THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 17051 - 17100 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
Ikwezi Mining Powerline and Substation Heritage Report | CULTURAL HERITAGE IMPACT ASSESSMENT OF G IKWEZI MINING 20 MVA 88/22KV SUBSTATION AND ASSOCIATED INGAGANE/UTRECHT/IKWEZI 88KV POWERLINE | Heritage Impact Assessment Specialist Reports | 23/05/2013 | 03/09/2013 - 18:48 | ||||
470328_Styldfrift TSF and associated infrastructure | HIA & Palaeo Assessment (Phase 1):Cultural Heritage Assessment for the Amendment to the Environmental Management Programme for the Proposed Tailings Storage Facility (TSF) and Associated Infrastructure at Royal Bafokeng Platinum Styldrift Mine Complex, Rustenburg Local Municipality, Bojanala District Municipality, North West Province | Heritage Impact Assessment Specialist Reports | 27/02/2015 | Francois Coetzee, Dr Heidi Fourie | 14/09/2015 - 11:58 | |||
HIA - Korana WEF | Heritage Impact Assessment for the Proposed Korana Wind Energy Facility on Farm Portions Namies South 2/212 and Poortjies 1/209 South of Pofadder in the NC Province | Heritage Impact Assessment Specialist Reports | 24/11/2014 | Timothy Hart, Lita Webley, Dave Halkett, Natalie Kendrick | ACO Associates CC | Savannah Environmental (Pty) Ltd | 08/01/2015 - 10:55 | |
Phase One Heritage Impact Assessment of the proposed Ulundi 19 Service Station | Phase One Heritage Impact Assessment of the proposed Ulundi 19 Service Station on Farm Dorsfontein, 526, GU, Ulundi, Ulundi Local Municipality, KwaZulu - Natal | Heritage Impact Assessment Specialist Reports | 25/05/2021 | Frans Prins | Active Heritage CC | Khobo Investment Properties (Pty( Ltd | 19/06/2021 - 12:24 | |
Heritage Impact Assessment - Mapleton | Heritage Impact Assessment Specialist Reports | 05/04/2017 | 10/12/2018 - 11:14 | |||||
Twinsaver Kliprivier Paper Mill Expansion Heritage Report | Heritage Impact Assessment Report for the Proposed Expansion of the Tissue Manufacturing Capacity at the Twinsaver Klipriver Operations Base near Henley on Klip, Gauteng Province. | Heritage Impact Assessment Specialist Reports | 20/05/2016 | Stephan Gaigher | G&A Heritage Management Consultants | Sivest - Gauteng | 23/06/2016 - 07:24 | |
Hoogland 3 Wind Farm and Hoogland 4 Wind Farm Heritage Report | HERITAGE IMPACT ASSESSMENT: PROPOSED HOOGLAND 3 WIND FARM AND HOOGLAND 4 WIND FARM, BEAUFORT WEST MAGISTERIAL DISTRICT, WESTERN CAPE AND FRASERBURG MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 19/01/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | SLR Consulting (South Africa) (Pty) Ltd | 13/04/2022 - 16:55 | |
HIA for Whitney Gardens Housing Development | Phase 1 Archaeological and Heritage Impact Assessment for the Proposed Housing Development remainder of portions 130, 368, 543 Syferfontein 51 IR, Whitney Gardens Ext.18 (Lyndhurst), under City of Johannesburg Metropolitan Municipality, Gauteng Province. | Heritage Impact Assessment Specialist Reports | 23/08/2022 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Integrated Specialist Services (Pty) Ltd | 02/02/2023 - 14:47 | |
Proposed K33/ K52 Road Intersection Development | HERITAGE IMPACT ASSESSMENT REQUIRED UNDER SECTION 38(8) OF THE NHRA (No. 25 OF 1999) PROPOSED K33/ K52 ROAD UPGRADE AND INTERSECTION DEVELOPMENT, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG | Heritage Impact Assessment Specialist Reports | 13/05/2018 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Heritage Contracts and Archaeological Consulting | 14/08/2018 - 14:59 | |
Panbult Interchange HIA | Archaeological and Heritage Impact Assessment Report for Proposed Panbult Interchange Upgrade in Mkhondo Local Municipality, Mpumalanga Province. | Heritage Impact Assessment Specialist Reports | 01/02/2016 | McEdward Murimbika, Palesa Mathibeli | LYMA Consulting Engineers | Nzumbululo Heritage Solutions | 24/03/2017 - 14:38 | |
Construction of gravel road in Gongolweni Village | Proposed development of 0.7 km and upgrading of 1.5 km gravel road in Gongolweni Village Msinga LM, Mzinyathi District DM, KwaZulu-Natal. | Heritage Impact Assessment Specialist Reports | 07/11/2017 | Len van Schalkwyk | eThembeni Cultural Heritage | Magalela & Associates (Pty) Ltd | 10/11/2017 - 16:04 | |
Heritage Impact Assessment for the proposed Aggeneys Wind and Solar Facility | Heritage Impact Assessment for the proposed Aggeneys Wind and Solar Facility | Heritage Impact Assessment Specialist Reports | 01/09/2022 | Jaco van der Walt | Beyond Heritage | Enviro-Insight CC | 07/11/2022 - 09:17 | |
HIA Kriel | PROPOSED EXPANSION OF THE EXISTING KRIEL ASH DAM FACILITY, KRIEL POWER STATION, KRIEL (GA-NALA), EMALAHLENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE | Heritage Impact Assessment Specialist Reports | 07/12/2016 | Polke Birkholtz | Professional Grave Solutions (Pty) Limited | Aurecon - Cape Town | 09/05/2017 - 13:39 | |
Heritage Report for Madadeni Sewer pipeline | CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE MADADENI BULK SEWER PIPELINE, NEWCASTLE REGION, KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | 01/06/2014 | Johnny Van Schalkwyk | Envirolution Consulting (Pty) Ltd | Envirolution Consulting (Pty) Ltd | 13/10/2014 - 13:25 | |
Cultural heritage impact assessment | Cultural heritage impact assessment for THE DEVELOPMENT OF THE PROPOSED LUTZBURG SOLAR POWER PLANT ON THE REMAINING EXTENT OF PORTION 2 OF THE FARM RUBY VALE NO 266 REGISTRATION DIVISION GORDONIA, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 01/03/2016 | Johnny Van Schalkwyk | 30/05/2016 - 13:17 | |||
Hoogland 1 Wind Farm and Hoogland 2 Wind Farm Heritage Report | HERITAGE IMPACT ASSESSMENT: PROPOSED HOOGLAND 1 WIND FARM AND HOOGLAND 2 WIND FARM, BEAUFORT WEST MAGISTERIAL DISTRICT, WESTERN CAPE | Heritage Impact Assessment Specialist Reports | 01/07/2022 | Jayson Orton, Elize Butler | ASHA Consulting(Pty) Ltd, Banzai Environmental (Pty) Ltd | SLR Consulting (South Africa) (Pty) Ltd | 22/03/2022 - 13:39 | |
Maritime Heritage Impact Assessment | Maritime Heritage Impact Assessment: ASN Africa METISS Subsea Fibre Optic Cable System | Heritage Impact Assessment Specialist Reports | 30/03/2018 | John Gribble | ACO Associates CC | Environmental Resources Management | 31/05/2019 - 17:14 | |
GLE3075 - HIA & Gap Analysis | Phase 2 of the Proposed Re-alignment of the P141-1 Provincial Road, Tweefontein Mine Complex, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 01/09/2015 | Johan Nel, Justin du Piesanie | Digby Wells Environmental | Glencore Operations South Africa (Pty) Ltd | 17/09/2015 - 12:02 | |
ARCHAEOLOGICAL IMPACT ASSESSMENT | ARCHAEOLOGICAL IMPACT ASSESSMENT | Heritage Impact Assessment Specialist Reports | 30/10/2015 | Ndivhuwo Eric Mathoho | Millennium Heritage Group | Millennium Heritage Group | 09/05/2016 - 11:58 | |
HIA Erksin Farm, Winterton, KZN | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED CULTIVATION OF 70 HECTARES OF ARABLE LAND AND THE EXPANSION OF AN EXISTING DAM ON PORTION 3 OF 1919, ERSKINE FARM, IN CATHKIN (NEAR WINTERTON), KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | Frans Prins | Active Heritage CC | Green Door Environmental | 28/07/2016 - 15:46 | ||
HIA for the Proposed 100MW PV Plant at the Samancor Chrome Operations, Steelpoort, Limpopo | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED 100MW PV PLANT AT THE SAMANCOR CHROME OPERATIONS, STEELPOORT, LIMPOPO | Heritage Impact Assessment Specialist Reports | 20/05/2021 | Wouter Fourie | PGS Heritage (Pty) Ltd | Royal Haskoning DHV | 03/11/2021 - 16:50 | |
New position for the Gutshwa substation | Letter of recommendation for the exemption from a phase 1 AIA / HIA for the proposed new position for the Gutshwa substation, Gutshwa, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 10/04/2017 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Wandima Environmental Services cc | 10/04/2017 - 10:09 | |
CONSTRUCTION ENVIRONMENTAL MANAGEMENT PROGRAMMES FOR THE STEELPOORT TO MARBELHALL 400KV POWER-LINE | COMPILATION OF CONSTRUCTION ENVIRONMENTAL MANAGEMENT PROGRAMMES FOR THE STEELPOORT TO MARBELHALL 400KV POWER-LINE AND THE STEELPOORT INTEGRATION PROJECT:HERITAGE RESOURCES ASSESSMENT | Heritage Impact Assessment Specialist Reports | 25/01/2013 | Johnny Van Schalkwyk | Iliso Consulting (Pty) Ltd | 07/05/2013 - 15:11 | ||
HIA FOR PRP KZN30/5/1/2/11361PR | Archaeological and Heritage Impact Assessment for Prospecting Right Application for Lithium, Feldspar, Tin, Tantalum, Zinc, and Dimension Stone (general) on Various Farms, Situated in the Magisterial District of uGu (Port Shepstone), Kwazulu NataL Province | Heritage Impact Assessment Specialist Reports | 19/05/2023 | Trust Mlilo | Integrated Specialist Services | Integrated Specialist Services (Pty) Ltd | 10/06/2023 - 20:50 | |
Klien Pella agriculture HIA | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CULTIVATION OF NEW LANDS AT KLEIN PELLA, NAMAKWALAND MAGISTERIAL DISTRICT, WESTERN CAPE | Heritage Impact Assessment Specialist Reports | 20/06/2015 | Jayson Orton | 30/06/2016 - 13:59 | |||
Hyperion PV1 - HIA 27.03.19 | Heritage Impact Assessment:Proposed Hyperion Solar Development 1, Lyndoch 432/Rem, Kuruman Magisterial District, Northern Cape | Heritage Impact Assessment Specialist Reports | 27/03/2019 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 05/04/2019 - 09:16 | |
HIA-ZENWEF | Heritage Impact Assessment for the Proposed ZEN Wind Energy Facility, Tulbach Magisterial District, Western Cape Province | Heritage Impact Assessment Specialist Reports | 09/11/2012 | Jayson Orton | ACO Associates CC | Savannah Environmental (Pty) Ltd | 04/03/2015 - 13:56 | |
Mbeki Sun Heritage Report | Heritage Studies for Mbeki Sun | Heritage Impact Assessment Specialist Reports | 09/10/2019 | A Abzhanov | HMS Auckland and HMS Londondery | Crane Registered Quantity Surveyors | 07/10/2021 - 15:54 | |
Dantoprox Mining Permit Application HIA and phase 1 PIA | HERITAGE SURVEY OF THE MINING PERMIT APPLICATION FOR PORTION ONE OF FARM THE CORNER 11328 ET, UMZUMBE, KZN | Heritage Impact Assessment Specialist Reports | 12/08/2021 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Dantoprox | 18/08/2021 - 12:18 | |
HIA Diepsloot Road K46 Phase 2 | HERITAGE IMPACT ASSSESSMENT FOR THE PROPOSED UPGRADE OF ROAD K46 PHASE 2 BETWEEN THE PWV5 AND N14, DIEPSLOOT, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY GAUTENG | Heritage Impact Assessment Specialist Reports | 04/12/2013 | Udo Kusel | African Heritage Consultants CC | SPOOR Environmental Services (PTY) Ltd. | 10/07/2014 - 10:42 | |
Sumitomo Heritage | FIRST PHASE DESKTOP HERITAGE IMPACT ASSESSMENT OF THE PROPOSED CONSTRUCTION OF THE SUMITOMO, RUBBER PLANT, EMNAMBITHI LOCAL MUNICIPALITY, KWAZULU-NATAL. | Heritage Impact Assessment Specialist Reports | 01/12/2015 | Frans Prins | 14/03/2016 - 15:29 | |||
ILI3864 - Iphiva Substation | Needs and Desirability Application Form: Eskoms Northern KZN Strengthening Project Iphiva Substations | Heritage Impact Assessment Specialist Reports | 13/11/2017 | Justin du Piesanie | Digby Wells Environmental | Eskom Holdings SOC Limited | 13/11/2017 - 17:03 | |
Heritage Impact Report | Heritage Impact Report for the proposed Nandoni Mixed Development on Farm 278MT within Thulamela Local Municipality in Vhembe District Limpopo Province | Heritage Impact Assessment Specialist Reports | 11/10/2018 | Eric Ndivhuho Mathoho | Millennium Heritage Group | Naledzi Environmental Consultants | 07/03/2019 - 10:36 | |
Carolina WTW | Cultural Heritage Resources Impact Assessment for the upgrade of drinking water works at Carolina Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 06/05/2013 | Udo Kusel | African Heritage Consultants CC | LEAP - Lanscape Architect Environmental Planner | 27/06/2013 - 12:20 | |
A PHASE 1 HIA REPORT FOR THE PROPOSED TOWNSHIP DEVELOPMENT OF MALAMULELE | A PHASE 1 HIA REPORT FOR THE PROPOSED TOWNSHIP DEVELOPMENT OF MALAMULELE EXTENTION E AT MALAMULELE, WITHIN THE COLLINS CHABANE LOCAL MUNICIPALITY, LIMPOPO PROVINCE. | Heritage Impact Assessment Specialist Reports | 22/07/2022 | Anton Pelser | APELSER ARCHAELOGICAL CONSULTING | 24/10/2022 - 11:44 | ||
HIA, Inca Energy Solar Facility, near Vredendal | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED VREDENDAL INCA SOLAR ENERGY FACILITY, VREDENDAL MAGISTERIAL DISTRICT, WESTERN CAPE | Heritage Impact Assessment Specialist Reports | 03/11/2011 | Jayson Orton | ACO Associates CC | Savannah Environmental (Pty) Ltd | CTS_503794 | 20/04/2018 - 14:39 |
Heritage Impact Assessment: Gamohaan Seokama 22kV powerline | Heritage Impact Assessment Specialist Reports | 31/05/2022 | 07/06/2022 - 11:27 | |||||
Pilansberg Nature Reserve HIA | Pilansberg Nature Reserve Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 26/02/2014 | Nkosinathi Godfrey Tomose | Aurecon - Cape Town | 05/03/2014 - 12:07 | ||
Heritage Reports | Please note that there are two reports 1) Report done for the Goedetrouw Infrastructure Option (preferred option with the least impact on heritage resources and graves), and 2) The Ketting Infrastructure Option, which was evaluated as an alternative option. | Heritage Impact Assessment Specialist Reports | 23/07/2019 | Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | Bateleur Environmental & Monitoring Services (Pty) Ltd | 16/08/2019 - 10:35 | |
HIA for Lapalala Founder's Lodge | Cultural Heritage Assessment of the Founders Lodge Development, Lapalala Wilderness Reserve, Waterberg, Limpopo Province | Heritage Impact Assessment Specialist Reports | 01/05/2016 | Francois P Coetzee | 02/08/2016 - 12:55 | |||
Wilger 132KV Power Line | Proposed Construction of the Wilger 132kV Power Line and the associated Switchyards on the Farm 267 Arriesfontein, Northern Cape Province | Heritage Impact Assessment Specialist Reports | 03/12/2013 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | 16/05/2014 - 12:15 | ||
Heritage Impact Assessment Report | Bishop 671 Portions 2 & 3: Prospecting boreholes and trenches Heritage Impact Assessment (HIA) Report March 2020 | Heritage Impact Assessment Specialist Reports | 17/03/2020 | Stephan Gaigher | G&A Heritage Management Consultants | 18/03/2020 - 12:31 | ||
HIA: UMDM Waste Facility, PMB | FIRST PHASE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED ESTABLISHMENT OF AN ORGANIC WASTE PROCESSING FACILITY ON ERF 10 000 (REM OF TOWN LANDS), AT WORLDS-VIEW PIETERMARITZBURG. | Heritage Impact Assessment Specialist Reports | 01/08/2014 | Frans Prins | Active Heritage CC | Green Door Environmental | 26/11/2014 - 15:28 | |
Oya Heritage Impact Assessment | Proposed development of the 800MW Oya solar photovoltaic (PV) facility and associated infrastructure near Matjiesfontein, Western Cape | Heritage Impact Assessment Specialist Reports | 28/07/2020 | Wouter Fourie | SiVEST SA (Pty) Ltd | PGS Heritage (Pty) Ltd | 13/08/2020 - 19:23 | |
Cultural HIA for Emergency Nondabula Water Reticulation Project | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED EMERGENCY NONDABULA WATER RETICULATION PROJECT, WARD 9 OF THE NODWENGU TRADITIONAL COUNCIL, ILEMBE REGIONAL MUNICIPALITY. | Heritage Impact Assessment Specialist Reports | 15/06/2015 | Frans Prins | 19/08/2015 - 14:53 | |||
HIA Report Jacaranda Boardroom | Heritage Impact Assessment in accordance to Section 27 (18) of NHRA 25 of 1999 for submission to SAHRA with Special Focus on Jacaranda Boardrooms upgrade of the Portions of the Farm Elandspoort 357- JR, Pretoria | Heritage Impact Assessment Specialist Reports | 21/02/2020 | Judith Muindisi, Monika Lauferts le Roux | Tsica Heritage Consultants | National Department of Public Works | 21/02/2020 - 09:56 | |
Heritage Impact Assessment for the Proposed Kathu Supplier Park | Heritage Impact Assessment for the Proposed Kathu Supplier Park on parts of the Remainder and on Portion 9 of the Farm Sekgame 461 on the southern side of the town of Kathu in the Gamagara Local Municipality, Northern Cape. | Heritage Impact Assessment Specialist Reports | 18/07/2014 | Marko Hutten, Polke Birkholtz | PGS Heritage and Grave Relocation Consultants | PGS Heritage and Grave Relocation Consultants | 10/03/2015 - 11:41 | |
HIA Pelzvale Water and Sewer Line | Heritage Impact Assessment for the Pelzvale Bulk Water and Sewer lines | Heritage Impact Assessment Specialist Reports | 01/09/2020 | Leonie Marais | Leonie Marais Heritage Practitioner | Leonie Marais Heritage Practitioner | 19/10/2020 - 11:09 | |
First Phase Heritage impact assessment of section of Farm PTN 1 Lot 252 EMP 13313 | First Phase Heritage impact assessment of section of Farm PTN 1 Lot 252 EMP 13313 | Heritage Impact Assessment Specialist Reports | 19/11/2017 | Frans Prins | Active Heritage CC | Active Heritage CC | 20/11/2017 - 22:35 | |
Ngwedi PV | Proposed development of Ngwedi, a solar PV facility and associated infrastructure on Portion 3 of the Farm McTaggarts Camp 453, near Upington in the Northern Cape Province | Heritage Impact Assessment Specialist Reports | 23/03/2020 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 23/07/2020 - 07:04 |