FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportTypesort descending ReportDate Authors AuthoringBody CommissioningCompany MapID < 2009 Post date
AIA Wrenchville Archaeological Impact Assessment Wrenchville Phase 2 Low Cost Housing Development, RE Erf 1, Kuruman, Northern Cape. Archaeological Specialist Reports 08/10/2019 Jonathan Kaplan 16/10/2019 - 10:00
ARCHAEOLOGICAL DESKTOP STUDY Archaeological Desktop Study for the Proposed Klei Minerale (Pty) Ltd Prospecting Right on Portions 16, 20 and 22 of the Farm Boekenhoutkloof 315 JR, Pretoria, Gauteng Archaeological Specialist Reports 21/07/2023 Tobias Coetzee Tobias Coetzee 18/09/2023 - 15:11
AIA - MTUBATUBA INTERCHANGE DEVELOPMENT ARCHAEOLOGICAL SURVEY OF THE PROPOSED MATUBATUBA DEVELOPMENTS Archaeological Specialist Reports 24/08/2008 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management CTS_127075 08/08/2013 - 13:32
Jagersfontein mine pipeline extension Heritage Impact Assessment of the Proposed Pipeline on subdivision 16 & Remain Extent of the farm Jagersfontein no. 14 in the Magisterial District of Xhariep, Free State Province Archaeological Specialist Reports 05/02/2013 Loudine Philip 11/02/2013 - 11:27
Heritage - Transalloys Archaeological Scoping Report for the Proposed Establishment of the Transalloys Coal-Fired Power Plant near Witbank, Mpumalanga Province Archaeological Specialist Reports 01/11/2013 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 25/11/2013 - 15:54
HERITAGE SURVEY OF THE OFFICE PARK ERF 1874, STUTTERHEIM, EASTERN CAPE Archaeological Specialist Reports 31/03/2013 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Amathole District Municipality 12/04/2013 - 12:32
AIA-TewaIsithaPV1 Archaeological Impact Assessment for the proposed Tewa Isitha Solar 1 PV Facility East Of Upington, Northern Cape Province. Archaeological Specialist Reports 02/12/2015 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 09/12/2015 - 12:51
Archaeological Assessment - FEIR Archaeological Specialist Reports 30/04/2016 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 25/10/2016 - 10:37
Matsheketsheni Cultural Heritage Report CULTURAL HERITAGE IMPACT ASSESSMENT OF THE MATSHEKETSHENI 20MVA 132/88kV SUBSTATION AND ASSOCIATED POWERLINES Archaeological Specialist Reports 20/10/2014 Frans Prins Department of Environmental Affairs Eskom Holdings SOC Ltd Land Development KZN 07/09/2019 - 03:53
Heritage Impact Assessment Report for PV facility on the Farm Adams 328 REPORT ON A HERITAGE IMPACT ASSESSMENT (AIA) FOR THE PROPOSED PHOTO-VOLTAIC SOLAR POWER GENERATION PLANT ON THE FARM ADAMS 328 NEAR HOTAZEL IN THE NORTHERN CAPE Archaeological Specialist Reports 01/04/2012 Anton Pelser Aurora Power Solutions - APS Invest One EScience Associates (Pty) Ltd 02/10/2012 - 11:02
Meletse Iron Ore Project - Final Amended EIAR Meletse Iron Ore Project: Heritage studies Archaeological Specialist Reports Sidney Miller, John E Almond, Prof C.J van Vuuren, Julius CC Pistorius African Heritage Consultants CC, Natura Viva CC, Department of Anthropology and Archaeology, UNISA, Dr Julius CC Pistorious Archaeologist and heritage Consultant Shangoni Management Services CTS_191857 06/02/2015 - 10:44
HIA report Gemsbok Solar PV1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED GEMSBOK SOLAR PV1 FACILITY, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE Archaeological Specialist Reports 21/07/2014 Jayson Orton Department of Environmental Affairs Mulilo Renewable Project Developments (Pty) Ltd 13/01/2015 - 15:45
Heritage Report_Mixed Use Development_Waterfall ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT APPLICATION FOR ENVIRONMENTAL AUTHORISATION Archaeological Specialist Reports 02/10/2023 Roy Muroyi Tsimba Archaeological Footprints (Pty) Ltd 26/10/2023 - 14:18
Samancor Tweefontein Phase 1 AIA Report for Sylvania Tweefontein Section Archaeological Specialist Reports 17/09/2020 Anton Pelser Samancor Chrome - Eastern Chrome Mines 14/10/2021 - 08:01
Mdoni Shelter Site Management Plan Management Plan: Mdoni rock art site, Lapalala Wilderness, Lephalale Local Municipality, Waterberg District Municipality, Limpopo Province, South Africa Archaeological Specialist Reports 18/04/2023 Jeremy Hollmann 18/04/2023 - 09:51
FS 30/5/1/1/2/10300 PR Baden-Baden HERITAGE AND ARCHAEOLOGICAL IMPACT ASSESSMENT: CASE: FS 30/5/1/1/2/10300 PR Archaeological Specialist Reports 03/03/2015 De Beers Consolidated Mines (Pty) Ltd 24/03/2015 - 14:17
Openwater HIA Heritage Impact Assessment at the site of proposed irrigation development on the farm Openwater near Upington, Northern Cape Archaeological Specialist Reports 10/04/2018 David Morris Ecological Management Services 25/05/2018 - 14:48
FibreCo Repeater Sites_ Route 3_Heritage_2015 FibreCo Telecommunications Ltd (FibreCo) was given environmental authorisation (EA) by the Department of Environmental Affairs in 2011 to construct and operate a fibre optic data cable along the national road between Cape Town and Durban (divided into three routes for assessment and authorisation purposes – routes 3, 4 and 5). An agreement reached between FibreCo and other telecommunication companies regarding the construction of the Cape-Durban route has resulted in changes to Route 3 (this project). Routes 4 and 5 have been assessed and discussed in a separate report. Archaeological Specialist Reports 20/05/2015 Celeste Booth SRK Consulting (Pty) Ltd - Pretoria 20/05/2015 - 14:38
ARCHAEOLOGICAL IMPACT ASSESSMENT ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED EXTENSION OF TORMIN MINE, WEST COAST, SOUTH AFRICA: ARCHAEOLOGICAL IMPACT ASSESSMENT Archaeological Specialist Reports 01/05/2018 Dave Halkett ACO Associates CC 20/09/2018 - 09:20
UMFOLOZI THETHA FINAL WALKDOWN REPORT Archaeological and Heritage Phase 2 EMP Walk down for proposed 765kv Umfolozi –Thetha powerline from Umfolozi Substation to the new Empangeni substationsin KwaZulu NatalProvince Archaeological Specialist Reports 01/09/2013 McEdward Murimbika Nzumbululo Heritage Solutions Eskom - Megawatt Park 16/01/2014 - 08:30
Heritage report Historical and Archaeological Heritage environmental authorisation amendment report: Khangela Emoyeni Wind Energy Facility near Richmond in the Northern Cape Archaeological Specialist Reports 01/09/2020 John Gribble 23/09/2020 - 15:49
Palmietfontein_Ventersdorp_AIA_Revised+desktop Palmietfontein_Ventersdorp_AIA_Revised+desktop Archaeological Specialist Reports 22/02/2020 Tobias Coetzee 28/02/2020 - 11:05
AIA: Wag n Bietjie Infrastructure ARCHAEOLOGICAL SPECIALIST STUDY In terms of Section 38(8) of the NHRA for a Proposed Development of the Wag n Bietjie infrastructure associated with the authorised PV Facilities near De Aar AIA Phase 1 26/11/2021 Nicholas Wiltshire, Jenna Lavin CTS Heritage Landscape Dynamics Environmental Consultants 25/04/2022 - 15:19
AIA_Ghaap_abattoir_Fourie_W_Jul11 Ghaap Abattoir: Cadastral coundary: A portion of Erf 1, Kuruman, Ga-Segonyana Municiapality, Northern Cape Province AIA Phase 1 27/07/2011 Wouter Fourie PGS Heritage and Grave Relocation Consultants 16/06/2012 - 14:45
AIA_Noodhulp_Caravan_Park_Huffman_TN_Feb08 Historic Impact Assessment for the Noodhulp Caravan Park, Bela Bela, Limpopo AIA Phase 1 01/02/2008 Thomas Huffman University of the Witwatersrand - Archaeological Resources Management MAPID_01667 16/06/2012 - 14:48
Final report on the results of a cultural heritage walk-down for the final EMP for the Spitskop-Marang 400 kv Eskom power line between Rustenburg and Northam Final report on the results of a cultural heritage walk-down for the final EMP for the Spitskop-Marang 400 kv Eskom power line between Rustenburg and Northam AIA Phase 1 01/01/2008 Anton van Vollenhoven, Anton Pelser Archaetnos CC 16/06/2012 - 08:54
AIA FOR THE PROPOSED NIGEL DIESEL DEPOT, NIGEL, EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF AREAS DEMARACTED FOR THE PROPOSED NIGEL DIESEL DEPOT ON PORTION 36 OF THE FARM VARKENSFONTEIN 169IR, EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE AIA Phase 1 01/03/2016 Neels Kruger Exigo Sustainability AGES (PTY) Ltd - Limpopo 13/04/2016 - 20:13
AIA_Struisbult_PV_2502_Orton_J_Feb12 HERITAGE IMPACT ASSESSMENT FOR A PROPOSED PHOTOVOLTAIC ENERGY PLANT ON THE FARM VOGELSTRUISBULT NEAR COPPERTON, NORTHERN CAPE AIA Phase 1 09/02/2012 Jayson Orton ACO Associates CC 16/06/2012 - 14:50
9-2-069-0002-20070821-CA Archaeological Impact Assessment: Tomis Abattoir Compost Facility (Farm Annex Schoongezicht 254/5, Division Tulbagh, Drakenstein Municipality, Western Cape) AIA Phase 1 21/08/2007 Hilary Deacon MAPID_02876 16/06/2012 - 14:36
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT WALMER STORMWATER DETENTION PONDS AND ASSOCIATED INFRASTRUCTURE, PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT WALMER STORMWATER DETENTION PONDS AND ASSOCIATED INFRASTRUCTURE, ERVEN 1935 AND 7006, WALMER, NELSON MANDELA BAY MUNICIPALITY, EASTERN CAPE, SOUTH AFFRICA AIA Phase 1 08/03/2013 Karen Van Ryneveld ArchaeoMaps Archaeological Consultancy Mbombela Local Municipality 21/11/2013 - 16:27
Archaeological Impact Assessment for Humansrus Solar PV Energy Facility 1 Archaeological Impact Assessment: Proposed Construction of Humansrus Solar PV Energy Facility 1 (previously named RE Capital 13 Solar Development) on the Remainder of the Farm Humansrus 147 near Copperton, Northern Cape (Assessment conducted under Section 38 (8) of the National Heritage Resources Act No 25 of 1999). AIA Phase 1 30/11/2014 Lita Webley ACO Associates CC Humansrus Solar PV Energy Facility 1 (Pty) Ltd. 03/02/2015 - 14:07
AIA FOR THE PROPOSED DOOR OF HOPE VILLAGE PROJECT, SEDIBENG DISTRICT MUNICIPALITY, GAUTENG PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON A PORTION OF THE FARM HARTSENBERGFONTEIN 332I FOR THE PROPOSED DOOR OF HOPE VILLAGE PROJECT, SEDIBENG DISTRICT MUNICIPALITY, GAUTENG PROVINCE AIA Phase 1 21/10/2019 Neels Kruger Exigo3 Sustainability Coastal & Environmental Services - East London 28/02/2020 - 15:26
AIA_Graceview_Industrial_Park_Huffman_TN_May07 Archaeological Impact Assessment for the Graceview Industrial Park, Gauteng AIA Phase 1 01/05/2007 Thomas Huffman University of the Witwatersrand - Archaeological Resources Management MAPID_00494 16/06/2012 - 14:45
13/Gibb/Melkhout Phase 1 Archaeological Impact Assessment Report: Proposed 132kV Power Line and Substation Infrastructure, Melkhout-Dieprivier, Kouga Local Municipality, Cacadu District, Eastern Cape Province, South Africa AIA Phase 1 08/05/2013 Elizabeth Wahl, Len van Schalkwyk eThembeni Cultural Heritage GIBB Engineering & Science - Port Elizabeth 20/05/2013 - 14:43
Old Creamery Winburg First Phase Archaeological and Heritage Investigation of the proposed Liquid and Solid Fertiliser Production Facililty at the Old Creamery, Winburg, Free State. AIA Phase 1 16/04/2012 Cobus Dreyer Pr. Aracheologist/Heritage Specialist 30/07/2012 - 15:20
AIA_Zeerust_graves_PLOT_1242_Pelser_AJ_Nov07 A Report on the Preliminary Investigation of Two Historical Graves on Plot 1242, Zeerust, Northwest Province AIA Phase 1 01/11/2007 Anton Pelser, Anton van Vollenhoven Archaetnos CC MAPID_02507 16/06/2012 - 14:51
9-2-266-0001-20060301-ACHMC A Phase 1 Heritage Impact Assessment (HIA) Study for a Proposed New Residential Development on the Farm Vlakfontein 723 KS near Marble Hall in the Mpumalanga Province, South African AIA Phase 1 01/03/2006 Julius CC Pistorius MAPID_01162 16/06/2012 - 14:40
9-2-111-0011-20031001-ACO Heritage Scoping Assessment of Linden Farm, (Erven 1630 and 1592) Hout Bay AIA Phase 1 01/10/2003 Timothy Hart ACO Associates CC MAPID_00146 16/06/2012 - 14:37
9-2-009-0001-20060718-AlbMus Heritage Impact Assessment of the Proposed Location for the Sewage Works at Nolukhanyo, Bathurst, Eastern Cape AIA Phase 1 18/07/2006 Lita Webley Albany Museum MAPID_00728 16/06/2012 - 14:33
9-2-012-0023-20050105b-ACRM Archaeological Assessment: Metropolitan Cemetery Study Phase II -Klip West (Phase 2&1) AIA Phase 1 05/01/2005 Jonathan Kaplan Agency for Cultural Resources Management MAPID_00076 16/06/2012 - 14:34
AIA_Malgaskraal_142_Mining_Nilssen_PJ_Apr07 Archaeological Impact Assessment Portion 2 of the Farm Malgaskraal 142 Rem, District of George, Western Cape Province: Application for Mining Right - Extension of Witfontein Quarry AIA Phase 1 17/04/2007 Peter Nilssen Centre for Archaeological Resource Management cc MAPID_01893 16/06/2012 - 14:47
9-2-052-0029-20040623-PAHS Preliminary Archaeological and Historical Investigation of the Proposed Residential Developments at the Golf Estate, Plettenberg Bay AIA Phase 1 23/06/2004 Cobus Dreyer MAPID_01615 16/06/2012 - 14:35
AIA_Falcon_Ridge_Avery_G_Jan05 Survey for Archaeological Occurrences on Proposed Development on the Falcon Ridge Private Wildlife Sanctuary (3420 AD Wydgelee) AIA Phase 1 22/01/2005 Graham Avery Iziko: South African Museum MAPID_01351 16/06/2012 - 14:45
AIA_Mount_Savannah_2nd_Huffman_TN_Dec04 Archaeological Investigation for Mount Savannah, Second Report AIA Phase 1 01/12/2004 Thomas Huffman University of the Witwatersrand - Archaeological Resources Management 16/06/2012 - 14:48
AIA_Skilpadhek_Border_Post_Van_Vollenhoven_AC_Oct07 A Report on a Cultural Heritage Impact Assessment at the Site for the Proposed Upgrading of the Skilpadhek Border Post, Northwest Province AIA Phase 1 01/10/2007 Anton van Vollenhoven, Anton Pelser Archaetnos CC MAPID_03261 16/06/2012 - 14:50
AIA_Riverwalk_-_Roodepoort_504JR_Coetzee_FP_Aug08 Cultural Heritage Survey of the Proposed Riverwalk Township Development on the Remainder of the Farm Roodepoort 504 JR, Gauteng Province AIA Phase 1 01/08/2008 Francois P Coetzee University of South Africa - Anthropology and Archaeology MAPID_02369 16/06/2012 - 14:49
AIA OF A DEMARCATED SURFACE PORTION ON THE FARM MACHOROGAN 106 FOR THE PROPOSED ANJUTONE PHOTOVOLTAIC POWER PLANT AND POWER LINE DEVELOPMENT ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF A DEMARCATED SURFACE PORTION ON THE FARM MACHOROGAN 106 FOR THE PROPOSED ANJUTONE PHOTOVOLTAIC POWER PLANT AND POWER LINE DEVELOPMENT, FRANCES BAARD DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE AIA Phase 1 30/11/2013 Neels Kruger AGES (PTY) Ltd - Pretoria Vidigenix 20/02/2014 - 15:39
AIA FOR THE DEVELOPMENT OF THE NEW HOPE 1, 2, 3, 4 SOLAR PARKS, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE DEVELOPMENT OF THE NEW HOPE 1, 2, 3, 4 SOLAR PARKS ON THE REMAINING EXTENT OF THE FARM N’ROUGAS ZUID 121, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE AIA Phase 1 20/04/2021 Neels Kruger Exigo Sustainability AGES (PTY) Ltd - Limpopo 24/06/2021 - 08:52
AIA_Kromme_Valley_113_Vodacom_Kaplan_JM_May08 Archaeological Impact Assessment: Proposed Vodacom Base Station and Connecting Powerline on the Farm Kromme Valley No. 115 Clanwilliam AIA Phase 1 26/05/2008 Jonathan Kaplan Agency for Cultural Resources Management MAPID_02690 16/06/2012 - 14:47
9-2-257-0009-20080501-RRCRC Phase 1 Heritage Resources Scoping Report Residential Development Ohrigstadt, Mpumalanga AIA Phase 1 01/05/2008 Frans Roodt R & R Cultural Resource Consultants MAPID_02224 16/06/2012 - 14:40