THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 16851 - 16900 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
AIA_Karakoel_Morris_D_Feb09 | Report on a Phase 1 Archaeological Assessment of the Site of Proposed Borrow Pits for Road-Building Purposes Along Road DR 3322 at Karakoel near Upington, Northern Cape | AIA Phase 1 | 01/02/2009 | David Morris | McGregor Museum | MAPID_03230 | 16/06/2012 - 14:46 | |
AIA - Wesley-Peddie | A Phase 1 Archaerological Impact Assessments of the Proposed Wesley-Peddie 132 KV Power Line for the Authorised Uncedo Lwethu Wind Energy Facility, Ngqushwa Local Municipality, Amathole District, Eastern Cape Province | AIA Phase 1 | 21/04/2014 | Johan Binneman | Eastern Cape Heritage Consultants | Savannah Environmental (Pty) Ltd | 25/04/2014 - 16:26 | |
AIA Of Zulti North Mining Lease | The Annual Archaeological Report of the Zulti North Mining Lease | AIA Phase 1 | 01/01/2010 | Gavin Anderson, Louise Anderson | Umlando: Archaeological Surveys & Heritage Management | Richards Bay Minerals | 02/07/2015 - 14:08 | |
ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED DEVELOPMENT OF EXXARO DORSTFONTEIN WEST DISCARD DUMP FACILITY AND TRANSPORTATION OF COAL FROM DCM WEST TO DCM EAST WITHIN EMALAHLENI LOCAL MUNICIPALITY OF NKANGALA DISTRICT IN MPUMALANGA PROVINCE. | AIA Phase 1 | 10/03/2020 | Munyadziwa Magoma | Nsovo Environmental Consulting | 09/09/2020 - 13:03 | ||
AIA_VERLORENVLEI_DIVERSION_CANAL_Orton_J_Sep09 | HERITAGE STATEMENT FOR THE PROPOSED VERLORENVLEI DIVERSION CANAL, CERES MAGISTERIAL DISTRICT, WESTERN CAPE | AIA Phase 1 | 29/09/2009 | Jayson Orton | ACO Associates CC | MAPID_03297 | 16/06/2012 - 14:51 | |
9-2-022-0024-19990601-ACRM | Archaeological Study Portion 1 of Farm Keurbos No. 274, Clanwilliam | AIA Phase 1 | 01/06/1999 | Jonathan Kaplan | Agency for Cultural Resources Management | MAPID_00200 | 16/06/2012 - 14:34 | |
9-2-240-0002-20010907-AI | Heritage Impact Assessment for the Proposed Additional Two Borrow Pits for the Proposed Upgrade of Gravel Tar Road Between Mukwakwaila, Bambeni to Nkomo Village in the, Limpopo Province | AIA Phase 1 | 07/09/2001 | Stephan Gaigher | Archaeo-Info | MAPID_00012 | 16/06/2012 - 14:39 | |
AIA_Chrome_Smelter_Brits_Van_der_Walt_J_Sep09 | Archaeological Impact Assessment Chrome Smelter, Brits, North West Province | AIA Phase 1 | 15/09/2009 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | MAPID_03179 | 16/06/2012 - 14:44 | |
A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR PUBLIC ACCESS TO SARDINIA BAY | A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR PUBLIC ACCESS TO SARDINIA BAY | AIA Phase 1 | 15/07/2015 | Johan Binneman | Eastern Cape Heritage Consultants | CEN Integrated Environmental Management Unit | 27/08/2015 - 12:56 | |
AIA_Schoongezicht_HistoricBurial | FINAL REPORT ON A PHASE ONE ARCHAEOLOGICAL INVESTIGATION OF A HISTORIC BURIAL AT SCHOONGEZICHT | AIA Phase 1 | 01/12/1998 | Mary Patrick | 14/09/2016 - 09:58 | |||
9-2-075-0002-20060612-NMB | Phase 1 Archaeological Impact Assessment: Vogelstruis Bult 104, Prieska District, Northern Cape, South Africa | AIA Phase 1 | 12/06/2006 | Karen Van Ryneveld | National Museum Bloemfontein - Archaeology Contracts Office | MAPID_00929 | 16/06/2012 - 14:37 | |
9-2-286-0001-20070209-NCHM | Heritage Impact Assessment for the Planned Witpoort Farm Style Living Development, Bronkhorstspruit Municipal District, Gauteng Province | AIA Phase 1 | 09/02/2007 | Johnny Van Schalkwyk | National Cultural History Museum | MAPID_01279 | 16/06/2012 - 14:41 | |
AIA: Notsi PV Projects Dealesville | ARCHAEOLOGICAL SPECIALIST STUDY In terms of Section 38(8) of the NHRA for the Proposed Development of the Dealesville Solar Projects | AIA Phase 1 | 22/09/2022 | Jenna Lavin, William Archer, Darya Presnyakova | CTS Heritage | Environamics | 04/07/2023 - 10:59 | |
Heritage Impact Assessment Proposed Visserspan PV Solar Energy Farm on Visserspan 40 near Dealesville, Free State | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED VISSERSPAN SOLAR PV FACILITY ON THE FARM VISSERSPAN NO. 40 NEAR DEALESVILLE, TOKOLOGO LOCAL MUNICIPALITY, FREE STATE PROVINCE | AIA Phase 1 | 18/01/2020 | Jonathan Kaplan | Agency for Cultural Resources Management | Enviroafrica CC | 18/03/2020 - 15:04 | |
A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED BRANDVALLEY WIND ENERGY FACILITY (WEF) | A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED BRANDVALLEY WIND ENERGY FACILITY (WEF) SITUATED IN THE KAROO HOOGLAND LOCAL MUNICIPALITY (NAMAKWA DISTRICT MUNICIPALITY), THE WITZENBURG LOCAL MUNICIPALITY (CAPE WINELANDS DISTRICT MUNICIPALITY) AND LAINGSBURG LOCAL MUNICIPALITY (CENTRAL KAROO DISTRICT MUNICIPALITY). | AIA Phase 1 | 01/07/2016 | Celeste Booth | Booth Heritage Consulting | EOH Coastal and Environmental Services | 28/04/2021 - 14:03 | |
9-2-111-0158-20050802-ACRM | Phase 1 Archaeological Impact Assessment Proposed Sand Mining Erven 550 & 552 Philippi Cape Town | AIA Phase 1 | 02/08/2005 | Jonathan Kaplan | Agency for Cultural Resources Management | MAPID_00210 | 16/06/2012 - 14:37 | |
AIA_MarathonNC-MetaffinMP_Pistorius_JCC_Sep07 | A Phase 1 Heritage Impact Assessment Study for a Proposed New 132 kV Power Line Running from the Existing Marathon/Northern Cape Power Line to the Proposed New Metaffin Substation near Nelspruit in the Mpumalanga Province | AIA Phase 1 | 01/09/2007 | Julius CC Pistorius | 16/06/2012 - 14:47 | |||
AIA_Braam_Pretorius_Road_Extension_Van_Schalkwyk_JA_Oct06 | A Survey of Heritage Resources in the Proposed Braam Pretorius Road Extension, Wonderboom Area, Pretoria | AIA Phase 1 | 01/10/2006 | Johnny Van Schalkwyk | National Cultural History Museum | 16/06/2012 - 14:43 | ||
AIA_Rosslyn_Lime_Acres_Dreyer_C_Nov07 | Archaeological and Historical Investigation of the Proposed Mining Activities at the Farm Rosslyn, Lime Acres, Northern Cape | AIA Phase 1 | 19/11/2007 | Cobus Dreyer | MAPID_02028 | 16/06/2012 - 14:49 | ||
AIA: Proposed Dalskroon Development | Archaeological Impact Assessment: Proposed Dalskroon Development | AIA Phase 1 | 01/05/2010 | Timothy Hart | ACO Associates CC | CTS_406224 | 27/07/2017 - 12:56 | |
9-2-069-0002-20030401-ACRM | Phase 1 Archaeological Impact Assessment Proposed Development Erf 23347, Paarl | AIA Phase 1 | 01/04/2003 | Jonathan Kaplan | Agency for Cultural Resources Management | MAPID_02787 | 16/06/2012 - 14:36 | |
9-2-275-0001-20071204-AHCC | Cultural Heritage Resources Impact Assessment of Holding 11, Sylviavale Agricultural Holdings IQ, Gauteng Province | AIA Phase 1 | 04/12/2007 | Udo Kusel | African Heritage Consultants CC | MAPID_01732 | 16/06/2012 - 14:41 | |
A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE KOOFONTEIN MINING RIGHTS APPLICATION | A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE KOOFONTEIN MINING RIGHTS APPLICATION ON VARIOUS PORTIONS OF THE FARMS KOOFONTEIN 265JQ & BOSCHFONTEIN 268JQ NEAR RUSTENBURG, NORTHWEST PROVINCE | AIA Phase 1 | 01/04/2021 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Red Kite Environmental Solutions (Pty) Ltd | 17/02/2022 - 13:31 | |
AIA_Hondeklipbaai_abalone_farm_Halkett_DJ_Sep00 | An initial assessment of heritage resources within the Trans Hex West Coast diamond concessions | AIA Phase 1 | 25/09/2000 | Dave Halkett | ACO Associates CC | 16/06/2012 - 14:46 | ||
9-2-326-0002-20071102-PAHS | Archaeological and Cultural Heritage Assessment of the Proposed Reservoir Dam Developments at Lindley, Free State | AIA Phase 1 | 02/11/2007 | Cobus Dreyer | MAPID_01813 | 16/06/2012 - 14:42 | ||
AIA_Lilyvale_2313_sub_7_&_25_Henderson_ZL_Jan04 | Report on Archaeological Survey of Subdivision 7, Remainder and Portion of Subdivision 25, of the Farm Lilyvale 2313, Bloemfontein | AIA Phase 1 | 01/01/2004 | Zoe Henderson | National Museum Bloemfontein - Archaeology Contracts Office | MAPID_00764 | 16/06/2012 - 14:47 | |
AIA_Nkambeni_Tented_Lodge_Celliers_JP_Mar11 | Phase 1 Archaeological Impact Assessment for Eco 8 Environmental Planners in respect of section 24 G of the Environmental Management Act (Act no 107 of 1998) at Nkambeni Tented Lodge, Nkambeni Trust Land, Numbi, Mpumalanga Province | AIA Phase 1 | 14/03/2011 | Jean-Pierre Celliers | Kudzala Antiquity | 16/06/2012 - 14:48 | ||
Kaapmuiden Ext 1 Township | Phase 1 Archaeological Survey on Portions 3 and 29 of the farm Kaapmuiden 212 JU, in respect of the proposed Kaapmuiden Ext 1 township development, Mpumalanga Province. | AIA Phase 1 | 10/03/2015 | Jean- Pierre Celliers | Kudzala Antiquity | Enpact Environmental Consultants CC | 27/07/2015 - 16:14 | |
AIA: MEERUST ESTATE FRANSCHOEK | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED DEVELOPMENT MEERUST ESTATE FRANSCHOEK | AIA Phase 1 | 01/06/2003 | Jonathan Kaplan | Agency for Cultural Resources Management | AIKMAN ASSOCIATES HERITAGE MANAGEMENT | CTS_368834 | 02/09/2016 - 13:14 |
AIA; Farm Brakkloof 443 - Plettenberg Bay | PHASE ONE ARCHAEOLOGICAL IMPACT ASSESSMENT: PORTIONS 24 AND 29 OF THE FARM BRAKKLOOF 443, PIESANG RIVER VALLEY, PLETTENBERG BAY, WESTERN CAPE. | AIA Phase 1 | 01/08/2008 | Lita Webley | ACO Associates CC | Pieter Badenhorst Professional Services | 23/04/2018 - 11:15 | |
PROPOSED UPGRADING OF EXISTING STORMWATER DRAINAGE SYSTEM IN THE VACINITY OF 56 MORSIM STREET, HYDE PARK, GAUTENG | PROPOSED UPGRADING OF EXISTING STORMWATER DRAINAGE SYSTEM IN THE VACINITY OF 56 MORSIM STREET, HYDE PARK, GAUTENG | AIA Phase 1 | 01/02/2019 | Liesl Stegmann | EnviroXcellence | 06/06/2019 - 10:50 | ||
Archaeological Survey of Erf 1092, Gansbaai (3419CB) | Archaeological Survey of Erf 1092, Gansbaai (3419CB) | AIA Phase 1 | 01/01/1994 | Graham Avery | Iziko: South African Museum | 16/06/2012 - 08:54 | ||
9-2-038-0001-20080722-AM | Phase 1 Archaeological Impact Assessment: Diamond Mining, Portions of Erven 1 & 341, Douglas, Northern Cape, South Africa | AIA Phase 1 | 22/07/2008 | Karen Van Ryneveld | MAPID_02072 | 16/06/2012 - 14:35 | ||
9-2-257-0002-20021001a-RRCRC | Phase 1 Archaeological Impact Assessment: Anglo-Platinum Smelter Water Supply Pipeline Polokwane: Limpopo | AIA Phase 1 | 01/10/2002 | Frans Roodt | R & R Cultural Resource Consultants | 16/06/2012 - 14:39 | ||
AIA_Elim_1053_Feedlot_Dreyer_C_Oct05 | Archaeological and Culture History Assessment of the Proposed Extensions to the Sheep Feedlot at the Farm Elim 1053, Senekal, Free State | AIA Phase 1 | 14/10/2005 | Cobus Dreyer | MAPID_01522 | 16/06/2012 - 14:44 | ||
AIA_Refenkgotso_Knoppiesfontein_94_Pelser_AJ_Nov09 | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED REFENKGOTSO EXTENSION TOWNSHIP DEVELOPMENT ON THE REMAINDER OF THE FARM KNOPPIESFONTEIN NO 94, FREE STATE PROVINCE | AIA Phase 1 | 01/11/2009 | Anton Pelser, Anton van Vollenhoven | Archaetnos CC | 16/06/2012 - 14:49 | ||
Madikwe | Madikwe | AIA Phase 1 | 16/06/2012 | Thomas Huffman | University of the Witwatersrand - Archaeological Resources Management | 16/06/2012 - 08:54 | ||
AIA_Green_House_Lodge_Van_Schalkwyk_JA_Sep08 | Heritage Impact Survey Report for the Proposed Green House Lodge, Madikwe Game Reserve, Thabazimbi Magisterial District, Limpopo Province | AIA Phase 1 | 01/09/2008 | Johnny Van Schalkwyk | MAPID_02084 | 16/06/2012 - 14:45 | ||
AIA_Baralink_Node_Development_Huffman_TN_Feb97 | Archaeological Survey of the Baralink Node Development | AIA Phase 1 | 01/02/1997 | Thomas Huffman | University of the Witwatersrand - Archaeological Resources Management | MAPID_00483 | 16/06/2012 - 14:43 | |
AIA; Preliminary Archaeological Survey of Karoopoort Farm | Preliminary Archaeological Survey of Karoopoort Farm | AIA Phase 1 | 24/10/2011 | Hugo Pinto, Katie Smuts | Agency for Cultural Resources Management | Cape Tanqua Tourism Services | 02/07/2018 - 10:13 | |
AIA_Mossdustria_and_Erf_6422_Nilssen_PJ_Mar09 | Archaeological Impact Assessment with Comment on Paleontology Construction of Sewer Pipelines for Mossdustria and Erf 6422, District Mossel Bay, Western Cape Province | AIA Phase 1 | 24/03/2009 | Peter Nilssen | Centre for Archaeological Resource Management cc | MAPID_01895 | 16/06/2012 - 14:48 | |
AIA FOR PROPOSED POWER LINE FOR SOLAR PARK IN NORTH WEST PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED 88 KV OR 132KV POWER LINE FOR THE CONNECTION OF THE CAROCRAFT SOLAR PARK TO THE ESKOM BOPHIRIMA SUBSTATION, NALEDI LOCAL MUNICIPALITY, BOPHIRIMA DISTRICT MUNICIPALITY, NORTH WEST PROVINCE | AIA Phase 1 | 06/05/2014 | Neels Kruger | AGES (PTY) Ltd - Pretoria | Vidigenix | 30/05/2014 - 09:45 | |
9-2-060-0041-20070502-ACRM | Phase 1 Archaeological Impact Assessment of the Proposed Construction of Chicken Houses on Portions 4 & 18 of the Farm Schoenmakersfontein No. 486 Riebeek West, Western Cape Province | AIA Phase 1 | 02/05/2007 | Jonathan Kaplan | Agency for Cultural Resources Management | MAPID_02747 | 16/06/2012 - 14:36 | |
9-2-269-0013-20020401-RRCRC | Phase 1 Archaeological Impact Assessment - Proposed Filling Station & Overnight Accommodation, Louis Trichardt Portion 4 of Rondebosch 287 LS | AIA Phase 1 | 01/04/2002 | Hester Marie Roodt | R & R Cultural Resource Consultants | MAPID_00626 | 16/06/2012 - 14:40 | |
AIA_Disselfontein_Keren_Solar_AIA_Kaplan_JM_Mar12 | ARCHAEOLOGICAL IMPACT ASSESSMENT THE PROPOSED DISSELFONTEIN KEREN ENERGY SOLAR PLANT NEAR HOPETOWN NORTHERN CAPE PROVINCE | AIA Phase 1 | 24/03/2012 | Jonathan Kaplan | Agency for Cultural Resources Management | 16/06/2012 - 14:44 | ||
AIA_PPC_Dwaalboom_Coetzee_FP_Nov08 | Cultural Heritage Survey of PPC Dwaalboom | AIA Phase 1 | 01/11/2008 | Francois P Coetzee | University of South Africa - Anthropology and Archaeology | MAPID_02363 | 16/06/2012 - 14:49 | |
9-2-089-0001-20040601-ACO | Heritage Scoping Study for the Proposed Rezoning and Subdivision of Erven 5100 & 5101, Strand | AIA Phase 1 | 01/06/2004 | Jayson Orton | ACO Associates CC | MAPID_00132 | 16/06/2012 - 14:37 | |
9-2-302-0002-20080120c-PAHS | First Phase Archaeological and Cultural Heritage Assessment of the Proposed Fichardtpark Distribution Centre and Power Line, Bloemfontein | AIA Phase 1 | 20/01/2008 | Cobus Dreyer | MAPID_01586 | 16/06/2012 - 14:42 | ||
AIA_Kriel_Colliery_Haul_Road_Van_Schalkwyk_JA_Jan01 | A Survey of Cultural Resources for the Kriel Colliery Haul Road, Mpumalanga Province | AIA Phase 1 | 01/01/2001 | Johnny Van Schalkwyk | National Cultural History Museum | MAPID_01169 | 16/06/2012 - 14:47 | |
AIA_Windsorton_Erf_1_Morris_D_Aug10 | Archaeological Impact Assessment on Windsorton Erf 1, Northern Cape (Mahatalle) | AIA Phase 1 | 30/08/2010 | David Morris | McGregor Museum | 16/06/2012 - 14:51 |