The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 15351 - 15400 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
9-2-269-0017-20070901-ACHMC | A Phase 1 Heritage Impact Assessment Study for a Proposed New Tshino Substation on the Farm Schuynshoogte 29 LT in the Limpopo Province | AIA Phase 1 | 01/09/2007 | Julius CC Pistorius | MAPID_01796 | 16/06/2012 - 14:40 | ||
AIA_Grootvlei-Balfour_Powerline_Huffman_TN_Aug07 | Archaeological Impact Assessment for the Grootvlei-Balfour Powerline, Mpumalanga | AIA Phase 1 | 01/08/2007 | Thomas Huffman | University of the Witwatersrand - Archaeological Resources Management | MAPID_01111 | 16/06/2012 - 14:45 | |
AIA_Tshipise_to_Mbodi_Powerline_Murimbika_M_Nov08 | Cultural and Archaeological Heritage Assessment Specialist Study for the Construction of Power-Line from Tshipise to Mbodi Primary School, Vhembe District Municipality, Limpopo Province | AIA Phase 1 | 01/11/2008 | McEdward Murimbika | Nzumbululo Heritage Solutions | MAPID_02448 | 16/06/2012 - 14:50 | |
9-2-228-0001-20051201-ACU | Heritage Assessment of the Proposed Residential Township Barbeque Downs Extension 22, Holding 22, Barbeque Downs Agricultural Holdings, Johannesburg Metropolitan Municipality | AIA Phase 1 | 01/12/2005 | Francois P Coetzee | University of South Africa - Archaeology Contracts Unit | MAPID_03074 | 16/06/2012 - 14:38 | |
AIA_Biesjesfontein_Victoria_West_PV_Pelser_AJ_Apr12 | A report on an Archaeological Impact Assessment (AIA) for the proposed photo-voltaic solar power generation plant on the Farm 270 (Biesjesfontein) near the Victoria West in the Northern Cape | AIA Phase 1 | 16/04/2012 | Anton Pelser | Archaetnos CC | 16/06/2012 - 14:43 | ||
9-2-018-0057-19981101-ACRM | Archaeological/Historical Study Proposed Blaauwberg Nature Reserve | AIA Phase 1 | 01/11/1998 | Jonathan Kaplan | Agency for Cultural Resources Management | MAPID_01968 | 16/06/2012 - 14:34 | |
AIA FOR THE PROPOSED RHODES SOLAR PARK 1, JOHN TAOLO GAETSEWE DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF A DEMARCATED SURFACE PORTION ON THE FARM RHODES 269 FOR THE PROPOSED RHODES SOLAR PARK 1 PHOTOVOLTAIC POWER PLANT & ACCESS ROAD DEVELOPMENT, JOE MOROLONG LOCAL MUNICIPALITY, JOHN TAOLO GAETSEWE DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | AIA Phase 1 | 18/05/2014 | Neels Kruger | Exigo3 Sustainability | Mira Energy (Pty) Ltd | 30/05/2014 - 09:32 | |
AIA Hillendale Mine Sep 2009 | The Archaeological Survey of the Hillendale Mine September 2009 | AIA Phase 1 | 01/10/2009 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Exxaro Resources | CTS_309707 | 06/07/2015 - 10:22 |
9-2-253-0003-20070703-RRCRC | Phase 1 Heritage Resources Impact Assessment (Scoping & Evaluation) Doornkraal Portion 76 Polokwane, Limpopo | AIA Phase 1 | 03/07/2007 | Frans Roodt | R & R Cultural Resource Consultants | MAPID_00863 | 16/06/2012 - 14:39 | |
AIA_Doornkuil_369_IQ_Coetzee_FP_Feb08 | Cultural Heritage Survey of the Proposed Mixed/Residential Development on Doornkuil 369 IQ, and Associated Infrastructure Upgrades, Sedibeng District Municipality | AIA Phase 1 | 01/02/2008 | Francois P Coetzee | University of South Africa - Anthropology and Archaeology | MAPID_02401 | 16/06/2012 - 14:44 | |
AIA_Rayton_1-3_Henderson_ZL_Jul07 | Archaeological Assessment Report for Subdivision Rayton 1/3, Bloemfontein District, Free State, South Africa | AIA Phase 1 | 19/07/2007 | Zoe Henderson, Gerda Coetzee, Mamakomoreng Nkhasi, C Koortzen | National Museum Bloemfontein - Archaeology Contracts Office | MAPID_03096 | 16/06/2012 - 14:49 | |
Bletterman slave quarters site: archaeotectural and archaeological investigations of a late 18th century structure and its contextual features | Bletterman slave quarters site: archaeotectural and archaeological investigations of a late 18th century structure and its contextual features | AIA Phase 1 | 01/01/1990 | Hennie Vos | Stellenbosch Museum | 16/06/2012 - 08:54 | ||
9-2-092-0004-20060501-ACO | Heritage Assessment of the Proposed Subdivision of Erf 2906 Swellendam | AIA Phase 1 | 01/05/2006 | Timothy Hart | ACO Associates CC | MAPID_02842 | 16/06/2012 - 14:37 | |
9-2-306-0001-20060630-PAHS | First Phase Archaeological and Cultural Heritage Assessment of the Proposed Township Development at Brandfort, Free State | AIA Phase 1 | 30/06/2006 | Cobus Dreyer | MAPID_00814 | 16/06/2012 - 14:42 | ||
AIA_Kwanobuhle_Ext_11_Binneman_J_Jul11 | A Phase 1 Archaeological Impact Assessment (AIA) for the proposed mixed-used housing development, Kwanobuhle, extension 11, Uitenhage, Nelon Mandela Bay Municipality, Eastern Cape Province. | AIA Phase 1 | 01/07/2011 | Johan Binneman, Celeste Booth, Natasha Higgitt | Albany Museum | 16/06/2012 - 14:47 | ||
Motorhawe perseel te 96-98 Dorpstraat, Stellenbosch: Historiese en argeologiese ondersoek | Motorhawe perseel te 96-98 Dorpstraat, Stellenbosch: Historiese en argeologiese ondersoek | AIA Phase 1 | 01/01/2000 | Hennie Vos | ArCape | 16/06/2012 - 08:54 | ||
AIA_Sukkel_113_JU_Fourie_W_Feb08 | Heritage Assessment Portions of the Farm Sukkel 113 JU, White River, Mpumalanga | AIA Phase 1 | 08/02/2008 | Wouter Fourie | Matakoma Heritage Consultants (Pty) Ltd | MAPID_03107 | 16/06/2012 - 14:50 | |
AIA_AlbanyKoowie_Power_Line_Van_Ryneveld_K_May11 | The Albany/Kowie Power Line (& bathurst Substation) Grahamstown - Port Alfred, Eastern Cape, South Africa | AIA Phase 1 | 06/05/2011 | Karen Van Ryneveld | 16/06/2012 - 14:43 | |||
AIA_Morning_Tide_Sterkspruit_33_JT_Birkholtz_PD_May06 | Phase 1 Heritage Impact Assessment for the Morning Tide Development Complex, Morning Tide Power Line and Abrina Residential Development-Sterkspruit 33 JT | AIA Phase 1 | 11/05/2006 | Polke Birkholtz | Archaeology Africa CC | MAPID_00673 | 16/06/2012 - 14:48 | |
AIA for the Cronimet Mine, Limpopo Province. | Archaeological Impact Assessment For the proposed additional underground and opencast mining, associated infrastructure and processing facilities at Thaba Cronimet Chrome Mine, Limpopo Province. | AIA Phase 1 | 26/02/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Worley Parsons RSA (Pty) Ltd | 23/08/2016 - 09:36 | |
9-2-055-0002-20060801-ACHMC | A Phase 1 Heritage Impact Assessment (HIA) Study for the Proposed New United Manganese of Kalahari (Umk) Mine on the Farms Botha 313, Smartt 314 and Rissik 330 near Hotazhel in the Northern Cape Province of South Africa | AIA Phase 1 | 01/08/2006 | Julius CC Pistorius | MAPID_00920 | 16/06/2012 - 14:36 | ||
9-2-266-0002-20010701-NCHM | A Survey of Cultural Resources in the New Bridge Location Penge Area Sekhukhuneland | AIA Phase 1 | 01/07/2001 | Johnny Van Schalkwyk | National Cultural History Museum | MAPID_00351 | 16/06/2012 - 14:40 | |
AIA_Freedom_Park_Rustenburg_Huffman_TN_Jan01 | Archaeological Assessment of Freedom Park, Rustenburg District Council | AIA Phase 1 | 01/01/2001 | Thomas Huffman | University of the Witwatersrand - Archaeological Resources Management | MAPID_03010 | 16/06/2012 - 14:45 | |
AIA Naauwpoort | A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED ESTABLISHMENT OF THE NAAUWPOORT SOLAR ENERGY FACILITY ON THE REMAINDER OF THE FARM NAAUWPOORT 1, NEAR NOUPOORT, UMSOBOMVU MUNICIPALITY, NORTHERN CAPE PROVINCE | AIA Phase 1 | 01/12/2012 | Celeste Booth, Sholeen Shanker | Albany Museum | Savannah Environmental (Pty) Ltd | 26/02/2013 - 16:24 | |
Samy's Wholesalers Expansion | HIA for the proposed expansion to the Samy's Whoesalers Warehouse, Kimberley - Northern Cape | AIA Phase 1 | 01/11/2014 | Stephan Gaigher | Gaigher & Associates | Samy's Wholesalers | 05/01/2015 - 11:57 | |
Umjindi Trust water pipeline | Phase 1 Archaeological Impact Assessment on the farm Sassenheim 695 JT regarding the location of graves in the vicinity of an existing water pipeline in Umjindi Trust, near Barberton, Mpumalanga Province. | AIA Phase 1 | 10/08/2015 | Jean-Pierre Celliers | Kudzala Antiquity | IWR Water Resources Pty Ltd | 20/11/2015 - 15:18 | |
9-2-214-0007-20080701-IHCvSJ | Heritage Impact Assessment for the Nkomazi Wilderness River Crossings, Carolina Magisterial District, Mpumalanga Province | AIA Phase 1 | 01/07/2008 | Johnny Van Schalkwyk | MAPID_02172 | 16/06/2012 - 14:38 | ||
9-2-300-0023-20040419-PAHS | First Phase Archaeological and Historical Investigation of the Proposed Residential Developments at the Golf Estate, Clarens, Free State | AIA Phase 1 | 19/04/2004 | Cobus Dreyer | MAPID_01527 | 16/06/2012 - 14:41 | ||
AIA_Kimberley_DS_and_Homestead_Substation_Morris_D_Oct10 | Heritage Impact Assessment of alternative routes of a proposed 132 kV power line between the existing Kimberley DS Substation and the Homestead Substation at the northern edge of Kimberley, Northern Cape. | AIA Phase 1 | 13/10/2010 | David Morris | McGregor Museum | 16/06/2012 - 14:46 | ||
AIA_Wind_Energy_Springbok_Kaplan_JM_Oct10 | ARCHAEOLOGICAL IMPACT ASSESSMENT OF A PROPOSED WIND ENERGY FACILITY NEAR SPRINGBOK NORTHERN CAPE | AIA Phase 1 | 10/10/2010 | Jonathan Kaplan | Agency for Cultural Resources Management | 16/06/2012 - 14:51 | ||
Eikehoff, Stellenbosch: Lotte 3/4 van die begrafplaas (1687 - 1717): Historiese en argeologiese ondersoek 2003 (Junie) | Eikehoff, Stellenbosch: Lotte 3/4 van die begrafplaas (1687 - 1717): Historiese en argeologiese ondersoek 2003 (Junie) | AIA Phase 1 | 01/01/2005 | Hennie Vos | ArCape | 16/06/2012 - 08:54 | ||
Heritage Report N2 from Verzameling to Leiden | Cultural heritage impact assessment for THE PLANNED IMPROVEMENT OF THE NATIONAL ROUTE N2, KM 30 (VERZAMELING) TO KM 60.0 (LEIDEN), GERT SIBANDE DISTRICT MUNICIPALITY, MPUMALANGA PROVINCE | AIA Phase 1 | 05/10/2022 | Johnny van Schalkwyk | Department of Forestry, Fisheries and the Environment | Chameleon Environmental | 27/10/2022 - 14:18 | |
9-2-243-0002-20001106-AI | Proposed Development of a Cellular Base Station-Kauletsi-Northern Province | AIA Phase 1 | 06/11/2000 | Marko Hutten, Stephan Gaigher | Archaeo-Info | MAPID_00261 | 16/06/2012 - 14:39 | |
AIA_Cosmo_City_Coetzee_FP_Jul08 | Cultural Heritage Survey of the Proposed Residential Development of Phase 2 of Cosmo City, City of Johannesburg Metropolitan Municipality | AIA Phase 1 | 01/07/2008 | Francois P Coetzee | University of South Africa - Anthropology and Archaeology | MAPID_02377 | 16/06/2012 - 14:44 | |
AIA_Powerline_Esselen_Cornwall_Van_Schalkwyk_JA_Jul09 | Heritage Impact Assessment for the Proposed Development of a Powerline from Esselen Park to Cornwall Hill, Gauteng Province | AIA Phase 1 | 01/07/2009 | Johnny Van Schalkwyk | MAPID_03163 | 16/06/2012 - 14:49 | ||
9-2-032-0001-20080801-ACRM | An Archaeological Assessment of Two Borrow Pits Alongside DR 3321 Uap, Northern Cape Province | AIA Phase 1 | 01/08/2008 | Jonathan Kaplan | Agency for Cultural Resources Management | MAPID_02107 | 16/06/2012 - 14:35 | |
VODACOM BASE STATION: LEPHALALE ARMY BASE, LIMPOPO PROVINCE. | HERITAGE IMPACT ASSESSMENT FOR THE VODACOM BASE STATION: LEPHALALE ARMY BASE, LIMPOPO PROVINCE. | AIA Phase 1 | 04/06/2022 | Jaco van der Walt | Tekplan Environmental | VODACOM (PTY) LTD | 13/06/2022 - 11:21 | |
P1AIA-Keigate Commercial Development, Farm 1307 and Portion of RE-1-665, EL, EC | Keigate Commercial Development, Farm 1307 and Portion of Farm RE/1/665 East London, Buffalo City Metropolitan Municipality, Eastern Cape, South Africa | AIA Phase 1 | 16/06/2014 | Karen Van Ryneveld | ArchaeoMaps Archaeological Consultancy | Control Civil Services cc | 04/08/2014 - 12:20 | |
9-2-081-0021-19990201-ACO | Phase 1 Archaeological Assessment Coastal Park Waste Landfill Site: Muizenberg | AIA Phase 1 | 01/02/1999 | Timothy Hart | ACO Associates CC | 16/06/2012 - 14:37 | ||
9-2-259-0008-20051101-AHCC | Cultural Heritage Resources Impact Assessment of the Farm Zuikerboschfontein 151 IQ and Portion 10 (Portion of Portion 8) of the Farm Steenekoppie 153 IQ Magaliesburg | AIA Phase 1 | 01/11/2005 | Udo Kusel | African Heritage Consultants CC | MAPID_00318 | 16/06/2012 - 14:40 | |
AIA_Solar_Brakpoort_2462_Morris_D_Feb12 | Specialist input for the environmental impact assessment for the proposed Brakpoort Karoo PV solar energy project, near Victoria West, Northern Cape province | AIA Phase 1 | 01/02/2012 | David Morris | McGregor Museum | 16/06/2012 - 14:50 | ||
Phase 1 HIA for Nakedi Solutions (Pty) Ltd Manganese Mining Right Application | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSSMENT REPORT FOR THE PROPOSED MINING RIGHT APPLICATION ON THE FARMS BADEN 90LR AND PORTION OF PORTION 0 OF BRONKHORSFONTEIN 42LR WITHIN BLOUBERG LOCAL MUNICIPALITY, CAPRICORN DISTRICT MUNICIPALITY OF LIMPOPO PROVINCE | AIA Phase 1 | 26/05/2021 | Trust Mlilo | Mudzunga Consulting (Pty) Ltd | Mudzunga Consulting (Pty) Ltd | 12/08/2022 - 02:27 | |
9-2-204-0004-20050110-NCHM | Heritage Impact Assessment: Belfast Extension 6 Township | AIA Phase 1 | 10/01/2005 | Johnny Van Schalkwyk | National Cultural History Museum | MAPID_00645 | 16/06/2012 - 14:38 | |
AIA_Medupi-Spitskop_Van_der_Walt_J_Dec09 | Heritage Walkthrough for the 132 km Medupi-Spitskop Transmission Powerline project, Northam, Limpopo Province | AIA Phase 1 | 14/12/2009 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | 16/06/2012 - 14:47 | ||
9-2-007-0003-20070627-PAHS | First Phase Archaeological and Cultural Heritage Assessment of the Proposed Leisure Residential Developments at the Farm Kin Mel 109 (Lovedale), Barkly East, Eastern Cape | AIA Phase 1 | 27/06/2007 | Cobus Dreyer | MAPID_01219 | 16/06/2012 - 14:33 | ||
AIA_Vlakvarkfontein_213_IR_Hutten_L_Nov10 | Heritage Impact Assessment for the Farm Vlakvarkfontein 213 IR Portion 2, Mpumalanga | AIA Phase 1 | 01/11/2010 | Louisa Hutten, Marko Hutten | 16/06/2012 - 14:51 | |||
AIA Report Askham Oxidation Ponds | Archaeological Impact Assessment for the proposed Construction of Oxidation Ponds near Askham in the Northern Cape Province | AIA Phase 1 | 06/04/2015 | Jan Engelbrecht | UBIQUE HERITAGE CONSULTANTS | Van Zyl Environmental Consultants | 18/06/2015 - 16:03 | |
AIA_BULWER-NCWADI_TRANSMISSION_LINE_Anderson_G_Feb95 | ESKOM: BULWER-NCWADI TRANSMISSION LINE (PHASE 1) | AIA Phase 1 | 01/02/1995 | Gavin Anderson | KwaZulu Natal Museum | MAPID_03298 | 16/06/2012 - 14:43 | |
AIA_Ovaal_PV_Morris_D_Jun10 | Archaeological Impact Assessment Phase 1: Proposed development of PV Power Station at Ovaal, near Douglas, Northern Cape | AIA Phase 1 | 08/06/2010 | David Morris | McGregor Museum | 16/06/2012 - 14:48 | ||
9-2-022-0036-20040601-ACO | An Archaeological Assessment of Three Proposed Farm Dam Locations in the Citrusdal District | AIA Phase 1 | 01/06/2004 | Dave Halkett | ACO Associates CC | MAPID_00188 | 16/06/2012 - 14:34 |