THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 17451 - 17500 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
Klipkraal WEF 3 Heritage Report | PROPOSED CONTRUCTION OF THE KLIPKRAAL WIND ENERGY FACILITY 3, NEAR FRASERBURG, NORTHERN CPE PROVINCE, SOUTH AFRICA. | Heritage Impact Assessment Specialist Reports | 19/08/2022 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 16/09/2022 - 16:57 | |
HIA for Lewin Chicken Layer Facility | Heritage Impact Assessment for the Proposed Lewin Chicken Layer Facility, Gauteng Province | Heritage Impact Assessment Specialist Reports | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Council for Scientific and Industrial Research | 16/04/2018 - 13:07 | ||
HIA for Namas Wind farm | HERITAGE IMPACT ASSESSMENT: PROPOSED GRID CONNECTION INFRASTRUCTURE FOR THE NAMAS WIND FARM, NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 02/03/2019 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 28/05/2019 - 16:33 | |
EXX3775 Permit Application Report | Permit Application: National Heritage Resources Act, 1999 (Act No. 25 of 1999) Section 34 Permit Application Process for the Exxaro Belfast Implementation Project, Belfast, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 05/10/2018 | Shannon Hardwick, Justin du Piesanie | Digby Wells Environmental | Exxaro Coal Mpumalanga (Pty) Ltd | 05/10/2018 - 12:23 | |
SPAR Perseverance Distribution Centre | Heritage Impact Report for the SPAR Warehouse and Associated Infrastructure, Port Elizabeth | Heritage Impact Assessment Specialist Reports | 06/02/2017 | Wouter Fourie, Jennifer Kitto | PGS Heritage and Grave Relocation Consultants | Sivest - Gauteng | 26/04/2017 - 12:51 | |
Greater Mthonjaneni Water Reticulation | (HIA) of the proposed Greater Mthonjaneni Water Reticulation Project within Ward 6 (Sub-Supply Area 5: Zone 3 and 4) within Mthonjaneni area. The project developer or applicant is the King Cetshwayo District Municipality. | Heritage Impact Assessment Specialist Reports | 01/12/2018 | Roy Muroyi | Tsimba Archaeological Footprints (Pty) Ltd | iSambulo Environmental Consulting | 19/10/2019 - 08:03 | |
HIA Report Security Upgrade Elandspoort 357 JR | Heritage Impact Assessment Report for Security Upgrades for Main Building on Farm Portion Elandspoort JR 357, Pretoria | Heritage Impact Assessment Specialist Reports | 21/02/2020 | Judith Muindisi, Monika Lauferts le Roux | Tsica Heritage Consultants | National Department of Public Works | 21/02/2020 - 11:41 | |
Umsobomvu WEF Heritage Walk Through | Heritage Impact Assessment Specialist Reports | 01/11/2022 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Coastal & Environmental Services - East London | 16/03/2023 - 11:19 | ||
Ga Maila HIA Proposed demarcation of Sites in Ga-Maila Village | Heritage Impact Assessment Report. Proposed Demarcation of Sites In Ga-Maila Village within Makhuduthamaga Local Municipality of the Sekhukhune District, Limpopo Province | Heritage Impact Assessment Specialist Reports | 20/10/2020 | Frans Roodt | Phaki Phakanani | 20/10/2020 - 06:22 | ||
NGCEBO WATER TREATMENT WORKS | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED NGCEBO WATER TREATMENT WORKS, LOCATED WITHIN THE MAPHUMULO LOCAL MUNICIPALITY | Heritage Impact Assessment Specialist Reports | 06/09/2013 | Frans Prins | Active Heritage CC | Green Door Environmental | 09/01/2014 - 09:18 | |
Clayville Bulk Services and Mix Use development | Proposed Mixed Use development and associated infrastructure on the Remainder of Erf 6138 Clayville Extension 45, Portion 41 (a Portion of Portion 7) and Portion 179 (a Portion of Portion 7) of the Farm Olifantsfontein 410-JR, within the City of Ekurhuleni Metropolitan Municipality, Gauteng Province | Heritage Impact Assessment Specialist Reports | 01/05/2017 | Jaco van der Walt | Gauteng - Department of Agriculture and Rural Development | LEAP -Landscape Architectural and Environmental Planning | 03/05/2019 - 10:45 | |
Heritage Assessment-Mqangqala Access Road | HERITAGE IMPACT ASSESSMENT OF THE PROPOSED MQANGQALA ACCESS ROAD, UMZUMBE MUNICIPALITY | Heritage Impact Assessment Specialist Reports | 18/09/2013 | Frans Prins | Active Heritage CC | Active Heritage CC | 20/09/2013 - 10:26 | |
ERG3537_NID_Addendum_Memo | Addendum Memo regarding the 7L5 and 7L6 Slimes Dams Prospecting Application, Ekurhuleni Metropolitan Municipality | Heritage Impact Assessment Specialist Reports | 29/09/2015 | Natasha Higgitt | Digby Wells Environmental | Ergo Mining (Pty) Ltd | 09/10/2015 - 13:52 | |
HIA Elandspoort 357- JR | Lifts upgrade on Portions of the Farm Elandspoort 357- JR, Pretoria, Tshwane, Gauteng | Heritage Impact Assessment Specialist Reports | 05/08/2019 | Judith Muindisi, Monika Lauferts le Roux | Tsica Heritage Consultants | Department of Public Works | 05/08/2019 - 13:54 | |
Leeuwpan HIA | A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR THE EXXARRO LEEUWPAN COAL CONSOLIDATION OF EMPR’S, CLOSE TO DELMAS IN THE MPUMALANGA PROVINCE | Heritage Impact Assessment Specialist Reports | 01/04/2013 | Anton van Vollenhoven | Archaetnos CC | GCS Water and Environmental Consultants - Head Office JHB | 04/04/2013 - 10:34 | |
LES4548 - Zuurfontein NID | Notification of Intent to Develop: Heritage Resources Management Process for the Portion 296 of the farm Zuurfontein 33 IR Proposed Residential Establishment Project | Heritage Impact Assessment Specialist Reports | 31/05/2017 | Justin du Piesanie | Digby Wells Environmental | Ekurhuleni Metropolitan Municipality | 31/05/2017 - 12:44 | |
Heritage Impact Assessment (Nov'21) | Appendix I - Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 11/11/2021 | Cherene de Bruyn | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 12/11/2021 - 08:41 | |
HIA for New Industrial Township, Lanseria, Johannesburg | Heritage Impact Assessment for the Proposed Establishment of a New Industrial Township on Portions 38 and 39 of the Farm Bultfontein No. 533-JQ, City of Johannesburg Metropolitan Municipality, Gauteng Province | Heritage Impact Assessment Specialist Reports | 11/11/2013 | Jennifer Kitto, Wouter Fourie | PGS Heritage and Grave Relocation Consultants | Singisa Environmental CC | 03/03/2014 - 16:13 | |
Phase 1 HIA Bultontein Pipeline | Phase 1 Heritage Impact Assessment of a proposed new 22 km – long water pipeline between the Dermspruit and the Bultfontein Water Treatment Works, Free State Province. | Heritage Impact Assessment Specialist Reports | 02/08/2017 | Lloyd Rossouw | National Museum Bloemfontein | NSVT Consultants | 08/11/2017 - 14:05 | |
Sibanye Gold PV Facility Project - Transmission lines | Heritage Impact Assessment as part of the Environmental Impact Assessment Report for the 132 KV Transmission Lines for the Photovoltaic Energy Facility Proposed for Sibanye Gold, West Rand District, Gauteng | Heritage Impact Assessment Specialist Reports | 15/02/2016 | Wouter Fourie | PGS Heritage (Pty) Ltd | Aurecon South Africa (Pty) Ltd | 21/07/2021 - 12:56 | |
A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR MARULA PLATINUM’S PROPOSED NEW MINE INFRASTRUCTURE IN THE STEELPOORT VALLLEY LIMPOPO PROVINCE | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR MARULA PLATINUM’S PROPOSED NEW MINE INFRASTRUCTURE IN THE STEELPOORT VALLLEY LIMPOPO PROVINCE | Heritage Impact Assessment Specialist Reports | Dr Julius CC Pistorius | 26/04/2022 - 09:48 | ||||
Public Participation Report _Section 37 Application of the Kwa Zulu Natal Heritage Act No 4 of 2008 Heritage Impact Assessment Building structures on Portion 3, of Erf 498 Scottsville | Public Participation Report Section 37 Application of the KwaZulu Natal Heritage Act No 4 of 2008 for the Heritage Impact Assessment Report for Portion 3 of Erf 498 Scottsville Pietermaritzburg. | Heritage Impact Assessment Specialist Reports | 03/05/2021 | Judith Muindisi | Tsica Heritage Consultants | ADOWA Property Developers | 03/05/2021 - 17:37 | |
BRMO - New Railway Bridge Heritage Report | A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED NEW RAILWAY BRIDGE AT THE BLACK ROCK MINING OPERATIONS, CLOSE TO HOTAZEL, NORTHERN CAPE PROVINCE. | Heritage Impact Assessment Specialist Reports | 01/03/2019 | Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | Assmang Black Rock Mining Operations | 30/05/2019 - 12:12 | |
HIA: Sikwebezi River, KZN | HERITAGE IMPACT ASSESSMENT OF THE PROPOSED SIKWEBEZI RIVER BRIDGE AND ASSOCIATED ROAD LOCATED IN OMBUMBINI, NEAR NONGOMA, NORTERN KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | 14/02/2014 | Frans Prins | Active Heritage CC | Green Door Environmental | 17/02/2014 - 11:37 | |
APM3249_HBAR | Environmental Authorisation Application: Prospecting Right Application for Paardekraal 279JQ & Waterval 306JQ, Phase 2 Draft Heritage Basic Assessment Report | Heritage Impact Assessment Specialist Reports | 23/06/2015 | Natasha Higgitt, Johan Nel | Digby Wells Environmental | 23/06/2015 - 12:08 | ||
Integrated HIA: Humansrus Solar PV Facility 4 | PROPOSED DEVELOPMENT OF HUMANSRUS SOLAR PV FACILITY 4 ON THE FARM HUMANSRUS 147, PRIESKA DISTRICT AND PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 22/04/2016 | Stefan de Kock, Lita Webley, John Almond, Stephen Stead | Perception Heritage Planning | Perception Heritage Planning | 05/05/2016 - 15:32 | |
The proposed upgrade of the Leeuwkuil Wastewater Treatment conveyances, Gauteng Province, South Africa | Heritage Impact Assessment for the proposed upgrade of the Leeuwkuil Wastewater Treatment conveyances, Gauteng Province, South Africa | Heritage Impact Assessment Specialist Reports | 01/07/2022 | Beyond Heritage | 31/08/2022 - 20:03 | |||
Heritage Impact Assessment for the suite of Kentani Solar Developments, Dealesville, Free State Province | Heritage impact assessment for eleven Solar PV Facilities and Supporting Electrical Infrastructure near Dealesville in the Free State Province Proposed by Mainstream Renewable Power Developments (Pty) Ltd. | Heritage Impact Assessment Specialist Reports | 05/05/2015 | Jayson Orton | ASHA Consulting(Pty) Ltd | Council for Scientific and Industrial Research | 07/08/2015 - 14:08 | |
Chapudi Coal Project Heritage Impact Assessment | The report is a Heritage Impact Assessment (HIA) for the Chapudi Project area which describes potential adverse and positive effects of the proposed mining operations on heritage resources. The report builds on a scoping survey conducted earlier and adds results of fieldwork which followed. The report will inform decisions on intervention strategies for sustainable management of the heritage resources in the mining area. The Impact Assessment follows the requirements of the National Heritage Resources Act (No 25: 1999), the relevant sections of which are Section 38 (Heritage Impact Assessment process), Section 34 (Buildings and Structures older than 60 years) Section 35 (Archaeological and Palaentological sites) and Section 36 (Graves and Burial Grounds). | Heritage Impact Assessment Specialist Reports | 18/11/2013 | Matodzi Silidi, Innocent Pikirayi | Mbofho Consulting and Project Managers | Jacana Environmental cc | 15/01/2014 - 18:13 | |
gingindlovu saps hia | DESKTOP HERITAGE SURVEY OF THE PROPOSED GINGINDLOVU POLICE STATION | Heritage Impact Assessment Specialist Reports | 18/08/2017 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | 07/09/2017 - 11:35 | ||
Final HIA, Kuilspoort Solar, Beaufort West | FINAL INTEGRATED HERITAGE IMPACT ASSESSMENT COMPILED IN TERMS OF SECTION 38(8) OF THE NATIONAL HERITAGE RESOURCES ACT, 1999 (ACT 25 OF 1999). PROPOSED PHOTOVOLTAIC PARK: KUILSPOORT 161/9, LEMOENFONTEIN SOUTH 162/REM & BULSKOP 163/1, DISTRICT BEAUFORT WEST | Heritage Impact Assessment Specialist Reports | 01/11/2011 | Stefan de Kock | Perception Heritage Planning | CTS_503276 | 11/04/2018 - 13:03 | |
San Kraal HIA and Walkthrough Report | Heritage Impact Assessment Specialist Reports | John Gribble | ACO Associates CC | Arcus Consulting | 27/09/2019 - 13:56 | |||
L3296: HIA and PIA | Heritage and Paleontological Impact Assessment for the proposed construction of new local road 3296 (Mathunzaneni) | Heritage Impact Assessment Specialist Reports | 15/05/2020 | Roy Muroyi, Dr. Heidi Fourie | Tsimba Archaeological Footprints (Pty) Ltd | Hanslab (Pty) Ltd | 24/07/2020 - 09:17 | |
Sand Winning Operation, Winterton, KZN | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED ESTABLISHMENT OF A SAND MINING OPERATION, FOR THE AUTHORISED BHEKUZULU-EMPANGENI WATER SUPPLY SCHEME, LOCATED NEAR WINTERTON,UTHUKELA DISTRICT MUNICIPALITY, KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | 25/09/2013 | Frans Prins | Active Heritage CC | Green Door Environmental | 26/09/2013 - 14:42 | |
BREEKKIERIE KENHARDT VAN WYKSVLEI | ARCHAEOLOGICAL & HERITAGE INVESTIGATION OF THE PROPOSED MTN CELL PHONE MAST AT BREEKKIERIE NEAR KENHARDT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 14/04/2011 | Cobus Dreyer | MTN (Pty) Ltd | MTN (Pty) Ltd | 18/10/2015 - 12:24 | |
The Proposed Soul City/Stafford Hill Housing Development for Formalization of Semi-formal Settlement in Majorisa, within Ward 31 of Newcastle Local Municipality, Kwazulu-Natal | The Proposed Soul City/Stafford Hill Housing Development for Formalization of Semi-formal Settlement in Majorisa, within Ward 31 of Newcastle Local Municipality, Kwazulu-Natal. | Heritage Impact Assessment Specialist Reports | 06/08/2021 | 06/08/2021 - 11:40 | ||||
Heritage Impact Assessment - PR11296 | Phase 1 Heritage Impact Assessment for proposed prospecting drilling on Portion 2 of Rozynbosch No.41 and Remaining Extent & Portion 1 of Wortel No. 42, Namaqualand District, NC Province. | Heritage Impact Assessment Specialist Reports | 09/12/2015 | Lloyd Rossouw | Paleo Field Services | Black Mountain Mining (PTY) LTD | 10/12/2015 - 11:47 | |
Heritage Assessment Report for Proposed Development at Cradock ERF 2578 corner R 61 and N 10 | Proposed development and related operation of facilities or infrastructure for the storage, or for the storage and handling, of a dangerous good (filling or service station) where such storage occurs in containers with a combine capacity of more than 80 m3 but less than 500 m3 with the combined capacity of [1x46 m3 Unleaded 93, 1x46 m3 95, 1x46 m3 diesel 50 & 1x46 m3 diesel 500; (Combined capacity=184m3)]; car wash and convenient store at Cradock; Erf Number 2578 corner R61 Road and N10; Chris Hani region within jurisdiction of Inxuba Yethemba Local Municipality, Eastern Cape Province. | Heritage Impact Assessment Specialist Reports | 30/01/2020 | 30/01/2020 - 01:42 | ||||
Henley-on Klip Landfill Closure | HERITAGE IMPACT ASSESSMENT REPORT FOR THE HENLEY-ON-KLIP GENERAL LANDFILL CLOSURE APPLICATION, MIDVAAL LOCAL MUNICIPALITY, GAUTENG | Heritage Impact Assessment Specialist Reports | 26/11/2012 | Anton Pelser | A Pelser Archaeological Consulting | 26/11/2012 - 11:12 | ||
ARCHAEOLOGICAL IMPACT ASSESSMENT FOR MURALENI SPORTS ARENA ON PORTION OF THE REMAINDER OF THE FARM SENTIMULAS LOCATION 291LS | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE PROPOSED MURALENI SPORTS ARENA ON PORTION OF THE REMAINDER OF THE FARM SENTIMULAS LOCATION 291LS, MURALENI-HAMANTSHA, MAKHADO LOCAL MUNICIPALITY OF THE VHEMBE DISTRICT, LIMPOPO PROVINCE, SOUTH AFRICA. | Heritage Impact Assessment Specialist Reports | 20/04/2021 | Ndivhuho Eric Mathoho | 23/07/2021 - 14:39 | |||
Eshane Housing HIA rev 1 | HIA Desktop Study for the Eshane Rural Subsidised Housing Development | Heritage Impact Assessment Specialist Reports | 27/07/2022 | Gavin Anderson, Louise Anderson | Umlando: Archaeological Surveys & Heritage Management | K2M Environmental | 28/07/2022 - 08:42 | |
EIA National Road 3: Keeversfontein to Warden DBPR Section | Heritage Specialist Report: Environmental Impact Assessment Report for National Road 3: Keeversfontein to Warden (De Beers Pass Section. DEA ref. no. 12/12/20/1992 | Heritage Impact Assessment Specialist Reports | 10/06/2014 | Len van Schalkwyk, Elizabeth Wahl | eThembeni Cultural Heritage | Cave Klapwijk and Associates, N3 Toll Concession (Pty) Ltd | 20/01/2015 - 09:41 | |
HIA and PIA for Skeerhok PV1 | Heritage Impact Assessment Specialist Reports | 21/02/2018 - 15:39 | ||||||
NOM5486 - NDA | Need and Desirability Application Form - Nomalanga Estates Expansion Project | Heritage Impact Assessment Specialist Reports | 04/03/2019 | Shannon Hardwick, Justin du Piesanie | Digby Wells Environmental | Nomalanga Property Holdings (Pty) Ltd | 04/03/2019 - 16:07 | |
Heritage Assessment - Solis Power I CSP Power Line | A report on a cultural heritage assessment for the Proposed construction of a 132kV overhead Powerline and Switchyard station for the authorized Solis Power I CSP Project near Upington, Nothern Cape Province | Heritage Impact Assessment Specialist Reports | 18/01/2016 | Anton van Vollenhoven | Archaetnos CC | Savannah Environmental (Pty) Ltd | 19/02/2016 - 13:42 | |
Norlim powerlines near Taung, North West Province | Phase 1 Archaeological Study for the proposed 22kv Norlim Dikhuting and Norlim Taung powerlines in the Baxton Area, Greater Taung Local Municipality, North West Province | Heritage Impact Assessment Specialist Reports | 05/05/2017 | Foreman Bandama | Sativa Travel and Environmental Consultants | Eskom - NWOU | 07/05/2017 - 13:24 | |
HIA Caledonian | Heritage Impact Assessment for the refurbishments of the Caledonian Stadium in Pretoria, Gauteng Province | Heritage Impact Assessment Specialist Reports | 15/02/2019 | Cherene de Bruyn, Nkosinathi Tomose | 05/06/2019 - 10:28 | |||
Nessie Knight Hospital Sulenkama demolition and Mjanyana Hospital Mjanyana | Heritage Impact Assessment of the Nessie Knight Hospital near Qumbu, and the Mjanana District Hospital near Encobo, both Eastern Cape | Heritage Impact Assessment Specialist Reports | 30/04/2013 | Deborah Whelan | Archaic Consulting | Terreco Environmental | 07/05/2013 - 16:20 | |
HIA Remhoogte | Heritage Report Assessment for Remhoogte Vodacom Mast | Heritage Impact Assessment Specialist Reports | Tekplan Environmental | Vodacom | 27/10/2020 - 04:14 | |||
Heritage Impact Assessment: Matlosana 132 kV Loop-in-Loop-Out Line and Substation | Heritage Impact Assessment: Matlosana 132 kV Loop-in-Loop-Out Line and Substation: Proposed Eskom Line on Sections of Portions 36 and 60 of the farm Palmietfontein 403 IP, City of Matlosana Local Municipality, North West Province. | Heritage Impact Assessment Specialist Reports | 25/06/2014 | Polke Birkholtz | PGS Heritage and Grave Relocation Consultants | Eskom - NWOU | 11/07/2014 - 14:54 |