THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 1651 - 1700 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|
9-2-233-0012-20080101-UWM | Swartkrans Cave, South Africa | Palaeontological Permit Report | 01/01/2008 | Travis Pickering | University of Wisconsin-Madison | 16/06/2012 - 14:38 | |
9-2-233-0017-20060301-BPI | An Acheulean Handaxe from Gladysvale Cave Site, Gauteng, South Africa | Archaeological Permit Report | 01/03/2006 | Evolutionary Studies Institute | 16/06/2012 - 14:38 | ||
9-2-233-0018-20000401-NONE | The Drimolen Skull: The Most Complete Australopithecine Carnium and Mandible to Date | Archaeological Permit Report | 01/04/2000 | A Keyser | 16/06/2012 - 14:38 | ||
9-2-233-0018-20060103-BPI | The Temporary Export of 12 Possible Bone Tools from the Plio-Pleistocene Site of Drimolen for Analysis as Part of a Study of the Bone Tools from Early Hominid Sites, | Export Permit Report | 03/01/2006 | Mike Raath, Lucinda Ruth Backwell, Francesco d’Errico | Evolutionary Studies Institute | 16/06/2012 - 14:38 | |
9-2-234-0001-20030801-ACHMC | A Heritage Impact Survey for a New Proposed Detergent Factory to Be Established at the Oaks, near the Junction of the R36 and Road 527 in the Northern Province of SA | AIA Phase 1 | 01/08/2003 | Julius CC Pistorius | MAPID_00235 | 16/06/2012 - 14:38 | |
9-2-234-0002-19960901-NCHM | A Survey of Cultural Resources in the Proposed Janetsi Dam Site, Letaba River | AIA Phase 1 | 01/09/1996 | Johnny Van Schalkwyk, S Moifatswane, S Smith | National Cultural History Museum | MAPID_02336 | 16/06/2012 - 14:38 |
9-2-234-0002-19960901b-NCHM | A Survey of Cultural Resources in the Proposed Lesitele Dam Site, Letsitele River | AIA Phase 1 | 01/09/1996 | Johnny Van Schalkwyk, S Moifatswane, S Smith | National Cultural History Museum | MAPID_02337 | 16/06/2012 - 14:38 |
9-2-234-0002-19980201-ACC | Historical Archaeological Investigation of the Northernmost Outpost of Steinaecker's Horse, Letaba District, Kruger National Park (Report No. I) | Archaeological Permit Report | 01/02/1998 | Anton van Vollenhoven, Anton Pelser, J van den Bos | Archaetnos CC | 16/06/2012 - 14:38 | |
9-2-234-0002-20010801-ACC | Historical Archaeological Investigation of the Northernmost Outpost of Steinaecker's Horse, Letaba District, Kruger National Park (Report No. II) | Archaeological Permit Report | 01/08/2001 | Anton van Vollenhoven, Anton Pelser, Frank Teichert | Archaetnos CC | 16/06/2012 - 14:38 | |
9-2-234-0002-20030401-CRC | Phase 1 Archaeological Impact Assessment for the Proposed Sewerage Line in Duiwelskloof | AIA Phase 1 | 01/04/2003 | Jaco van der Walt, M van der Ryst | 16/06/2012 - 14:38 | ||
9-2-234-0002-20030801-ACC | Historical Archaeological Investigation of the Northernmost Outpost of Steinaecker's Horse, Letaba District, Kruger National Park (Report No. III) | Archaeological Permit Report | 01/08/2003 | Anton van Vollenhoven | Archaetnos CC | 16/06/2012 - 14:38 | |
9-2-234-0002-20050306-AHCC | Cultural Heritage Resources Impact Assessment on Malokong Hill | AIA Phase 1 | 06/03/2005 | Udo Kusel | African Heritage Consultants CC | MAPID_01048 | 16/06/2012 - 14:38 |
9-2-234-0002-20061201-ACC | A Historical Archaeological Investigation of the Sabi Bridge Post of Steinaecker's Horse, Skukuza District, Kruger National Park (Report No. I) | AIA Phase 1 | 01/12/2006 | Anton Pelser, Anton van Vollenhoven, Frank Teichert | Archaetnos CC | MAPID_02344 | 16/06/2012 - 14:38 |
9-2-234-0002-20070801-ACC | A Historical Archaeological Investigation of the Sabi Bridge Post of Steinaecker's Horse, Skukuza District, Kruger National Park (Report No. II) | AIA Phase 1 | 01/08/2007 | Anton van Vollenhoven, Anton Pelser, Frank Teichert | Archaetnos CC | MAPID_02324 | 16/06/2012 - 14:38 |
9-2-234-0002-20080401-ACC | A Historical Archaeological Investigation of the Sabi Bridge Post of Steinaecker's Horse, Skukuza District, Kruger National Park (Report No. III) | AIA Phase 1 | 01/04/2008 | Anton van Vollenhoven, Anton Pelser, Frank Teichert | Archaetnos CC | MAPID_03263 | 16/06/2012 - 14:38 |
9-2-234-0002-20080401-RRCRC | Phase 1 Heritage Resources Impact Assessment Senwamokgope Village Demarcation Mopani District Municipality, Limpopo, Statement with Regard to Heritage Resources Management | AIA Phase 1 | 01/04/2008 | Frans Roodt | R & R Cultural Resource Consultants | MAPID_03001 | 16/06/2012 - 14:38 |
9-2-234-0004-20010101-RRCRC | Archaeological Impact Assessment: Fry Dam: Raising of Dam Wall, Matomashoek 371 LT & Gemsbokspruit 372 LT | AIA Phase 1 | 01/01/2001 | Frans Roodt | R & R Cultural Resource Consultants | MAPID_00237 | 16/06/2012 - 14:38 |
9-2-234-0004-20010409-RRCRC | Proposed Tzaneen Extension 60, Archaeological Impact Assessment | AIA Phase 1 | 09/04/2001 | Frans Roodt | R & R Cultural Resource Consultants | MAPID_00238 | 16/06/2012 - 14:38 |
9-2-234-0004-20030416-RRCRC | Phase 1 Heritage Resources Impact Assessment (Scoping & Evaluation) : Upgrading of Road 4392: Bushbuckridge: Statement with Regard to Heritage Resources Management | HIA Letter of Exemption | 16/04/2003 | Frans Roodt | R & R Cultural Resource Consultants | MAPID_00236 | 16/06/2012 - 14:38 |
9-2-234-0004-20031129-AHCC | Cultural Heritage Resources, Mogoboya Long Valley (150 Residential Sites) | AIA Phase 1 | 29/11/2003 | Udo Kusel | African Heritage Consultants CC | MAPID_00239 | 16/06/2012 - 14:38 |
9-2-234-0004-20070201-RRCRC | Heritage Impact Assessment: Skoongelegen Residential Development Tzaneen: Ga-Kgapane Limpopo | AIA Phase 1 | 01/02/2007 | Frans Roodt | R & R Cultural Resource Consultants | MAPID_00003 | 16/06/2012 - 14:38 |
9-2-234-0004-20070601-AI | Heritage Impact Assessment for the Proposed Shopping Centre and On-Site Sewege Treatment Plant at Maake near Lenyenye, Limpopo Province | AIA Phase 1 | 01/06/2007 | Stephan Gaigher | Archaeo-Info | MAPID_00890 | 16/06/2012 - 14:38 |
9-2-234-0008-20020901-WU | Preliminary Investigation Into the Context and Integrity of an Earlier Stone Age Site in the Shashe-Limpopo Basin | Archaeological Permit Report | 01/09/2002 | Ryan Gibbon | University of the Witwatersrand | 16/06/2012 - 14:38 | |
9-2-234-0008-20041026-WU | Final Report: Earlier Stone Age Geoarchaeology of the Northern Kruger Park | Archaeological Permit Report | 26/10/2004 | Ryan Gibbon | University of the Witwatersrand | 16/06/2012 - 14:38 | |
9-2-234-0008-20041101-WU | Earlier Stone Age Geoarchaeology of the Northern Kruger Park | Archaeological Permit Report | 01/11/2004 | Ryan Gibbon | University of the Witwatersrand | 16/06/2012 - 14:39 | |
9-2-234-0011-20000201-NCHM | A Survey of Cultural Resources on a Section of the Farm Novengilla, Letsitele Area, Northern Province | AIA Phase 1 | 01/02/2000 | Johnny Van Schalkwyk | National Cultural History Museum | MAPID_00240 | 16/06/2012 - 14:39 |
9-2-234-0011-20000701-NCHM | Final Report on Archaeological Excavations on a Section of the Farm Novengilla 562 LT, Letsitele Area, Northern Province | Archaeological Permit Report | 01/07/2000 | Johnny Van Schalkwyk | National Cultural History Museum | MAPID_00463 | 16/06/2012 - 14:39 |
9-2-235-0002-19950301-NCHM | A Survey of Archaeological Resource in the Witpoort Mining Lease Area, Ottosdal | AIA Phase 1 | 01/03/1995 | Johnny Van Schalkwyk | National Cultural History Museum | MAPID_00796 | 16/06/2012 - 14:39 |
9-2-235-0002-20050401-RARC | The Documentation of Engravings on Driekuil Hill, Farm Driekuil 280 IP, Lichtenburg, North-West Province, South Africa: Phase 2 Mitigation Report | Archaeological Permit Report | 01/04/2005 | Jeremy Hollmann | Rock Art Research Institute | 16/06/2012 - 14:39 | |
9-2-235-0002-20050620-PAHS | Archaeological Assessment of the Proposed Rehabilitation of the Road (P34/3) Between Delareyville & Sannieshof, North West Province | AIA Phase 1 | 20/06/2005 | Cobus Dreyer | 16/06/2012 - 14:39 | ||
9-2-235-0002-20060601-NONE | Catalogue of Rock Engravings Removed from Driekuil I on the Farm Driekuil 280 IP Central Region North-West Province, South Africa for Sampling and Analytical Purposes | Archaeological Permit Report | 01/06/2006 | Jeremy Hollmann | 16/06/2012 - 14:39 | ||
9-2-235-0002-20080601-ACC | A Report on a Cultural Heritage Impact Assessment for the Proposed Bodibe Housing Project, Northwest Province | AIA Phase 1 | 01/06/2008 | Anton van Vollenhoven, Anton Pelser | Archaetnos CC | MAPID_02231 | 16/06/2012 - 14:39 |
9-2-236-0002-20040401-NCHM | Heritage Impact Assessment for the Proposed Coromandel Township Development, Lydenburg District, Mpumalanga | AIA Phase 1 | 01/04/2004 | Johnny Van Schalkwyk | National Cultural History Museum | MAPID_01150 | 16/06/2012 - 14:39 |
9-2-236-0002-20051101-ACHMC | An Assessment of the Heritage Potential for a Proposed New Route for a 132 kV Power Line Between the Merensky Substation and the Proposed New Burgersfort Substation in the Mpumalanga and Limpopo Provinces of South Africa | AIA Phase 1 | 01/11/2005 | Julius CC Pistorius | MAPID_02423 | 16/06/2012 - 14:39 | |
9-2-236-0002-20051212-KA | Report on Archaeological Survey on the Farm Sterkspruit in the Lydenburg District, 33 JT | AIA Phase 1 | 12/12/2005 | Jean-Pierre Celliers | Kudzala Antiquity | MAPID_00670 | 16/06/2012 - 14:39 |
9-2-236-0002-20060222-MPL | Township Development on Portions 140-182 and 190-206 on the Farm Sterkspruit 33 JT, District Lydenburg. Scoping Heritage Assessment | AIA Phase 1 | 22/02/2006 | Jaco van der Walt, Wouter Fourie | Matakoma Heritage Consultants (Pty) Ltd | MAPID_00671 | 16/06/2012 - 14:39 |
9-2-236-0002-20060301-ACHMC | A Phase I Heritage Impact Assessment (HIA) Study For the Lannex North Open Cape Archaeological Survey CCt Mine on the Farm Grootboom 336 KT in the Mpumalanga Province of South Africa | AIA Phase 1 | 01/03/2006 | Julius CC Pistorius | MAPID_01151 | 16/06/2012 - 14:39 | |
9-2-236-0002-20060901-AHCC | Cultural Heritage Resources Management Plan for Buffelskloof Eco Estate Mpumalanga | AIA Phase 3 | 01/09/2006 | Udo Kusel | African Heritage Consultants CC | 16/06/2012 - 14:39 | |
9-2-236-0002-20060922-AHCC | Cultural Heritage Resources Impact Assessment for the Proposed Development on the Farms Buffelskloof 382 JT, Waterval 385 JT. Roodewaalshoek 17 JT, Naauwpoort 11 JT and Belvedere 385 KT Mpumalanga Province | AIA Phase 1 | 22/09/2006 | Udo Kusel | African Heritage Consultants CC | MAPID_00675 | 16/06/2012 - 14:39 |
9-2-236-0002-20061001a-RRCRC | Phase 1 Heritage Resources Impact Assessment (Scoping & Evaluation) Sterkspruit 33 JT Plot 71 Lydenburg, Mpumalanga | AIA Phase 1 | 16/10/2006 | Frans Roodt | R & R Cultural Resource Consultants | MAPID_01380 | 16/06/2012 - 14:39 |
9-2-236-0002-20061113-NCHM | Heritage Impact Assessment: Spitskop 65 KT | AIA Phase 1 | 13/11/2006 | Johnny Van Schalkwyk | National Cultural History Museum | MAPID_02325 | 16/06/2012 - 14:39 |
9-2-236-0002-20070201-ACHMC | A Phase 1 Heritage Impact Assessment (HIA) Study for the Proposed Extension of Mining Activities at Everest Platinum Mine (Everest) in the Mpumalanga Province of South Africa | AIA Phase 1 | 01/02/2007 | Julius CC Pistorius | MAPID_00853 | 16/06/2012 - 14:39 | |
9-2-236-0002-20070309a-CCC | Wagenbietjie Estate Heritage Conservation Management Plan | AIA Phase 3 | 09/03/2007 | Robert de Jong | Cultmatrix CC | 16/06/2012 - 14:39 | |
9-2-236-0002-20070420-RRCRC | Heritage Resources Impact Assessment: EIA Application: A New Dam Wall at Whiskey Creek Trout Farm: Thaba Chweu Local Municipality. Letter of Recommendation for Exemption | AIA Phase 1 | 20/04/2007 | Frans Roodt | R & R Cultural Resource Consultants | MAPID_00677 | 16/06/2012 - 14:39 |
9-2-236-0002-20070625-RRCRC | Phase 1 Heritage Resource Impact Assessment (Scoping & Evaluation), Sterkspruit 33 JT Plot 62, Lydenberg: Mpumalanga | AIA Phase 1 | 25/06/2007 | Frans Roodt | R & R Cultural Resource Consultants | MAPID_01384 | 16/06/2012 - 14:39 |
9-2-236-0002-20071101-AACC | Re: Revisit to the Proposed Abrina Residential Development | AIA Phase 1 | 01/11/2007 | Polke Birkholtz | Archaeology Africa CC | MAPID_02315 | 16/06/2012 - 14:39 |
9-2-236-0002-20071101-AHCC | Cultural Heritage Resources Impact Assessment of New Ventilation Shaft for Khutula Colliery on the Farm Smithfield 44 IS, Mpumalanga | HIA Phase 1 | 01/11/2007 | Udo Kusel | African Heritage Consultants CC | MAPID_02022 | 16/06/2012 - 14:39 |
9-2-236-0002-20071201-NCHM | Heritage Impact Assessment for the Proposed Brohan Township to Be Developed on Portions of the Farm Pimlico 305 JT, Mbombela Municipality, Mpumalanga | AIA Phase 1 | 01/12/2007 | Johnny Van Schalkwyk | National Cultural History Museum | MAPID_01177 | 16/06/2012 - 14:39 |
9-2-236-0002-20080201-NHS | Phase 1: Archaeological and Heritage Impact Assessment Study for the Proposed Upgrade of 10 km Section of Road D2976 Between Daantjie and Mpakeni Villages in Mbombela Local Municipality, Mpumalanga Province | AIA Phase 1 | 01/02/2008 | McEdward Murimbika | Nzumbululo Heritage Solutions | MAPID_02225 | 16/06/2012 - 14:39 |
9-2-236-0002-20080401-ACHMC | A Phase 1 Heritage Impact Assessment Study for the Upgrading of Eskom's Hilltop Substation on the Farm Hilltop 458 near Nelspruit in the Mpumalanga Province | AIA Phase 1 | 01/04/2008 | Julius CC Pistorius | MAPID_01713 | 16/06/2012 - 14:39 |