THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 1301 - 1350 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
EXX4731 - NID | Notification of Intent to Develop: Heritage Resources Management Process for the Exxaro Matla Mine | Heritage Impact Assessment Specialist Reports | 25/10/2017 | Justin du Piesanie | Digby Wells Environmental | Exxaro Coal Mpumalanga (Pty) Ltd | 27/10/2017 - 07:36 | |
Heritage Impact Assessment Report for the Proposed Haakdoorndrift Opencast Activities | Heritage Impact Assessment Report for the Proposed Haakdoorndrift Opencast Activities at the Anglo American Platinum’s Amandelbult Mine at Thabazimbi, Limpopo Province | Heritage Impact Assessment Specialist Reports | 26/05/2016 | Stephan Gaigher, JF Durand, Lynette Herbst | G&A Heritage Management Consultants | Aurecon South Africa (Pty) Ltd | 03/04/2017 - 09:13 | |
Heritage Impact Assessment for the Proposed Installation of Four Underground Tanks on Erf 854 in Thohoyandou-P Ext 1, Thulamela Local Municipality, Limpopo Province. | Heritage Impact Assessment for the Proposed Installation of Four Underground Tanks on Erf 854 in Thohoyandou-P Ext 1, Thulamela Local Municipality, Limpopo Province. | Heritage Impact Assessment Specialist Reports | 27/06/2016 | Marko Hutten | Tekplan Environmental | 11/07/2016 - 08:57 | ||
Addendum to Platreef HIA | Heritage Impact Assessment Addendum Report: Addendum to the Environmental Impact Assessment Report for the Proposed Platreef Underground Mine, near Mokopane, Limpopo Province | Heritage Impact Assessment Specialist Reports | 31/03/2016 | Justin du Piesanie | Digby Wells Environmental | Platreef Resources (Pty) Ltd | 15/09/2016 - 14:53 | |
The proposed upgrade of the Leeuwkuil Wastewater Treatment conveyances, Gauteng Province, South Africa | Heritage Impact Assessment for the proposed upgrade of the Leeuwkuil Wastewater Treatment conveyances, Gauteng Province, South Africa | Heritage Impact Assessment Specialist Reports | 01/07/2022 | Lara Lucija Kraljević | SAHRA Council | Beyond Heritage | 31/08/2022 - 20:08 | |
HERITAGE IMPACT ASSESSMENT OF REM OF THE FARM BIGGS | Heritage Impact Assessment for the proposed Mixed Use Development on Portion of REM OF THE FARM BIGGS NO 18388 referred to as “Greytown Road Development” UMshwathi Local Municipality, uMgungundlovu District Municipality, KwaZulu-Natal | Heritage Impact Assessment Specialist Reports | Mike Webster | eThembeni Cultural Heritage | 05/08/2021 - 23:51 | |||
HIA for the proposed Development of the Naledi Station Precinct, Soweto | Heritage Impact Assessment for the proposed Development of the Naledi Station Precinct, Soweto, Gauteng Province | Heritage Impact Assessment Specialist Reports | 30/03/2012 | Johnny Van Schalkwyk | Iliso Consulting (Pty) Ltd | 14/03/2013 - 14:18 | ||
HIA Pilanesberg Nature Reserve | A Heritage Impact Assessment study of a built environment and landscape feature located in Pilansberg Nature Reserve, Pilanesberg, North West Province, South Africa. | Heritage Impact Assessment Specialist Reports | 13/02/2014 | Nkosinathi Godfrey Tomose | Aurecon - Cape Town | 07/03/2014 - 15:25 | ||
2020/JvS/051Wouter | THE MINING RIGHT APPLICATION FOR DIAMONDS ON PORTION OF REMAINING EXTENT OF PORTION 9 (WOUTER) OF THE FARM LANYON VALE 376, NEAR NIEKERSHOOP, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE. | Heritage Impact Assessment Specialist Reports | 01/07/2020 | Johnny van Schalkwyk | 18/03/2021 - 09:09 | |||
A Desktop HIA Report For formalization of Warburton informal settlement and Township Development | A Desktop Heritage Impact Assessment Report For formalization of Warburton informal settlement and Township Development on Portion 15 of the farm Ferniehaugh 70-IT at Warburton (Msukaligwa Local Municipality) in the Gert Sibande District Municipality of Mpumalanga - APAC023/54 | Heritage Impact Assessment Specialist Reports | 01/06/2023 | Anton Pelser | APELSER ARCHAELOGICAL CONSULTING | GLOBAL GEO ENVIRO SPECIALISTS (PTY) LTD | 22/07/2023 - 10:13 | |
HIA Solar-Aries 400kV Power Lines | Proposed Establishment of Several Electricity Distribution Lines within the Northern Cape Province | Heritage Impact Assessment Specialist Reports | 22/02/2013 | Stephan Gaigher | Zitholele Consulting | 13/09/2013 - 14:25 | ||
HIA, MR 587 borrow pit, near Murraysburg, Central Karoo | Heritage Impact Assessment: MR 587 Central Karoo Beaufort West – Central Karoo Municipality, Western Cape | Heritage Impact Assessment Specialist Reports | 14/07/2015 | Vidamemoria Heritage Consultants | Aurecon South Africa (Pty) Ltd | CTS_503537 | 13/04/2018 - 16:57 | |
HIA report for Hernic Baseline | Heritage Impact Assessment for Hernic Baseline | Heritage Impact Assessment Specialist Reports | Dr Julius CC Pistorius | JMA Consulting (Pty) Ltd | 23/06/2020 - 03:19 | |||
HIA - Project Blue Solar | Heritage Impact Assessment for the Proposed Project Blue Wind Energy | Heritage Impact Assessment Specialist Reports | Savannah Environmental (Pty) Ltd | 26/08/2014 - 12:04 | ||||
Heritage Impact Assessment of Remainder of the farm Cecilia 2352 | Phase 1 Heritage Impact Assessment of Remainder of the farm Cecilia 2352 and farm Bloemfontein 654, Bloemfontein, FS Province. | Heritage Impact Assessment Specialist Reports | 19/11/2014 | Paleo Field Services | Mangaung Metropolitan Municipality | 18/11/2015 - 06:45 | ||
Heritage Impact Assessment Buffelspoort Solar | Heritage Impact Assessment Specialist Reports | 06/12/2022 | Michelle | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 06/12/2022 - 13:09 | ||
ERG3537_7L4_NID | Notification of Intent to Develop for the Prospecting Right and Environmental Authorisation Application for the 7L4 Slimes Dam on Vogelstruisbult 127 IR and Daggafontein 125 IR | Heritage Impact Assessment Specialist Reports | 13/08/2015 | Natasha Higgitt, Johan Nel | Digby Wells Environmental | Ergo Mining (Pty) Ltd | 26/08/2015 - 09:21 | |
ABO Ujekamanzi MTS & LILO1 Heritage Impact Assessment | Proposed development of the Ujekamanzi Wind Energy Facility 1 LILO and MTS Infrastructure near Amersfoort, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 28/04/2023 | Jenna Lavin | CTS Heritage | SiVEST SA (Pty) Ltd | 20/06/2023 - 15:59 | |
NRF4874 - HIA | The South African Radio Astronomy Observatory Square Kilometre Array Heritage Impact Assessment and Conservation Management Plan Project: Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 30/07/2018 | Justin du Piesanie, Jaco van der Walt, Marion Bamford, Brendan Hart, Yasmin Mayat, Stephanie Mulder, Shannon Hardwick | Digby Wells Environmental | South African Radio Astronomy Observatory | 01/08/2018 - 06:37 | |
Empire-Perth Storm water Conduits HIA Report | Cultural heritage impact assessment for THE PROPOSED INSTALLATION OF EMPIRE-PERTH CORRIDOR CONDUITS AND OUTFALLS STORM WATER MANAGEMENT SYSTEMS, CITY OF JOHANNESBURG DISTRICT MUNICIPALITY, GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 30/07/2016 | J.A. van Schalkwyk | Envirolution Consulting (Pty) Ltd | 03/02/2017 - 14:57 | ||
Heritage Impact Assessment | Heritage Impact Assessment (Archaeology, Cultural Landscape and Palaeontology) for the Proposed 132 kV Overhead Power Line and Associated Electrical Grid Infrastructure to Support the Proposed Vhuvhili Solar Energy Facility near Secunda, Mpumalanaga | Heritage Impact Assessment Specialist Reports | 04/11/2022 | Jayson Orton, Jaco van der Walt, Marion Bamford | ASHA Consulting(Pty) Ltd | Vhuvhili Solar (RF) (Pty) Ltd | 15/11/2022 - 14:05 | |
Craddlehill HIA | PHASE 1: ARCHAEOLOGICAL IMPACT ASSESSMENT REPORT FOR THE PROPOSED DEVELOPMENT OF TWO FILLING STATIONS AND ASSOCAITED INFRASTUCTURE ALONG THE R24 ROAD IN MAGALIESBURG, GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 20/10/2017 | Trust Mlilo | Mawenje Consulting Africa (Pty) Ltd | Nedmac Projects Pty Ltd | 01/11/2017 - 11:00 | |
Heritage impact Assessment PV 2 | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED SOLARRESERVE KOTULO TSATSI PHOTOVOLTAIC POWER PLANT 2 | Heritage Impact Assessment Specialist Reports | 31/03/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 03/04/2017 - 17:35 | |
Phezukomoya Heritage Impact Assessment | Heritage Impact Assessment for the Proposed Phezukomoya Wind Energy Facility to be situated in the Northern Cape | Heritage Impact Assessment Specialist Reports | 30/11/2017 | Tim Hart | ACO Associates CC | Arcus Consulting | 08/02/2018 - 14:04 | |
HIA Clairwood_Phase 1 | Heritage Impact Assessment of the proposed Clairwood Logistics Park, eThekwini Municipality. | Heritage Impact Assessment Specialist Reports | 01/08/2012 | Frans Prins | Active Heritage CC | Kerry Seppings Environmental Management | 17/12/2013 - 08:27 | |
HERITAGE ASSESSMENT AND MANAGEMENT PLAN FOR THE PROSPECTING RIGHT APPLICATION ON PORTION 1 OF THE FARM MATSAP 81, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 20/07/2015 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | SLR Consulting (Africa) | 05/10/2015 - 15:20 | ||
Phase 1 Heritage Assessment: Steraine (Pty) Ltd | Exemption from further Archaeological and Palaeontological Impact Assessment: proposed establishment of the 0.8 ha Steraine Chicken Layer and 0.07 ha Packing Facility near Kroonstad, FS Province | Heritage Impact Assessment Specialist Reports | 03/05/2019 | Lloyd Rossouw | Environmental Management Group (Pty) Ltd | Palaeo Field Services | 23/05/2019 - 15:22 | |
CULTURAL HERITAGE AND ARCHAEOLOGICAL IMPACT ASSESSMENT SPECIALIST STUDY REPORT ,MOKGOPA MINERALS : FARM ZWARTRAND 145 IP | CULTURAL HERITAGE AND ARCHAEOLOGICAL IMPACT ASSESSMENT SPECIALIST STUDY REPORT FOR THE PROPOSED BULK SAMPLING ACTIVITIES INCLUDING TRENCHING IN CASES OF ALLUVIAL DIAMOND PROSPECTING SITUATED ON THE REMAINING EXTENT OF THE FARM ZWARTRAND 145 IP | Heritage Impact Assessment Specialist Reports | 18/01/2017 | 18/01/2017 - 13:06 | ||||
Proposed Moletjie Regional Water Scheme | Proposed Moletjie Regional Water Scheme Polokwane Local Municipality, Limpopo Province Cultural Heritage Scoping Report | Heritage Impact Assessment Specialist Reports | 06/09/2006 | Vhufa Hashu Heritage Consultants | Dynamic Integrated Geo-Environmental Services cc | 20/05/2015 - 16:37 | ||
Cultural Heritage assessment Tenbosch Timeshare Resort | Cultural Heritage Assessment of the Proposed Timeshare Resort Development on Portion 101 of the Farm Tenbosch 162 JU, near Komatipoort, Nkomazi Local Municipality in the Ehlanzeni District Municipality, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 01/07/2016 | Francois Coetzee | Roosmaryn Boerdery (Edms) Bpk | 08/11/2016 - 09:41 | ||
Sendawo Grid Heritage Report | SENDAWO POWERLINE ALTERNATIVES – SENDAWO PROJECTS Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 19/05/2016 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | Sivest - Gauteng | 13/06/2016 - 09:58 | |
Heritage Impact Assessment | Phase 1 Heritage Impact Assessment for proposed extension of the Letsopa Township in Ottosdal, NW Province | Heritage Impact Assessment Specialist Reports | 30/06/2021 | Lloyd Rossouw | Paleo Field Services | 18/08/2022 - 11:09 | ||
Heritage report 2012 | Archaeological Impact Assessment for the Proposed Spitz Land Residential Development , Roodepoort Gauteng | Heritage Impact Assessment Specialist Reports | 22/12/2012 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Marsh Environmental Services | 21/06/2018 - 10:49 | |
Graskoppies WEF Grid Heritage Impact Report | Graskoppies Wind Energy Facility (WEF) – 132kV Grid connection and substation Heritage Impact Report | Heritage Impact Assessment Specialist Reports | 08/12/2017 | Wouter Fourie | PGS Heritage (Pty) Ltd | Sivest - Gauteng | 18/12/2017 - 11:37 | |
Section 37 Application of the Kwa Zulu Natal Heritage Act No 4 of 2008 Heritage Impact Assessment Building structures on Portion 3 of Erf 498 Scottsville | Section 37 Application of the Kwa Zulu Natal Heritage Act No 4 of 2008 Heritage Impact Assessment Building structures on Portion 3 of Erf 498 Scottsville | Heritage Impact Assessment Specialist Reports | 04/03/2021 | Judith Muindisi, Monika Lauferts le Roux | Tsica Heritage Consultants | ADOWA Property Developers | 04/03/2021 - 19:08 | |
Soyuz 1 WEF HIA | HERITAGE IMPACT ASSESSMENT REPORT FOR THE SOYUZ 1 WIND ENERGY FACILITY PROJECT, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 01/02/2023 | Nelius Kruger | Coastal & Environmental Services - East London | Soyuz 1 (Pty) Ltd | 14/03/2023 - 14:18 | |
Heritage - Witberg WEF Amendment (Feb'19) | Prposed Witberg Wind Energy Facility Amendment 2018 Supplementary Assessment of the Proposed Amendments. | Heritage Impact Assessment Specialist Reports | 12/02/2019 | Tim Hart | ACO Associates CC | Savannah Environmental (Pty) Ltd | 19/03/2019 - 15:01 | |
Cultural heritage impact assessment: THE DEVELOPMENT OF THE PROPOSED PROTEA SOLAR POWER PLANT | Cultural heritage impact assessment for ON A PORTION OF THE FARM HARTSBOOM 734, VRYBURG REGION, NORTH WEST PROVINCE | Heritage Impact Assessment Specialist Reports | 31/01/2016 | Johnny Van Schalkwyk | Protea Solar Power Plant (Pty) Ltd | 25/04/2016 - 14:56 | ||
Phase One Heritage Impact Assessment of the proposed Ulundi 19 Service Station | Phase One Heritage Impact Assessment of the proposed Ulundi 19 Service Station on Farm Dorsfontein, 526, GU, Ulundi, Ulundi Local Municipality, KwaZulu - Natal | Heritage Impact Assessment Specialist Reports | 25/05/2021 | Frans Prins | Active Heritage CC | Khobo Investment Properties (Pty( Ltd | 19/06/2021 - 12:24 | |
HIA - Hopefield | Heritage Impact Assessment of a Proposed Wind Energy Facility (Hopefield Community Wind Farm) to be situated on Farm Leliefontein 1/317 Hopefield District, South Western Cape | Heritage Impact Assessment Specialist Reports | 20/12/2013 | Timothy Hart | ACO Associates CC | Savannah Environmental (Pty) Ltd | 07/01/2014 - 15:24 | |
SOU5014 Notification of Intent to Develop (RfE) | Environmental Impact Assessment for the Klipspruit Colliery Water Treatment Plant and associated pipeline, Mpumalanga - Notification of Intent to Develop | Heritage Impact Assessment Specialist Reports | 13/07/2018 | Shannon Hardwick, Justin du Piesanie | Digby Wells Environmental | South32 SA Coal Holdings (Pty) Limited | 13/07/2018 - 15:26 | |
Heritage Report - Hertzogville PV 2 | Archaeological Impact Assessment for the Proposed Hertzogville PV 2 Solar Energy Facility on the farm Albert 986 Free State r | Heritage Impact Assessment Specialist Reports | 03/04/2012 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 15/07/2013 - 15:19 | |
Hoogland 3 Wind Farm and Hoogland 4 Wind Farm Heritage Report | HERITAGE IMPACT ASSESSMENT: PROPOSED HOOGLAND 3 WIND FARM AND HOOGLAND 4 WIND FARM, BEAUFORT WEST MAGISTERIAL DISTRICT, WESTERN CAPE AND FRASERBURG MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 19/01/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | SLR Consulting (South Africa) (Pty) Ltd | 13/04/2022 - 16:55 | |
HIA for Whitney Gardens Housing Development | Phase 1 Archaeological and Heritage Impact Assessment for the Proposed Housing Development remainder of portions 130, 368, 543 Syferfontein 51 IR, Whitney Gardens Ext.18 (Lyndhurst), under City of Johannesburg Metropolitan Municipality, Gauteng Province. | Heritage Impact Assessment Specialist Reports | 23/08/2022 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Integrated Specialist Services (Pty) Ltd | 02/02/2023 - 14:47 | |
Cultural Heritage Mang Plan and Impact Assessment | Cultural Heritage Mang Plan and Impact Assessment for the proposed Umsobomvu Coal Mine, near Dundee, KZN | Heritage Impact Assessment Specialist Reports | 01/08/2014 | Anton van Vollenhoven | KwaZulu-Natal Amafa and Research Institute | Umsobomvu MIning Holdings (Pty) Ltd | 25/05/2015 - 10:52 | |
Heritage Impact Assessment for the proposed Aggeneys Wind and Solar Facility | Heritage Impact Assessment for the proposed Aggeneys Wind and Solar Facility | Heritage Impact Assessment Specialist Reports | 01/09/2022 | Jaco van der Walt | Beyond Heritage | Enviro-Insight CC | 07/11/2022 - 09:17 | |
HIA for Jacomynspan Project | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED EXPLORATION ACTIVITIES AT THE JACOMYNSPAN PROJECT, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 10/02/2014 | Anton van Vollenhoven | Archaetnos CC | GCS Water and Environmental Consultants - Head Office JHB | 02/06/2014 - 12:45 | |
Third Road Bridge Heritage Screener Report | Third Road Bridge Heritage Screener Report | Heritage Impact Assessment Specialist Reports | 10/11/2017 | Nicholas Wiltshire | Envirolution Consulting (Pty) Ltd | 09/01/2018 - 09:10 | ||
Adendum to Sorata-Witsieshoek 132kV Line HIA | ADDENDUM TO HIA In terms of Section 38(8) of the NHRA for a Sorata-Witsieshoek 132kV Line | Heritage Impact Assessment Specialist Reports | 10/12/2018 | Jenna Lavin | CTS Heritage | 28/01/2019 - 15:37 | ||
CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED DRIEFONTEIN PIPELINE DEVELOPMENT | Heritage Impact Assessment Specialist Reports | 31/01/2013 | Frans Prins | 26/11/2013 - 15:12 |