FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitlesort descending ReportType ReportDate Authors AuthoringBody CommissioningCompany MapID < 2009 Post date
AIA_Strybult_542_Pistorius_JCC_Aug08 A Phase 1 Heritage Impact Assessment (HIA) Study for Sasol's Proposed new shaft complex on Strybult 542 and for the North Block on the Eastern Highveld in the Mpumalanga Province. AIA Phase 1 01/08/2008 Julius CC Pistorius 16/06/2012 - 14:50
Strybult_542_Sasol_Secunda_archaeology A Phase 1 Heritage Impact Assessment (HIA) Study for Sasol’s Proposed new shaft complex on Strybult 542 and for the North Block on the Eastern Highveld in the Mpumalanga Province. AIA Phase 1 01/05/2008 Julius CC Pistorius Clean Stream Environmental Services 30/01/2013 - 09:09
Phase 1 HIA for Exxaro AMEP A Phase 1 Heritage Impact Assessment (HIA) Study for the Consolidated Environmental Management Programme Report (Consolidated EMPR) for Arnot Coal on the Eastern Highveld in the Mpumalanga Province HIA Phase 1 30/09/2011 Julius CC Pistorius Golder Associates, Exxaro Resources 17/10/2014 - 13:57
9-2-248-0001-20040101-ACHMC A Phase 1 Heritage Impact Assessment (HIA) Study for the Existing Kabokweni Waste Water Treatment Works and for an Extension of this Plant AIA Phase 1 01/01/2004 Julius CC Pistorius 16/06/2012 - 14:39
AIA_WRP_Pistorius_JCC_Oct10 A Phase 1 Heritage Impact Assessment (HIA) Study for the expansion of the Mine Water Reclamation Scheme near eMalahleni (Witbank) in the Mpumalanga Province of South Africa AIA Phase 1 01/10/2010 Julius CC Pistorius 16/06/2012 - 14:51
9-2-263-0020-20060201-ACHMC A Phase 1 Heritage Impact Assessment (HIA) Study for the Impala Platinum Shaft 17 Complex on the Farm Vlakfontein 276 JQ near Rustenburg in the North-West Province of South Africa AIA Phase 1 01/02/2006 Julius CC Pistorius MAPID_00804 16/06/2012 - 14:40
A phase 1 Heritage Impact Assessment (HIA) study for the Proposed construction of a clean water pipeline from The Middelburg water reclamation plant to the Middelburg colliery in the Mpumalanga province A phase 1 Heritage Impact Assessment (HIA) study for the proposed construction of a clean water pipeline from the Middelburg water reclamation plant to the Middelburg colliery in the Mpumalanga province HIA Phase 1 16/09/2013 Julius CC Pistorius Private Jones & Wagener Engineering and Environmental Consultants 24/11/2014 - 14:14
HIA Report A phase 1 Heritage Impact Assessment (HIA) study for the Proposed construction of a clean water pipeline from the Middelburg water reclamation plant to the Middelburg colliery in the Mpumalanga province HIA Phase 1 02/09/2013 Julius CC Pistorius Private Jones & Wagener Engineering and Environmental Consultants 24/11/2014 - 14:51
9-2-204-0012-20050101-ACHMC A Phase 1 Heritage Impact Assessment (HIA) Study for the Proposed Dullstroom Country Lodge Phase 3 Residential Development near Dullstroom in the Mpumalanga Province, SA AIA Phase 1 01/01/2005 Julius CC Pistorius MAPID_00649 16/06/2012 - 14:38
9-2-236-0002-20070201-ACHMC A Phase 1 Heritage Impact Assessment (HIA) Study for the Proposed Extension of Mining Activities at Everest Platinum Mine (Everest) in the Mpumalanga Province of South Africa AIA Phase 1 01/02/2007 Julius CC Pistorius MAPID_00853 16/06/2012 - 14:39
AIA_Spitzkop_Kennedys_Vale_361_Pistorius_JCC_Jul_07_Pistorius_JCC_Jul07 A Phase 1 Heritage Impact Assessment (HIA) Study for the Proposed New Spitzkop Platinum Mine in the Steelpoort in the Mpumalanga Province AIA Phase 1 01/07/2007 Julius CC Pistorius MAPID_02307 16/06/2012 - 14:50
AIA_Spitzkop_Platinum_Mine_Pistorius_JCC_Jul07 A phase 1 Heritage impact assessment (HIA) Study for the proposed New Spitzkop Platinum Mine in the Steelpoort in the Mpumalanga Province of South Africa AIA Phase 1 01/07/2007 Julius CC Pistorius MAPID_03428 16/06/2012 - 14:50
9-2-055-0002-20060801-ACHMC A Phase 1 Heritage Impact Assessment (HIA) Study for the Proposed New United Manganese of Kalahari (Umk) Mine on the Farms Botha 313, Smartt 314 and Rissik 330 near Hotazhel in the Northern Cape Province of South Africa AIA Phase 1 01/08/2006 Julius CC Pistorius MAPID_00920 16/06/2012 - 14:36
9-2-242-0018-20070201-ACHMC A Phase 1 Heritage Impact Assessment (HIA) Study for the Proposed New Water Treatment Project at Optimum Colliery near Hendrina in the Mpumalanga Province of South Africa AIA Phase 1 01/02/2007 Julius CC Pistorius MAPID_01155 16/06/2012 - 14:39
AIA_Leeuwpoort_205IR_Pistorius_JCC_Apr12 A Phase 1 Heritage Impact Assessment (HIA) study for the proposed super centre complex on the farm Leeuwpoort 205IR in the Delmas Industrial Township on the eastern highveld in the Mpumalanga Province. AIA Phase 1 01/04/2012 Julius CC Pistorius 16/06/2012 - 14:47
9-2-212-0013-20070501-ACHMC A Phase 1 Heritage Impact Assessment (HIA) Study for the Upgrading of Eskom's veekraal substation on the Farm Veekraal 221 in the Madibeng District of the North-West Province, South Africa HIA Phase 1 01/05/2007 Julius CC Pistorius MAPID_01044 16/06/2012 - 14:38
HIA Leeuwkop Platinum Mine A Phase 1 Heritage Impact Assessment for Afplats' Leeuwkop Platinum Mine Project on Leeuwkraal 408JQ near Madibeng in the North-West Province with an Addendum Containing Known Heritage Sites on Wolwekraal 408JQ and Kareepoort 407JQ HIA Phase 1 01/06/2012 Julius CC Pistorius SLR Consulting (Africa) 04/07/2012 - 14:12
GaMohaan Quarry Phase 1 Heritage Impact Assessment A Phase 1 Heritage Impact Assessment for Afrimat Aggregates Trading (Pty) Ltd’s proposed for Mining Right and Water Use License application for the existing GaMohaan Quarry, near Kuruman, Northern Cape. AIA Phase 1 28/08/2015 Foreman Bandama Mbviseni Sustainable Environmental Initiative Afrimat Aggregates (Trading) (Pty) Ltd 12/11/2015 - 14:54
Phase 1 Heritage Impact Assessment A Phase 1 Heritage Impact Assessment for the proposed development of a shopping mall, filling station and associated activities on a piece of land approximately 7.7 ha on a Portion of the remaining extent of the farm Goedverwatching 19LT at Tshakhuma Village within Makhado Local Municipality of Limpopo Province. HIA Phase 1 24/07/2019 24/07/2019 - 09:32
Phase 1 Heritage Impact Assessment A Phase 1 Heritage Impact Assessment for the proposed development of a shopping mall, filling station and associated activities on a piece of land approximately 7.7 ha on a Portion of the remaining extent of the farm Goedverwatching 19LT at Tshakhuma Village within Makhado Local Municipality of Limpopo Province. HIA Phase 1 24/07/2019 Trust Mlilo Integrated Specialist Services (Pty) Ltd 24/07/2019 - 11:04
HIA for Witbank Clinker reclamation A Phase 1 Heritage Impact Assessment for the proposed Reclaiming of clinker (ash from old power stations) in Witbank, eMalahleni Local Municipality in Mpumalanga Province. Archaeological Specialist Reports 22/05/2017 Trust Mlilo Mbviseni Sustainable Environmental Initiative Mbviseni Sustainable Environmental Initiative 03/07/2017 - 10:19
KANANA HIA a Phase 1 Heritage Impact Assessment for the proposed township establishment on Portion 100 of Farm Nooitgedacht 434-IP within the jurisdiction of City of Matlosana LM in the North West Province HIA Phase 1 22/11/2022 Roy Muroyi Tsimba Archaeological Footprints (Pty) Ltd Ditsamai Investments & Projects (Pty) Ltd 23/08/2023 - 13:01
HIA-upgrading of bulk sewer lines in Tembisa, Ivory Park and and Clayville A Phase 1 Heritage Impact Assessment for the proposed upgrading of bulk sewer lines in Tembisa, Ivory Park and and Clayville, Gauteng Province. HIA Phase 1 23/11/2018 Trust Mlilo Integrated Specialist Services (Pty) Ltd Citofield 23/12/2018 - 17:45
9-2-242-0003-20050201-ACHMC A Phase 1 Heritage Impact Assessment for Various Portions of the Farm Mapochsgronden 500 JS, in Roossenekal in Mpumalanga Province, SA HIA Phase 1 01/02/2005 Julius CC Pistorius MAPID_00718 16/06/2012 - 14:39
Amanzi Pivots Farm Waterford HIA A Phase 1 Heritage Impact Assessment of proposed installation of new irrigation pivots and associated infrastructure on portion 0 and 2 of the farm Waterford 229 outside Hopetown, NC Province. AIA Phase 1 04/10/2017 Lloyd Rossouw Paleo Field Services Paleo Field Services 12/02/2018 - 20:36
Phase 1 HIA for Komati Solar PV and BESS A PHASE 1 HERITAGE IMPACT ASSESSMENT REPORT FOR THE ESKOM KOMATI POWER STATION SOLAR ENERGY FACILILTY (SEF) MPUMALANGA PROVINCE HIA Phase 1 01/06/2023 Anton Apelser A Pelser Archaeological Consulting WSP Group Africa (Pty) Ltd 05/07/2023 - 11:20
HIA for the Proposed Braamfontein PRASA Depot Upgrade A Phase 1 Heritage Impact Assessment Report for the Proposed Braamfontein PRASA Depot Upgrade as part of PRASA Railway Modernization Project HIA Phase 1 16/07/2013 Nkosinathi Godfrey Tomose Ecosolve (Pty) Ltd 05/09/2013 - 22:06
HIA for the Proposed Durban Yard PRASA Depot Upgrade A Phase 1 Heritage Impact Assessment Report for the Proposed Durban Yard PRASA Depot Upgrade as part of PRASA Railway Modernization Project HIA Phase 1 15/07/2013 Nkosinathi Godfrey Tomose Ecosolve (Pty) Ltd 06/09/2013 - 06:41
Johandeo - HIA A PHASE 1 HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED JOHANDEO PHASE 2 TOWNSHIP ESTABLISHMENT SITUATED ON THE REMAINDER OF PORTION 8 OF THE FARM RIETKUIL 554 IQ, EMFULENI LOCAL MUNICIPALITY IN GAUTENG PROVINCE. Heritage Scoping 01/02/2022 Trust Mlilo Integrated Specialist Services 24/10/2022 - 11:57
HIA for the Proposed Springfield PRASA Depot Upgrade A Phase 1 Heritage Impact Assessment Report for the Proposed Springfield PRASA Depot Upgrade as part of PRASA Railway Modernization Project HIA Phase 1 09/07/2013 Nkosinathi Godfrey Tomose Ecosolve (Pty) Ltd 05/09/2013 - 22:28
HIA for the Proposed Springfield PRASA Depot Upgrade A Phase 1 Heritage Impact Assessment Report for the Proposed Springfield PRASA Depot Upgrade as part of PRASA Railway Modernization Project HIA Phase 1 09/07/2013 Nkosinathi Godfrey Tomose Ecosolve (Pty) Ltd 05/09/2013 - 22:28
HIA for Wolmerton PRASA Depot Upgrade A Phase 1 Heritage Impact Assessment Report for the Proposed Wolmerton PRASA Depot Upgrade as part of PRASA Railway Modernization Project 09/07/2013 Nkosinathi Godfrey Tomose Ecosolve (Pty) Ltd 05/09/2013 - 22:21
Phase 1 Heritage Impact Assessment Report for the Proposed Wolmerton PRASA Depot A Phase 1 Heritage Impact Assessment Report for the Proposed Wolmerton PRASA Depot Upgrade as part of PRASA Railway Modernization Project 09/07/2013 Nkosinathi Godfrey Tomose Ecosolve (Pty) Ltd 06/09/2013 - 07:05
9-2-253-0027-20071101-ACHMC A Phase 1 Heritage Impact Assessment Study for a Proposed New 132 kV Power Line Between the Existing Voorspoed Substation and the Proposed New Dwaalkop Substation near Chuniespoorr in the Limpopo Province AIA Phase 1 01/11/2007 Julius CC Pistorius MAPID_01479 16/06/2012 - 14:39
AIA_MarathonNC-MetaffinMP_Pistorius_JCC_Sep07 A Phase 1 Heritage Impact Assessment Study for a Proposed New 132 kV Power Line Running from the Existing Marathon/Northern Cape Power Line to the Proposed New Metaffin Substation near Nelspruit in the Mpumalanga Province AIA Phase 1 01/09/2007 Julius CC Pistorius 16/06/2012 - 14:47
9-2-281-0002-20070901-ACHMC A Phase 1 Heritage Impact Assessment Study for a Proposed New 132 kV Power Line Running from the New Matlabas Substation to the Proposed New Bulge Substation in the Limpopo Province AIA Phase 1 01/09/2007 Julius CC Pistorius MAPID_01482 16/06/2012 - 14:41
9-2-269-0017-20070901-ACHMC A Phase 1 Heritage Impact Assessment Study for a Proposed New Tshino Substation on the Farm Schuynshoogte 29 LT in the Limpopo Province AIA Phase 1 01/09/2007 Julius CC Pistorius MAPID_01796 16/06/2012 - 14:40
Pelly-Warmbad HIA 27 May 13 A Phase 1 Heritage Impact assessment Study for Eskom's Poposed 132kV Chikadee Power Line (Loop-Out) from the Warmbad-Pelly 132 kV Backbone to the Rust de Winter Substation HIA Phase 1 31/05/2013 19/11/2013 - 10:40
Phase 1 Eskom Pienaarsriver CNC HIA Study A Phase 1 Heritage Impact Assessment Study for Eskom's Proposed CNC in Pienaarsrivier in the Limpopo Province HIA Phase 1 20/09/2013 Julius CC Pistorius Texture Environmental Consultants 30/03/2014 - 17:51
Phase 1 Eskom Pienaarsriver CNC HIA Study A Phase 1 Heritage Impact Assessment Study for Eskom's Proposed CNC in Pienaarsrivier in the Limpopo Province HIA Phase 1 20/09/2013 Julius CC Pistorius Texture Environmental Consultants 30/03/2014 - 17:51
Phase 1 Eskom Pienaarsriver CNC HIA Study A Phase 1 Heritage Impact Assessment Study for Eskom's Proposed CNC in Pienaarsrivier in the Limpopo Province HIA Phase 1 20/09/2013 Julius CC Pistorius Texture Environmental Consultants 30/03/2014 - 17:52
Phase 1 Eskom Pienaarsriver CNC HIA Study A Phase 1 Heritage Impact Assessment Study for Eskom's Proposed CNC in Pienaarsrivier in the Limpopo Province HIA Phase 1 20/09/2013 Julius CC Pistorius Texture Environmental Consultants 30/03/2014 - 17:52
Phase 1 Eskom Pienaarsriver CNC HIA Study A Phase 1 Heritage Impact Assessment Study for Eskom's Proposed CNC in Pienaarsrivier in the Limpopo Province HIA Phase 1 20/09/2013 Julius CC Pistorius Texture Environmental Consultants 30/03/2014 - 17:52
Nokeng Fluorspar A Phase 1 heritage impact assessment study for Eskom's proposed Nokeng Fluorpsar project: The construction of a new 132Kv Power Line between the Rust de Winter Substation and the proposed new Nokeng Substation with associated Infrastructure near Rust De Winter in the Limpopo province of South Africa AIA Phase 1 01/06/2011 Julius CC Pistorius Texture Environmental Consultants 25/09/2012 - 11:06
AIA_Dwaalkop_Mining_Pistorius_JCC_Mar09 A Phase 1 Heritage Impact Assessment Study for Lonmin' Proposed New Dwaalkop Mining operations near Lebowakgomo in Chuniespoort in the Limpopo Province. AIA Phase 1 01/03/2009 Julius CC Pistorius 16/06/2012 - 14:44
AIA_Jane_Furse_Substation_Pistorius_JCC_Oct10 A Phase 1 Heritage Impact Assessment Study for the Eskom's proposed new 132 Kv Power Line running between Jane Furse substation and Mamatshekele in the Limpopo Province of South Africa AIA Phase 1 01/10/2010 Julius CC Pistorius 16/06/2012 - 14:46
HIA for Sorata-Witsieshoek 132kV Line, Phuthaditjhaba, Free State Province, South Africa A PHASE 1 HERITAGE IMPACT ASSESSMENT STUDY FOR THE PROPOSED 132kV LINES - SORATA-WITSIESHOEK, PHUTHADITJHABA, FREE STATE PROVINCE, SOUTH AFRICA. HIA Phase 1 10/02/2013 Nkosinathi Godfrey Tomose Margen Industrial Service cc 06/06/2013 - 15:03
A Phase 1 Heritage Impact Assessment Study, Charlestown, KwaZulu-Natal Province, South Africa A PHASE 1 HERITAGE IMPACT ASSESSMENT STUDY FOR THE PROPOSED CHARLESTOWN HOUSING DEVELOPMENT, KWAZULU-NATAL, SOUTH AFRICA. PROJECT NO: K12020009 HIA Phase 1 20/03/2013 Nkosinathi Godfrey Tomose ENPROCON (Pty) Ltd 06/06/2013 - 13:42
Phase 1 HIA for the Turfvlakte Open Pit Project A Phase 1 Heritage Impact Assessment Study for the Proposed Exxaro Turfvlakte Open Pit Project near Lephalale in the Limpopo Province HIA Phase 1 01/03/2018 Julius CC Pistorius Dr Julius CC Pistorious Archaeologist and heritage Consultant Golder Associates Africa (Pty) Ltd 22/01/2020 - 14:27
Phase 1 HIA for the Turfvlakte Open Pit Project (updated) A Phase 1 Heritage Impact Assessment Study for the Proposed Exxaro Turfvlakte Open Pit Project near Lephalale in the Limpopo Province. HIA Phase 1 01/06/2020 Dr Julius CC Pistorius Dr Julius CC Pistorious Archaeologist and heritage Consultant Golder Associates Africa (Pty) Ltd 06/11/2020 - 06:50

Pages

CSV
 
 

Search form