FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRefsort ascending ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany MapID < 2009 Post date
AIA Naauwpoort A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED ESTABLISHMENT OF THE NAAUWPOORT SOLAR ENERGY FACILITY ON THE REMAINDER OF THE FARM NAAUWPOORT 1, NEAR NOUPOORT, UMSOBOMVU MUNICIPALITY, NORTHERN CAPE PROVINCE AIA Phase 1 01/12/2012 Celeste Booth, Sholeen Shanker Albany Museum Savannah Environmental (Pty) Ltd 26/02/2013 - 16:24
AIA N8 Realignment FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE PROPOSED REALIGNMENT OF THE N8 NATIONAL ROAD BETWEEN THE R26/N8 INTERSECTION & MASERU BRIDGE BORDER POST, LADYBRAND, FREE STATE AIA Phase 1 03/06/2013 Cobus Dreyer 18/06/2015 - 10:14
AIA N8 Realignment FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE PROPOSED REALIGNMENT OF THE N8 NATIONAL ROAD BETWEEN THE R26/N8 INTERSECTION & MASERU BRIDGE BORDER POST, LADYBRAND, FREE STATE AIA Phase 1 03/06/2013 Cobus Dreyer 18/06/2015 - 10:19
AIA Muisvlakte ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED ESKOM MUISVLAKTE BATTERY ENERGY STORAGE SYSTEM ON PORTION 3 OF THE FARM GYPSYM 5, PORT NOLLOTH, NORTHERN CAPE AIA Phase 1 04/02/2019 Jonathan Kaplan EIM Environmental Services cc 04/02/2019 - 12:34
AIA Mosito Mining Rooifontein 1722 Phase 1 Archaeological Impact Assessment for a mining permit application on the remainder of the Farm Du Toitspan 119 (Now Rooifontein 1722), District of Boshof, Free state Province HIA Phase 1 09/02/2017 Lloyd Rossouw National Museum Bloemfontein 10/02/2017 - 11:35
AIA Morokweng Filling Station ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED MOROKWENG FILLING STATION AND SHOPPING CENTRE, NORTH WEST PROVINCE AIA Phase 1 17/01/2017 Jaco van der Walt Heritage Contracts and Archaeological Consulting LEAP - Lanscape Architect Environmental Planner 08/06/2017 - 09:42
AIA Monitoring, Elephant Point First Progress Report on the Archaeological Monitoring of construction activity at Elephant Point located on Portion 10 of the farm Belfast 291 KU, Mpumalanga Province. Archaeological Monitoring 13/08/2012 Jean-Pierre Celliers Kudzala Antiquity Eco8 Environmental Planners CTS_116795 05/04/2013 - 11:36
AIA Mokopane Y Junction, Limpopo Province AIA FOR THE PROPOSED WATER SUPPLY PIPELINE LINKING EXISTING PIPELINES AT THE PERCY FYFE Y-JUNCTION AND THE MOKOPANE HIGH RESERVOIR, LIMPOPO PROVINCE AIA Phase 1 27/10/2014 Jaco van der Walt Heritage Contracts and Archaeological Consulting Tekplan Environmental 10/11/2014 - 14:36
AIA Mogalakwena PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT for ENVASS (Pty) Ltd on erf 1 of Masehlaneng and erf 1480 of Sekgakgapeng, Mokopane, Limpopo AIA Phase 1 24/02/2017 Tobias Coetzee 16/03/2017 - 15:42
AIA Meyerton Archaeological Impact Assessment for Meyerton Mall and Residential Development on Portion 64 of Portion 81 of the Farm Rietfontein 364IQ, Meyerton, Gauteng, Province. AIA Phase 1 11/05/2017 26/05/2017 - 11:40
AIA MELKSTROOM UPINGTON 4 FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE HOUSING DEVELOPMENTS AT MELKSTROOM 563, UPINGTON, NORTHERN CAPE AIA Phase 1 06/05/2013 Neil Devenish MDA Town and Regional Planners MDA Town and Regional Planners 16/05/2013 - 19:41
AIA MELKSTROOM HOUSING UPINGTON FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE HOUSING DEVELOPMENTS AT MELKSTROOM 563, UPINGTON, NORTHERN CAPE AIA Phase 1 18/04/2013 Cobus Dreyer MDA Town and Regional Planners 22/04/2013 - 16:06
AIA Lot 1768 Kakamas South Heritage Impact Assessment of proposed sand mining in the bed of the Hartebees River on Lot 1768 Kakamas South, near Kakamas, Northern Cape. AIA Phase 1 17/12/2017 David Morris Archaeology department, McGreggor Museum Archaeology department, McGreggor Museum 17/01/2018 - 07:15
AIA Lomoteng 669 Baseline Archaeological Reconnaissance Report on the Farm Lomoteng 669, North of Postmasburg in the Siyanda District Municipality of the Northern Cape Province AIA Phase 1 Peter Beaumont 27/02/2015 - 13:51
AIA Lohatlha 673 Phase 1 Archaeological Impact Assessment Report on Three Portions of the Farm Lohatlha 673 North of Postmasburg, Siyanda District Municipality, Northern Cape Province AIA Phase 1 14/10/2008 Peter Beaumont McGregor Museum Geo-Rock International 22/03/2013 - 14:26
AIA Loeriesfontein Orlight Transmission Lines HERITAGE IMPACT ASSESSMENT: PROPOSED LOERIESFONTEIN PHOTO-VOLTAIC SOLAR POWER PLANT ON PORTION 5 OF THE FARM KLEIN ROOIBERG 227, NORTHERN CAPE PROVINCE HIA Phase 1 01/04/2012 Lita Webley, Dave Halkett ACO Associates CC Digby Wells Environmental 11/06/2012 - 14:34
AIA LOE Namaqua Water Supply RECOMMENDED EXEMPTION FROMFURTHER ARCHAEOLOGICALSTUDIES: THE PROPOSED NAMAQUA REGIONAL WATER SUPPLY SCHEME BETWEEN HENKRIES AND STEINKOPF, NORTHERN CAPE PROVINCE AIA Desktop 01/07/2012 Jonathan Kaplan Agency for Cultural Resources Management Enviroafrica CC 16/08/2012 - 08:45
AIA Leithlo Resort Cultural Heritage Resources Impact Assessment of Erf 5041 (Portion of Erf 1) Kuruman Municipality Ga-Segonyana Administrative District Northern Cape AIA Phase 1 02/06/2011 Udo Kusel African Heritage Consultants CC AB Enviro Consult CC 11/06/2012 - 11:59
AIA Kyalami Corner, Gauteng Province ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED KYALAMI CORNER BUSINESS DEVELOPMENT, GAUTENG PROVINCE AIA Phase 1 30/06/2016 Jaco van der Walt Heritage Contracts and Archaeological Consulting LEAP - Lanscape Architect Environmental Planner 15/09/2016 - 11:53
AIA Kwanonkqubela Alexandria Community Health Centre, Erf 623, Alexandria A LETTER OF RECOMMENDATION (WITH CONDITIONS) FOR THE EXEMPTION OF A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED KWANONKQUBELA ALEXANDRIA COMMUNITY HEALTH CENTRE ON ERF 623, ALEXANDRIA, NDLAMBE LOCAL MUNICIPALITY, EASTERN CAPE PROVINCE AIA Phase 1 09/12/2014 Celeste Booth CEN Integrated Environmental Management Unit 30/01/2015 - 16:35
AIA Kwandwe Development A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED CONSTRUCTION OF AN AIRSTRIP AND FAMILY LODGE ON PORTION 3 (KOODOOS RUN) (A PORTION OF PORTION 2) OF THE FARM NOOITGEDAGT NO. 92 AND PORTION 2 (THE FORT) OF THE FARM KOESTERS DRIFT NO. 129, KWANDWE PRIVATE GAME RESERVE IN THE ALBANY DISTRICT, EASTERN CAPE PROVINCE Amended to: A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT OF TWO PROPOSED SITES FOR THE CONSTRUCTION OF A FAMILY LODGE ON THE ABOVE PROPERTY AIA Phase 1 01/08/2013 Johan Binneman Eastern Cape Heritage Consultants CEN Integrated Environmental Management Unit 17/10/2013 - 12:16
AIA Krone-Endora Mining Right Application Areas Archaeological Impact Assessment of the proposed Krone-Endora Diamond Mine (Mining Rights Applications 10011MR & 10017MR) on portions of farms Krone 104MS and Endora 66MS near Alldays, Musina, Limpopo Province AIA Phase 1 24/04/2014 Shadreck Chirikure, Foreman Bandama Department of Mineral Resources EcoPartners 25/04/2014 - 14:35
AIA Klipspruit Shopping Centre AIA FOR THE PROPOSED ESTABLISHMENT OF A SHOPPING CENTRE ON PORTION 14 OF THE REMAINDER OF PORTION 1 OF THE FARM KLIPSPRUIT NO. 870-KS, LIMPOPO AIA Phase 1 15/11/2015 Jaco van der Walt Heritage Contracts and Archaeological Consulting METHALE ENVIRONMENTAL CONSULTING 19/01/2016 - 20:26
AIA Khumani Housing Erven 83 & 2467, Kuruman A REPORT ON ARCHAEOLOGICAL IMPACT ASSESSMENTS (AIA’S) FOR PROPOSED HOUSING DEVELOPMENTS ON ERVEN 83 AND 2467, KURUMAN, IN THE NORTHERN CAPE AIA Phase 1 01/06/2012 Anton Pelser Erioloba Consulting 07/06/2012 - 12:16
AIA Kenhardt Transmission Lines Orlight HERITAGE IMPACT ASSESSMENT: PROPOSED KENHARDT PHOTO-VOLTAIC SOLAR POWER PLANT ON REMAINDER OF THE FARM KLEIN ZWART BAST 188, NORTHERN CAPE PROVINCE HIA Phase 1 01/04/2012 Lita Webley, Dave Halkett ACO Associates CC Digby Wells Environmental 11/06/2012 - 14:29
AIA Kangala Discard EIA ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED KANGALA COAL MINE ON PORTIONS 1 AND REMAINING EXTENT OF PORTION 2 OF WOLVENFONTEIN 244 IR IN THE DELMAS AREA, MPUMALANGA PROVINCE Archaeological Specialist Reports Wouter Fourie, Marike Fourie Digby Wells Environmental, PGS Grave Solutions Environmental Impact Management Services (Pty) Ltd 06/07/2021 - 15:12
AIA K97 Road Upgrade Archaeological Impact Assessment For the proposed K97 Road in Bon Accord, Pretoria North, Gauteng Province. AIA Phase 1 19/11/2014 Jaco van der Walt Heritage Contracts and Archaeological Consulting Envirolution Consulting (Pty) Ltd 20/11/2014 - 05:50
AIA Junction 21 Archaeological Impact Assessment Report for the Junction 21 Township Development, Gauteng. AIA Phase 1 13/04/2013 Jaco van der Walt Heritage Contracts and Archaeological Consulting 23/08/2013 - 12:27
AIA Jan Smuts Upgrade Archaeological Impact Assessment for the proposed Jan Smuts Carriage Way, Gauteng Province AIA Phase 1 13/03/2017 Jaco van der Walt Heritage Contracts and Archaeological Consulting Envirolution Consulting (Pty) Ltd 19/06/2018 - 09:28
AIA Jan Kempdorp Infill Heritage Impact Assessment (Archaeology) for the proposed Guldenskat Residential Development, Jan Kempdorp, Northern Cape AIA Phase 1 31/07/2019 David Morris Archaeology department, McGreggor Museum NSVT Consultants 20/08/2019 - 14:30
AIA Ishwati Emoyeni Combined Environmental Impact Assessment for the proposed Ishwati Emoyeni Wind Energy Facility and Supporting Eskom Transmission and Eskom Distribution Grid Connection Infrastructure near Murraysburg, Western Cape. Chapeter 13: Archaeology Impact Assessment. AIA Phase 1 01/01/2014 Dave Halkett ACO Associates CC Council for Scientific and Industrial Research CTS_251296 02/03/2015 - 10:56
AIA Inkululeko Carolus Poort 553 A Phase 1 Archaeological Impact Assessment for the Proposed Establishment of the Inkululeko Solar Energy Facility on Portion 2 of the Farm Carolus Poort 167, near Noupoort, Northern Cape Province AIA Phase 1 01/04/2012 Celeste Booth Albany Museum Savannah Environmental (Pty) Ltd 19/06/2012 - 08:39
AIA Inchanga Development in Cliffdale ARCHAEOLOGICAL SURVEY OF THE PROPOSED DEVELOPMENT IN CLIFFDALE AIA Phase 1 09/10/2008 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Kerry Seppings Environmental Management CTS_305271 03/07/2015 - 09:45
AIA Hydra-Persus in various cases file Hydra-Perseus and Beta-Perseus 765KV Transmission Power Lines Environmental Impact Assessment. Impact on Cultural Heritage Resources AIA Phase 1 31/03/2006 A Van Jaarsveld Arcus Gibb (Pty) Ltd 03/10/2014 - 10:33
AIA Hillendale Mine September 2008 survey The Archaeological Survey of the Hillendale Mine September 2008 AIA Phase 1 01/09/2008 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Exxaro Resources CTS_305243 03/07/2015 - 09:24
AIA Hillendale Mine September 2008 The Archaeological Survey of the Hillendale Mine September 2008 AIA Phase 1 01/09/2008 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Exxaro Resources CTS_305218 03/07/2015 - 09:06
AIA Hillendale Mine Sep 2009 The Archaeological Survey of the Hillendale Mine September 2009 AIA Phase 1 01/10/2009 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Exxaro Resources CTS_309707 06/07/2015 - 10:22
AIA Hillendale Mine October 2007 The Archaeological Survey of the Hillendale Mine October 2007 AIA Phase 1 07/10/2007 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Exxaro Resources CTS_305509 03/07/2015 - 12:48
AIA Hillendale Mine November 2008 survey The Archaeological Survey of the Hillendale Mine November 2008 AIA Phase 1 01/11/2008 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Exxaro Resources CTS_305238 03/07/2015 - 09:21
AIA Hillendale Mine May 2006 The archaeological survey of the Hillendale Mine, Ticor, KwaZulu-Natal AIA Phase 1 02/06/2006 Gavin Anderson, Louise Anderson Umlando: Archaeological Surveys & Heritage Management CTS_304040 02/07/2015 - 14:08
AIA Hillendale Mine March 2009 The Archaeological Survey of the Hillendale Mine March 2009 AIA Phase 1 06/04/2009 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Exxaro Resources CTS_309717 06/07/2015 - 10:29
AIA Hillendale Mine June 2007 The Archaeological Survey of Hillendale Mine June 2007 AIA Phase 1 06/06/2007 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Exxaro Resources CTS_305506 03/07/2015 - 12:46
AIA Hillendale Mine June 2006 The archaeological survey of the Hillendale Mine, Ticor, KwaZulu-Natal AIA Phase 1 02/07/2006 Gavin Anderson, Louise Anderson Umlando: Archaeological Surveys & Heritage Management CTS_304036 02/07/2015 - 14:05
AIA Hillendale Mine July 2007 The Archaeological Survey of Hillendale Mine July 2007 AIA Phase 1 10/07/2007 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Exxaro Resources CTS_305502 03/07/2015 - 12:43
AIA Hillendale Mine Jan 2008 survey ARCHAEOLOGICAL SURVEY AT HILLENDALE MINE January 2008 AIA Phase 1 04/02/2008 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Exxaro Resources CTS_305222 03/07/2015 - 09:09
AIA Hillendale Mine Feb 2009 The Archaeological Survey of the Hillendale Mine February 2009 AIA Phase 1 01/02/2009 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Exxaro Resources CTS_309712 06/07/2015 - 10:26
AIA Hillendale Mine August 2008 The Archaeological Survey of the Hillendale Mine August 2008 AIA Phase 1 01/08/2008 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Exxaro Resources CTS_305213 03/07/2015 - 09:03
AIA Hillendale Mine April 2007 The archaeological survey of Hillendale Mine: April 2007 AIA Phase 1 30/04/2007 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Exxaro Resources CTS_305490 03/07/2015 - 12:35
AIA Hillendale Mine April 2007 The archaeological survey of Hillendale Mine: April 2007 AIA Phase 1 13/04/2007 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Exxaro Resources CTS_305498 03/07/2015 - 12:41
AIA Hillendale Mine Apr 2008 Survey The Archaeological Survey of the Hillendale Mine Apr 2008 AIA Phase 1 11/04/2008 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Exxaro Resources CTS_305297 03/07/2015 - 08:59