A REPORT ON A SECOND ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED NEW RAILWAY BRIDGE AT THE BLACK ROCK MINING OPERATIONS, CLOSE TO HOTAZEL, NORTHERN CAPE PROVINCE | A REPORT ON A SECOND ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED NEW RAILWAY BRIDGE AT THE BLACK ROCK MINING OPERATIONS, CLOSE TO HOTAZEL, NORTHERN CAPE PROVINCE | Archaeological Specialist Reports | 05/11/2019 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | EScience Associates (Pty) Ltd | 02/12/2019 - 13:45 | |
HIA FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES (SHARED) | HIA FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES (SHARED) | Heritage Impact Assessment Specialist Reports | 15/11/2015 | Timothy Hart | ACO Associates CC | Arcus Consulting | 17/05/2016 - 13:46 | |
Phase 1 Cultural Heritage Impact Assessment: | PROSPECTING RIGHT APPLICATION FOR PORTION 35 OF RIETVLEI 150, VRYHEID REGION, ABAQULUSI LOCAL MUNICIPALITY, KWAZULU-NATAL | HIA Phase 1 | 01/06/2020 | J.A. van Schalkwyk | Information Decision Systems | 02/07/2020 - 10:16 | ||
Phase 2 Study PIA | Palaeontological Impact Assessment for the Proposed Prospecting Rights Application on Rietvlei 150 HU, ~20km east of Vryheid, KwaZulu-Natal Province | PIA Phase 2 | 27/08/2019 | Marion Bamford | 19/03/2020 - 11:39 | |||
(PPM) PROPOSED ROCK WASTE DUMP EXTENSION | A HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR PILANESBURG PLATINUM MINES’ (PPM) PROPOSED ROCK WASTE DUMP EXTENSION NEAR THE PILANESBERG IN THE NORTH-WEST PROVINCE OF SOUTH AFRICA | HIA Phase 1 | 06/06/2009 | Julius CC Pistorius | Pilanesberg Platinum Mines (Pty) Ltd | SLR Consulting (Africa) | 21/11/2013 - 17:18 | |
ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED DEVELOPMENT OF EXXARO DORSTFONTEIN WEST DISCARD DUMP FACILITY AND TRANSPORTATION OF COAL FROM DCM WEST TO DCM EAST WITHIN EMALAHLENI LOCAL MUNICIPALITY OF NKANGALA DISTRICT IN MPUMALANGA PROVINCE. | AIA Phase 1 | 10/03/2020 | Munyadziwa Magoma | Nsovo Environmental Consulting | 09/09/2020 - 13:03 | ||
ARCHAEOLOGICAL SURVEY | PHASE 1 ARCHAEOLOGICAL SURVEY ON PORTION 3 OF THE FARM EZAKHENI C 16863 GS IN ALFRED DUMA LOCAL MUNICIPALITY, KWAZULU NATAL PROVINCE | AIA Phase 1 | 10/07/2019 | Churchill Mpiyesizwe Guduza | Nkululeko Environment and Development Agency | Nkululeko Environment and Development Agency | 06/02/2020 - 18:29 | |
Construction of a Substation and 132kV Power Line from Heilbron (via Frankfort) to Villiers, Free State Province. | Heritage Impact Walkdown Report for the Construction of a Substation and 132kV Power Line from Heilbron (via Frankfort) to Villiers, Free State Province. | HIA Phase 1 | 19/06/2017 | Stephan Gaigher | G&A Heritage Management Consultants | Eskom Distribution Free State Operating Unit | 20/07/2017 - 14:28 | |
Croydon/Germiston River Crossings HIA | Phase 1 Cultural Heritage Impact Assessment for THE PROPOSED CONSTRUCTION OF RIVER CROSSINGS ALONG UNDERGROUND HV FEEDER CABLES IN GERMISTON AND CROYDON, EKURHULENI DISTRICT MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 15/12/2017 | 20/02/2018 - 10:51 | ||||
EIA FOR CSP IN BOKPOORT, NORTHERN CAPE | AMENDMENT: EIA APPLICATION FOR CSP IN BOKPOORT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 06/03/2018 | Johan van Schalkwyk, Cobus Dreyer | 16/03/2018 - 16:30 | |||
Erf 924, Bo-Kaap | Nr. 54 Chiappini Street, Erf 924, Bo-Kaap, Cape Town renovation | Heritage Statement | 03/10/2013 | 03/10/2013 - 13:42 | ||||
HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED VUTSHINI-NKANDLA WATER SCHEME (NORTH): PHASE 1 WITHIN THE NKANDLA | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED VUTSHINI-NKANDLA WATER SCHEME (NORTH): PHASE 1 WITHIN THE NKANDLA LOCAL MUNICIPALITY, NORTHERN KWAZULU-NATAL. | HIA Letter of Exemption | 28/01/2015 | Len van Schalkwyk | eThembeni Cultural Heritage | ACER (Africa) Environmental Management Consultants | 24/02/2015 - 13:04 | |
Heritage Report For Popo Molefe | Heritage Report : Popo Molefe | HIA Phase 1 | 25/08/2020 | A Stone | Bobo Productions | Maropeng 'a Afrika | 04/09/2020 - 16:02 | |
HIA | A REPORT ON A PHASE 1 HERITAGE IMPACT ASSESSMENT FOR A MINING RIGHT APPLICATION ON PORTION 1 OF THE FARM KLEINZUIKERBOSCHPLAAT 5IS NEAR OGIES, SITUATED IN THE EMALAHLENI MAGISTERIAL DISTRICT IN THE MPUMALANGA PROVINCE | HIA Phase 1 | 01/05/2018 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Ndlelehle Mining and Consulting | 12/02/2019 - 05:40 | |
HIA Borrow Pit 12 | Phase 1 Heritage Impact Assessment of a new borrow pit (BP 12) at Dithakong, located northeast of Kuruman, NC Province | HIA Phase 1 | 02/09/2019 | Lloyd Rossouw | 04/12/2019 - 08:29 | |||
HIA Caledon Wind Farm | Environmental Impact Assessment for the Establishment of the Caledon Wind Farm, Western Cape Province | HIA Phase 1 | 01/10/2011 | Timothy Hart | ACO Associates CC | Arcus Gibb (Pty) Ltd | CTS_329679 | 08/09/2015 - 12:27 |
HIA De Kleine Oliphantskop 1481 | Remainder Farm De Kleine Oliphantskop 1481 HERITAGE ASSESSMENT In terms of Section 38(1) 0f the NationaI Heritage Resources Act (Act 25 of 1999) | HIA Phase 1 | 01/03/2009 | Quahnita Samie | vidamemor ia her itage c o n s u l t a n t s | VASSIL PANTCHEV | CTS_329607 | 04/09/2015 - 12:03 |
HIA Exemption for Sugar Cane Agricultural Development by Senekal Boerdery near Mkuze | Application for Exemption from a Phase 1 Heritage Impact Assessment for the Proposed agricultural development by Senekal Boerdery near Mkuze,uMkhanyakude District Municipality, KwaZulu-Natal, South Africa | HIA Letter of Exemption | 28/01/2015 | Len van Schalkwyk | eThembeni Cultural Heritage | ACER (Africa) Environmental Management Consultants | 03/03/2015 - 14:02 | |
HIA for In-situ Rural Subsidised Housing Project , Qadi Ward 8, Maphumulo | Cultural Heritage Impact Assessment of the Proposed Rural Subsidised Housing Project , Qadi Traditional Authority (Ward 8), Maphumulo. | HIA Phase 1 | 08/08/2014 | Frans Prins | Active Heritage CC | Simon Vines TRP (SA) | 02/09/2014 - 05:04 | |
INGLESBY 580 OLIFANTSHOEK, | FIRST PHASE ARCHAEOLOGICAL & HERITAGE INVESTIGATION OF THE PROPOSED MINE PROSPECTING AT THE REMAINING EXTENT OF THE FARM INGLESBY 580 NEAR OLIFANTSHOEK, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 10/05/2014 | Cobus Dreyer | RE A Kgona General Services CC | RE A Kgona General Services CC | 27/09/2014 - 21:35 | |
IXOPO RENEWAL ENERGY PLANT | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT DONE FOR THE PROPOSED IXOPO RENEWAL ENERGY PLANT, KWAZULU-NATAL PROVINCE | HIA Phase 1 | 23/06/2016 | Prof. Anton van Vollenhoven | A.C. van Vollenhoven | EON Consulting | 21/10/2016 - 16:06 | |
Lebone Solar Farm - HIA | Phase 1 Archaeological Impact Assessment & Palaeontological Assessment Lebone Solar Farm The Remaining Extent of the Farm Onverwag No. 728 and Portion 2 of the Farm Vaalkranz Np. 220, Welkom, Free State Province | Heritage Impact Assessment Specialist Reports | 17/10/2013 | Karen Van Ryneveld, Gideon Groenewald | ArchaeoMaps Archaeological Consultancy | Enviroworks | 12/11/2013 - 15:08 | |
Lougot Logistics Industrial Park, Cato Ridge | Phase 1 Heritage Impact Assessment Report: Proposed Subdivision for Lougot Logistics Industrial Park on Portion of the Remainder of a Portion of Portion 30 of The Farm Uitkomst and Doornrug No. 852, Cato Ridge, eThekwini Metropolitan Municipality, KwaZulu-Natal | HIA Phase 1 | 14/10/2014 | Elizabeth Wahl | eThembeni Cultural Heritage | Lougot Property Investments (Pty) Ltd | 15/10/2014 - 12:39 | |
M1562 Oribi Gorge Dams Heritage Screener | M1562 Oribi Gorge Dams Heritage Screener (CTS15_005) | 28/07/2015 | Kyla Bluff, Mariagrazia Galimberti, Peter Kloos, Nicholas Wiltshire | CTS Heritage | Envirosol - Environmental Solutions | 28/07/2015 - 14:20 | ||
Moletjie Grave Rescue Project | Rescue Exhumation and Relocation of a Human Skeleton at Moletjie, Polokwane, Limpopo Province | Archaeological Permit Report | 20/07/2015 | Stephan Gaigher | G&A Heritage Management Consultants | Polokwane Local Municipality | 24/07/2015 - 12:32 | |
Nzalo DBAR Heritage Report | Phase One Heritage Impact Assessment Of The Proposed Coal-Link, Nzalo (Mqabe) Near Vryheid, Kzn. | Heritage Impact Assessment Specialist Reports | 21/02/2014 | Frans Prins | Sivest - Gauteng | 22/04/2015 - 10:45 | ||
Olievenhoutpoort | Evaluation of existing built structures on: Portion 662 of the Farm Olievenhoutpoort 196 IQ Johannesburg, Gauteng In terms of Section 34 of the National Heritage Resources Act | HIA Phase 2 | 01/04/2017 | Engela White | 31/08/2017 - 11:49 | |||
Palmietfontein_Ventersdorp_AIA_Revised+desktop | Palmietfontein_Ventersdorp_AIA_Revised+desktop | Archaeological Specialist Reports | 22/02/2020 | Tobias Coetzee | 28/02/2020 - 11:05 | |||
Proposed KiPower 400kV loop-in and loop-out transmission lines to connect the KiPower IPP to the national grid | A phase I Heritage Impact Assessment (HIA) study for the proposed KiPower 400kV loop-in and loop-out transmission lines to connect the KiPower IPP to the national grid on the eastern Highveld in the Mpumalanga province | HIA Phase 1 | 12/05/2016 | Julius CC Pistorius | Dr Julius CC Pistorious Archaeologist and heritage Consultant | Jones & Wagener Engineering and Environmental Consultants | 19/05/2016 - 15:03 | |
REMAINING EXTENT OF FARM FAIRFIELD 520, HAY DISTRICT | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT REPORT ON A 4 HA PORTION OF THE REMAINING EXTENT OF FARM FAIRFIELD 520, SITUATED ~30 KM NORTH OF CAMPBELL, HAY MAGISTERIAL DISTRICT, NORTHERN CAPE PROVINCE | AIA Phase 1 | 12/02/2013 | Peter Beaumont | De Beers Consolidated Mines - Kimberley Mines | McGregor Museum | 04/04/2013 - 12:25 | |
Rustfontein Dam WTW facility HIA | Phase 1 Heritage Impact Assessment of the proposed extension of the Rustfontein Dam WTW facility, Free State Province. | HIA Phase 1 | 21/03/2015 | Lloyd Rossouw | Paleo Field Services | Aryx Consulting Limited | 08/12/2015 - 12:52 | |
SALDANHA NAVAL TRAINING BASE & SOUTH AFRICAN MILITARY ACADEMY | HERITAGE IMPACT ASSESSMENT & VISUAL IMPACT ASSESSMENT - SALDANHA NAVAL TRAINING BASE & SOUTH AFRICAN MILITARY ACADEMY | HIA Phase 1 | 01/02/2012 | Bridget O'Donoghue | CTS_345805 | 24/11/2015 - 17:26 | ||
Sedibelo Phase I Heritage Impact Assessment (HIA) study | A PHASE I HERITAGE IMPACT ASSESSMENT STUDY FOR A COMBINED PLATINUM MINING OPERATION NEAR THE PILANESBERG IN THE NORTH-WEST PROVINCE: CHANGING THE LAYOUT OF MINE INFRASTRUCTURE FOR THE APPROVED OPEN CAST AND UNDERGROUND MINING OPERATION AT THE SEDIBELO PLATINUM MINE | HIA Phase 1 | 16/02/2012 | Julius CC Pistorius | Itereleng Bakgatla Mineral Resources (Pty) Ltd | SLR Consulting (Africa) | CTS_104253 | 11/11/2012 - 19:33 |
Sedibelo Phase I Heritage Impact Assessment (HIA) study | A PHASE I HERITAGE IMPACT ASSESSMENT STUDY FOR A COMBINED PLATINUM MINING OPERATION NEAR THE PILANESBERG IN THE NORTH-WEST PROVINCE: CHANGING THE LAYOUT OF MINE INFRASTRUCTURE FOR THE APPROVED OPEN CAST AND UNDERGROUND MINING OPERATION AT THE SEDIBELO PLATINUM MINE | HIA Phase 1 | 16/02/2012 | Julius CC Pistorius | Itereleng Bakgatla Mineral Resources (Pty) Ltd | SLR Consulting (Africa) | 11/11/2012 - 19:33 | |
SIDING COMMERCIAL DEVELOPMENT ERF 1500, HILTON, UMNGENI LOCAL MUNICIPALITY | ARCHAEOLOGICAL IMPACT ASSESSMENT REPORT ON PROPOSED SIDING DEVELOPMENT ERF 1500, HILTON, UMNGENI LOCAL MUNICIPALITY, UMGUNGUNDLOVU DISTRICT MUNICIPALITY, KWAZULU-NATAL | Jeremy Hollmann | Norton dos Santos Architects T/A Design Workshop | Norton dos Santos Architects T/A Design Workshop | 02/11/2020 - 11:32 | |||
ST JAMES/MAKHOSINI 88KV POWERLINE AND 20 MVA MAKHOSINI 88/22KV SUBSTATION, | HERITAGE IMPACT ASSESSMENT OF THE PROPOSED ST JAMES/MAKHOSINI 88KV POWERLINE AND 20 MVA MAKHOSINI 88/22KV SUBSTATION, NORTHERN KWAZULU-NATAL | HIA Phase 1 | 12/05/2014 | Frans Prins | Ludloko Developments | Active Heritage CC | 27/11/2014 - 06:16 | |
STRUWIG DAM HIA | HERITAGE IMPACT ASSESSMENT OF THE PROPOSED STRUWIG DAM | HIA Phase 1 | 15/07/2017 | Frans Prins | Active Heritage CC | Enviroedge | 11/08/2017 - 10:44 | |
The construction of a Biogas Facility. | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE CONSTRUCTION OF THE PROPOSED MIDLANDS BIOGASS PROJECT, PIETERMARITZBURG. | Heritage Impact Assessment Specialist Reports | Frans Prins | Active Heritage CC | 25/04/2016 - 17:05 | |||
THT370579122 - TSHILISANANI INNOCENT MUZILA | THT370579122 - TSHILISANANI INNOCENT MUZILA -PIA Desktop Study | PIA Desktop | 02/02/2021 | 01/03/2021 - 23:37 | ||||
TSHIAME / INDUSTRIQUA, HARRISMITH, FREE STATE | FIRST PHASE ARCHAEOLOGICAL, PALAEONTOLOGICAL & GEOLOGICAL INVESTIGATION OF THE PROPOSED TOWNSHIP & LIGHT INDUSTRIAL & AGRO-PROCESSING DEVELOPMENTS AT TSHIAME / INDUSTRIQUA, HARRISMITH, FREE STATE | Heritage Impact Assessment Specialist Reports | 27/10/2014 | Cobus Dreyer | ENVIROMATRIX (Pty) Ltd | ENVIROMATRIX (Pty) Ltd | 30/10/2014 - 19:13 | |
UMPHEME HOUSING SCHEME | A LETTER OF RECOMMENDATION FOR EXEMPTION FOR UMPHEME HOUSING SCHEME | Heritage Statement | 25/11/2019 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Afzelia Environmental Consultants Pty Ltd | 15/12/2019 - 10:55 | |
Various Farms in Humansdorp | PRELIMINARY HERITAGE IMPACT ASSESSMENT REPORT FOR PROSPECTING FOR STONE & ASSOCIATED MINERALS ON VARIOUS FARMS IN THE HUMANSDORP DISTRICT. | HIA Phase 1 | 01/02/2010 | Stellenryck Environmental Solutions | Brickrush (Pty) Ltd | 22/05/2013 - 09:51 | ||
VICTOR SWITCHING STATION AND 132kV POWER LINE | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR ESKOM’S PROPOSED NEW VICTOR SWITCHING STATION AND 132kV POWER LINE IN THE GREATER TUBATSE LOCAL MUNICIPALITY IN THE STEELPOORT VALLEY IN THE LIMPOPO PROVINCE | HIA Phase 1 | 16/07/2013 | Julius CC Pistorius | Nzumbululo Heritage Solutions | Nzumbululo Heritage Solutions | 16/07/2013 - 11:14 | |
VICTOR SWITCHING STATION AND 132kV POWER LINE | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR ESKOM’S PROPOSED NEW VICTOR SWITCHING STATION AND 132kV POWER LINE IN THE GREATER TUBATSE LOCAL MUNICIPALITY IN THE STEELPOORT VALLEY IN THE LIMPOPO PROVINCE | Archaeological Specialist Reports | 12/07/2013 | Julius CC Pistorius | Nzumbululo Heritage Solutions | Nzumbululo Heritage Solutions | 12/07/2013 - 15:43 | |
!Xha Wind Energy Facility (WEF) Grid Heritage Impact Report | !Xha Wind Energy Facility (WEF) – 132kV Grid connection and substation Heritage Impact Report | Heritage Impact Assessment Specialist Reports | 08/12/2017 | Wouter Fourie | PGS Heritage (Pty) Ltd | Sivest - Gauteng | 18/12/2017 - 15:40 | |
!Xhaboom Wind Energy Facility (WEF) | !Xhaboom Wind Energy Facility (WEF) Heritage Scoping Report | Heritage Impact Assessment Specialist Reports | 04/11/2016 | Wouter Fourie | PGS Grave Solutions | Sivest - Gauteng | 23/06/2017 - 16:55 | |
'My place is the Bitterpits': the home territory of Bleek and Lloyd's /Xam San informants. | Deacon, J. 1986. 'My place is the Bitterpits': the home territory of Bleek and Lloyd's /Xam San informants. African Studies 45: 135-155. | Research Publication | Janette Deacon | 29/10/2015 - 13:08 | ||||
(Amended Heritage Report) 132kV transmission line from Maanhaarberg WEF to Hydra Substation | Addendum to the Original Approved Heritage Impact Assessment Report: Proposed construction of a 132kV transmission line from the Longyuan Mulilo De Aar Maanhaarberg Wind Energy Facility near De Aar, Northern Cape – Dated 10 April 2014 | Heritage Impact Assessment Specialist Reports | 01/09/2015 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | 21/10/2015 - 10:29 | ||
(PPM) PROPOSED ROCK WASTE DUMP EXTENSION | A HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR PILANESBURG PLATINUM MINES’ (PPM) PROPOSED ROCK WASTE DUMP EXTENSION NEAR THE PILANESBERG IN THE NORTH-WEST PROVINCE OF SOUTH AFRICA | 21/11/2013 - 17:15 | ||||||
1, 2, 3, 4 Sahaba Lane & 64, 68, 72 Ciappini Street | Existing Housing Condition and Assessment of Recommended Work on City | Site Inspection Report | 20/03/2018 | Dieter Bossow | 19/04/2018 - 10:49 |