ReportRef ReportTitle ReportType ReportDatesort descending Authors AuthoringBody CommissioningCompany Post date
Proposed installation of rooftop PV panels, Sexton's House, Evangelical Lutheran Church 22/10/2020 Louise van Riet 22/10/2020 - 12:02
Tau Gas Plant AIA AIA/EIA Report HIA Phase 1 22/10/2020 Mabuda Mmbudziseni Moses Nsovo Environmental Consulting 04/03/2021 - 18:16
Erf 1852: 2 Lion Street Section 34 application: Erf 1852: 2 Lion Street Heritage Statement 23/10/2020 Vidamemoria Heritage Consultants 30/10/2020 - 13:13
Heritage Screener: Great Karoo OHL HERITAGE SCREENING ASSESSMENT FOR BASIC ASSESSMENT PROCESS FOR THE GRID CONNECTION INFRASTRUCTURE, INCLUDING 132KV OVERHEAD POWERLINE, SWITCHING STATION AND ANCILLARIES, FOR THE GREAT KAROO WIND FARM, NORTHERN CAPE Heritage Scoping 23/10/2020 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 30/10/2020 - 15:05
Hhalmense HIA HIA FOR THE HHALMENSE ACCESS ROAD, WARD 2 STULWANE, KZN HIA Phase 1 23/10/2020 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Nzingwe Consultancy 27/05/2021 - 16:30
PHASE 1 HIA REPORT !KHEIS TOWNSHIP EXPANSION GROBLERSHOOP NORTHERN CAPE VERSION 2 PROPOSED TOWNSHIP EXPANSION ON PORTION 16 FARM BOEGOEBERGNEDERSETTING RE/48, GROBLERSHOOP, !KHEIS LOCAL MUNICIPALITY, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE. HIA Phase 1 24/10/2020 Heidi Fivaz, Jan Engelbrecht, Elize Butler UBIQUE HERITAGE CONSULTANTS Enviroafrica CC 29/01/2021 - 11:05
AIA FOR THE DEVELOPMENT OF A DAM OAND CONNECTING PIPELINES ON BISMARCK 116 MS, SKUTWATER 115 MS & WEIPE 47 MS IN THE WEIPE AREA, VHEMBE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE DEVELOPMENT OF A DAM ON THE FARMS BISMARCK 116 MS & KONINGSMARK 117 MS AND CONNECTING PIPELINES ON BISMARCK 116 MS, SKUTWATER 115 MS & WEIPE 47 MS IN THE WEIPE AREA, VHEMBE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE AIA Phase 1 25/10/2020 Neels Kruger Exigo Sustainability AGES (PTY) Ltd - Limpopo 27/01/2021 - 13:27
SIB6297 - DBAR Appendix H (Heritage Impact Assessment) Heritage Impact Assessment: Basic Assessment Process for the Closure of the Cooke Underground Operations HIA Phase 1 26/10/2020 Shannon Hardwick, Justin du Piesanie Digby Wells Environmental Sibanye Gold Limited 26/10/2020 - 15:59
HERITAGE SPECIALIST INPUT FOR THE AMENDMENT OF THE ENVIRONMENTAL AUTHORISATION (EA), BOKPOORT SPECIALIST INPUT FOR THE AMENDMENT OF THE ENVIRONMENTAL AUTHORISATION (EA): AS PART OF THE FARM BOKPOORT 390 NEAR GROBLERSHOOP, !KHEIS LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE Heritage Statement 26/10/2020 Johnny Van Schalkwyk ACWA Power Energy Africa (Pty) Ltd 11/12/2020 - 08:52
Draft Basic Assessment Report for Sunny Mining (Pty) Ltd BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT FOR THE APPLICATION OF A PROSPECTING RIGHT WITHOUT BULK SAMPLING SITUATED ON THE FARMS MATJESFONTEIN NO. 97, BLAAUWBLOEMETJES KEEP NO. 95, AND DE VREEDE NO. 133 IN THE ADMINISTRATIVE DISTRICT OF SUTHERLAND, NORTHERN CAPE Conservation Management Plan 27/10/2020 27/10/2020 - 11:18
Desktop Cultural Heritage Scoping Report and Palaeontological Desktop Study Desktop Study of Cultural Heritage Resources of Richtersveld for two prospecting right applications with bulk sampling for alluvial diamonds on the left bank of the Orange River, Richtersveld, Namaqualand, Northern Cape Province of South Africa Heritage Scoping 28/10/2020 Eric Mathoho Millennium Heritage Group Ndi GEOLOGICAL CONSULTING SERVICES PTY LTD 17/11/2020 - 10:53
Brandewynkop CMP CONSERVATION MANAGEMENT PLAN FOR THE PROTECTION OF HERITAGE RESOURCES AT BRANDEWYNKOP, HUMANSDORP MAGISTERIAL DISTRICT, EASTERN CAPE PROVINCE Conservation Management Plan 28/10/2020 Cecilene Muller, Jayson Orton ASHA Consulting(Pty) Ltd Gibson Bay Wind Farm (Pty) Ltd. 01/10/2020 - 07:15
Desktop Cultural Heritage Scoping Report and Palaeontological Desktop Study Desktop Study of Cultural Heritage Resources of Richtersveld, for two prospecting rights with bulk sampling for alluvial diamonds along the Orange River, Richtersveld, Namaqualand, Northern Cape Province of South Africa Heritage Scoping 28/10/2020 Eric Mathoho Millennium Heritage Group Ndi GEOLOGICAL CONSULTING SERVICES PTY LTD 17/11/2020 - 10:13
PIA for the proposed bulk water and sewer pipelines, Hammanskraal West Ext 10 Palaeontological Impact Assessment for the proposed bulk water and sewer pipelines, Hammanskraal West Ext 10 PIA Desktop 29/10/2020 29/10/2020 - 14:23
Umkomanzi Drift housing project Umkomanzi Drift housing project, Craigieburn, eThekwini Municipality, KwaZulu-Natal HIA Phase 1 30/10/2020 Jean Beater JLB Consulting Vuvamu (Pty) Ltd 24/11/2020 - 10:18
Heritage Screening Assessment: Oya OHL Desktop Heritage Screening Assessment: Proposed development of an overhead powerline for the approved Oya PV Facility, Western and Northern Cape Heritage Scoping 30/10/2020 Jenna Lavin CTS Heritage G7 Energies (Pty) Ltd 02/11/2020 - 08:09
Oya WEF Amendment Letter Kudusberg WEF Environmental Authorisation Amendment: Specialist Impact Statement Heritage Impact Assessment Specialist Reports 31/10/2020 Katie Smuts Rennie Scurr Adendorff G7 Energies (Pty) Ltd 19/11/2020 - 11:21
NAZARETH FILLING STATION Phase 1 Cultural Heritage Impact Assessment: THE DEVELOPMENT OF A FUEL FILLING STATION ON PART OF PORTION 119, MIDDELBURG TOWN AND TOWNLANDS 287JS, STEVE TSHWETE LOCAL MUNICIPALITY, MPUMALANGA PROVINCE HIA Phase 1 31/10/2020 J.A. van Schalkwyk Mpumalanga Provincial Heritage Resources Authority 03/02/2021 - 13:00
NAZARETH FILLING STATION HIA Report Phase 1 Cultural Heritage Impact Assessment: THE DEVELOPMENT OF A FUEL FILLING STATION ON PART OF PORTION 119, MIDDELBURG TOWN AND TOWNLANDS 287JS, STEVE TSHWETE LOCAL MUNICIPALITY, MPUMALANGA PROVINCE HIA Phase 1 31/10/2020 J.A. van Schalkwyk Mpumalanga Provincial Heritage Resources Authority 03/02/2021 - 13:04
Droogfontein 3 BESS PROPOSED CONSTRUCTION AND OPERATION OF THE BATTERY ENERGY STORAGE SYSTEM (BESS) AND ASSOCIATED INFRASTRUCTURE FOR THE AUTHORISED DROOGFONTEIN 3 SOLAR PHOTOVOLTAIC (PV) ENERGY FACILITY LOCATED NEAR KIMBERLEY IN THE SOL PLAATJE LOCAL MUNICIPALITY, FRANCIS BAARD DISTRICT MUNICIPALITY, IN THE NORTHERN CAPE PROVINCE OF SOUTH AFRICA. Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 02/11/2020 Wouter Fourie PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 19/05/2021 - 17:01
HERITAGE IMPACT ASSESSMENT HERITAGE IMPACT ASSESSMENT, FOR THE PROPOSED VODACOM PTY LTD 22 KV POWERLINE, DINGLETON, GAMAGARA LOCAL MUNICIPALITY, NORTHERN CAPE HIA Phase 1 02/11/2020 02/11/2020 - 08:33
Heritage Impact Assessment Heritage Resources Management Process for the Rustenburg Base Metals Refinery Bulk Chemical Storage Facility Relocation Project, North West Province Heritage Impact Assessment Specialist Reports 02/11/2020 Shannon Hardwick Digby Wells Environmental 15/07/2021 - 10:03
HIA for proposed Ladysmith development HERITAGE SURVEY OF THE PROPOSED ERF 1 LADYSMITH HOUSING DEVELOPMENT, KZN HIA Phase 1 03/11/2020 Gavin Anderson 20/01/2020 - 13:51
Palaeontological Assessment for the Hankey Sanitation Upgrade PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED UPGRADING OF THE HANKEY SANITATION SYSTEM, KOUGA LOCAL MUNICIPALITY, EASTERN CAPE PROVINCE PIA Desktop 03/11/2020 Elize Butler Banzai Environmental (Pty) Ltd Banzai Environmental (Pty) Ltd 06/11/2020 - 18:19
PROPOSED CONSTRUCTION OF A TELECOMMUNCATION MAST NEAR HANVOVER, NORTHERN CAPE PROVINCE PROPOSED CONSTRUCTION OF A 25M HIGH TELECOMMUNCATION MAST ON REM OF THE FARM ELANDSHEUWEL 146 NEAR HANVOVER, NORTHERN CAPE PROVINCE AIA Desktop 03/11/2020 Jonathan Kaplan, John Almond ACRM Enviroafrica CC 15/11/2020 - 13:46
Motivation for Full Phase 1 HIA Exemption for Weltevredenpark Extension 4 - Erven 710 and 711 MOTIVATION FOR FULL PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) EXEMPTION FOR THE ERVEN 710 & 711 WELTEVREDENPARK EXTENSION 4 HOUSING DEVELOPMENT WITHIN THE JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE HIA Letter of Exemption 03/11/2020 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING K2M Environmental 11/11/2020 - 14:44
Loeriesfontein BESS HIA PROPOSED CONSTRUCTION AND OPERATION OF THE BATTERY ENERGY STORAGE SYSTEM (BESS) AND ASSOCIATED INFRASTRUCTURE FOR THE AUTHORISED LOERIESFONTEIN 3 PV SOLAR ENERGY FACILITY LOCATED NEAR LOERIESFONTEIN IN THE HANTAM LOCAL MUNICIPALITY, NAMAKWA DISTRICT IN THE NORTHERN CAPE PROVINCE OF SOUTH AFRICA Heritage Impact Assessment Specialist Reports 04/11/2020 Wouter Fourie PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 26/05/2021 - 17:22
Platsjambok East BESS HIA PROPOSED CONSTRUCTION AND OPERATION OF THE BATTERY ENERGY STORAGE SYSTEM (BESS) AND ASSOCIATED INFRASTRUCTURE FOR THE AUTHORISED PLATSJAMBOK EAST SOLAR PHOTOVOLTAIC (PV) ENERGY FACILITY, LOCATED NEAR THE TOWN OF PRIESKA, IN THE SIYATHEMBA LOCAL MUNICIPALITY, PIXLEY KA SEME DISTRICT IN THE NORTHERN CAPE PROVINCE OF SOUTH AFRICA. Heritage Impact Assessment Specialist Reports 04/11/2020 Wouter Fourie PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 27/05/2021 - 10:17
street 106586 LETTER OF EXEMPTION FOR STREET 106586, INANDA, KZN HIA Letter of Exemption 04/11/2020 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Hanslab (Pty) Ltd 13/11/2020 - 08:50
Mierdam BESS HIA PROPOSED CONSTRUCTION AND OPERATION OF THE BATTERY ENERGY STORAGE SYSTEM (BESS) AND ASSOCIATED INFRASTRUCTURE AND INCLUSION OF ADDITIONAL LISTED ACTIVITIES FOR THE AUTHORISED MIERDAM PHOTO VOLTAIC (PV) SOLAR ENERGY FACILITY LOCATED NEAR THE TOWN OF PRIESKA, IN THE SIYATHEMBA LOCAL MUNICIPALITY, PIXLEY KA SEME DISTRICT IN THE NORTHERN CAPE PROVINCE OF SOUTH AFRICA. Heritage Impact Assessment Specialist Reports 04/11/2020 Wouter Fourie PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 26/05/2021 - 16:09
Platsjambok West BESS HIA PROPOSED CONSTRUCTION AND OPERATION OF THE BATTERY ENERGY STORAGE SYSTEM (BESS) AND ASSOCIATED INFRASTRUCTURE FOR THE AUTHORISED PLATSJAMBOK WEST SOLAR PHOTOVOLTAIC (PV) ENERGY FACILITY, LOCATED NEAR THE TOWN OF PRIESKA, IN THE SIYATHEMBA LOCAL MUNICIPALITY, PIXLEY KA SEME DISTRICT IN THE NORTHERN CAPE PROVINCE OF SOUTH AFRICA. Heritage Impact Assessment Specialist Reports 04/11/2020 Wouter Fourie PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 26/05/2021 - 16:36
Dwarsrug BESS HIA PROPOSED CONSTRUCTION AND OPERATION OF THE BATTERY ENERGY STORAGE SYSTEM (BESS) AND ASSOCIATED INFRASTRUCTURE FOR THE AUTHORISED DWARSRUG WIND ENERGY FACILITY, LOCATED NEAR LOERIESFONTEIN IN THE HANTAM LOCAL MUNICIPALITY, NAMAKWA DISTRICT IN THE NORTHERN CAPE PROVINCE OF SOUTH AFRICA. Heritage Impact Assessment Specialist Reports 04/11/2020 Wouter Fourie PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 26/05/2021 - 16:56
Arcaheological Assessment for the proposed Hankey Sanitation Upgrade A LETTER OF RECOMMENDATION (WITH CONDITIONS) FOR THE EXEMPTION OF A FULL PHASE 1 ARCHAEOLOGICAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED UPGRADING OF THE HANKEY SANITATION SYSTEM WITHIN THE KOUGA LOCAL MUNICIPALITY OF THE EASTERN CAPE PROVINCE HIA Letter of Exemption 05/11/2020 Johan Binneman Eastern Cape Heritage Consultants Eastern Cape Heritage Consultants 06/11/2020 - 18:15
Zebediela Nickel Mine HIA INTEGRATED HERITAGE IMPACT ASSESSMENT (HIA) ON VARIOUS PORTIONS OF THE FARM UITLOOP 3 KS FOR THE PROPOSED ZEBEDIELA NICKEL MINE PROJECT, MOGALAKWENA LOCAL MUNICIPALITY AND THE WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE HIA Phase 1 05/11/2020 Exigo Sustainability Lesego Platinum Uitloop (Pty) Metals 20/11/2020 - 16:43
PHASE 1 HIA REPORT FOR THE PROPOSED BRAKPAN EXTENSION 12 HOUSING DEVELOPMENT PHASE 1 HIA REPORT FOR THE PROPOSED BRAKPAN EXTENSION 12 HOUSING DEVELOPMENT ON PORTION 51 OF MODDERFONTEIN 76IR IN THE CITY OF EKURHULENI OF GAUTENG HIA Phase 1 05/11/2020 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING K2M Environmental 11/11/2020 - 13:31
Farm Blesboklaagte 296 JS Coal Mining Permit Application on portion of portion 23 of the Farm Blesboklaagte 296 JS Visual Impact Assessment 05/11/2020 SINGO CONSULTING (PTY) LTD Department of Mineral Resources - Mpumalanga 21/10/2020 - 01:21
Draft Basic Assessment Report for Trust Mining and Energy (Pty) Ltd DRAFT BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT FOR THE APPLICATION OF A MINING PERMIT SITUATED ON THE REMAINING EXTENT OF THE FARM RIETPAN 17, IN THE MAGISTERIAL DISTRICT OF WELKOM, FREE STATE Conservation Management Plan 05/11/2020 05/11/2020 - 14:31
PIA Desktop Study - Eldorado Park Proper Project A (Erf 917 & 1913) Eldorado Park Proper Project A Housing Development - Erf 917 & 1913, City of Johannesburg Metropolitan Municipality, Gauteng Province Palaeontological Impact Assessment: Desktop Study PIA Desktop 06/11/2020 Dr. Heidi Fourie Dr Heidi Fourie K2M Environmental 30/11/2020 - 13:31
PIA Desktop Study - Eldorado Park Extension 6 Eldorado Park Extension 6 Housing Development - Erf 6459, City of Johannesburg Metropolitan Municipality, Gauteng Province Palaeontological Impact Assessment: Desktop Study PIA Desktop 06/11/2020 Dr. Heidi Fourie Dr Heidi Fourie K2M Environmental 30/11/2020 - 13:41
PIA Desktop Study - Eldorado Park Extension 7 (Erf 5564) Eldorado Park Extension 7 Housing Development - Erf 5564, City of Johannesburg Metropolitan Municipality, Gauteng Province Palaeontological Impact Assessment: Desktop Study PIA Desktop 06/11/2020 Dr. Heidi Fourie Dr Heidi Fourie K2M Environmental 30/11/2020 - 13:47
Oya WEF Walkdown Report ARCHAEOLOGICAL and PALAEONTOLOGICAL WALKDOWN REPORT for the final layout for the proposed 86MW Oya Wind Energy Facility and associated infrastructure, between Matjiesfontein and Sutherland in the Western and Northern Cape Provinces HIA Phase 3 06/11/2020 Jenna Lavin, Nicholas Wiltshire, Dewald Wilken, Nikki Mann CTS Heritage G7 Energies (Pty) Ltd 12/11/2020 - 13:38
PIA Desktop Study - Eldorado Park Proper Project C - Erf 4793 Eldorado Park Proper Project C Housing Development - Erf 4793, City of Johannesburg Metropolitan Municipality, Gauteng Province Palaeontological Impact Assessment: Desktop Assessment PIA Desktop 06/11/2020 Heidi Fourie Dr Heidi Fourie K2M Environmental 30/11/2020 - 13:56
Oya WEF HMP HERITAGE CONSERVATION MANAGEMENT PLAN for the 86MW Oya Wind Energy Facility and associated infrastructure, between Matjiesfontein and Sutherland in the Western and Northern Cape Provinces HIA Phase 3 06/11/2020 Jenna Lavin CTS Heritage G7 Energies (Pty) Ltd 12/11/2020 - 13:41
Oya WEF Amendment Letter - Palaeontology Kudusberg WEF Environmental Authorisation Amendment: Specialist Impact Statement for Palaeontology Palaeontological Specialist Reports 06/11/2020 Elize Butler Banzai Environmental (Pty) Ltd G7 Energies (Pty) Ltd 19/11/2020 - 11:26
DESKTOP PIA FOR BRAKPAN EXTENSION 12 HOUSING DEVELOPMENT Palaeontological Impact Assessment: Desktop Study for Brakpan Extension 12 Housing Development – Rem of Portion 51 of the Farm Modderfontein City of Ekurhuleni Metropolitan Municipality, Gauteng Province PIA Desktop 06/11/2020 Dr. Heidi Fourie Dr Heidi Fourie K2M Environmental 11/11/2020 - 13:43
Motivation for Full Phase 1 HIA Exemption for Erf 4232 of Eersterust Extension 6 MOTIVATION FOR FULL PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) EXEMPTION FOR THE ERF 4232 EERSTERUST EXTENSION 6 HOUSING DEVELOPMENT WITHIN THE GREATER TSHWANE METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE HIA Letter of Exemption 06/11/2020 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING K2M Environmental 11/11/2020 - 14:21
DESKTOP PIA FOR EERSTERUST EXTENSION 6 HOUSING DEVELOPMENT - ERF 4232 Eersterust Extension 6 Housing Development - Erf 4232 Palaeontological Impact Assessment: Desktop Study PIA Desktop 06/11/2020 Dr. Heidi Fourie Dr Heidi Fourie K2M Environmental 11/11/2020 - 14:28
Heritage Screening Assessment: Richards Bay Powerline Heritage Screening Assessment for the Proposed development of a power line to connect a 400MW gas-to-power plant in the Richards Bay area to the electricity grid, Richards Bay Heritage Scoping 06/11/2020 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 17/11/2020 - 09:59
PIA Exemption Letter for Weltevreden Park Extension 4 Housing Development - Erf 710 & 711 Weltevreden Park Extension 4 Housing Development - Erf 710 & 711, City of Johannesburg Metropolitan Municipality, Gauteng Province Palaeontological Impact Assessment: Exemption Letter Palaeontological Monitoring 06/11/2020 Dr. Heidi Fourie Dr Heidi Fourie K2M Environmental 11/11/2020 - 14:49
D2217 & L1661 Rd upgrade A LETTER OF EXEMPTION FOR UPGRADE OF L1881 AND D2217 ROADS. MSUNDUZI MUNICIPALITY, KZN HIA Letter of Exemption 09/11/2020 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Ecolink 09/11/2020 - 12:09

Pages

CSV
 
 