THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 1101 - 1150 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
NEW KHULU TAILINGS STORAGE FACILITY HIA | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED NEW KHULU TAILINGS STORAGE FACILITY AND ASSOCIATED INFRASTRUCTURE PROJECT, DWARSRIVIER CHROME MINE, LIMPOPO PROVINCE | Heritage Impact Assessment Specialist Reports | 31/08/2021 | Jaco van der Walt | Beyond Heritage | Envirogistics (Pty) Ltd | 01/03/2022 - 12:09 |
HIA Matatiele Truck Stop | HERITAGE IMPACT ASSESSMENT (INCLUDING PHASE ONE PALEONTOLOGY DESKTOP ASSESSMENT) OF THE PROPOSED MATATIELE TRUCK STOP, MATATIELE LOCAL MUNICIPALITY, EASTERN CAPE | Frans Prins | Active Heritage CC | Green Door Environmental | 06/03/2019 - 15:11 | ||
HIA Kookfontein | HERITAGE IMPACT REPORT, FOR INCLUSION IN THE ENVIRONMENTAL ASSESSMENT REPORT FOR THE PROPOSED KOOKFONTEIN PROSPECTING RIGHT APPLICATION, SEDIBENG DISTRICT MUNICIPALTY, GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 22/05/2020 | PGS Heritage (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 25/08/2020 - 11:18 | |
Phase 1 Cultural Heritage Impact Assessment: | Phase 1 Cultural Heritage Impact Assessment: ENVIRONMENTAL IMPACT ASSESSMENT (SCOPING AND EIR-PHASE) FOR THE PROPOSED PROSPECTING RIGHT APPLICATION TO PROSPECT FOR DIAMONDS ALLUVIAL (DA), DIAMONDS GENERAL (D) AND DIAMONDS (DIA) NEAR WOLMARANSSTAD ON PORTION 8, 16, 19, 21, 22 AND 27 OF THE FARM KATBOSCHFONTEIN 164, REGISTRATION DIVISION: HO, NORTH WEST PROVINCE | HIA Phase 1 | 26/09/2023 | Johnny van Schalkwyk | 28/09/2023 - 13:34 | ||
Response to SAHRA Comments-July 2013 | Respose to SAHRA-July 2013 | PIA Desktop | 03/07/2013 | Bruce Rubidge | University of the Witwatersrand | Iliso Consulting (Pty) Ltd | 04/07/2013 - 09:43 |
Turffontein - PIA | 27/02/2023 - 10:54 | ||||||
HIA DA2S WEF Substation and BESS | HERITAGE IMPACT ASSESSMENT: PROPOSED CONSTRUCTION AND OPERATION OF A 132KV SUBSTATION FOR THE DE AAR 2 SOUTH WIND ENERGY FACILITY, DE AAR, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 31/08/2020 | John Gribble | 20/10/2020 - 10:29 | ||
Desktop HIA Plot 226 Vioolsdrift | HERITAGE IMPACT ASSESSMENT: PROPOSED PROSPECTING ON PLOT 226 VIOOLSDRIFT SETTLEMENT, NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE PROVINCE | HIA Phase 1 | 21/04/2023 | Jayson Orton | ASHA Consulting(Pty) Ltd | ASHA Consulting(Pty) Ltd | 26/04/2023 - 12:41 |
ILI3864 - Iphiva-Duma NDA | Needs and Desirability Application Form for the Eskom Northern KZN Strengthening Project Iphiva-Duma 400 kV Powerline | Heritage Impact Assessment Specialist Reports | Justin du Piesanie | Digby Wells Environmental | Eskom Holdings SOC Limited | 13/11/2017 - 15:35 | |
Archaeological Impact Assessment for proposed Geluk Mine | Phase 1 Archaeological Impact Assessment for an iron and vanadium ore mine with associated infrastructure / Geluk Mine on farms Geluk 512KS, Geluk Oos 513KS and Ironstone 847KS at Magnet Heights by Rakhoma Mining Resources (Pty) Ltd near Steelpoort, Limpopo Province | AIA Phase 1 | 30/11/2015 | Eric Ndivhuho Mathoho | Millennium Heritage Group | Naledzi Environmental Consultants | 08/08/2016 - 12:59 |
Palaeontological Impact Assessment Kakamas-South | Palaeontological Impact Assessment for the proposed sand mining operation situated on a 5ha section of the Hartbees River on Erf 1768 Kakamas-South Northern Cape Province | PIA Desktop | 31/01/2018 | Marion Bamford | Kobus Duvenhage Bouers BK | 13/02/2018 - 18:14 | |
PALAEONTOLOGICAL DESKTOP ASSESSMENT | PALAEONTOLOGICAL DESKTOP ASSESSMENT for THE PROSPECTING RIGHT APPLICATION FOR DIAMONDS ALLUVIAL ON THE FARM AANSLUIT 250, REGISTRATION DIVISION: HOPETOWN, NORTHERN CAPE PROVINCE | PIA Desktop | 11/04/2022 | Elize Butler | Banzai Environmental (Pty) Ltd | 03/05/2022 - 14:57 | |
Archaeological Impact Assessment - Draft EIA Buffels 2 | 31/08/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 26/09/2016 - 13:32 | ||
BRMO - New Railway Bridge Heritage Report | A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED NEW RAILWAY BRIDGE AT THE BLACK ROCK MINING OPERATIONS, CLOSE TO HOTAZEL, NORTHERN CAPE PROVINCE. | Heritage Impact Assessment Specialist Reports | 01/03/2019 | Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | Assmang Black Rock Mining Operations | 30/05/2019 - 11:59 |
CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF THE EMONDLO. ST JAMES AND LEKSAND SUBSTATION YARDS | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF THE EMONDLO. ST JAMES AND LEKSAND SUBSTATION YARDS, INCLUDING THE RECONSTRUCTION OF THE EXISTING LEKSAND-ST JAMES 88/22kV POWERLINE AND THE CONSTRUCTION OF THE NEW EMONDLO-ST JAMES 88/22kV POWERLINE | Heritage Impact Assessment Specialist Reports | 26/04/2012 | Frans Prins | Active Heritage CC | Kerry Seppings Environmental Management | 09/09/2013 - 16:21 |
PIA-Helpmekaar Dam, near Tarkastad, CHDM, Eastern Cape | PIA-Helpmekaar Dam, near Tarkastad, CHDM, Eastern Cape | PIA Phase 1 | 22/12/2020 | Elize Butler | 22/12/2020 - 11:04 | ||
Heritage Impact Assessment for the Crowthorne X 27 Township Development, Johannesburg Metropolitan Municipality, Gauteng Province | Heritage Impact Assessment for the Crowthorne X 27 Township Development, Johannesburg Metropolitan Municipality, Gauteng Province | HIA Phase 1 | 27/06/2022 | Jaco van der Walt | Beyond Heritage | Isquare Environmental Planning and GIS | 06/07/2022 - 09:14 |
AIA & Paleo Reports - Hibernia | Archaeological Impact Assessment for the Proposed Hibernia Solar Project near the town of Lichtenburg in the North West Province of South Africa & Paleontological Report: Recommended Exemption From Further Palaeontological Studies: Proposed Hibernia Pv Solar Energy Facility Near Lichtenburg, Ditsobotla Local Municipality, North West Province | 14/10/2013 | Jaco van der Walt, John E Almond | Heritage Contracts and Archaeological Consulting, Natura Viva CC | Savannah Environmental (Pty) Ltd | 12/11/2013 - 11:53 | |
Heritage Scoping Report Nseleni Independent Floating Power Plant | Heritage Scoping Report Nseleni Independent Floating Power Plant | Heritage Scoping | 02/06/2020 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | SE Solutions | 04/03/2021 - 22:22 |
694HIA - Proposed Meiringspark Extensions 10 and 11 | Heritage Impact Assessment for the Proposed Meiringspark Extensions 10 and 11 located on Portion 603 and Part of Portion 604 of the Farm Townlands of Klerksdorp 424 IP, Matlosana Local Municipality, Dr Kenneth Kaunda District Municipality, North West Province. | Heritage Impact Assessment Specialist Reports | 20/04/2023 | Polke Birkholtz | PGS Heritage (Pty) Ltd | Ecologic Afrika (Pty) Ltd | 05/06/2023 - 16:28 |
Exemption letter for desktop PIA | PROPOSED TRANSNET FREIGHT RAIL NEW RAILWAY LINK BETWEEN THARISA MINE AND THE MAINLINE (BETWEEN MARIKANA STATION TO THE WEST AND TURFGROUND SIDING TO THE EAST), MARIKANA, NORTHWEST PROVINCE | PIA Desktop | 11/08/2015 | John Almond | Natura Viva CC | 14/08/2015 - 10:27 | |
AIA Greefspan Power Station II 2637 - Letter | Development of PV Power Station at Greefspan near Douglas, Northern Cape | Archaeological Specialist Reports | 18/06/2012 | David Morris | McGregor Museum | Van Zyl Environmental Consultants | 18/06/2012 - 11:55 |
AIA - Final | Archaeological Impact Assessment Report For The Proposed Orkney Solar Farm North West Province | Archaeological Specialist Reports | 31/01/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 24/02/2017 - 09:01 |
Mahoebe Archaeological Impact Assessment | MAHOEBE EIENDOMME: PROPOSED 2MW PHOTOVOLTAIC POWER PLANT DEVELOPMENT ON A PORTION OF THE FARM DE HOEK 32, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | Archaeological Specialist Reports | 28/09/2015 | Nelius Kruger | Exigo Sustainability | EOH | 08/10/2015 - 16:06 |
Dock Road, V&A Waterfront (Gateway Precinct) | Dock Road, Victoria and Alfred Waterfront (Gateway Precinct) Phase One Development Proposal. Heritage Impact Assessment in terms of Section 38 (4) of the NHR Act. Prepared for the Victoria and Alfred Waterfront Company | HIA Phase 1 | 01/08/2012 | Nicolas Baumann | Victoria and Alfred Waterfront Company | 21/09/2012 - 11:48 | |
HERITAGE SCOPING ASSESSMENT FOR THE PROPOSED LC DE VILLIERS CULVERT UPGRADE PROJECT, PRETORIA, GAUTENG PROVINCE | HERITAGE SCOPING ASSESSMENT FOR THE PROPOSED LC DE VILLIERS CULVERT UPGRADE PROJECT ON THE REMAINDER OF PORTION 0 OF THE FARM KOEDOESPOORT 456 JR, PRETORIA, TSHWANE MUNICIPAL AREA, GAUTENG PROVINCE | HIA Letter of Exemption | 15/09/2016 | Neels Kruger | Exigo Sustainability | Exigo Sustainability | 09/11/2016 - 15:48 |
HIA; Proposed Borrow Pit, DR01381, Warmwaterberg | Heritage Impact Assessment for a Proposed Borrow Pit Located Along DR 01381 northeast of Warmwaterberg in the Cape Winelands District Municipality, Western Cape. | HIA Phase 1 | 27/02/2013 | Quahnita Samie, Madelon Tusenius | Vidamemoria Heritage Consultants, Natura Viva CC | Aurecon South Africa (Pty) Ltd | 12/06/2018 - 13:32 |
Dannhauser HIA | PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED DURNACOL TO DANNHAUSER WATER PROJECT, NEWCASTLE LOCAL MUNICIPALITY, KZN. | HIA Phase 1 | 15/05/2019 | Frans Prins | Active Heritage CC | SLR Consulting (South Africa) (Pty) Ltd | 30/08/2019 - 14:10 |
HERITAGE REPORT | HERITAGE STATEMENT RELATING TO CONTEXT | Heritage Statement | 24/08/2022 | Lindsay Napier | 26/08/2022 - 10:42 | ||
AIA_Olyven_Kolk_Solar_Power_Halkett_DJ_Aug11 | Archaeological Impact Assessment: Proposed Olyven Kolk Solar Power Plant, Northern Cape Province | AIA Phase 1 | 01/08/2011 | Dave Halkett, Jayson Orton | ACO Associates CC | 16/06/2012 - 14:48 | |
CULTURAL HERITAGE IMPACT ASSESSMENT OF ERF 61, LINCOLN MEADE, UMSUNDUZI MUNICIPALITY. | CULTURAL HERITAGE IMPACT ASSESSMENT OF ERF 61, LINCOLN MEADE, UMSUNDUZI MUNICIPALITY. | Heritage Impact Assessment Specialist Reports | 01/07/2018 | Frans Prins | Active Heritage CC | Active Heritage CC | 25/11/2019 - 16:47 |
HIA: Aggeneys PV Solar Energy Facility | HERITAGE IMPACT ASSESSMENT: PROPOSED AGGENEYS PHOTOVOLTAIC SOLAR ENERGY FACILITY AT BLOEMHOEK NEAR AGGENEYS, NORTHERN CAPE PROVINCE | HIA Phase 1 | 01/04/2013 | David Morris | Solar Capital Aggeneys | 10/02/2014 - 10:37 | |
HIA Tshing x 9 | PHASE I CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT ON A PORTION OF PORTION 7, A PORTION OF PORTION 18 AND A PORTION OF PORTION 23 OF THE FARM DOORNPAN NO. 195 IP, TSHING EXTENSION 9 VENTERSDORP NORTH WEST PROVINCE | HIA Phase 1 | 18/07/2017 | Udo Kusel | African Heritage Consultants CC | Akha Maduna Property Development (Pty) Ltd | 05/05/2021 - 14:47 |
Founders Estates FE 9 Heritage Report | 31/08/2022 | 20/10/2022 - 11:16 | |||||
Heritage Report for deviation at 58 Edmonds Road, Glenwood,Durban | Heritage report for 58 Edmonds Road demonstrating how heritage and street characteristics are retained in addition of a driveway and other minor elevations. Glenwood, KZN, Amafa | Heritage Statement | 18/07/2023 | Amanda Lead | Lead Architects | Lead Architects | 18/07/2023 - 14:29 |
Phase 1 Eskom Pienaarsriver CNC HIA Study | A Phase 1 Heritage Impact Assessment Study for Eskom's Proposed CNC in Pienaarsrivier in the Limpopo Province | HIA Phase 1 | 20/09/2013 | Julius CC Pistorius | Texture Environmental Consultants | 30/03/2014 - 17:52 | |
HIA for Vlakkeland Residential Development, Paarl | PROPOSED DEVELOPMENT: ERVEN 8359, 8378, 8399, Rem 8370, 8400, 12628, 12633 & 33027 PAARL HERITAGE IMPACT ASSESSMENT REPORT | HIA Phase 1 | 01/07/2014 | Cindy Postlethwayt | Guillaume Nel Environmental Consultancy | 26/09/2014 - 15:47 | |
HIA Mabaso Gravel Road | Proposed construction of 6.9km gravel road in Mabaso Village, Klip River Native Location 4665 Msinga LM, Mzinyathi District DM, KwaZulu-Natal | Heritage Scoping | 10/03/2017 | Len van Schalkwyk | eThembeni Cultural Heritage | Magalela & Associates (Pty) Ltd | 11/04/2017 - 11:18 |
HIA for the proposed Slovas Housing Development | HIA FOR THE PROPOSED SLOVAS HOUSING DEVELOPMENT, KWAMBONAMBI, KZN | HIA Phase 1 | 26/06/2021 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | K2M Environmental | 28/06/2021 - 13:18 |
TSHIAME / INDUSTRIQUA, HARRISMITH, FREE STATE | FIRST PHASE ARCHAEOLOGICAL, PALAEONTOLOGICAL & GEOLOGICAL INVESTIGATION OF THE PROPOSED TOWNSHIP & LIGHT INDUSTRIAL & AGRO-PROCESSING DEVELOPMENTS AT TSHIAME / INDUSTRIQUA, HARRISMITH, FREE STATE | Heritage Impact Assessment Specialist Reports | 27/10/2014 | Cobus Dreyer, Johan Loock | ENVIROMATRIX (Pty) Ltd | ENVIROMATRIX (Pty) Ltd | 20/01/2015 - 12:00 |
COP3706_NID | Notification of Intent to Develop: Environmental Authorisation Application for the 102 Amendment for the Copper Sunset Sand Mining Operation, Free State | Heritage Impact Assessment Specialist Reports | 27/11/2015 | Natasha Higgitt | Digby Wells Environmental | Copper Sunset Sand (Pty) Ltd | 04/12/2015 - 09:15 |
Proposed Olifantsfontein Rehabilitation along Kaalspruit HIA | Cultural heritage impact assessment for THE PROPOSED OLIFANTSFONTEIN WETLAND REHABILITATION ALONG THE KAALSPRUIT, EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 30/11/2016 | J.A. van Schalkwyk | 31/05/2017 - 15:08 | ||
Basic Assessment Report | Basic Assessment Report | 07/09/2021 | Rizqah Baker | SLR Consulting (Africa) (Pty) Ltd | SLR Consulting (Africa) (Pty) Ltd | 07/09/2021 - 09:04 | |
AIA-Bayview Wind Farm, near Port Elizabeth, NMBM, Eastern Cape | Phase 1 Archaeological and Cultural heritage Impact Assessment - Bayview Wind Farm, near Port Elizabeth, Nelson Mandela Metropolitan Municipality, Eastern Cape | AIA Phase 1 | 16/08/2018 | Karen Van Ryneveld | EOH Coastal & Environmental Services (CES) - Port Elizabeth | 16/08/2018 - 10:21 | |
Amakhala Emoyeni Palaeontology | Palaeontological Impact Assessment of a proposed wind energy facility to be situated on a site south-east of Cookhouse and asouth of Bedford in the Eastern Cape province. The Amakhala-Emoyeni Wind Energy Facility | PIA Phase 1 | 01/09/2010 | Billy De Klerk | Albany Museum | 18/01/2013 - 09:19 | |
PHASE 1 HIA & REPORT FOR THE PROPOSED RIETVLEI EXTENSION 24 TOWNSHIP DEVELOPMENT | A PHASE 1 HIA & REPORT FOR THE PROPOSED RIETVLEI EXTENSION 24 TOWNSHIP DEVELOPMENT LOCATED ON PORTION 712 OF THE FARM DOORNKLOOF 391JR TSHWANE METROPOLITAN AREA, GAUTENG | HIA Phase 1 | 06/08/2021 | 15/11/2021 - 08:55 | |||
Heritage Report | Kitso Mine Mediation on disturbed graves | Archaeological Monitoring | 15/10/2018 | Edward Matenga | Edward Matenga | Edward Matenga | 03/11/2018 - 19:48 |
Borrow-pit 01 Phase 1 HIA in Ga-Masemola | PHASE 1 HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED BORROW PIT SITE IN GA-MASEMOLA VILLAGE ASSOCIATED WITH THE PROPOSED 5.3K ROAD WITHIN MAKHUDUTHAMAGA LOCAL MUNICIPALITY OF SEKHUKHUNE DISTRICT OF LIMPOPO PROVINCE. | HIA Phase 1 | 13/03/2020 | Richard Munyai | Road Agency Limpopo Soc Ltd | Mamadi and Company SA (Pty) Ltd | 17/03/2020 - 13:27 |
PORTION 1 OF FARM 137, BARKLY WEST DISTRICT | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT REPORT ON A ~3 HA AREA, ~2 KM NORTH-EAST OF THE KORTWAL HOMESTEAD, ON PORTION 1 OF FARM 137, SITUATED ~45 KM ENE OF DANIËLSKUIL, BARKLY WEST MAGISTERIAL DISTRICT, NORTHERN CAPE PROVINCE. | AIA Phase 1 | 24/02/2013 | Peter Beaumont | McGregor Museum | De Beers Consolidated Mines - Kimberley Mines | 04/04/2013 - 12:51 |
HIA: SCSC Solar PV at Bagatla Mine | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed development of SCSC solar PV and battery storage facility near Northam in the Limpopo and North West Provinces | HIA Phase 1 | 10/06/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 06/12/2022 - 13:10 |