BRAKPAN, EKHURHULENI, GAUTENG HIA Phase 1 15/03/2023 Anton Apelser 29/03/2023 - 09:13
A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE KOOFONTEIN MINING RIGHTS APPLICATION A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE KOOFONTEIN MINING RIGHTS APPLICATION ON VARIOUS PORTIONS OF THE FARMS KOOFONTEIN 265JQ & BOSCHFONTEIN 268JQ NEAR RUSTENBURG, NORTHWEST PROVINCE AIA Phase 1 01/04/2021 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Red Kite Environmental Solutions (Pty) Ltd 17/02/2022 - 13:31
HIA Prt350-THE-WILLOWS A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR RESIDENTIAL DEVELOPMENT ON PORTION 350 OF THE FARM THE WILLOWS 350JR TSHWANE METROPOLITAN AREA, GAUTENG. For: Pierre Joubert Professional Landscape Architect & Environmental Planner [15 Marikana Street, WIERDAPARK, CENTURION, 0157]. REPORT: APAC021/71. by: APAC – APELSER ARCHAEOLOGICAL CONSULTING (Accredited member of ASAPA) , September 2021 .Member: AJ Pelser BA (UNISA), BA (Hons) (Archaeology), MA (Archaeology) [WITS]. [P.O.BOX 73703 LYNNWOOD RIDGE0040 Tel: 083 459 3091 Fax: 086 695 7247 Email: apac.heritage@gmail.com Comprehensive and Professional Solutions for all Heritage Related Matters. CK 2006/014630/23 VAT NO.: 4360226270. HIA Phase 1 30/09/2021 Anton Pelser Anton Pelser PIERRE JOUBERT LANDSCAPE ARCHITECT & ENVIRONMENTAL PLANNER 07/10/2021 - 14:10
Zandspruit Extensions 97-103 A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR PROPOSED ZANDSPRUIT Extensions 97, 103 and 104 TOWNSHIP ESTABLISHMENTS ON VARIOUS PORTIONS OF THE FARM ZANDSPRUIT 191IQ (SONNEDAL AREA B), GAUTENG - APAC020/13 HIA Phase 1 03/02/2020 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Bokamoso Landscape Architects and Environmental Consultants CC 18/08/2020 - 10:50
Zandspruit Extensions 93-96 A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR PROPOSED ZANDSPRUIT EXTENSIONS 93-96 TOWNSHIP ESTABLISHMENT ON VARIOUS PORTIONS OF THE FARM ZANDSPRUIT 191IQ (SONNEDAL AREA C), GAUTENG - APAC020/14 HIA Phase 1 03/02/2020 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Bokamoso Landscape Architects and Environmental Consultants CC 18/08/2020 - 10:40
Kirkney HIA A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR PROPOSED TOWNSHIP DEVELOPMENT ON PORTION 136 OF THE FARMS ZANDFONTEIN 317JR NEAR KIRKNEY, GREATER TSHWANE MUNICIPALITY GAUTENG PROVINCE HIA Phase 1 27/01/2023 Anton Apelser ASSOCIATION OF SOUTH AFRICAN PROFESSIONAL ARCHEAOLOGISTS APELSER ARCHAEOLOGICAL CONSULTING 13/03/2023 - 15:51
PHASE 1 HIA & REPORT FOR PROPOSED DEVELOPMENT ON PORTION 39 OF ERF 493 OF THE FARM KALKHEUWEL 493JQ, GAUTENG A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR PROPOSED DEVELOPMENT ON PORTION 39 OF ERF 493 OF THE FARM KALKHEUWEL 493JQ, GAUTENG - APAC023/18 HIA Phase 1 01/03/2023 Anton Pelser APELSER ARCHAELOGICAL CONSULTING Nali Sustainability Solutions (Pty) Ltd 26/04/2023 - 08:44
PROPOSED FILLING STATION DEVELOPMENT ON ERVEN 296 & 298-301, REMBRANDT PARK EXTENSION 5 A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR A PROPOSED FILLING STATION DEVELOPMENT ON ERVEN 296 & 298-301, REMBRANDT PARK EXTENSION 5 IN EDENVALE, GAUTENG - APAC020/64 HIA Phase 1 31/08/2020 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Nali Sustainability Solutions (Pty) Ltd 04/09/2020 - 11:49
Thorntree East HIA A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE PROPOSED THORNTREE VIEW EAST DEVELOPMENT ON VARIOUS PORTIONS OF THE FARMS HAAKDOORNBOOM 267JR & KRUISFONTEIN 259JR NEAR SOSHANGUVE, GAUTENG HIA Phase 1 03/08/2020 APELSER ARCHAEOLOGICAL CONSULTING 23/06/2021 - 11:00
Project Fairway A Phase 1 Cultural ad Heritage impact Assessment 9HIA) study for the proposed extension of mining operations (Project Fairway) at Everest Platinum mine on parts of several adjoining farms in the Steenkampsberge between Roosenekal and lydenburg in the Mpumalnga province of South Africa. HIA Phase 1 01/10/2011 Julius CC Pistorius Metago Environmental Engineers (Pty) Ltd 22/04/2013 - 15:05
AIA - Wesley-Peddie A Phase 1 Archaerological Impact Assessments of the Proposed Wesley-Peddie 132 KV Power Line for the Authorised Uncedo Lwethu Wind Energy Facility, Ngqushwa Local Municipality, Amathole District, Eastern Cape Province AIA Phase 1 21/04/2014 Johan Binneman Eastern Cape Heritage Consultants Savannah Environmental (Pty) Ltd 25/04/2014 - 16:26
HIA - Proposed agricultural area for Duma 201-JU A Phase 1 Archaeological/Heritage Impact Assessment for a proposed citrus plantation on portion 5 of the farm Duma 201-JU, City of Mbombela, Mpumalanga Province HIA Phase 1 25/11/2021 Christine Van Wyk Rowe SAHRA Council SAHRA Council 13/12/2021 - 13:43
9-2-212-0001-20000901-ACHMC A Phase 1 Archaeological Survey of Portions 11777, 1178, 1179, 1180, 1181, 1182 of the Farm Hartebeespoort B 410 JQ in the Brits District of the North West: Addendum to the Environmental Management Programme Done for Eagle Quarries AIA Phase 1 01/09/2000 Julius CC Pistorius MAPID_01171 16/06/2012 - 14:38
9-2-242-0003-19991001-ACHMC A Phase 1 Archaeological Survey and Assessment for Impala Imperial Quarry on Portions 500 JS and 778 JS of the Farm Mapochsgronde in the Mpumalanga Province of SA AIA Phase 1 01/10/1999 Julius CC Pistorius MAPID_01131 16/06/2012 - 14:39
9-2-018-7204-19980601-ACO A Phase 1 Archaeological Investigation of Portions of Waterhof, Hof Street, Cape Town AIA Phase 1 01/06/1998 Timothy Hart, Dave Halkett ACO Associates CC MAPID_00476 16/06/2012 - 14:34
9-2-101-0012-20021201-ACO A Phase 1 Archaeological Investigation of Portions of Land at Bekbaai and Paternosterbaai, Paternoster AIA Phase 1 01/12/2002 Dave Halkett, Timothy Hart ACO Associates CC MAPID_00407 16/06/2012 - 14:37
AIA_Mosselbaai_Natuurreservaat_Nilssen_PJ_Dec98 A Phase 1 Archaeological Investigation of Mosselbaai Natuurreservaat CC, a portion of Verlorenvlei Farm (Number 8), Elandsbaai AIA Phase 1 27/12/1998 Peter Nilssen Archaeological Exposures MAPID_01926 16/06/2012 - 14:48
9-2-101-0012-19980501-ACO A Phase 1 Archaeological Investigation of Farm 1062 (Previously 967) Paternoster AIA Phase 1 01/05/1998 Dave Halkett, Timothy Hart ACO Associates CC MAPID_00196 16/06/2012 - 14:37
9-2-022-0029-19980501-ACO A Phase 1 Archaeological Investigation of a Section of the Farm 'Malkoppan' West of the Coastal Road, Lamberts Bay AIA Phase 1 01/05/1998 Dave Halkett, Timothy Hart ACO Associates CC MAPID_00187 16/06/2012 - 14:34
9-2-022-0024-19951001-ACO A Phase 1 Archaeological Investigation of a Portion of Malkoppan AIA Phase 1 01/10/1995 Timothy Hart, Dave Halkett ACO Associates CC MAPID_00184 16/06/2012 - 14:34
Heritage - Nojoli A phase 1 archaeological impact assessments of the proposed new substation and 132kv power line at the Nojoli wind farm near Cookhouse, Blue Crane Route Local Municipality, Cacadu District, Eastern Cape Province AIA Phase 1 01/11/2013 Johan Binneman Eastern Cape Heritage Consultants Savannah Environmental (Pty) Ltd 14/11/2013 - 16:25
N10/3 AIA A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT: UPGRADE OF N10 SECTION 3 FROM THE RIET RIVER (KM45.2) TO TARKA BRIDGE (KM 68.5) Archaeological Specialist Reports 06/06/2013 Celeste Booth Albany Museum - Archaeology Coastal & Environmental Services - Grahamstown 02/05/2013 - 11:13
AIA_Kei_Beach_Hotel_Binneman_J_Dec08 A Phase 1 Archaeological Impact Assessment: The Proposed Kei Beach Hotel and Apartment Development, Erven 160, 161, 162 and 163, Kei River, Amathole District Municipality, Eastern Cape Province AIA Phase 1 01/12/2008 Johan Binneman, Celeste Booth Albany Museum MAPID_02063 16/06/2012 - 14:46
AIA_SAPS_Call_Centre_Central_Hill_Binneman_J_Dec08 A Phase 1 Archaeological Impact Assessment: South African Police Services (SAPS) 10111 Call Centre, Erven 530 and 4162, Central Hill, Port Elizabeth, Eastern Cape Province AIA Phase 1 01/12/2008 Johan Binneman, Celeste Booth Albany Museum MAPID_02127 16/06/2012 - 14:49
9-2-083-0004-20060601-ACRM A Phase 1 Archaeological Impact Assessment: Somerset West Business Park Sewer, Somerset West, Cape Town AIA Phase 1 01/06/2006 Jonathan Kaplan Agency for Cultural Resources Management MAPID_02845 16/06/2012 - 14:37
9-2-052-0020-20061001-ACRM A Phase 1 Archaeological Impact Assessment: Proposed Development Portion 6 of the Farm 575 Afdaksrivier Caledon AIA Phase 1 01/10/2006 Jonathan Kaplan Agency for Cultural Resources Management MAPID_02860 16/06/2012 - 14:35
9-2-052-0020-20060601-ACRM A Phase 1 Archaeological Impact Assessment: Proposed Development Portion 5 of Farm 436 Caledon AIA Phase 1 01/06/2006 Jonathan Kaplan Agency for Cultural Resources Management MAPID_02844 16/06/2012 - 14:35
9-2-052-0020-20060601b-ACRM A Phase 1 Archaeological Impact Assessment: Proposed Development Erven 3002, 3326 & 3327 (Hornlee) Knysna AIA Phase 1 01/06/2006 Jonathan Kaplan Agency for Cultural Resources Management MAPID_02846 16/06/2012 - 14:35
AIA: Airstrip and Two Proposed Sites for Construction of Family Lodge, Kwandwe Private Game Reserve A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT OF TWO PROPOSED SITES FOR THE CONSTRUCTION OF AN AIRSTRIP & TWO PROPOSED SITES FOR A FAMILY LODGE ON PORTION 3 (KOODOOS RUN) (A PORTION OF PORTION 2) OF THE FARM NOOITGEDAGT NO. 92 AND PORTION 2 (THE FORT) OF THE FARM KOESTERS DRIFT NO. 129, KWANDWE PRIVATE GAME RESERVE, EASTERN CAPE AIA Phase 1 01/08/2013 Johan Binneman Eastern Cape Heritage Consultants CEN Integrated Environmental Management Unit CTS_ 17/08/2017 - 13:12
9-2-060-0001-20051201-ACRM A Phase 1 Archaeological Impact Assessment of Two Proposed Borrow Pits Along the DR 1154 Riebeek Kasteel AIA Phase 1 01/12/2005 Jonathan Kaplan Agency for Cultural Resources Management MAPID_00052 16/06/2012 - 14:36
9-2-022-0036-20050801-ACRM A Phase 1 Archaeological Impact Assessment of Two Borrow Pits Along the MR 310 Citrusdal AIA Phase 1 01/08/2005 Jonathan Kaplan Agency for Cultural Resources Management MAPID_00045 16/06/2012 - 14:34
9-2-022-0024-20060701-ACRM A Phase 1 Archaeological Impact Assessment of Three Borrow Pits Alongside MR 539 and DR 1487, Clanwilliam AIA Phase 1 01/07/2006 Jonathan Kaplan Agency for Cultural Resources Management MAPID_02850 16/06/2012 - 14:34
AIA_Farm_1014_Vredenburg_Kaplan_JM_Jan03 A Phase 1 Archaeological Impact Assessment of the Remainder of Farm 1014 Groot Paternoster, Vredenburg, Cape West Coast AIA Phase 1 02/01/2003 Jonathan Kaplan Agency for Cultural Resources Management 16/06/2012 - 14:45
AIA_Goedgeloof_745_prt_176_Binneman_J_Jul11 A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED, SUBDIVISION AND REZONING OF PORTION 176 OF THE FARM GOEDGELOOF NO. 745, FROM AGRICULTURE ZONE 1 TO SPECIAL ZONE FOR RURAL RESIDENTIAL PURPOSES IN ST FRANCIS BAY, KOUGA LOCAL MUNICIPALITY, EASTERN AIA Phase 1 28/07/2011 Johan Binneman Eastern Cape Heritage Consultants 16/06/2012 - 14:45
Phase 1 AIA: Rocky Coast Housing A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED ROCKY COAST RESIDENTIAL DEVELOPMENT ON PORTION 78 & 79 OF FARM ONGEGUNDE VRYHEID NO. 746 (ROCKY COAST FARM) AT CAPE ST FRANCIS IN THE KOUGA LOCAL MUNICIPALITY OF THE EASTERN CAPE PROVINCE AIA Phase 1 01/09/2019 Johan Binneman Eastern Cape Heritage Consultants Public Process Consultants 22/11/2019 - 12:06

Pages

CSV
 
 

Search form