FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportTypesort descending ReportDate Authors AuthoringBody CommissioningCompany MapID < 2009 Post date
HIA for Whitney Gardens Housing Development Phase 1 Archaeological and Heritage Impact Assessment for the Proposed Housing Development remainder of portions 130, 368, 543 Syferfontein 51 IR, Whitney Gardens Ext.18 (Lyndhurst), under City of Johannesburg Metropolitan Municipality, Gauteng Province. Heritage Impact Assessment Specialist Reports 23/08/2022 Trust Mlilo Integrated Specialist Services (Pty) Ltd Integrated Specialist Services (Pty) Ltd 02/02/2023 - 14:47
Logagane HIA revised final Heritage Impact Assessment Specialist Reports 18/06/2013 Wouter Fourie PGS Heritage and Grave Relocation Consultants Environmental Impact Management Services (Pty) Ltd 18/06/2013 - 14:12
Uitkoms DBAR Heritage Report Cultural Heritage Impact Assessment Of The Proposed Uitkoms Antra, Coal-Link Project, Mpumalanga Province Heritage Impact Assessment Specialist Reports 21/02/2014 Frans Prins Active Heritage CC Sivest - Gauteng 14/04/2015 - 13:54
Heritage Impact Assessment for the proposed Aggeneys Wind and Solar Facility Heritage Impact Assessment for the proposed Aggeneys Wind and Solar Facility Heritage Impact Assessment Specialist Reports 01/09/2022 Jaco van der Walt Beyond Heritage Enviro-Insight CC 07/11/2022 - 09:17
SPAR Perseverance Distribution Centre Heritage Impact Assessment Heritage Impact Assessment Report for the proposed SPAR Warehouse and Associated Infrastructure, Port Elizabeth Heritage Impact Assessment Specialist Reports 06/02/2017 Wouter Fourie, Jennifer Kitto PGS Heritage and Grave Relocation Consultants Sivest - Gauteng 26/04/2017 - 13:41
Third Road Bridge Heritage Screener Report Third Road Bridge Heritage Screener Report Heritage Impact Assessment Specialist Reports 10/11/2017 Nicholas Wiltshire Envirolution Consulting (Pty) Ltd 09/01/2018 - 09:10
Adendum to Sorata-Witsieshoek 132kV Line HIA ADDENDUM TO HIA In terms of Section 38(8) of the NHRA for a Sorata-Witsieshoek 132kV Line Heritage Impact Assessment Specialist Reports 10/12/2018 Jenna Lavin CTS Heritage 28/01/2019 - 15:37
Hoogland 1 Wind Farm and Hoogland 2 Wind Farm Heritage Report HERITAGE IMPACT ASSESSMENT: PROPOSED HOOGLAND 1 WIND FARM AND HOOGLAND 2 WIND FARM, BEAUFORT WEST MAGISTERIAL DISTRICT, WESTERN CAPE Heritage Impact Assessment Specialist Reports 01/07/2022 Jayson Orton, Elize Butler ASHA Consulting(Pty) Ltd, Banzai Environmental (Pty) Ltd SLR Consulting (South Africa) (Pty) Ltd 22/03/2022 - 13:39
Jacaranda trees HIA Heritage impact assessment: removal of the Jacaranda mimosaefolia trees at the intersection of West and Burger Streets, Pietermaritzburg, for the alignment of the Msunduzi Integrated Rapid Public Transport Network Heritage Impact Assessment Specialist Reports 30/01/2017 Archaic Consulting 05/04/2017 - 11:45
Nessie Knight Impact Assessment Nessie Knight Impact Assessment Heritage Impact Assessment Specialist Reports 30/07/2013 Deborah Whelan Archaic Consulting Eastern Cape Provincial Government 01/08/2013 - 17:40
Inanda Glebe HIA INANDA-GLEBE RETICULATION PROJECT, ETHEKWINI MUNICIPALITY, KWAZULU-NATAL HERITAGE IMPACT ASSESSMENT Heritage Impact Assessment Specialist Reports 28/04/2017 Jean Beater 01/06/2017 - 10:20
Twinsaver Kliprivier Tissue Manufacturing Capacity Expansion Heritage Report Heritage Impact Assessment Report for the Proposed Expansion of the Tissue Manufacturing Capacity at the Twinsaver Klipriver Operations Base near Henley on Klip, Gauteng Province. Heritage Impact Assessment Specialist Reports 20/05/2016 Stephan Gaigher G&A Heritage Management Consultants Sivest - Gauteng 22/06/2016 - 14:09
D1269 HIA / PIA Cultural Heritage Impact Assessment of the Proposed Upgrade of District Road (D1269) to Blacktop Surface. Msinga Local Municipality uMzinyathi District Municipality KwaZulu-Natal & Palaeontological Impact Assessment for the proposed upgrade of District Road D1269 (Msinga Local Municipality, KwaZulu-Natal) to a blacktop surface. Heritage Impact Assessment Specialist Reports 01/08/2018 14/08/2018 - 08:09
HIA for the Proposed 100MW PV Plant at the Samancor Chrome Operations, Steelpoort, Limpopo HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED 100MW PV PLANT AT THE SAMANCOR CHROME OPERATIONS, STEELPOORT, LIMPOPO Heritage Impact Assessment Specialist Reports 20/05/2021 Wouter Fourie PGS Heritage (Pty) Ltd Royal Haskoning DHV 03/11/2021 - 16:50
Construction of gravel road in Mashunka Village Proposed development of 1.6 km and upgrading of 4.7 km of gravel road in Mashunka Village Msinga LM, Mzinyathi District DM, KwaZulu-Natal. Heritage Impact Assessment Specialist Reports 06/11/2017 Len van Schalkwyk eThembeni Cultural Heritage Magalela & Associates (Pty) Ltd 10/11/2017 - 15:36
Cultural heritage impact assessment Cultural heritage impact assessment for THE DEVELOPMENT OF THE PROPOSED LIFE SOLAR POWER PLANT ON THE REMAINING EXTENT OF PORTION 2 OF THE FARM RUBY VALE NO 266 REGISTRATION DIVISION GORDONIA, NORTHERN CAPE PROVINCE Heritage Impact Assessment Specialist Reports 01/03/2016 Johnny Van Schalkwyk 30/05/2016 - 12:29
HIA FOR PRP KZN30/5/1/2/11361PR Archaeological and Heritage Impact Assessment for Prospecting Right Application for Lithium, Feldspar, Tin, Tantalum, Zinc, and Dimension Stone (general) on Various Farms, Situated in the Magisterial District of uGu (Port Shepstone), Kwazulu NataL Province Heritage Impact Assessment Specialist Reports 19/05/2023 Trust Mlilo Integrated Specialist Services Integrated Specialist Services (Pty) Ltd 10/06/2023 - 20:50
Mbeki Sun Heritage Report Heritage Studies for Mbeki Sun Heritage Impact Assessment Specialist Reports 09/10/2019 A Abzhanov HMS Auckland and HMS Londondery Crane Registered Quantity Surveyors 07/10/2021 - 15:54
Putfontein 103 HIA report Putfontein 103 Heritage impact assessment report Heritage Impact Assessment Specialist Reports 20/04/2015 - 10:04
Dantoprox Mining Permit Application HIA and phase 1 PIA HERITAGE SURVEY OF THE MINING PERMIT APPLICATION FOR PORTION ONE OF FARM THE CORNER 11328 ET, UMZUMBE, KZN Heritage Impact Assessment Specialist Reports 12/08/2021 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Dantoprox 18/08/2021 - 12:18
HIA - Khai-Ma WEF Heritage Impact Assessment for the Proposed Khai-Ma WEF on farm portions south of Pofadder in the NC Province Heritage Impact Assessment Specialist Reports 23/11/2015 Timothy Hart, Lita Webley, Dave Halkett, Natalie Kendrick ACO Associates CC Savannah Environmental (Pty) Ltd 07/01/2015 - 13:58
Tlisitseng 2 132kV Substation and Power Line Heritage Report TLISITSENG PROJECT - TLISITSENG 2 SUBSTATION AND POWER LINE Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 29/06/2017 Wouter Fourie PGS Heritage and Grave Relocation Consultants Sivest - Gauteng 07/07/2017 - 13:28
A PHASE 1 HIA REPORT FOR THE PROPOSED TOWNSHIP DEVELOPMENT OF MALAMULELE A PHASE 1 HIA REPORT FOR THE PROPOSED TOWNSHIP DEVELOPMENT OF MALAMULELE EXTENTION E AT MALAMULELE, WITHIN THE COLLINS CHABANE LOCAL MUNICIPALITY, LIMPOPO PROVINCE. Heritage Impact Assessment Specialist Reports 22/07/2022 Anton Pelser APELSER ARCHAELOGICAL CONSULTING 24/10/2022 - 11:44
ORWRDP Phase II Borrow Pits Addendum 1 Heritage Resources Identification and Assessment. Olifants River Water Resources Development Project Phase 2 (ORWRDP II). Borrow pits BP 13 & 22 Revised 2011/05/11 Heritage Impact Assessment Specialist Reports 11/05/2011 Willem Coenraad Nienaber University of Pretoria - Business Enterprises Aurecon - Head Office 14/02/2014 - 09:20
Heritage Impact Assessment: Gamohaan Seokama 22kV powerline Heritage Impact Assessment Specialist Reports 31/05/2022 07/06/2022 - 11:27
Heritage Reports Please note that there are two reports 1) Report done for the Goedetrouw Infrastructure Option (preferred option with the least impact on heritage resources and graves), and 2) The Ketting Infrastructure Option, which was evaluated as an alternative option. Heritage Impact Assessment Specialist Reports 23/07/2019 Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants Bateleur Environmental & Monitoring Services (Pty) Ltd 16/08/2019 - 10:35
WRE Nkunzana Prospecting Right,Nkandla Local Municipality Nkunzana Prospecting Right Application: Heritage and Palaeontology Specialist Report Heritage Impact Assessment Specialist Reports 14/12/2018 - 15:09
HIA Dwarsug 07-01-19 Proposed Construction of an Access Road for the Dwarsrug Wind Farm, Near Loeriesfontein Phase 1 HIA Heritage Impact Assessment Specialist Reports 07/01/2019 IIan Smeyatsky PGS Heritage (Pty) Ltd Savannah Environmental (Pty) Ltd 04/04/2019 - 15:59
Heritage Impact Assessment Report Bishop 671 Portions 2 & 3: Prospecting boreholes and trenches Heritage Impact Assessment (HIA) Report March 2020 Heritage Impact Assessment Specialist Reports 17/03/2020 Stephan Gaigher G&A Heritage Management Consultants 18/03/2020 - 12:31
Heritage Impact Assessment Matjesspruit Heritage impact assessment for the ADDITIONAL AREA OF THE PROPOSED PHOTOVOLTAIC POWER PLANT ON A PORTION OF THE FARM MATJESSPRUIT 145HP, LEEUDORINGSTAD REGION, NORTH WEST PROVINCE Heritage Impact Assessment Specialist Reports 29/09/2015 Johnny Van Schalkwyk 14/10/2015 - 12:15
Oya Heritage Impact Assessment Proposed development of the 800MW Oya solar photovoltaic (PV) facility and associated infrastructure near Matjiesfontein, Western Cape Heritage Impact Assessment Specialist Reports 28/07/2020 Wouter Fourie SiVEST SA (Pty) Ltd PGS Heritage (Pty) Ltd 13/08/2020 - 19:23
Davel Project A Phase I Heritage Impact Assessment study for the proposed Davel Project near Bethal in the Mpumalanga Province Heritage Impact Assessment Specialist Reports 01/11/2017 Julius CC Pistorius Jaco K Consulting 21/02/2018 - 17:44
HIA Report Jacaranda Boardroom Heritage Impact Assessment in accordance to Section 27 (18) of NHRA 25 of 1999 for submission to SAHRA with Special Focus on Jacaranda Boardrooms upgrade of the Portions of the Farm Elandspoort 357- JR, Pretoria Heritage Impact Assessment Specialist Reports 21/02/2020 Judith Muindisi, Monika Lauferts le Roux Tsica Heritage Consultants National Department of Public Works 21/02/2020 - 09:56
Cosmo Lanseria HIA PROPOSED CONSTRUCTION OF COSMO CITY/LANSERIA BULK SUPPLY PIPELINE, JOHANNESBURG, GAUTENG Heritage Impact Assessment Specialist Reports 19/12/2013 Johnny Van Schalkwyk CTS_158348 04/03/2014 - 10:18
HIA Pelzvale Water and Sewer Line Heritage Impact Assessment for the Pelzvale Bulk Water and Sewer lines Heritage Impact Assessment Specialist Reports 01/09/2020 Leonie Marais Leonie Marais Heritage Practitioner Leonie Marais Heritage Practitioner 19/10/2020 - 11:09
UAR2967_NID De Grooteboom Mining Permit Application and Associated Environmental Management Plan: Notification of Intent to Develop Heritage Impact Assessment Specialist Reports 22/04/2015 Natasha Higgitt Digby Wells Environmental De Groote Boom Minerals (Pty) Ltd 22/04/2015 - 14:38
Cultural Heritage Assessment - Prime Spot Cultural Heritage Assessment of a Portion of Portion 1 of the Farm Vischgat 467IR, Sedibeng District Municipality, Midvaal Local Municipality, Gauteng Heritage Impact Assessment Specialist Reports 01/09/2013 Francois P Coetzee Umhlaba Environmental Consulting CC 18/01/2018 - 16:50
Ngwedi PV Proposed development of Ngwedi, a solar PV facility and associated infrastructure on Portion 3 of the Farm McTaggarts Camp 453, near Upington in the Northern Cape Province Heritage Impact Assessment Specialist Reports 23/03/2020 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 23/07/2020 - 07:04
HIA Ergo SEF (Phase 1) HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED ERGO MINING SOLAR (PV) ENERGY: PHASE 1 PROJECT, GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports 15/07/2021 Jaco van der Walt Tshedza 1 Pre Project Development (Pty) Ltd HCAC Heritage Consultants 17/09/2021 - 17:25
Amaoti Heritage Impact Assessment HIA DESKTOP FOR THE GREATER AMAOTI HOUSING DEVELOPMENT Heritage Impact Assessment Specialist Reports 07/11/2021 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management SiVEST SA (Pty) Ltd 30/11/2021 - 12:33
KwaTshatshu pedestrian bridge HERITAGE SURVEY OF THE KWATSHATSHU PEDESTRIAN BRIDGE, KING WILLIAMS TOWN, EASTERN CAPE Heritage Impact Assessment Specialist Reports 25/03/2015 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Coastal & Environmental Services - East London 26/03/2015 - 08:50
Heritage Impact Assessment (HIA) Report PROPOSED NEW TOWNSHIP DEVELOPMENT AT MANGAUNG Heritage Impact Assessment Specialist Reports 19/06/2020 Stephan Gaigher G&A Heritage Management Consultants INALUK Consulting services 11/06/2020 - 12:35
STEELPOORT TO MARBELHALL 400KV POWER-LINE COMPILATION OF CONSTRUCTION ENVIRONMENTAL MANAGEMENT PROGRAMMES FOR THE STEELPOORT TO MARBELHALL 400KV POWER-LINE AND THE STEELPOORT INTEGRATION PROJECT: HERITAGE RESOURCES ASSESSMENT Heritage Impact Assessment Specialist Reports 10/12/2012 Johnny Van Schalkwyk Iliso Consulting (Pty) Ltd 07/05/2013 - 15:06
VGRWSS-II: Upgrade of Existing Scheme - Heritage Impact Assessment Heritage Impact Assessment for the proposed Upgrade of the Vaal Gamagara Regional Water Supply Scheme Phase 2 Heritage Impact Assessment Specialist Reports David Morris, Abenicia Henderson McGregor Museum 21/08/2019 - 10:07
HIA: BEESHOEK MINE OPTIMISATION PROJECT HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED BEESHOEK MINE OPTIMISATION PROJECT, POSTMASBURG, NORTHERN CAPE PROVINCE Heritage Impact Assessment Specialist Reports 31/05/2021 Jaco van der Walt HCAC Heritage Consultants Envirogistics (Pty) Ltd 27/08/2021 - 09:13
UCD6170 - NID Notification of Intent to Develop - Proposed Dalyshope Coal Mining Project, situated in the Magisterial District of Lephalale, Limpopo Province Heritage Impact Assessment Specialist Reports 02/03/2021 Shannon Hardwick, Justin du Piesanie Digby Wells Environmental Anglo Operations Proprietary Limited 02/03/2021 - 20:06
HIA Sand Mine Concordia 2100 HERITAGE IMPACT ASSESSMENT: PROPOSED SAND MINE ON PLOT 2100, CONCORDIA, NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 31/12/2021 Jayson Orton ASHA Consulting(Pty) Ltd ASHA Consulting(Pty) Ltd 20/05/2022 - 09:18
HIA Mabopane Pedestrian and Cycle path CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH AT MABOPANE GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports 22/05/2013 Udo Kusel African Heritage Consultants CC SPOOR Environmental Services (PTY) Ltd. 10/07/2014 - 08:12
Heritage Impact Assessment (Nov'21) AppH - Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 11/11/2021 Cherene de Bruyn PGS Heritage (Pty) Ltd Savannah Environmental (Pty) Ltd 12/11/2021 - 09:10
Louw Wepener Monument A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR THE ALTERATIONS TO THE LOUW WEPENER MEMORIAL, BETHULIE, FREE STATE PROVINCE Heritage Impact Assessment Specialist Reports 12/11/2020 Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants Federasie van Afrikaanse Kultuurvereniginge 12/11/2020 - 10:20