FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportTypesort ascending ReportDate Authors AuthoringBody CommissioningCompany MapID < 2009 Post date
AIA; Proposed Residential Development, Protea Ridge, Cape Town ARCHAEOLOGICAL IMPACT ASSESSMENT: PROPOSED RESIDENTIAL DEVELOPMENT ON PROTEA RIDGE (FARM 948), KOMMETJIE, SIMONSTOWN DISTRICT, CAPE TOWN METRO AIA Phase 1 01/06/2011 Lita Webley, Jayson Orton ACO Associates CC Doug Jeffery Environmental Consultants 16/07/2018 - 12:09
Anglo Platinum Rustenburg Revised Report A REPORT ON THE UPDATING OF A PREVIOUS CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE EMPR ALIGNMENT AND CONSOLIDATION PROCESS AT ANGLO AMERICAN PLATINUM: RUSTENBURG PLATINUM MINES – RUSTENBURG SECTION, NORTHWEST PROVINCE AIA Phase 1 01/02/2014 Anton van Vollenhoven Archaetnos CC WSP Environmental Pty Ltd - Cape Town 03/04/2014 - 16:10
9-2-281-0037-20050201-HAC Phase 1 Report on the Monitoring and Assessment of the Archaeology Around the Brakkekloof Homestead on Portion 5 on Farm Brakkekloof No 959 AIA Phase 1 01/02/2005 Ute Seemann MAPID_00616 16/06/2012 - 14:41
Water Storage Facility Thabo Mofutsanyane Phase 1 Archaeological Impact Assessment Report: Investigations for the proposed construction of a Water Storage Facility in the Meulspruit near Rosendal as well as the water pipeline to Senekal within the Thabo Mofutsanyane District of Free State Province AIA Phase 1 01/09/2011 Eric Ndivhuho Mathoho Vhufa Hashu Heritage Consultants JIS Environmental Engineers 30/07/2012 - 14:49
off take 6b PROPOSED CONSTRUCTION OF OFF TAKE 6B POTABLE WATER PIPELINE AS PART OF THE LOWER THUKELA BULK WATER SUPPLY AT NEW GUELDERLAND TO NEW GUELDERLAND RESERVOIR ILEMBE DISTRICT MUNICIPALITY, KZN AIA Phase 1 28/10/2014 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Triplo4 Sustainable Solutions (Pty) Ltd 03/11/2014 - 09:00
9-2-259-0017-20000501-ACHMC The Archaeological Potential of the Proposed Trajectory of the K105 Rd Scoping Report: A Portion of Approximately 8.4 km of Route K105 Between the N1-21 Ands Clayville AIA Phase 1 01/05/2000 Julius CC Pistorius MAPID_00540 16/06/2012 - 14:40
AIA_Riverwalk_-_Roodepoort_504JR_Coetzee_FP_Aug08 Cultural Heritage Survey of the Proposed Riverwalk Township Development on the Remainder of the Farm Roodepoort 504 JR, Gauteng Province AIA Phase 1 01/08/2008 Francois P Coetzee University of South Africa - Anthropology and Archaeology MAPID_02369 16/06/2012 - 14:49
9-2-054-0001-20050308-ACRM Phase 1 Archaeological Impact Assessment Portion 2 of Farm 420 Kuils River Western Cape Province AIA Phase 1 08/03/2005 Jonathan Kaplan Agency for Cultural Resources Management MAPID_02812 16/06/2012 - 14:36
AIA, expansion of borrow pit DR02162/3.8/L/100, north-west of Piketberg ARCHAEOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF A BORROW PIT ON STINKFONTEIN A 97, PIKETBERG AREA, WEST COAST DISTRICT MUNICIPALITY, WESTERN CAPE AIA Phase 1 01/03/2013 Madelon Tusenius Natura Viva CC Vidamemoria Heritage Consultants CTS_503690 18/04/2018 - 09:31
AIA_Sterkspruit_33_JT_Plot_59_Roodt_F_Oct06 Phase 1 Heritage Resources Impact Assessment (Scoping & Evaluation) Sterkspruit 33 JT Plot 59 Lydenburg, Mpumalanga AIA Phase 1 16/10/2006 Frans Roodt R & R Cultural Resource Consultants MAPID_01383 16/06/2012 - 14:50
Sabie Hydro Power Project, Hazyview Phase 1 Archaeological / Heritage Impact Assessment for the proposed Sabie Hydro Power (Pty Ltd) project on portion 17 of the farm Tevrede 178JT, Hazyview, Mpumalanga Province AIA Phase 1 19/10/2016 Christine Van Wyk Rowe Adansonia Heritage Consultants Rhengu Environmental Services 19/10/2016 - 09:48
AIA_Kees_Zyn_Doorns_Celliers_JP_Apr11 Phase 1 Archaeological Impact Assessment for Eco 8 Environmental Planners concerning the proposed development concerning the Cradle of Life and Safari Park on various portions of the farm Kees Zyn Doorns 708 JT, Mpumalanga Province AIA Phase 1 08/04/2011 Jean-Pierre Celliers Kudzala Antiquity 16/06/2012 - 14:46
AIA_Afrikaans_Language_Monument_Webley_L_Sep08 Phase One Heritage Impact Assessment: Office Development at Afrikaans Language Monument, Paarl, Drakenstein Municipality, Western Cape AIA Phase 1 01/09/2008 Lita Webley ACO Associates CC MAPID_02534 16/06/2012 - 14:43
9-2-240-0002-20010907-AI Heritage Impact Assessment for the Proposed Additional Two Borrow Pits for the Proposed Upgrade of Gravel Tar Road Between Mukwakwaila, Bambeni to Nkomo Village in the, Limpopo Province AIA Phase 1 07/09/2001 Stephan Gaigher Archaeo-Info MAPID_00012 16/06/2012 - 14:39
9-2-006-0001-20071005b-PAHS First Phase Archaeological and Cultural Heritage Assessment of the Proposed Diamond Prospecting on Cyferfontein (Remainder Grootrivierwagendrif 29) Aliwal North, Eastern Cape: AIA Phase 1 05/10/2007 Cobus Dreyer MAPID_01455 16/06/2012 - 14:33
9-2-300-0012-20060525b-PAHS First Phase Archaeological and Cultural Heritage Investigation of the Proposed Housing Developments on the Farm Welgelegen 102, Clarens, Free State AIA Phase 1 25/05/2006 Cobus Dreyer MAPID_01572 16/06/2012 - 14:41
AIA_Elandsfontein_346IQ_Birkholtz_PD_Nov08 Heritage Impact Assessment: Proposed Western Areas Community Development Project Located on Portion 1 of the Farm Elandsfontein 346 IQ, West Rand District Municipality, Gauteng Province AIA Phase 1 21/11/2008 Polke Birkholtz PGS Heritage and Grave Relocation Consultants 16/06/2012 - 14:44
AIA_Ghaap_abattoir_Fourie_W_Jul11 Ghaap Abattoir: Cadastral coundary: A portion of Erf 1, Kuruman, Ga-Segonyana Municiapality, Northern Cape Province AIA Phase 1 27/07/2011 Wouter Fourie PGS Heritage and Grave Relocation Consultants 16/06/2012 - 14:45
AIA_New_Paternoster_WWTW_Kaplan_J_May09 Phase 1 Archaeological Impact Assessment the Proposed Construction of a New Waste Water Treatment Works at Paternoster (Remainder of Portion 3 of the Farm Besterskraal No. 38 and Erf 1519) AIA Phase 1 01/05/2009 Jonathan Kaplan Agency for Cultural Resources Management MAPID_02596 16/06/2012 - 14:48
AIA on Jan Hendriksfontein 263 IT, Ermelo AIA Phase 1 20/08/2012 Tobias Coetzee Environmental Assurance Vunene Mining (Pty) Ltd 11/12/2012 - 15:28
Phase 1 Heritage Impact Assessment Specialised Study Proposed Eskom Powerline Connecting from Proposed Line to Ga-Thoka to New Substation Site at Dikgale Village in Polokwane Municipality, Limpopo Province Phase 1 Heritage Impact Assessment Specialised Study Proposed Eskom Powerline Connecting from Proposed Line to Ga-Thoka to New Substation Site at Dikgale Village in Polokwane Municipality, Limpopo Province AIA Phase 1 16/06/2012 McEdward Murimbika Nzumbululo Heritage Solutions 16/06/2012 - 14:33
SANRAL R61 Mudstone Borrow Pit, Engcobo, Eastern Cape Heritage Impact Assessment for the Proposed SANRAL R61 Section 6 Borrow Pit in the Engcobo Local Municipality, Chris Hani District Municipality of the Eastern Cape Province. AIA Phase 1 23/10/2017 EOH Coastal and Environmental Services 10/01/2018 - 13:16
AIA_Uniondale_Road_Upgrading_Nilssen_PJ_Jul06 Proposed Upgrading of Road Sections and Relocation of an Intersection in the Uniondale Area: Archaeological Heritage Impact Assessment AIA Phase 1 20/07/2006 Peter Nilssen MAPCRM CC MAPID_01902 16/06/2012 - 14:51
AIA_Coega_IDZ_Binneman_J_May10 A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT OF THE GREATER COEGA INDUSTRIAL DEVELOPMENT ZONE (IDZ), NEAR PORT ELIZABETH, NELSON MANDELA BAY MUNICIPALITY, EASTERN CAPE PROVINCE AIA Phase 1 18/05/2010 Johan Binneman Eastern Cape Heritage Consultants 16/06/2012 - 14:44
AIA_Ptn_73-76_Zwartkop_525_Pelser_AJ_Dec09 A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR A PROPOSED EQUESTRIAN ESTATE DEVELOPMENT ON PORTION 73 - 76 OF THE FARM ZWARTKOP 525 JQ, NEAR MULDERSDRIF, GAUTENG AIA Phase 1 01/12/2009 Anton Pelser, Anton van Vollenhoven Archaetnos CC 16/06/2012 - 14:49
Report GroenbergEnviro Norriseep illegal vineyard development - AIA S24G Application, illegal vineyard development on Norriseep, Rem of the Farm Afstof No. 421, near Onseepkans, Kai! Ma Municipality, Northern Cape AIA Phase 1 20/08/2020 Jonathan Kaplan ACRM Valam Boerdery (Pty) Ltd 31/03/2021 - 13:09
AIA BREIDBACH SEWER AND PUMPSTATION PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED BREIDBACH CROSS CATCHMENT TRANSFER PUMPING SCHEME (SEWER PIPELINE), BREIDBACH, KING WILLIAMS TOWN, AMATHOLE DISTRICT MUNICIPALITY. AIA Phase 1 31/07/2019 Celeste Booth Booth Heritage Consulting Makhetha Environmental Consultants 11/09/2019 - 10:13
PTN 26 Syferfontein (a) PHASE I CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT ON PORTION 26 OF THE FARM SYFERFONTEIN 438 IQ POTCHEFSTROOM NORTH WEST PROVINCE AIA Phase 1 05/12/2016 Udo Kusel African Heritage Consultants CC AB Enviro Consult CC 05/12/2016 - 13:50
AIA_Shemula_Water_Supply_Kaplan_JM_Jan95 Shemula Community Water Supply Scheme AIA Phase 1 01/01/1995 Jonathan Kaplan Agency for Cultural Resources Management 16/06/2012 - 14:50
ERVEN 269 AND 272 IN VOLKSRUST A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSOLIDATION OF ERVEN 269 AND 272 IN VOLKSRUST, MPUMALNGA PROVINCE AIA Phase 1 01/06/2012 Anton van Vollenhoven Archaetnos CC 28/06/2012 - 16:06
AIA_Diepsloot_Reservoir_Van_Schalkwyk_JA_Feb12 Heritage Impact Assessment for the Proposed Diepsloot Reservoir Development, Pretoria Magisterial District, Gauteng Province AIA Phase 1 01/02/2012 Johnny Van Schalkwyk 16/06/2012 - 14:44
AIA_Falcon_Ridge_Avery_G_Jan05 Survey for Archaeological Occurrences on Proposed Development on the Falcon Ridge Private Wildlife Sanctuary (3420 AD Wydgelee) AIA Phase 1 22/01/2005 Graham Avery Iziko: South African Museum MAPID_01351 16/06/2012 - 14:45
AIA_Morgenzon_PV2_Phase_2_Van_der_Walt_J_Apr12 AIA for the proposed Morgenzon PV 2 Solar Energy Facility on the Farm Morgenzon no 35, Northen Cape Province AIA Phase 1 13/04/2012 Jaco van der Walt Heritage Contracts and Archaeological Consulting CTS_7409 16/06/2012 - 14:48
Archaeological Impact Assessment for Humansrus PV 2 Grid Connection Archaeological Impact Assessment: Proposed Construction of Humansrus PV 2 Grid Connection (associated with the Humansrus PV Energy Facility, previously named RE Capital 14 Solar Development) on the Remainder of the Farm Humansrus 147 near Copperton, Northern Cape (Assessment conducted under Section 38 (8) of the National Heritage Resources Act No 25 of 1999) AIA Phase 1 30/11/2014 Lita Webley ACO Associates CC Humansrus Solar PV Energy Facility 2 (Pty) Ltd. 03/02/2015 - 16:33
Scoping AIA, Beaufort West Photovoltaic Power Station (Solar), Kuilspoort Scoping Archaeological Impact Assessment: Proposed Beaufort West Photovoltaic Power Station (Solar): southern portion of properties; 2/158 Lemoenkloof, RE 9/161 Kuilspoort, RE 162 Suid-lemoensfontein and RE 1/163 Bulskop, Beaufort West, Western Province AIA Phase 1 25/05/2011 Peter Nilssen Centre for Heritage and Archaeological Resource Management cc Cape Environmental Assessment Practitioners CTS_503231 11/04/2018 - 10:12
9-2-253-0184-20071024-AHCC Cultural Heritage Resources Impact Assessment for Proposed New Development on Holding 111 Valley Settlements No 3 Agricultural Holdings I.R., Midvaal Local Municipality, Gauteng Province AIA Phase 1 24/10/2007 Udo Kusel African Heritage Consultants CC MAPID_01250 16/06/2012 - 14:39
Gustav Klingbiel Hotel HERITAGE ASSESSMENT FOR THE KLINGBIEL HOTEL PROJECT, LYDENBURG, MPUMALANGA AIA Phase 1 01/03/2009 Thomas Huffman University of the Witwatersrand - Archaeological Resources Management Seaton Thomson & Associates 06/11/2012 - 11:57
AIA_THREE_RIVERS_Van_Schalkwyk_JA_Oct07 Heritage Survey Report for the Proposed Development in the Three Rivers Area of Vereeniging, Gauteng Province AIA Phase 1 01/10/2007 Johnny Van Schalkwyk MAPID_02439 16/06/2012 - 14:50
AIA_Brits_Solar_Ext50_Hutten_L_Sep11 Heritage Impact Assessment for the proposed Brits Solar Park in Brits Extension 50, North West Province AIA Phase 1 01/09/2011 Marko Hutten Hutten Heritage Consultants 16/06/2012 - 14:43
Archaeological Impact Assessment for proposed Magareng Grain Silo Storage Facility Archaeological Impact Assessment for the proposed Magareng Grain Silo Storage Facility on Portion 6, farm Fourteen Streams 311 Registration Division of Barkley West RD, near Warrenton Town, Magareng Local Municipality, Frances Baard District Municipality, Northern Cape Province AIA Phase 1 29/06/2015 Ndivhuwo Eric Mathoho Millennium Heritage Group Naledzi Environmental Consultants 03/03/2016 - 15:28
9-2-032-0001-20051001-McGM Report on a Phase 1 Archaeological Assessment of Proposed Salt Mining Areas on the Opstaan Pan, North of Upington, Northern Cape AIA Phase 1 01/10/2005 David Morris McGregor Museum MAPID_00959 16/06/2012 - 14:35
Bakkerhuis: 'n Historiese, strukturele en argeologiese ondersoek na Dorpstraat 155, Stellenbosch Bakkerhuis: 'n Historiese, strukturele en argeologiese ondersoek na Dorpstraat 155, Stellenbosch AIA Phase 1 01/01/1994 Hennie Vos Stellenbosch Museum 16/06/2012 - 08:54
AIA_Intabazwe_Residential_Development_Van_Ryneveld_K_Apr07 Phase 1 Intabazwe Residential Development, Harrismith, Free State, South Africa AIA Phase 1 25/04/2007 Karen Van Ryneveld 16/06/2012 - 14:46
9-2-102-0001-20030301-ACO Phase 1 Archaeological Assessment of Proposed Diamond Mining Areas Situated at the Farms Geelwal Karoo, Klipvley Karoo Kop and Graauduinen, Vredendal District, Western Cape AIA Phase 1 01/03/2003 Timothy Hart ACO Associates CC MAPID_00409 16/06/2012 - 14:37
9-2-015-0037-19990311-US Cultural Resource Management: Kleinmond Harbour Development Final Report AIA Phase 1 11/03/1999 N Berrington, C Snel Stellenbosch University MAPID_01327 16/06/2012 - 14:34
AIA_Philippi_East_Sports_Hall_Halkett_DJ_Oct97 Archaeology Assessment of the Philippi East Community Sports and Recreational Hall Site AIA Phase 1 01/10/1997 Dave Halkett, Timothy Hart, Royden Yates ACO Associates CC 16/06/2012 - 14:48
9-2-228-0001-20051201-ACU Heritage Assessment of the Proposed Residential Township Barbeque Downs Extension 22, Holding 22, Barbeque Downs Agricultural Holdings, Johannesburg Metropolitan Municipality AIA Phase 1 01/12/2005 Francois P Coetzee University of South Africa - Archaeology Contracts Unit MAPID_03074 16/06/2012 - 14:38
AIA_Eskom_Jagersbos_-_Greyton_Kaplan_JM_Jun08 Phase 1 Archaeological Impact Assessment Proposed Jagersbos - Greyton 66 kV Powerline and Greyton Substation, Western Cape Province AIA Phase 1 30/06/2008 Jonathan Kaplan Agency for Cultural Resources Management MAPID_02717 16/06/2012 - 14:45
New Cemetery Cillie Proposed establishment of new cemetery at Cillie Twonship AIA Phase 1 26/02/2013 Cobus Dreyer Stabilis Development (Pty) Ltd 26/02/2013 - 12:16
AIA[P1] Needs Camp / Potsdam Borrow Pit [NCP_BP01], near East London, BCMM, EC Phase 1 Archaeological Impact Assessment - Proposed Utilization of the Needs Camp / Potsdam Borrow Pit [NCP_BP01], (near East London), BCMM, Eastern cape, South Africa AIA Phase 1 16/12/2014 Terreco Environmental 16/12/2014 - 22:24