FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportTypesort descending ReportDate Authors AuthoringBody CommissioningCompany MapID < 2009 Post date
XCSA Paardekop Mine Paardekop Coal Mine: Phase 1 Cultural Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 30/06/2013 Mamoluoane Seliane Strategic Environmental Focus (Pty) Ltd - Pretoria Strategic Environmental Focus (Pty) Ltd - Pretoria 02/08/2013 - 09:22
HIA - Zonnequa Wind Farm (26.09.18) Heritage Impact Assessment: Proposed Zonnequa Wind Farm Near Kleinsee, Namakwaland Magisterial District, Northern Cape Heritage Impact Assessment Specialist Reports 26/09/2018 Jayson Orton ASHA Consulting(Pty) Ltd Savannah Environmental (Pty) Ltd 22/10/2018 - 16:51
Kalahari Solar Power Project Heritage Impact Report Kalahari Solar Power Project Heritage Impact Assessment Report and Heritage Management Plan developed by Robert De Jong and Associates Heritage Impact Assessment Specialist Reports 22/02/2011 Robert de Jong Cultmatrix CC WSP Environmental Pty Ltd - Johannesburg 15/01/2014 - 12:02
HIA, borrow pit (DR2196/22.74/L/50) extension on portion 1, Farm no. 643, Clanwilliam Heritage Impact Assessment: DR 2196 West Coast Clanwilliam - West Coast District Municipality, Western Cape Heritage Impact Assessment Specialist Reports 26/06/2013 Vidamemoria Heritage Consultants Nadeson Consulting Services CTS_503751 18/04/2018 - 15:13
Heritage Impact Assessment - FBAR Wind Garden App I - Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 28/07/2021 Cherene de Bruyn PGS Heritage (Pty) Ltd Savannah Environmental (Pty) Ltd 29/07/2021 - 10:59
Palaeontological Pre-construction walkthrough report AUTHORISED 140MW RIETRUG (DFFE Ref: 12/12/20/1782/1/AM5) AND 140MW SUTHERLAND (DFFE Ref: 12/12/20/1782/2/AM6) WIND ENERGY FACILTIES (WEFS) AND THEIR ASSOCIATED GRID CONNECTIONS (DFFE REF: 14/12/16/3/3/1/2457/AM1, 14/12/16/3/3/1/2458 & 14/12/16/3/3/1/2077/AM2) BETWEEN SUTHERLAND & MERWEVILLE, KAROO HOOGLAND MUNICIPALITY (NAMAQUA DISTRICT), NORTHERN CAPE AND LAINGSBURG MUNICIPALITY (CENTRAL KAROO DISTRICT), WESTERN CAPE PROVINCES Heritage Impact Assessment Specialist Reports 01/12/2022 John E. Almond Natura Viva CC Natura Viva CC 08/12/2022 - 15:51
HIA New Reserve Bank Bloemfontein - Philip and Botes HIA New Reserve Bank Bloemfontein Heritage Impact Assessment Specialist Reports 31/05/2016 Loudine Philip Roodt Architects 20/06/2016 - 08:46
Ikwezi Mining Powerline and Substation Heritage Report Ingagane/Utrecht/Ikwezi 88kV powerline and Ikwezi 20MVA 88/22kV substation and associated access roads Heritage Impact Assessment Specialist Reports 23/05/2013 Frans Prins Ludloko Developments 03/09/2013 - 19:13
Werda HIA PHASE 1 HERITAGE IMPACT ASSESSMENT REQUESTED IN TERMS OF SECTION 38 OF THE NATIONAL HERITAGE RESOURCES ACT NO 25/1999 FOR THE PROPOSED MINE PROSPECTING ON REMAINING PORTION OF THE FARM JACOBSFONTEIN 503 (WERDA) NEAR POSTMASBURG IN THE NORTHERN CAPE PROVINCE Heritage Impact Assessment Specialist Reports 29/09/2016 Edward Matenga 31/01/2017 - 10:01
Port Shepstone Gaol HIA Part 2014 12 07 Port Shepstone Gaol Heritage Impact Assessment Specialist Reports 05/12/2014 Robert J W Brusse Robert J W Brusse Robert J W Brusse 03/04/2017 - 11:18
SANRAL R33 Road Upgrade Project Heritage Impact Assessment for the SANRAL R33 Road Upgrade Project located along the R33 between the N1 Highway and the town of Modimolle, Modimolle-Mookgopong Local Municipality, Waterberg District Municipality, Limpopo Province Heritage Impact Assessment Specialist Reports 11/09/2022 Polke Birkholtz PGS Heritage (Pty) Ltd Environmental Edge 11/10/2022 - 16:49
Heritage Impact Assessment (Nov'21) Sun Garden App I - HIA Heritage Impact Assessment Specialist Reports 12/11/2021 Cherene de Bruyn PGS Heritage (Pty) Ltd Savannah Environmental (Pty) Ltd 12/11/2021 - 17:43
HIA: Toscana 2, KZN CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED ESTABLISHMENT OF A RESIDENTIAL DEVELOPMENT ON REM OF ERF 1, AND PORTIONS 5 AND 6 OF ERF 221, WINTERSKLOOF, KWAZULU-NATAL Heritage Impact Assessment Specialist Reports 28/03/2014 Frans Prins Active Heritage CC Green Door Environmental 30/10/2014 - 11:48
MURUNWA VODACOM TELEMAST, LIMPOPO PROVINCE. PROPOSED CONSTRUCTION OF THE BONISWA SITE 2021, MURUNWA VODACOM TELEMAST, LIMPOPO PROVINCE. Heritage Impact Assessment Specialist Reports 16/03/2022 Stephan Gaigher Tekplan Environmental 30/03/2022 - 12:30
HIA for Proposed Solid Waste Landfill, Rossouw, Eastern Cape Heritage Impact Assessment for the Proposed Development of a New Solid Waste Landfill Site at Rossouw, near Barkley East, by Senqu Local Municipality in the Joe Gqabi District Municipality, Eastern Cape Province. Heritage Impact Assessment Specialist Reports 31/07/2013 Jennifer Kitto, Wouter Fourie PGS Heritage and Grave Relocation Consultants Terreco Environmental 04/12/2014 - 12:57
Desktop Heritage Impact Assessment Report Desktop Heritage Impact Assessment Report for the prospecting rights application: on the Farm Stompoor 109 near Prieska in the Northern Cape Province. Heritage Impact Assessment Specialist Reports 27/09/2018 Stephan Gaigher G&A Heritage Management Consultants 27/09/2018 - 13:31
Heritage Report for SASA 4c-6c Underwater Heritage Impact Assessment for Marine Prospecting Areas off the West Coast of South Africa Heritage Impact Assessment Specialist Reports 12/12/2017 Vanessa Maitland De Beers Marine (Pty) Ltd 21/12/2017 - 15:05
HIA 250 000m3 Loskop Dam, KZN CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED CONSTRUCTION OF THE 250 00 mᵌ DAM, ON THE FARM DRANKENSBERG LOCATION NO. 9605, NEAR LOSKOP. FOR THE AUTHORISED BHEKUZULU-EMPANGENI WATER SUPPLY SCHEME, LOCATED NEAR WINTERTON, UTHUKELA DISTRICT MUNICIPALITY, KWAZULU-NATAL Heritage Impact Assessment Specialist Reports Frans Prins Active Heritage CC Green Door Environmental 21/04/2017 - 14:30
1566 Heritage Report PROPOSED VALLEY TAILINGS STORAGE FACILITY PROJECT IN HARMONY’S FREE STATE OPERATIONS, NEAR WELKOM, FREE STATE PROVINCE. Heritage Impact Assessment Specialist Reports Nikki Mann PGS Heritage (Pty) Ltd Environmental Impact Management Services (Pty) Ltd 21/06/2023 - 13:13
HIA-KonkoonsiesII Heritage Impact Assessment for a Proposed 132kV Power Line and Substation at the Konkoonsies II SEF, Kenhardt Magisterial District, Northern Cape Province Heritage Impact Assessment Specialist Reports 16/08/2015 Jayson Orton ASHA Consulting(Pty) Ltd Savannah Environmental (Pty) Ltd 01/09/2015 - 11:20
Swartberg Heritage Assessment HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED EXTENSION OF SWARTBERG MINE ON BLACK MOUNTAIN MINE, AGGENEYS, NORTHERN CAPE PROVINCE Heritage Impact Assessment Specialist Reports 28/02/2019 David Morris, Abenicia Henderson, Jani Archaeology department, McGreggor Museum 05/06/2019 - 15:17
Heritage Impact assessment Mooi Mgeni transfer Scheme, Phase 2 KZN Heritage Impact Assessment Specialist Reports 25/07/2012 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Coastal & Environmental Services - Grahamstown 02/05/2013 - 10:07
HEUNINGKRANZ PROJECT Phase 1 AIA report on archaeological context and heritage resources on the farms Heuningkrans 364 and Langverwacht 432 in the Postmasburg District Municipality of the Northern Cape Province Heritage Impact Assessment Specialist Reports Udo Kusel African Heritage Consultants CC Synergistics Environmental Services 29/05/2018 - 14:19
Heritage Impact Assessment Eskom Aloe 132kV Proposed Eskom Aloe Substation and Loop in Loop Out Powerlines Heritage Impact Assessment Specialist Reports 19/06/2020 Vhufa Hashu Heritage Consultancy CC 02/10/2020 - 10:16
Eskom Groovlei PV HIA Eskom Groovlei PV HIA Heritage Impact Assessment Specialist Reports 15/10/2012 Wouter Fourie Eskom Holdings SOC Ltd Environmental Impact Management Services (Pty) Ltd 31/01/2014 - 10:29
Heritage Impact Assessment for Portion 123, Vlakfontein 523-JR Cultural heritage impact assessment for THE PROPOSED LEWENDE WOORD DEVELOPMENT ON PORTION 123 OF PORTION 28 OF THE FARM VLAKFONTEIN 523JR, KUNGWINI LOCAL MUNICIPALITY, GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports 30/11/2016 - 09:33
Specialist report for Heritage studies for mm heritage studies for the proposed township development on Rhenosterspruit farm. Heritage Impact Assessment Specialist Reports 02/10/2018 Adriaan Botha 3 Degrees Architects 241 Currie Road (Pty) Ltd 05/10/2018 - 12:51
HIA for Goudrand Extensions 12 to 15 Heritage Impact Assessment for the proposed establishment of Goudrand Ext, 12, Goudrand Ext. 13, Goudrand Ext. 14 and Goudrand Ext. 15 situated within the Roodepoort Magisterial District, City of Johannesburg Metropolitan Municipality, Gauteng Province. Heritage Impact Assessment Specialist Reports 22/03/2014 Polke Birkholtz PGS Heritage and Grave Relocation Consultants Dino Properties (Pty) Ltd 24/04/2014 - 21:38
Naturena - Devland Reservoir Phase I Cultural Heritage Resources Impact Assessment for the Devland Naturena Reservoir and Bulk Pipeline Johannesburg Gauteng Province Heritage Impact Assessment Specialist Reports 04/06/2013 Udo Kusel African Heritage Consultants CC LEAP - Lanscape Architect Environmental Planner 27/06/2013 - 13:00
Dwarsrug BESS HIA PROPOSED CONSTRUCTION AND OPERATION OF THE BATTERY ENERGY STORAGE SYSTEM (BESS) AND ASSOCIATED INFRASTRUCTURE FOR THE AUTHORISED DWARSRUG WIND ENERGY FACILITY, LOCATED NEAR LOERIESFONTEIN IN THE HANTAM LOCAL MUNICIPALITY, NAMAKWA DISTRICT IN THE NORTHERN CAPE PROVINCE OF SOUTH AFRICA. Heritage Impact Assessment Specialist Reports 04/11/2020 Wouter Fourie PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 26/05/2021 - 16:56
Fleurhof Pipe HIA Fleurhof Pipeline Basic Cultural Heritage Assessment Heritage Impact Assessment Specialist Reports Johnny Van Schalkwyk 31/10/2013 - 11:39
Pretoriuspark Extension 40 Residential Development Notification of Intent to Develop: Application for Environmental Authorisation for the proposed Township Development on part of the Remainder of Portion 284 of the farm Garsfontein 384 JR, City of Tshwane, Gauteng Heritage Impact Assessment Specialist Reports 30/06/2016 Justin du Piesanie, Johan Nel Digby Wells Environmental City of Tshwane Metropolitan Municipality 30/06/2016 - 14:42
HIA Burnlea Trust Wetland Rehab CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED ESTABLISHMENT OF AN 800 COW DAIRY, THREE NEW DAMS, EXPANSION OF AN EXISTING DAM AND THE CULTIVATION OF 131 HA OF VELD ON PORTION 3 AND PORTION 4 OF NEW BIGGIN NO 13390, PORTION 1 OF LOT FP 364 NO 11628, REM OF LOT FP 277B NO. 9266, REM OF LOT FP 320 NO 8965, REM OF SUNRISE NO 5567 AND REM OF BURNLEA NO 15994 LOCATED NEAR TO UNDERBERG Heritage Impact Assessment Specialist Reports 10/07/2011 Frans Prins Active Heritage CC Green Door Environmental 14/07/2017 - 11:12
HIA for Lapalala Founder's Lodge Cultural Heritage Assessment of the Founders Lodge Development, Lapalala Wilderness Reserve, Waterberg, Limpopo Province Heritage Impact Assessment Specialist Reports 01/05/2016 Francois P Coetzee 02/08/2016 - 12:55
HIA - Aggeneys PV 2 31.03.19 Heritage Impact Assessment for the Proposed Aggeneys 2 - 100 MW Solar PV Facility and Associated Infrastructure Near Aggeneys, Namakwaland Magisterial District, Northern Cape Heritage Impact Assessment Specialist Reports 31/03/2019 Jayson Orton ASHA Consulting(Pty) Ltd Savannah Environmental (Pty) Ltd 17/04/2019 - 09:14
TGME MINE DEVELOPMENT PROJECT (10161) HIA PROPOSED “TGME MINE DEVELOPMENT PROJECT (10161)”: GOLD MINING PROJECTS IN TERMS OF PRE-MINED RESIDUE AND HARD ROCK MINING, SABIE REGION, MPUMALANGA PROVINCE Heritage Impact Assessment Specialist Reports 01/09/2017 J.A. van Schalkwyk 15/12/2017 - 14:51
Soyuz 1 WEF HIA HERITAGE IMPACT ASSESSMENT REPORT FOR THE SOYUZ 1 WIND ENERGY FACILITY PROJECT, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE Heritage Impact Assessment Specialist Reports 01/02/2023 Nelius Kruger Coastal & Environmental Services - East London Soyuz 1 (Pty) Ltd 14/03/2023 - 14:18
HIA Wilmar Vegetable Oil Pipeline Proposed Development Of The Proposed Edible Oil Pipeline For Wilmar Sa (pty) Ltd, From Berth 706 / 707 / 708 To Rb IDZ Phase 1a, Richards Bay Heritage Impact Assessment Specialist Reports 31/03/2019 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 17/05/2019 - 13:50
Magalies 2 HIA HERITAGE IMPACT ASSESSMENT: PROPOSED DEVELOPMENT OF POULTRY FARM AT MAGALIES 2 IN MAGALIESBURG, MOGALE CITY LOCAL MUNICIPALITY, GAUTENG PROVINCE. Heritage Impact Assessment Specialist Reports 07/08/2017 Trust Mlilo Gauteng Department of Agriculture and Rural Development Farmland Partners Pty Ltd 01/11/2017 - 10:13
A REPORT ON AN ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF FIVE FOOTBRIDGES TO VILLAGES (MONONTSHA), QWA-QWA, FREE STATE PROVINCE A REPORT ON AN ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF FIVE FOOTBRIDGES TO VILLAGES (MONONTSHA), QWA-QWA, FREE STATE PROVINCE Heritage Impact Assessment Specialist Reports 05/05/2021 Prof. Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants Spatial Solutions Inc. 25/02/2022 - 16:51
HIA and PIA for Skeerhok PV1 Heritage Impact Assessment Specialist Reports 21/02/2018 - 15:39
WRE Nkunzana Prospecting Right,Nkandla Local Municipality Nkunzana Prospecting Right Application: Heritage and Palaeontology Specialist Report Heritage Impact Assessment Specialist Reports 14/12/2018 - 15:09
Sibanye Gold PV Facility Project - Transmission lines Heritage Impact Assessment as part of the Environmental Impact Assessment Report for the 132 KV Transmission Lines for the Photovoltaic Energy Facility Proposed for Sibanye Gold, West Rand District, Gauteng Heritage Impact Assessment Specialist Reports 15/02/2016 Wouter Fourie PGS Heritage (Pty) Ltd Aurecon South Africa (Pty) Ltd 21/07/2021 - 12:56
HIA Hoekplaas Heritage Impact Assessment for Multiple Proposed Solar Energy Facilities on Farm Hoekplaas 146, Copperton, Northern Cape. Heritage Impact Assessment Specialist Reports 09/07/2013 Jayson Orton ACO Associates CC Aurecon - Cape Town 24/03/2015 - 10:51
41032 Senekal Abstraction Heritage Impact Assessment for proposed construction of a new water abstraction facility at the Cyferfontein Dam near Senekal, Setsotso Local Municipality, FS Province. Heritage Impact Assessment Specialist Reports 01/03/2022 Lloyd Rossouw 14/07/2022 - 10:28
Proposed K33/ K52 Road Intersection Development HERITAGE IMPACT ASSESSMENT REQUIRED UNDER SECTION 38(8) OF THE NHRA (No. 25 OF 1999) PROPOSED K33/ K52 ROAD UPGRADE AND INTERSECTION DEVELOPMENT, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG Heritage Impact Assessment Specialist Reports 13/05/2018 Jaco van der Walt Heritage Contracts and Archaeological Consulting Heritage Contracts and Archaeological Consulting 14/08/2018 - 14:59
HIA, expansion of borrow pits at km 8.5 and 29.3 along DR02404, near Murraysburg Heritage Impact Assessment: DR 2404 Central Karoo Murraysburg – Central Karoo District Municipality, Western Cape Heritage Impact Assessment Specialist Reports 25/04/2012 Vidamemoria Heritage Consultants Aurecon South Africa (Pty) Ltd CTS_503583 16/04/2018 - 11:19
HIA for Jacomynspan Project A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED EXPLORATION ACTIVITIES AT THE JACOMYNSPAN PROJECT, NORTHERN CAPE PROVINCE Heritage Impact Assessment Specialist Reports 10/02/2014 Anton van Vollenhoven Archaetnos CC GCS Water and Environmental Consultants - Head Office JHB 02/06/2014 - 12:45
The Rehabilitation of Diepkloof Dam The Rehabilitation of Diepkloof Dam Located in the Larger Soweto Region, City of Johannesburg Metropolitan Municipality, Gauteng Province Heritage Impact Assessment Specialist Reports 25/05/2020 Johan van Schalkwyk 16/09/2020 - 23:26
HIA Solar-Aries 400kV Power Lines Proposed Establishment of Several Electricity Distribution Lines within the Northern Cape Province Heritage Impact Assessment Specialist Reports 22/02/2013 Stephan Gaigher Zitholele Consulting 13/09/2013 - 14:25

Pages

CSV
 
 

Search form