FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
HIA FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH IN THE MABOPANE AREA OF GAUTENG PROVINCE CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH AT MABOPANE GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports 22/05/2013 Udo Kusel African Heritage Consultants CC SPOOR Environmental Services (PTY) Ltd. 20/09/2013 - 15:55
Cove Ridge Estate Mixed-Use Development, Portions 21, 22 & 23 of Farm 925, Cove Ridge, EL, BCMM, EC HIA - Cove Ridge Estate Mixed-Use Development, Portions 21, 22 & 23 of Farm 925, Cove Ridge, East London, Buffalo City Metropolitan Municipality, Eastern Cape HIA Phase 1 29/04/2015 Karen Van Ryneveld, John Almond Indwe Environmental Consulting 29/04/2015 - 08:39
PIA PPM Chrome Project Pilanesburg Platinum Mine Chrome Project – Palaeontological Impact Assessment PIA Desktop 10/02/2011 Bruce Rubidge Evolutionary Studies Institute SLR Consulting (Africa) 14/09/2012 - 15:41
Palaeontological Impact Assessment: Desktop Study - Ganspan Wetland Reserve Project, Northern Cape Province Palaeontological Impact Assessment: Desktop Study - Ganspan Wetland Reserve Project Phokwane Local Municipality, Frances Baard District Municipality, Northern Cape Province PIA Desktop 19/08/2019 Dr. Heidi Fourie Dr Heidi Fourie Coastal & Environmental Services - East London 08/10/2019 - 21:38
9-2-026-0011-20070801b-Cape Archaeological Survey CCCC Fort Glamorgan. Draft Report on the Planned Exhumation of 25 Historic Burials at Fort Glamorgan, East London. Report Prepared for the Department of Correctional Services Archaeological Permit Report 08/01/2007 Mary Patrick, Jacqui Friedling Cape Archaeological Survey CC 16/06/2012 - 14:34
PIA: PE Airport Stormwater Upgrade Palaeontology Exemption letter for Port Elizabeth Airport Stormwater Upgrade HIA Letter of Exemption 27/05/2013 Rosemary Prevec Albany Museum SRK Consulting (Pty) Ltd - Pretoria 27/05/2013 - 14:43
HIA for Hermes Deviation powerline and substation Heritage Impact Assessment for Hermes Deviation powerline and substation Heritage Impact Assessment Specialist Reports 30/11/2013 Johnny Van Schalkwyk Envirolution Consulting (Pty) Ltd 05/11/2013 - 14:54
Beaconfields Cemetery:Removal of portion of perimeter fence STATUS QUO REPORT FOR SEDIBENG REGIONAL SANITATION SCHEME: PIPELINE TO PUMP STATION 2 RUNNING IN THE VICINITY OF VERENEEIGING CONCENTRATION CAMP CEMETERY (BEACONSFIELD CEMETERY) IN VERENEEGING, GAUTENG PROVINCE BGG Phase 1 10/11/2019 Trust Mlilo Rand Water 17/05/2020 - 19:43
AIA[ASI]-Koukamma Electrification Project, Hermanuskraal, Kou-Kamma LM, Eastern Cape AIA[ASI]-Archaeological Site Inspection - Koukamma Electrification Project, Hermanuskraal, Kou-Kamma Local Municipality, Eastern Cape Archaeological Monitoring 30/03/2016 Karen Van Ryneveld Royal Haskoning DHV 30/03/2016 - 09:18
THE PROPOSED LANGEBAANWEG TRUCK STOP AND FILLING STATION ON THE REMAINDER OF PORTION 7 OF FARM LANGEBERG NO. 185, LANGEBAAN WESTERN CAPE HIA: THE PROPOSED LANGEBAANWEG TRUCK STOP AND FILLING STATION ON THE REMAINDER OF PORTION 7 OF FARM LANGEBERG NO. 185, LANGEBAAN WESTERN CAPE 29/03/2019 Jenna Lavin CTS Heritage Guillaume Nel Environmental Consultancy 30/09/2020 - 13:07
Borrow pit 3 D3232 PROPOSED NEW BORROW PIT (3) ON THE ROAD D3232, ON THE FARM BLINKWATER 165 LT, NEAR MOREBENG (SOEKMEKAAR), LIMPOPO PROVINCE Heritage Scoping 21/07/2017 - 14:55
Camden 400KV Heritage Impact Assessment Heritage Impact Assessment for the Proposed Camden Up to 400KV Powerline and Collector Substation HIA Phase 1 30/06/2022 Jaco van der Walt WSP Group Africa (Pty) Ltd Beyond Heritage 06/09/2022 - 16:45
HIA for the Proposed Subsidized Housing at Cornfields. PHASE ONE CULTURAL HERITAGE IMPACT ASSESSMENT OF A PROPOSED LOW INCOME HOUSING DEVELOPMENT AT CORNFIELDS D NEAR ESTCOURT, KWAZULU-NATAL. Heritage Impact Assessment Specialist Reports 01/10/2014 Frans Prins, Sian Hall Active Heritage CC 15/10/2014 - 15:45
PIA Report for Kokstad housing project Palaeontological Impact Assessment for the proposed Kokstad CRU Housing Project, KwaZulu Natal Province - Desktop Study PIA Desktop 24/11/2016 Marion Bamford Evolutionary Studies Institute Fuze Environmental Services 06/02/2017 - 19:08
HERITAGE IMPACT ASSESSMENT OF THE PROPOSED MANDLAKAZI BULK WATER PIPELINE, PHASE 5 FIRST PHASE CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED MANDLAKAZI BULK WATER PIPELINE, PHASE 5, NORTHERN KWAZULU-NATAL. HIA Phase 1 01/02/2017 Frans Prins Active Heritage CC Enviroedge 03/05/2017 - 13:51
Phase 1 Heritage Impact Assessment for two agricultural pivot localities on the farm Gladiam (Kloof 143), Niekerkshoop, NC Province. Phase 1 Heritage Impact Assessment for two agricultural pivot localities on the farm Gladiam (Kloof 143), Niekerkshoop, NC Province. AIA Phase 1 12/09/2019 Lloyd Rossouw Paleo Field Services Paleo Field Services 05/11/2019 - 10:22
HIA Screening SAB Rosslyn Pipeline NEW NATURAL GAS TRANSMISSION SUPPLY PIPELINE TO SAB PTY LTD, ROSSLYN, TSHWANE METROPOLITAN MUNICIPALITY, GAUTENG Construction of new natural gas pipeline on Erf 79, Erf 9 and Erf 66 Rosslyn, Akasia, City of Tshwane Metropolitan Municipality, Gauteng Province Site Assessment and Heritage Screening Report Heritage Scoping 20/11/2017 Jennifer Kitto PGS Heritage (Pty) Ltd Environmental Impact Management Services (Pty) Ltd 20/11/2017 - 15:25
Palaeontology Amahleke Water Supply PIA: Proposed expansion of the Amahleke Water Supply Scheme near Dimbaza outside King Williams Town, Buffalo City Metropolitan Municipality, Eastern Cape PIA Phase 1 10/12/2015 John Almond Buffalo City Municipality 15/01/2016 - 12:16
HIA Swift Grid Connection North West Province HIA Swift Grid Connection North West Province HIA Phase 1 28/02/2023 Jaco van der Walt Beyond Heritage SRK Consulting (Pty) Ltd - Johannesburg 26/10/2023 - 13:19
Suid-Afrika se eerste permanente Christelike kerk: Argeologiese opgrawings te D'Ouwe werf Suid-Afrika se eerste permanente Christelike kerk: Argeologiese opgrawings te D'Ouwe werf AIA Phase 2 01/01/1981 Hennie Vos Stellenbosch Museum 16/06/2012 - 14:33
Elders Colliery HIA Cultural Heritage Assessment for the updated Elders Colliery above ground project areas, Mpumalanga Province Heritage Impact Assessment Specialist Reports 01/10/2015 Johnny Van Schalkwyk SRK Consulting (Pty) Ltd - Johannesburg 30/05/2016 - 10:09
Phase 1 HIA for Nakedi Solutions (Pty) Ltd Manganese Mining Right Application PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSSMENT REPORT FOR THE PROPOSED MINING RIGHT APPLICATION ON THE FARMS BADEN 90LR AND PORTION OF PORTION 0 OF BRONKHORSFONTEIN 42LR WITHIN BLOUBERG LOCAL MUNICIPALITY, CAPRICORN DISTRICT MUNICIPALITY OF LIMPOPO PROVINCE AIA Phase 1 26/05/2021 Trust Mlilo Mudzunga Consulting (Pty) Ltd Mudzunga Consulting (Pty) Ltd 12/08/2022 - 02:27
Shongweni South permit report Shongweni South permit report Archaeological Permit Report 26/09/2018 Geeske Langejans, Gerrit Leendert Dusseldorp 26/09/2018 - 11:12
Paleontological Desktop Assessment PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED DRILLING PROJECTS IN THE NORTHERN CAPE BY DE BEERS CONSOLIDATED MINES PIA Desktop 05/12/2020 Elize Butler Banzai Environmental (Pty) Ltd De Beers Consolidated Mines (Pty) Ltd 18/12/2020 - 15:04
Cultural Heritage for the farms Donkerpoort 448, Randstephne 443KQ, Thabazimbi First Phase Cultural Heritage Essay for the farms Donkerpoort 448KQ, Randstephne 445KQ and Waterval 443 KQ, Thabazimbi, Limpopo Province. AIA Phase 1 01/06/2011 Sidney Miller African Heritage Consultants CC Shangoni Management Services 23/04/2014 - 08:59
HIA: SBPM Solar PV at Bagatla Mine HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed development of SBPM solar PV and battery storage facility near Northam in the Limpopo and North West Provinces HIA Phase 1 10/06/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 06/12/2022 - 13:12
Visual Statement for Humansrus PV 1 Grid Connection (previously RE Capital 13 Solar Development) Grid Connections Visual Statement for Humansrus PV 1 Grid Connection (associated with the Humansrus PV Energy Facility 1, previously named RE Capital 13 Solar Development), RE/147 Humansrus, near Copperton, Northern Cape. Visual Impact Assessment 24/11/2014 Visual Resource Management Africa cc Humansrus Solar PV Energy Facility 1 (Pty) Ltd. 03/02/2015 - 15:27
AIA Desktop for Upgrading of R335 from Motherwell to Addo UPGRADING OF THE MAIN ROAD MR450 (R335) FROM MOTHERWELL TO ADDO, NELSON MANDELA BAY MUNICIPALITY AND SUNDAYS RIVER VALLEY LOCAL MUNICIPALITY, EASTERN CAPE AIA Desktop 28/10/2018 Umlando: Archaeological Surveys & Heritage Management 18/01/2019 - 17:05
Heritage Report for Merapi PV Solar Facility 361, 362, 363 & 364 Heritage Impact Assessment Study for the Proposed PV Energy Facilities, near Excelsior, Free State HIA Phase 1 Nkosinathi Godfrey Tomose 08/02/2013 - 12:17
Rietkloof WEF Heritage Statement PART TWO AMENDMENT FOR THE APPROVED RIETKLOOF WEF NEAR MATJIESFONTEIN IN THE WESTERN CAPE Heritage Statement 10/11/2021 Jenna Lavin CTS Heritage WSP Group Africa (Pty) Ltd 08/12/2021 - 06:36
PIA for proposed fuel service station at Kenton on Seea Palaeontological Impact Assessment for new fuel service station at Kenton on Sea Palaeontological Specialist Reports 01/05/2015 Robert Gess SRK Consulting (South Africa) (Pty) Ltd - PLZ 23/06/2015 - 11:43
BYPASS WATER PIPELINE BLOEMFONTEIN FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE PROPOSED BYPASS WATER PIPELINE DEVELOPMENT AT BLOEMFONTEIN HIA Phase 1 04/07/2014 Cobus Dreyer Nemai Consulting Nemai Consulting 14/07/2014 - 20:14
HEUNINGKRANZ PROJECT - PALAEONTOLOGICAL ASSESSMENT PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED MINING ACTIVITY ON THE FARMS HEUNINGKRANZ 364 R/E AND LANGVERWACHT 432 PORTION 1, TSANTSABANE LOCAL MUNICIPALITY, SIYANDA DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE. PIA Desktop 01/08/2017 Gideon Groenewald EXM Advisory Services (Pty) Ltd 29/05/2018 - 14:32
Wild Coast SEZ Phase 2 Heritage Report HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED WILD COAST SPECIAL ECONOMIC ZONE - INDUSTRIAL DEVELOPMENT EIA (IMPACT ASSESSMENT PHASE), EASTERN CAPE HIA Phase 2 31/07/2018 Frans Prins Active Heritage CC WSP Environmental Pty Ltd - Johannesburg 13/08/2018 - 07:10
Additions & Alterations to existing dwelling Additions & Alterations to existing dwelling at 58 Lloyd Avenue, Bluff, ERF 16 Non Impact Assessment Related Reports 29/05/2023 Kyle de Lange AMAFA HD Projects 29/05/2023 - 08:47
A DESKTOP HERITAGE IMPACT ASSESSMENT REPORT FOR THE LWABANTU MINERAL RESOURCES MINING RIGHTS APPLICATION A DESKTOP HERITAGE IMPACT ASSESSMENT REPORT FOR THE LWABANTU MINERAL RESOURCES MINING RIGHTS APPLICATION ON PORTION 2 OF THE FARM RUSTPLAATS 165KU IN THE ZULULAND DISTRICT MUNICIPALITY, ABAQULISI LOCAL MUNICIPALITY KWAZULU-NATAL PROVINCE - APAC023/73 03/07/2023 Anton Pelser APELSER ARCHAELOGICAL CONSULTING Licebo Environmental and Mining (Pty) Ltd 20/09/2023 - 08:52
Heritage Impact Assessment of Remainder of the farm Cecilia 2352 Phase 1 Heritage Impact Assessment of Remainder of the farm Cecilia 2352 and farm Bloemfontein 654, Bloemfontein, FS Province. Heritage Impact Assessment Specialist Reports 19/11/2014 Paleo Field Services Mangaung Metropolitan Municipality 18/11/2015 - 06:45
AIA; Destruction of the Remainder of Danger Point 1 Archaeological Monitoring of the Destruction of the Remainder of Danger Point 1, Irvin and Johson Abalone Farm Danger Point Gaansbaai Archaeological Monitoring 01/08/2004 Jonathan Kaplan Agency for Cultural Resources Management Irvin & Johnson SA Ltd 06/04/2018 - 16:18
HIA Report A phase 1 Heritage Impact Assessment (HIA) study for the Proposed construction of a clean water pipeline from the Middelburg water reclamation plant to the Middelburg colliery in the Mpumalanga province HIA Phase 1 02/09/2013 Julius CC Pistorius Private Jones & Wagener Engineering and Environmental Consultants 24/11/2014 - 14:51
PIA Exemption - Grootwitpan BASIC PALAEONTOLOGICAL ASSESSMENT Letter of Recommendation for Exemption from further Palaeontological Studies CONSOLIDATION OF SALT PAN MINING RIGHTS ON GROOT WITPAN 327 INDUSTRIAL SALT (PTY) LTD. Portions 10, 13, 18 & 20 of Groot Witpan 327, Gordonia District, Northern Cape HIA Letter of Exemption 24/10/2022 John Pether Geological and Palaeontological Consultant Site Plan Consulting 26/10/2022 - 14:17
HIA SIERAAD KOMATIPOORT PHASE 1 ARCHAEOLOGICAL / HERITAGE IMPACT ASSESSMENT FOR PROPOSED ALTERATION OF VIRGIN NATURAL LANFOR AGRICULTURAL USE: PORTION 1 OF SIERAAD 386 JU, KOMATIPOORT AREA MPUMALANGA PROVINCE AIA Phase 1 18/07/2013 Christine Van Wyk Rowe Rhengu Environmental Services Rhengu Environmental Services 18/07/2013 - 07:40
HIA Carocraft Heritage Impact Assessment for the Proposed Carocraft Solar Park east of Vryburg, North West Province HIA Phase 1 01/11/2012 AGES (PTY) Ltd - Pretoria 06/12/2012 - 09:28
Powerline - HIA 10/05/2023 - 11:50
Phase 1 Heritage report 1st PHASE CULTURAL HERITAGE IMPACT ASESSEMENT FOR THE FARMS DONKERPOORT 448 KQ, RANDSTEPHNE 455 KQ AND WATERVAL 443 KQ, THABAZIMBI, LIMPOPO PROVINCE HIA Phase 1 01/05/2014 Sidney Miller African Heritage Consultants CC 24/06/2014 - 12:03
North Park HIA Heritage Impact Assessment Specialist Reports 16/05/2017 - 14:58
Heritage Impact Assessment for the clearing of indigenous vegetation for citrus and crop lands on the farm River 141 MS within Musina Local Municipality, Vhembe District, Limpopo Province Heritage Impact Assessment for the clearing of indigenous vegetation for citrus and crop lands on the farm River 141 MS within Musina Local Municipality, Vhembe District, Limpopo Province HIA Phase 1 12/03/2021 Jaco van der Walt Heritage Contracts and Archaeological Consulting Tua Conserva Environmental 22/07/2021 - 17:34
Louisvale AIA ARCHAEOLOGICAL IMPACT ASSESSMENT for Proposed cultivation of pecan nut trees including associated infrastructure on the Farm Bethesda 238/38 & 335/38 Louisevale, Upington, Northern Cape Archaeological Specialist Reports 24/06/2016 15/06/2016 - 11:29
Onderstepoort Extension 45 A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE PROPOSED ONDERSTEPOORT EXTENSION 45 TOWNSHIP DEVELOPMENT ON PORTIONS 71-73 & PORTIONS 77-78 OF THE FARM HAAKDOORNBOOM 267JR NEAR SOSHANGUVE IN THE TSHWANE METROLPOLITAN MUNICIPALITY OF GAUTENG - APAC021/14 HIA Phase 1 11/02/2021 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Envirovision Consulting CC 16/02/2021 - 08:41
HERITAGE SCOPING ASSESSMENT FOR THE PROPOSED LC DE VILLIERS CULVERT UPGRADE PROJECT, PRETORIA, GAUTENG PROVINCE HERITAGE SCOPING ASSESSMENT FOR THE PROPOSED LC DE VILLIERS CULVERT UPGRADE PROJECT ON THE REMAINDER OF PORTION 0 OF THE FARM KOEDOESPOORT 456 JR, PRETORIA, TSHWANE MUNICIPAL AREA, GAUTENG PROVINCE HIA Letter of Exemption 15/09/2016 Neels Kruger Exigo Sustainability Exigo Sustainability 09/11/2016 - 15:48
Existing Borrow Pit Stella Stella Borrow Pit HIA Phase 1 01/12/2022 Lloyd Rossouw Paleo Field Service 17/04/2023 - 10:28