FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRefsort ascending ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
Section 41 Application of the Kwa Zulu Natal Heritage Act No 4 of 2008 Heritage Impact Assessment Building structures on Portion 3, 4, 5 and 68 of Erf 498 Scottsville Section 41 Application of the Kwa Zulu Natal Heritage Act No 4 of 2008 Heritage Impact Assessment Building structures on Portion 3, 4, 5 and 68 of Erf 498 Scottsville 04/03/2021 Judith Muindisi, Monika Lauferts le Roux Tsica Heritage Consultants ADOWA Property Developers 04/03/2021 - 17:45
Section 38 for Residential Development Nooitgedacht 268-IT PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) FOR THE PROPOSED DEVELOPMENT ON PORTION 7 OF THE FARM NOOITGEDACHT 268-IT, ERMELO, MPUMALANGA PROVINCE HIA Phase 1 11/12/2018 Leonie Marais-Botes Leonie Marais Botes Rock Environmental Consulting (Pty) Ltd 11/12/2018 - 08:37
Section 37 Application of the Kwa Zulu Natal Heritage Act No 4 of 2008 Heritage Impact Assessment Building structures on Portion 3 of Erf 498 Scottsville Section 37 Application of the Kwa Zulu Natal Heritage Act No 4 of 2008 Heritage Impact Assessment Building structures on Portion 3 of Erf 498 Scottsville Heritage Impact Assessment Specialist Reports 04/03/2021 Judith Muindisi, Monika Lauferts le Roux Tsica Heritage Consultants ADOWA Property Developers 04/03/2021 - 19:08
SECTION 34 TOTAL DEMOLISHING OF MOROKWENG PRIMARY SCHOOL HERITAGE IMPACT ASSESSMENT IN TERMS OF SECTION 34 (1) OF NHRA FOR THE PROPOSED TOTAL DEMOLISHING OF MOROKWENG PRIMARY SCHOOL SITUATED IN KAGISO MOLAPO LOCAL MUNICIPALITY OF DR RUTH SEKGOMOTSI MOMPATI DISTRICT MUNICIPALITY, NORTH WEST PROVINCE IN SOUTH AFRICA Built Environment and Cultural Landscapes 30/11/2022 Jennifer Mokakabye Setjo Sesho Consultants Lesekha Consulting 12/01/2023 - 11:28
SECTION 27(18) APPLICATION FOR A CHANGE IN PLANNING STATUS TO 118 CHURCH STREET, SCHOTSEKLOOF, ERF 10169 Heritage Statement 16/07/2014 Claire Abrahamse 03/07/2014 - 15:56
Section 27 Application - Roeland & Belvedere Entrances Erf 9240, Roeland & Belvedere Entrances, Stal Plein, Parliament Precinct, Cape Town Heritage Statement 07/02/2022 Patrimoine Concepts Patrimoine Concepts Coega Development Corporation (Pty) Ltd 12/02/2022 - 17:43
Section 24G-PIA-Burlington Citrus Section 24G-PIA-Burlington Citrus Heritage Statement 07/06/2023 Elize Butler 07/06/2023 - 08:10
Section 24G-AIA-Burlington Citrus Section 24G-AIA-Burlington Citrus Heritage Statement 07/06/2023 Karen Van Ryneveld 07/06/2023 - 08:08
Section 24G application for sand mining operation, Cliffdale Section 24G application for sand mining operation on Remainder of Portions 130, 132 and 133, Cliffdale, eThekwini Municipality HIA Phase 1 18/06/2021 Jean Beater JLB Consulting Afzelia Environmental Consultants Pty Ltd 26/07/2021 - 17:31
Section 24 G Rectification application for existing development on sections of Portions 16, 17 and 18 of the Farm Franschoek 593 LT, near Haenertsberg, Limpopo Phase 1 Heritage Resources Scoping Report - Section 24 G Rectification application for existing development on sections of Portions 16, 17 and 18 of the Farm Franschoek 593 LT, near Haenertsburg, Limpopo HIA Phase 1 01/06/2017 Frans Roodt Shasa Heritage Consultants CC Polygon Environmental Planning CC 28/08/2017 - 09:56
Section 10 N11 Heritage impact assessment for the: PROPOSED UPGRADE OF SECTION 10 OF THE N11 NATIONAL ROAD, MIDDELBURG TO LOSKOP DAM, MPUMALANGA PROVINCE AIA Phase 1 01/01/2012 Johnny Van Schalkwyk Heritage Archaeologist & Consultant Lidwala Consulting Engineers (SA) (Pty) Ltd 29/10/2012 - 16:25
Second Substantive Amendment Application for a Revision to Turbine and Hub Specifications of the proposed split and amended Sutherland Wind Energy Facilities Second Substantive Amendment Application for a Revision to Turbine and Hub Specifications of the proposed split and amended Sutherland Wind Energy Facilities (i.e. three 140 MW Wind Energy Facilities: Sutherland Wind Energy Facility (WEF); Sutherland 2 WEF; and Rietrug WEF), Sutherland, Northern and Western Cape Provinces. HIA Letter of Exemption 12/12/2016 Jayson Orton ASHA Consulting(Pty) Ltd ASHA Consulting(Pty) Ltd 15/12/2016 - 11:01
Second Substantive Amendment Application for a Revision to Turbine and Hub Specifications of the proposed split and amended Sutherland Wind Energy Facilities Second Substantive Amendment Application for a Revision to Turbine and Hub Specifications of the proposed split and amended Sutherland Wind Energy Facilities (i.e. three 140 MW Wind Energy Facilities: Sutherland Wind Energy Facility (WEF); Sutherland 2 WEF; and Rietrug WEF), Sutherland, Northern and Western Cape Provinces. HIA Letter of Exemption 12/12/2016 Jayson Orton ASHA Consulting(Pty) Ltd ASHA Consulting(Pty) Ltd 15/12/2016 - 11:14
Second Substantive Amendment Application for a Revision to Turbine and Hub Specifications of the proposed split and amended Sutherland Wind Energy Facilities Second Substantive Amendment Application for a Revision to Turbine and Hub Specifications of the proposed split and amended Sutherland Wind Energy Facilities (i.e. three 140 MW Wind Energy Facilities: Sutherland Wind Energy Facility (WEF); Sutherland 2 WEF; and Rietrug WEF), Sutherland, Northern and Western Cape Provinces HIA Letter of Exemption 12/12/2016 Jayson Orton ASHA Consulting(Pty) Ltd ASHA Consulting(Pty) Ltd 15/12/2016 - 11:26
Second Substantive Amendment Application for a Revision to Turbine and Hub Specifications of the proposed split and amended Sutherland Wind Energy Facilities Second Substantive Amendment Application for a Revision to Turbine and Hub Specifications of the proposed split and amended Sutherland Wind Energy Facilities (i.e. three 140 MW Wind Energy Facilities: Sutherland Wind Energy Facility (WEF); Sutherland 2 WEF; and Rietrug WEF), Sutherland, Northern and Western Cape Provinces HIA Letter of Exemption 12/12/2016 Jayson Orton ASHA Consulting(Pty) Ltd ASHA Consulting(Pty) Ltd 15/12/2016 - 11:29
SECOND PHASE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED MANDLAKAZI BULK WATER PIPELINE, PHASE 5 [nid:398227] [nid:407815] SECOND PHASE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED MANDLAKAZI BULK WATER PIPELINE, PHASE 5 [nid:398227] [nid:407815] HIA Phase 2 08/01/2018 Frans Prins Active Heritage CC Enviroedge 17/01/2018 - 13:38
SECOND HIA Eskom Transnet Project SECOND HIA Eskom Transnet Project HIA Phase 1 16/10/2019 Anton van Vollenhoven 17/10/2019 - 12:28
SECOND HIA Eskom Transnet Project SECOND HIA Eskom Transnet Project HIA Phase 1 16/10/2019 Prof. Anton van Vollenhoven 17/10/2019 - 12:34
Sebokeng Waste Water Works Heritage Impact Assessment for the proposed expansion of the Sebokeng Waste Water Treatment Works, Sedibeng District Municipality, Gauteng Province AIA Phase 1 01/12/2011 Johnny Van Schalkwyk 06/08/2012 - 15:45
Seaview Housing PIA Palaeontological Impact Assessment Desktop Study Proposed Seaview Low-Cost Housing Development Nelson Mandela Bay Municipality, Eastern Cape PIA Desktop 22/03/2017 John Pether SRK Consulting (South Africa) (Pty) Ltd - PLZ 26/04/2017 - 14:52
Seaview Housing AIA A Phase 1 Archaeological Impact Assessment (AIA) for the proposed Nelson Mandela Municipality (NMBM) Seaview Low Income Housing Development, Seaview, Nelson Mandela Bay Municipality, Eastern Cape Province. AIA Phase 1 01/03/2017 Celeste Booth Booth Heritage Consulting SRK Consulting (South Africa) (Pty) Ltd - PLZ 26/04/2017 - 14:41
Seaview & Greenbushes Bulk Water Palaeontology LoE Proposed Seaview & Greenbushes Bulk Water Supply near Port Elizabeth, Nelson Mandela Bay Municipality, Eastern Cape HIA Letter of Exemption 01/07/2016 John Almond Natura Viva CC SRK Consulting (South Africa) (Pty) Ltd - PLZ 21/09/2016 - 15:43
Seaview & Greenbushes Bulk Water Archaeology LoE A Letter of Recommendation (with conditions) for the exemption of a full Phase 1 Archaeological Impact Assessment (AIA) for the proposed expansion of the bulk water supply infrastructure of potable water to Seaview and Greenbushes supply areas, Nelson Mandela Bay Metropolitan, Eastern Cape Province. HIA Letter of Exemption 01/08/2016 Celeste Booth Booth Heritage Consulting SRK Consulting (South Africa) (Pty) Ltd - PLZ 21/09/2016 - 15:34
SE2 Grave impact report A Report on the impact on identified graves by construction of the water pipeline (SE2) between Spitskop Pump Station and Mototolo Mine, located near Steelpoort, Limpopo Province Site Inspection Report 06/07/2023 Jean-Pierre Celliers Kudzala Antiquity Alta van Dyk Environmental Consultants cc 07/08/2023 - 07:58
Sdangeni Access Road HIA EXTENSION OF THE SDANGENI ACCESS ROAD, NKOSAZANA DLAMINI-ZUMA MUNICIPALITY, UNDERBERG, KZN HIA Phase 1 15/01/2021 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Umlando: Archaeological Surveys & Heritage Management 21/01/2021 - 11:49
SCREENING REPORT FOR AN ENVIRONMENTAL AUTHORIZATION SCREENING REPORT FOR AN ENVIRONMENTAL AUTHORIZATION AS REQUIRED BY THE 2014 EIA REGULATIONS – PROPOSED SITE ENVIRONMENTAL SENSITIVITY: Farm 1655 Viljoenshof Boshoff 07/06/2023 Tiyiselani Macebele Biomental Services (Pty) Ltd Biomental Services (Pty) Ltd 21/09/2023 - 08:02
Screener: Portion 31 of ERF 3083 Pietermaritzburg Desktop Heritage Screening Assessment for the Proposed extension of current waste treatment operations onto vacant industrial land located to the west of the current Alumicor premises located at 31 Barnsley Road, Camps Drift in Pietermaritzburg HIA Letter of Exemption 16/09/2021 Jenna Lavin CTS Heritage 16/09/2021 - 13:57
Screener for Tshabo Housing Development Heritage Screener Proposed Housing Development in Tshabo Village, King Williams Town 18/07/2017 Katie Smuts, Kyla Bluff CTS Heritage Terreco Environmental 11/08/2017 - 09:39
Scottburgh HIA Exemption Application for Exemption from a Phase 1 Heritage Impact Assessment PROPOSED EXTENSION OF SCOTTBURGH QUARRY ON THE REMAINDER OF LOT 11 NO 1842, UGU DISTRICT, KwaZulu-Natal HIA Letter of Exemption 19/08/2015 Len van Schalkwyk eThembeni Cultural Heritage Greenmined Environmental 22/04/2016 - 13:27
Scoteville Phase II HIA for Built Environment Phase 2 heritage impact assessment (Built Environment) for the proposed Scottsville Petrol Filling Station on New England Road, Pietermaritzburg with a drive-thru establishment, two level offices and a line shops on site. HIA Phase 2 17/11/2020 Roy Muroyi Tsimba Archaeological Footprints (Pty) Ltd Hanslab (Pty) Ltd 17/11/2020 - 16:22
Scoteville Phase II Built Environment HIA Phase 2 heritage impact assessment (Built Environment) for the proposed Scottsville Petrol Filling Station on New England Road, Pietermaritzburg with a drive-thru establishment, two level offices and a line shops on site. HIA Phase 2 17/11/2020 Roy Muroyi Tsimba Archaeological Footprints (Pty) Ltd Hanslab (Pty) Ltd 17/11/2020 - 16:53
SCOPING REPORT: WATER PIPELINE BETWEEN ROOIWINKEL AND NABABEEP, NORTHERN CAPE ARCHAEOLOGICAL SCOPING THE PROPOSED CONSTRUCTION OF A NEW WATER PIPELINE BETWEEN ROOIWINKEL AND NABABEEP, NORTHERN CAPE Heritage Scoping 24/10/2011 Jonathan Kaplan Agency for Cultural Resources Management Enviroafrica CC 18/08/2016 - 10:32
Scoping Report: Environmental Impact Study for Township Development Scoping Report: Environmental Impact Study for Township Development on Portion of a portion 288 of the Farm Bethesda, RAASWATER Heritage Scoping 01/11/2006 29/03/2021 - 11:47
Scoping Report: Environmental impact study for township development Scoping Report: Environmental impact study for township development on portion of plot 788, Olyfenhoutsdrift Settlement, Kalksloot for //Khara Hais Municipality Heritage Scoping 01/11/2006 //Khara Hais Municipality //Khara Hais Municipality 25/03/2021 - 10:59
Scoping Report: Environmental impact study for change in landuse Scoping Report: Environmental impact study for a change in landuse on a portion of the remainder of erf 1, Keimoes Road: Upington Heritage Scoping 01/11/2006 //Khara Hais Municipality //Khara Hais Municipality 25/03/2021 - 10:02
Scoping Report: Environmental impact study for change in land use Scoping Report: Environmental impact study for the change in land use of erf 5498, a portion of erf 308 and a portion of the remainder of erf 1: Upington for //Khara Hais Municipality Heritage Scoping 01/11/2006 //Khara Hais Municipality //Khara Hais Municipality 25/03/2021 - 10:33
Scoping Report: Environmental Impact Study For A Change In Landuse on Erf 5686, Rosedale Upington Scoping Report: Environmental Impact Study For A Change In Landuse on Erf 5686, Rosedale Upington Heritage Scoping 01/11/2006 //Khara Hais Municipality National Department of Tourism 29/03/2021 - 15:27
Scoping Report Rietfontein Housing Preliminary Heritage Impact Assessment Report Proposed Low Income Housing Project Rietfontein, Remainder Farm No. 585, Gordonia Road, Groot Mier Municipality, Northern Cape Heritage Scoping 01/01/2013 Liezl van Pletzen-Vos, Renee Rust Pro-Active Archaeology Enviroafrica CC 28/02/2013 - 11:33
SCOPING REPORT PALAEONTOLOGY: Maghoebe Eiendomme Solar Park, Northern Cape Province SCOPING REPORT PALAEONTOLOGY: Proposed 2 MW photovoltaic power plant on a portion of the farm De Hoek 32, Pixley ka Seme District Municipality, Northern Cape Province PIA Desktop 19/10/2015 Francois Durand Francois Durand Exigo Sustainability 27/10/2015 - 14:19
Scoping Report Garob Wind Proposed Garob Wind Energy Facility Project, Northern Cape Province (DEA Ref No. 14/12/16/3/3/2/279) Heritage Statement 11/06/2012 Jaco van der Walt Heritage Contracts and Archaeological Consulting 11/06/2012 - 08:47
Scoping report for aggregate opencast mining The application has been accepted by the department of Mineral Resources, required the applicant to lodge a scoping report. BE & CL Scoping Report 15/04/2016 02/04/2016 - 15:59
Scoping Report : Environmental Impact Study For Township Development Scoping Report : Environmental Impact Study For Township Development On Portion of a portion 288 of the farm Bethesda, Raaswater For Khara Hais Municipality. Heritage Scoping 01/11/2006 //Khara Hais Municipality //Khara Hais Municipality 17/03/2021 - 12:45
Scoping Report Pier 1 & 2 DBN Port UHIA Scoping Report prepared for Transnet on the potential for UHIA and HIA in vicinity of Pier 1 and Pier 2, Port of Durban, KwaZulu-Natal Heritage Scoping 15/11/2011 Vanessa Maitland Council for Scientific and Industrial Research Transnet National Ports Authority - Saldanha 25/07/2013 - 22:57
Scoping Report Scoping Report for the development of Agricultural areas on Portion85 of Farm no. 40, Vaalkoppies, Upington 04/11/2015 30/10/2015 - 15:52
Scoping PIA - Igolide Wind Energy Facility Palaeontological Impact Assessment for the proposed Igolide WEF, north of Fochville and southeast of Carltonville, Gauteng Province PIA Desktop 14/05/2023 Marion Bamford Prof Marion Bamford Enertrag South Africa (Pty) Ltd 23/06/2023 - 13:20
Scoping Phase Archaeological Assessment Scoping Archaeological Impact Assessment for the proposed development of Joram Solar Facility near Upington on Remainder of Portion 62 and a Portion of Portion 9 of the Farm Vryheid No. 40, //Khara Hais Municipality, Northern Cape Province. AIA Desktop 25/08/2014 Peter Nilssen Private Perception Heritage Planning 03/09/2014 - 14:15
Scoping Inputs from the Specialist: Heritage Impact Assessment Scoping and Environmental Impact Assessment For the proposed Kap Vley Wind Energy Facility, Namakwaland Magisterial District, Northern Cape Province: Scoping Report Heritage Scoping 12/09/2017 Jayson Orton ASHA Consulting(Pty) Ltd 07/11/2017 - 10:53
Scoping HIA_P166-1/2 ROAD DEVELOMENT Heritage impact scoping assessment for the PROPOSED P166-1/2 ROAD DEVELOMENT, MBOMBELA, MPUMALANGA PROVINCE HIA Phase 1 01/09/2012 Johnny Van Schalkwyk Royal Haskoning DHV 12/03/2013 - 15:05
Scoping HIA: Upington Solar Thermal 3 Proposed development of Phase 2 and Phase 3 of the Upington Solar Thermal Plant on Portion 3 of the Farm McTaggarts Camp 453 near Upington, Northern Cape: Scoping Phase Heritage Input Heritage Scoping 01/09/2013 David Morris McGregor Museum Savannah Environmental (Pty) Ltd 16/04/2014 - 13:38
Scoping HIA Pofadder- Khai-Ma, Korana, Poortjies Scoping Heritage Impact Assessment for Three Wind Energy Facilities, Khai-Ma, Poortjies and Korana Wind Facilities on Four Farms Portions South of Pofadder in the Northern Cape Province Heritage Scoping 26/05/2014 Timothy Hart ACO Associates CC Savannah Environmental (Pty) Ltd 28/05/2014 - 13:41