FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportTypesort ascending ReportDate Authors AuthoringBody CommissioningCompany MapID < 2009 Post date
9-2-042-0006-19970101-ACRM Archaeological Survey: Salamander Cove AIA Phase 1 01/01/1997 Jonathan Kaplan Agency for Cultural Resources Management MAPID_02647 16/06/2012 - 14:35
AIA_Erf_36_St_Helena_Revised_Kaplan_J_May09 Phase 1 Archaeological Impact Assessment: Proposed Development of Erf 36 St. Helena Bay Saldanha -Vredenburg District AIA Phase 1 01/05/2009 Jonathan Kaplan Agency for Cultural Resources Management MAPID_02598 16/06/2012 - 14:44
AIA[P1]-SANRAL: Upgrade of the R63, Section 13, Fort Beaufort to Alice, Nkonkobe Local Municipality, Eastern Cape Phase 1 Archaeological and Cultural Heritage Impact Assessment - SANRAL: Upgrade of the R63-Section 13, Fort Beaufort (km35.77) to Alice (km58.86), Nkonkobe Local Municipality, Eastern Cape AIA Phase 1 22/10/2016 Karen Van Ryneveld EOH Coastal & Environmental Services (CES) - East London 22/10/2016 - 11:09
AIA-Lowlands Hydropower and Distribution, near Cradock, CHDM, EC AIA-Lowlands Hydropower and Distribution, near Cradock, CHDM, EC AIA Phase 1 22/12/2020 Karen Van Ryneveld 22/12/2020 - 08:44
Oude Bloemhof-perseel, Stellenbosch: 'n Historiese argeologiese ondersoek. In opdrag van Absa Eiendomme Oude Bloemhof-perseel, Stellenbosch: 'n Historiese argeologiese ondersoek. In opdrag van Absa Eiendomme AIA Phase 1 01/01/1994 Hennie Vos, B Heydenrych Stellenbosch Museum 16/06/2012 - 14:33
9-2-106-0021-19940201-ACO Archaeological Survey of Four Dam Sites in the Paarl/Wellington Area AIA Phase 1 01/02/1994 Timothy Hart, Dave Halkett ACO Associates CC MAPID_01448 16/06/2012 - 14:37
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT CASTEEL DSRP Phase 1 Archaeological Impact Assessment for the Proposed Casteel Dam Safety Rehabilitation Project on a Portion of the Remaining Extent of the Farm Kasteel 231 KU, Acornhoek, Mpumalanga AIA Phase 1 04/04/2023 Tobias Coetzee Agri Civils Geo-Tech & Heritage Naledzi Environmental Consultants 27/06/2023 - 07:41
9-2-269-0031-20051019-NCHM Heritage Impact Assessment: Phiphidi Waterfall AIA Phase 1 19/10/2005 Johnny Van Schalkwyk National Cultural History Museum MAPID_00010 16/06/2012 - 14:41
AIA_Hantam_PV_2049_Van_der_Walt_J_Jan12 AIA for the proposed Hantam PV Solar Energy Facility on the Farm Narosies 228, Loeriesfontein, Northern Cape Province AIA Phase 1 06/01/2012 Jaco van der Walt, Marlize Lombard Heritage Contracts and Archaeological Consulting 16/06/2012 - 14:45
AIA_Tweefontein_696_erf_2654_9215_Kaplan_J_Oct08 Phase 1 Archaeological Impact Assessment the Proposed Swartland Shopping Mall Remainder Farm Tweefontein No. 696, Erf 2654 (Portion of Erf 327), Erf 9215 (Portion of Erf 2654) & Portion of Erf 327 Malmesbury AIA Phase 1 01/10/2008 Jonathan Kaplan Agency for Cultural Resources Management MAPID_02558 16/06/2012 - 14:50
Postmasburg MPLC_AIA Phase 1 Archaeological Impact Assessment for a proposed new lifestyle centre on Erf 1C, Postmasburg, NC Province. AIA Phase 1 10/07/2020 Lloyd Rossouw Paleo Field Services Kumba Iron Ore 13/07/2020 - 13:42
9-2-015-0003-20060801-ACRM Phase 1 Archaeological Impact Assessment: Proposed Housing Development Portion 25 of the Farm Compagniesdrift No. 436 Caledon AIA Phase 1 01/08/2006 Jonathan Kaplan Agency for Cultural Resources Management MAPID_02853 16/06/2012 - 14:34
AIA_Blocuso_HIA_Morris_D_Apr12 Heritage Impact Assessment Blocuso AIA Phase 1 23/04/2012 David Morris McGregor Museum 16/06/2012 - 14:43
AIA_Noodhulp_Caravan_Park_Huffman_TN_Feb08 Historic Impact Assessment for the Noodhulp Caravan Park, Bela Bela, Limpopo AIA Phase 1 01/02/2008 Thomas Huffman University of the Witwatersrand - Archaeological Resources Management MAPID_01667 16/06/2012 - 14:48
Phase 1 AIA Umlabu Relocation of Plant Phase 1 Archaeological Impact Assessment for the Proposed Relocation of the Coal Handling and Preparation Plant and Tailings Storage Facility to Portions 5 and 10 of the Farm Voorslag 274 IS AIA Phase 1 10/10/2014 Tobias Coetzee 18/11/2014 - 11:34
AIA; Proposed Groot Drakenstein Sewer, Western Cape ARCHAEOLOGICAL IMPACT ASSESSMENT THE PROPOSED GROOT DRAKENSTEIN SEWER, WESTERN CAPE AIA Phase 1 01/09/2011 Jonathan Kaplan Agency for Cultural Resources Management Arcus Gibb (Pty) Ltd 26/06/2018 - 13:46
AIA FOR THE PROPOSED BERG-EN-DAL MONUMENT ENTRANCE ALTERATION PROJECTAS PART OF THE N4 UPGRADE, MPUMALANGA PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON BERG-EN-DAL 378JT FOR THE PROPOSED BERG-EN-DAL MONUMENT ENTRANCE ALTERATION PROJECTAS PART OF THE N4 UPGRADE, NKANGALA DISTRICT MUNICIPALITY, MPUMALANGA PROVINCE AIA Phase 1 11/09/2019 Neels Kruger Exigo Sustainability WBHO Construction 11/09/2019 - 14:50
Schoongezicht Colliery A Report on a Heritage Impact Assessment for Umthombo Schoongezicht Colliery, close to Delmas in the Mpumalanga Province AIA Phase 1 01/04/2012 Anton van Vollenhoven Archaetnos CC Ground Water Consulting Services 13/06/2012 - 12:20
9-2-253-0003-20090101-NHS Cultural and Archaeological Heritage Assessment Specialist Study for the Construction of Power-Line at Zebedielas 123 KS Capricorn District Municipality, Limpopo Province AIA Phase 1 01/01/2009 McEdward Murimbika Nzumbululo Heritage Solutions 16/06/2012 - 14:39
AIA_Rhino_Andalusite_Mine_Huffman_TN_Dec04 Archaeological Assessment for the Rhino Andalusite Mine Second Report AIA Phase 1 01/12/2004 Thomas Huffman University of the Witwatersrand - Archaeological Resources Management MAPID_00465 16/06/2012 - 14:49
AIA: SPITSKOP WEF A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED SPITSKOP WIND ENERGY FACILITY AND ASSOCIATED INFRASTRUCTURE ON A SITE NORTH-WEST OF RIEBEECK EAST, BLUE CRANE ROUTE MUNICIPALITY AND MAKANA MUNICIPALITY, EASTERN CAPE PROVINCE. AIA Phase 1 01/03/2013 Celeste Booth, Sholeen Shanker Savannah Environmental (Pty) Ltd CTS_386746 14/02/2017 - 09:18
REMAINING EXTENT OF FARM FAIRFIELD 520, HAY DISTRICT PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT REPORT ON A 4 HA PORTION OF THE REMAINING EXTENT OF FARM FAIRFIELD 520, SITUATED ~30 KM NORTH OF CAMPBELL, HAY MAGISTERIAL DISTRICT, NORTHERN CAPE PROVINCE AIA Phase 1 12/02/2013 Peter Beaumont De Beers Consolidated Mines - Kimberley Mines McGregor Museum 04/04/2013 - 12:25
A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE VANADIUM RESOURCES SALT ROAST LEACH PLANT A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE VANADIUM RESOURCES SALT ROAST LEACH PLANT ON A PORTION OF PORTIONS 3 & 13 OF THE FARM TWEEFONTEIN 360KT NEAR STEELPOORT IN THE LIMPOPO PROVINCE AIA Phase 1 01/04/2022 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Red Kite Environmental Solutions (Pty) Ltd 15/11/2022 - 21:25
AIA FOR THE PROPOSED TWICKENHAM ROADS UPGRADE PROJECT IN THE STEELPOORT AREA, LIMPOPO PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED TWICKENHAM ROADS UPGRADE PROJECT IN THE STEELPOORT AREA, GREATER TUBATSE LOCAL MUNICIPALITY, LIMPOPO PROVINCE AIA Phase 1 18/07/2016 Neels Kruger Exigo Sustainability AGES (PTY) Ltd - Limpopo 13/12/2016 - 11:49
First Phase Archaeological and heritage Assessment of the site proposed for the Vodacom mast at the farm Buffelskloof 511 IQ, Vredefort Dome, North West Province First Phase Archaeological and heritage Assessment of the site proposed for the Vodacom mast at the farm Buffelskloof 511 IQ, Vredefort Dome, North West Province AIA Phase 1 07/01/2010 Cobus Dreyer 16/06/2012 - 08:54
9-2-095-0001-20071001-PAHS First Phase Archaeological and Cultural Heritage Assessment of the Proposed Leisure Residential Developments at De Fonteine 364, Uitenhage, Eastern Cape AIA Phase 1 01/10/2007 Cobus Dreyer MAPID_01233 16/06/2012 - 14:37
9-2-313-0009-20040621-PAHS First Phase Archaeological and Historical Investigation of the Proposed Residential Developments at the Farm Maria 853 near Rosendal, Free State AIA Phase 1 21/06/2004 Cobus Dreyer MAPID_00816 16/06/2012 - 14:42
Impuma quarry Klein Rivier and Buffelbosch Archaeology MINING RIGHT APPLICATION: FARMS KLEIN RIVIER (713-32) AND BUFFELSBOSCH (742-14), HUMANSDORP DISTRICT, EASTERN CAPE, SOUTH AFRICA AIA Phase 1 25/06/2012 Karen Van Ryneveld ArchaeoMaps Archaeological Consultancy Site Plan Consulting 11/07/2012 - 15:55
AIA_Tanganani_Ext_7_Coetzee_FP_Dec08 Cultural Heritage Survey of the Proposed Township Development (Tanganani Ext 7) on Portion 119 (Portion of Portion 2) of the Farm Diepsloot 388 JR, Gauteng AIA Phase 1 01/12/2008 Francois P Coetzee University of South Africa - Anthropology and Archaeology MAPID_02360 16/06/2012 - 14:50
Mivami Final Heritage Report PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED SECTION 102 EMP AMENDMENT FOR MIVAMI AGRI-MINING PTY LTD TO INCLUDE THE REMAINING EXTENT OF KWAGGASLAAGTE 121 IP INTO THE PROSPECTING RIGHR FOR DUNBAR 119 IP AND PORTION 9 OF HOUTKOP 152 IP, IN DITSOBOTLA LOCAL MUNICIPALITY, NORTH OF NGAKA MODIRI MOLEMA DISTRICT MUNCIPALITY, NORTH WEST PROVINCE AIA Phase 1 01/03/2017 Trust Mlilo Kimopax Pty Ltd Integrated Specialist Services 06/06/2022 - 14:34
9-2-032-0004-20060822-McGM Phase 1 Heritage Impact Assessment Report on a Planned Extension of Kalksloot Settlement, Siyanda District Municipality, Northern Cape AIA Phase 1 22/08/2006 Peter Beaumont McGregor Museum MAPID_00971 16/06/2012 - 14:35
AIA-Drip Irrigation and Spekboom development, Pokjesfontein, EC AIA-Drip Irrigation and Spekboom development, Pokjesfontein, EC AIA Phase 1 29/08/2023 Karen Van Ryneveld 29/08/2023 - 10:17
AIA_Amathemba_erf_493_and_584_Kaplan_JM_Aug09 Archaeological Impact Assessment: Proposed Sand Mining on Erf 493 & 584 Schaapkraal Cape Town AIA Phase 1 01/08/2009 Jonathan Kaplan Agency for Cultural Resources Management MAPID_02676 16/06/2012 - 14:43
AIA_Mount_Savannah_2nd_Huffman_TN_Dec04 Archaeological Investigation for Mount Savannah, Second Report AIA Phase 1 01/12/2004 Thomas Huffman University of the Witwatersrand - Archaeological Resources Management 16/06/2012 - 14:48
HIA Berlin Kaapsehoop Survey SPECIALIST REPORT FOR PHASE 1 ARCHAEOLOGICAL / HERITAGE IMPACT ASSESSMENT, SURVEY AND MANAGEMENT GUIDELINES FOR MAJUBA 1 ROCK ART SITE: BERLIN PLANTATION, KAAPSEHOOP, MPUMALANGA. AIA Phase 1 01/08/2012 Christine Van Wyk Rowe Adansonia Heritage Consultants Komatiland Forests 14/11/2012 - 14:35
9-2-266-0002-20040801-RRCRC Phase 1 Heritage Impact Assessment: Upgrading of Penge Sewer Works Limpopo Province AIA Phase 1 01/08/2004 Frans Roodt R & R Cultural Resource Consultants MAPID_00363 16/06/2012 - 14:40
AIA_Ganzekraal_Kaplan_JM_Jun91 A Report on the Archaeological Sensitivity of Ganzekraal AIA Phase 1 01/06/1991 Jonathan Kaplan Agency for Cultural Resources Management MAPID_01825 16/06/2012 - 14:45
AIA_Pretoriuskraal_AH_19_Van_der_Walt_J_Sep07 Archaeological Impact Assessment. Township Development on Sub Division of AH19, Pretoriuskraal, Orkney, North West Province AIA Phase 1 25/09/2007 Jaco van der Walt Matakoma Heritage Consultants (Pty) Ltd MAPID_01024 16/06/2012 - 14:49
9-2-008-0001-20060529-McGM Stamper Claim on a Portion of the Farm Longlands, Barkly-West AIA Phase 1 29/05/2006 Karen Van Ryneveld McGregor Museum MAPID_00952 16/06/2012 - 14:33
9-2-081-0073-19990601-ACO An Archaeological Baseline Study of Millers Point AIA Phase 1 01/06/1999 Dave Halkett ACO Associates CC MAPID_00142 16/06/2012 - 14:37
9-2-300-0023-20060724-PAHS First Phase Archaeological and Cultural Heritage Assessment of the Proposed Residential Developments on the Farm Craig Rossie 1422, Clarens, Free State AIA Phase 1 24/07/2006 Cobus Dreyer MAPID_01487 16/06/2012 - 14:41
AIA_Klein_Zwart_Bast_1988_Solar_Power_Station_Pelser_AJ_Jan11 A report on archaeological impact assessment (AIA) for the proposed solar energy plant on Klein Zwart-Bast 188, Kenhardt District, Northern Cape AIA Phase 1 11/01/2011 Anton Pelser Archaetnos CC 16/06/2012 - 14:46
AIA_Wits_Medical_Centre_Fourie_W_Feb08 Archaeological Impact Assessment: Proposed Upgrade of the Wits Donald Gordon Medical Centre, Johannesburg Gauteng Province AIA Phase 1 12/02/2008 Wouter Fourie Matakoma Heritage Consultants (Pty) Ltd MAPID_03234 16/06/2012 - 14:51
AIA for the Mining Right Application on the Farm Dikpens, Calvinia Archaeological Impact Assessment For the Mining Right Application on the Farm Dikpens 182 Portions 2 and 4 situated in the District of Calvinia (Northern Cape Province) AIA Phase 1 05/08/2013 Jaco van der Walt Heritage Contracts and Archaeological Consulting Site Plan Consulting 19/08/2013 - 16:26
9-2-024-0001-20071201-AlbMus A Phase 1 Archaeological Heritage Impact Assessment for the Proposed New Entrance Gate with Associated Infrastructure and the Construction and Upgrade of Roads in the Mountain Zebra National Park, Cradock District AIA Phase 1 01/12/2007 Johan Binneman Albany Museum MAPID_01223 16/06/2012 - 14:34
9-2-248-0001-20080414-KA Phase 1 Archaeological Impact Assessment on Portion 21 (Portion of Portion 8) of the Farm Shandon 194 JU and Portion 4 of the Rest 454 JT in the Nelspruit Area, Mbombela Municipality, Mpumalanga AIA Phase 1 14/04/2008 Jean-Pierre Celliers Kudzala Antiquity MAPID_02109 16/06/2012 - 14:39
AIA_Dams_Loverswalk1063_Rossouw_L_Jul11 Phase 1 AIA and PIA of two proposed dams on the farms Loverswalk 1063 and Smithkraal 1519, Boshof District, Free State AIA Phase 1 01/07/2011 Lloyd Rossouw 16/06/2012 - 14:44
Archaeology Impact Assesment Archaeology Impact Assessment for the Proposed Dyasonsklip Solar Energy Facility 1 and Grid connection AIA Phase 1 01/12/2014 Lita Webley ACO Associates CC Cape Environmental Assessment Practitioners 06/02/2015 - 12:50
AIA_Messina_Platinum_Mine_Borrow_pit_AI_Mar02 Heritage Impact Assessment for the Expansion of a Borrow Pit: Evaluation of the Heritage Component of the Environmental Impact Assessment for the Expansion of a Borrow Pit at the Messina Platinum Mine - Lebowagomo, Northern Province AIA Phase 1 25/03/2002 Stephan Gaigher Archaeo-Info MAPID_00258 16/06/2012 - 14:47
AIA - Paulshoek Bulk Water Supply ARCHAEOLOGICAL SPECIALIST STUDY In terms of Section 38(8) of the NHRA for a PROPOSED PAULSHOEK BULK WATER SUPPLY AIA Phase 1 16/08/2018 Jenna Lavin, Jonathan Kaplan Cedar Tower Services Enviroafrica CC 16/08/2018 - 15:13