THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 15901 - 15950 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
AIA FOR THE PROPOSED TWICKENHAM ROADS UPGRADE PROJECT IN THE STEELPOORT AREA, LIMPOPO PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED TWICKENHAM ROADS UPGRADE PROJECT IN THE STEELPOORT AREA, GREATER TUBATSE LOCAL MUNICIPALITY, LIMPOPO PROVINCE | AIA Phase 1 | 18/07/2016 | Neels Kruger | Exigo Sustainability | AGES (PTY) Ltd - Limpopo | 13/12/2016 - 11:48 |
AIA FOR THE PROPOSED TWICKENHAM ROADS UPGRADE PROJECT IN THE STEELPOORT AREA, LIMPOPO PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED TWICKENHAM ROADS UPGRADE PROJECT IN THE STEELPOORT AREA, GREATER TUBATSE LOCAL MUNICIPALITY, LIMPOPO PROVINCE | AIA Phase 1 | 18/07/2016 | Neels Kruger | Exigo Sustainability | AGES (PTY) Ltd - Limpopo | 13/12/2016 - 11:49 |
AIA FOR THE PROPOSED TRANSNET WATERBERG RAIL CORRIDOR EXPANSION PROJECT (MARAKELE LOOP) IN THE WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF DEMARACTED AREAS ON A PORTION OF BLAAUWPAN 133KQ FOR THE PROPOSED TRANSNET WATERBERG RAIL CORRIDOR EXPANSION PROJECT (MARAKELE LOOP) IN THE WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | AIA Phase 1 | 05/04/2018 | Neels Kruger | Exigo Sustainability | EOH Coastal & Environmental Services (CES) - East London | 20/04/2018 - 08:21 |
AIA FOR THE PROPOSED TRANSNET WATERBERG RAIL CORRIDOR EXPANSION PROJECT (DIEPSPRUIT LOOP) IN THE WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF DEMARACTED AREAS ON PORTIONS OF ROOIPAN 357LQ AND ZANDFONTEIN 382LQ FOR THE PROPOSED TRANSNET WATERBERG RAIL CORRIDOR EXPANSION PROJECT (DIEPSPRUIT LOOP) IN THE WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | AIA Phase 1 | 05/04/2018 | Neels Kruger | Exigo Sustainability | EOH Coastal & Environmental Services (CES) - East London | 20/04/2018 - 08:17 |
AIA FOR THE PROPOSED TRANSNET HEYSTERKRAND RAILWAY LOOP PROJECT IN THE BOJANALA DISTRICT MUNICIPALITY, NORTH WEST PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF DEMARACTED AREAS ON A PORTION OF RHENOSTERFONTEIN 86JQ FOR THE PROPOSED TRANSNET HEYSTERKRAND RAILWAY LOOP PROJECT IN THE BOJANALA DISTRICT MUNICIPALITY, NORTH WEST PROVINCE | AIA Phase 1 | 10/05/2018 | Neels Kruger | Exigo Sustainability | Coastal & Environmental Services - East London | 18/05/2018 - 11:19 |
AIA FOR THE PROPOSED TRANSNET BOSHOEK RAILWAY LOOP PROJECT IN THE BOJANALA PLATINUM DISTRICT MUNICIPALITY, NORTH WEST PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF DEMARACTED AREAS ON A PORTION OF BOSCHHOEK 103JQ FOR THE PROPOSED TRANSNET BOSHOEK RAILWAY LOOP PROJECT IN THE BOJANALA PLATINUM DISTRICT MUNICIPALITY, NORTH WEST PROVINCE | AIA Phase 1 | 09/05/2018 | Neels Kruger | Exigo Sustainability | Coastal & Environmental Services - East London | 17/05/2018 - 11:26 |
AIA FOR THE PROPOSED TIDIMALO TOWNSHIP ESTABLISHMENT AT TIDIMALO, DELPORTSHOOP, NORTHERN CAPE PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT OF AREAS DEMARACTED FOR THE PROPOSED TIDIMALO TOWNSHIP ESTABLISHMENT ON A PORTION OF ERF 696 TIDIMALO, DELPORTSHOOP, FRANCES BAARD DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | AIA Phase 1 | 31/03/2016 | Neels Kruger | Exigo Sustainability | Frances Baard District Municipality | 08/04/2016 - 08:40 |
AIA FOR THE PROPOSED THINUS MARITZ DAM DEVELOPMENT PROJECT IN THE WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON A PORTION OF THE FARM GROENDRAAI 213KQ FOR THE PROPOSED THINUS MARITZ DAM DEVELOPMENT PROJECT IN THE WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | AIA Phase 1 | 29/11/2021 | Neels Kruger | Neels Kruger | SPOOR Environmental Services (PTY) Ltd. | 10/12/2021 - 15:33 |
AIA for the proposed Springs Fresh Produce Market | ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED SPRINGS FRESH PRODUCE MARKET, GAUTENG PROVINCE | AIA Phase 1 | 03/02/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | ABS Africa | 11/04/2018 - 19:00 |
AIA FOR THE PROPOSED SONFIN OSEILAND 1MWP PV PLANT DEVELOPMENT ON A PORTION OF THE FARM REINGELUK 107, NORTHERN CAPE PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED SONFIN OSEILAND 1MWP PV PLANT DEVELOPMENT PROJECT ON A PORTION OF THE FARM REINGELUK 107, KAI GARIB LOCAL MUNICIPALITY, SIYANDA DISTRICT MUNICIPALITY NORTHERN CAPE PROVINCE | AIA Phase 1 | 23/08/2017 | Neels Kruger | Exigo Sustainability | EP3 Environmental | 23/08/2017 - 14:16 |
AIA FOR THE PROPOSED SMOKEY HILLS OPENCAST MINING PROJECT AND STORM WATER CONTROL DAMS, STEELPOORT AREA, LIMPOPO PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON THE FARM MAANDAGSHOEK 254 KT FOR THE PROPOSED SMOKEY HILLS OPENCAST MINING PROJECT AND STORM WATER CONTROL DAMS, STEELPOORT AREA, GREATER TUBATSE LOCAL MUNICIPALITY, LIMPOPO PROVINCE | AIA Phase 1 | 01/11/2016 | Neels Kruger | Exigo Sustainability | Phokathaba Platinum (Pty) Ltd | 14/11/2016 - 15:45 |
AIA FOR THE PROPOSED SHIRLEY PHOTOVOLTAIC POWER PLANT DEVELOPMENT, NORTHERN CAPE PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF A DEMARCATED SURFACE PORTION ON THE FARM SHIRLEY 367 FOR THE PROPOSED SHIRLEY PHOTOVOLTAIC POWER PLANT AND POWER LINE DEVELOPMENT, GAMAGARA LOCAL MUNICIPALITY, JOHN TAOLO GAETSEWE DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | AIA Phase 1 | 18/05/2014 | Neels Kruger | AGES (PTY) Ltd - Pretoria | Danax Energy (Pty) Ltd | 30/05/2014 - 09:39 |
AIA FOR THE PROPOSED SEKGAME ELECTRICITY INFRASTRUCTURE EXPANSION PROJECT, SISHEN MINE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF DEMARCATED SURFACE PORTIONS ON THE FARM SEKGAME 461 FOR THE PROPOSED SEKGAME ELECTRICITY INFRASTRUCTURE EXPANSION PROJECT, SISHEN MINE, NORTHERN CAPE PROVINCE | AIA Phase 1 | 02/12/2014 | Neels Kruger | Exigo3 Sustainability | Sishen Iron Ore Company (Pty) Ltd | 17/06/2015 - 11:15 |
AIA FOR THE PROPOSED SCHOONUITZICHT FARM BA PROJECT, MAKHADO LOCAL MUNICIPALITY, LIMPOPO PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON REMAINDER OF PORTION 37 AND PORTION 3 OF THE FARM SCHOONUITZICHT 10LT FOR THE PROPOSED SCHOONUITZICHT FARM BA PROJECT, MAKHADO LOCAL MUNICIPALITY, LIMPOPO PROVINCE | AIA Phase 1 | 05/01/2021 | Neels Kruger | Exigo Sustainability | AGES (PTY) Ltd - Limpopo | 26/01/2021 - 07:12 |
AIA FOR THE PROPOSED SANPARKS DAWID KRUIPER REST CAMP DEVELOPMENT PROJECT IN THE KGALAGADI TRANSFRONTIER PARK,NORTHERN CAPE PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED SANPARKS DAWID KRUIPER REST CAMP DEVELOPMENT PROJECT IN THE KGALAGADI TRANSFRONTIER PARK, MIER LOCAL MUNICIPALITY, ZF MGCAWU DISTRICT, NORTHERN CAPE PROVINCE | AIA Phase 1 | 15/07/2017 | Neels Kruger | Exigo Sustainability | Delron Environmental Assessment Practitioners | 23/08/2017 - 13:46 |
AIA FOR THE PROPOSED RHODES SOLAR PARK 1, JOHN TAOLO GAETSEWE DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF A DEMARCATED SURFACE PORTION ON THE FARM RHODES 269 FOR THE PROPOSED RHODES SOLAR PARK 1 PHOTOVOLTAIC POWER PLANT & ACCESS ROAD DEVELOPMENT, JOE MOROLONG LOCAL MUNICIPALITY, JOHN TAOLO GAETSEWE DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | AIA Phase 1 | 18/05/2014 | Neels Kruger | Exigo3 Sustainability | Mira Energy (Pty) Ltd | 30/05/2014 - 09:32 |
AIA FOR THE PROPOSED RHODES 2 SOLAR PARK ON THE FARM RHODES 269, NORTHERN CAPE PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF AREAS DEMARACTED FOR THE PROPOSED PHOTOVOLTAIC POWER PLANT (RHODES 2 SOLAR PARK) ON A PORTION OF THE FARM RHODES 269, JOE MOROLONG LOCAL MUNICIPALITY, JOHN TAOLO GAETSEWE DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | AIA Phase 1 | 16/04/2016 | Neels Kruger | Exigo Sustainability | Miko Energy (Pty) Ltd. | 12/02/2016 - 09:48 |
AIA FOR THE PROPOSED RAYTON CEMETERY DEVELOPMENT, GAUTENG PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED RAYTON CEMETERY DEVELOPMENT, GAUTENG PROVINCE | AIA Phase 1 | 30/11/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | LEAP - Lanscape Architect Environmental Planner | 02/12/2015 - 21:48 |
AIA FOR THE PROPOSED RAPHUTI INFORMAL SETTLEMENT PROJECT, WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON PORTIONS OF THE FARM WEIKRANS 539KQ FOR THE PROPOSED RAPHUTI INFORMAL SETTLEMENT PROJECT, WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | AIA Phase 1 | 23/02/2021 | Neels Kruger | Exigo Sustainability | Kantey & Templer Consulting Engineers | 25/10/2021 - 12:00 |
AIA FOR THE PROPOSED PROTEA RIDGE DEVELOPMENT, GAUTENG PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED PROTEA RIDGE DEVELOPMENT, GAUTENG PROVINCE | AIA Phase 1 | 17/05/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Eco Assessments | 13/06/2016 - 16:02 |
AIA FOR THE PROPOSED PLATINUM PHOTOVOLTAIC POWER PLANT DEVELOPMENT, THABAZIMBI LOCAL MUNICIPALITY, LIMPOPO PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF A DEMARCATED SURFACE PORTION ON THE FARM GROOTKUIL 409KQ FOR THE PROPOSED PLATINUM PHOTOVOLTAIC POWER PLANT DEVELOPMENT, THABAZIMBI LOCAL MUNICIPALITY, WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | AIA Phase 1 | 19/05/2014 | Neels Kruger | Exigo3 Sustainability | Firefly Investments 224 (RF) (Pty) Ltd | 28/07/2015 - 09:27 |
AIA FOR THE PROPOSED PHOSPHORIC ACID PLANT, STANDERTON, MPUMALANGA | AIA FOR THE PROPOSED PHOSPHORIC ACID PLANT, STANDERTON, MPUMALANGA | AIA Phase 1 | 15/12/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Terra Pacis Environmental (Pty) Ltd | 25/07/2017 - 09:14 |
AIA for the proposed Orkney Solar Farm | AIA for the proposed Orkney Solar Farm, NW Province | Archaeological Specialist Reports | 17/01/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 24/01/2017 - 09:26 |
AIA FOR THE PROPOSED ONDERSTEPOORT X42 MIXED USE TOWNSHIP ESTABLISHMENT | AIA FOR THE PROPOSED ONDERSTEPOORT X42 MIXED USE TOWNSHIP ESTABLISHMENT | 30/11/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | LEAP - Lanscape Architect Environmental Planner | 06/01/2016 - 16:02 | |
AIA FOR THE PROPOSED NKANDLA EXTENSION 2 TOWNSHIP ESTABLISHMENT, HARTSWATER, FRANCES BAARD DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT OF AREAS DEMARACTED FOR THE PROPOSED NKANDLA EXTENSION 2 TOWNSHIP ESTABLISHMENT ON A PORTION OF ERF 258 NKANDLA, FRANCES BAARD DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | AIA Phase 1 | 31/03/2016 | Neels Kruger | Frances Baard District Municipality | 08/04/2016 - 08:48 | |
AIA FOR THE PROPOSED NIGEL DIESEL DEPOT, NIGEL, EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF AREAS DEMARACTED FOR THE PROPOSED NIGEL DIESEL DEPOT ON PORTION 36 OF THE FARM VARKENSFONTEIN 169IR, EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | AIA Phase 1 | 01/03/2016 | Neels Kruger | Exigo Sustainability | AGES (PTY) Ltd - Limpopo | 13/04/2016 - 20:13 |
AIA FOR THE PROPOSED NIGEL DIESEL DEPOT, NIGEL, EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF AREAS DEMARACTED FOR THE PROPOSED NIGEL DIESEL DEPOT ON PORTION 36 OF THE FARM VARKENSFONTEIN 169IR, EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | AIA Phase 1 | 01/03/2016 | Neels Kruger | Exigo Sustainability | AGES (PTY) Ltd - Limpopo | 13/04/2016 - 20:13 |
AIA FOR THE PROPOSED NIGEL BULK WATER PIPELINE PHASE 2 PROJECT, EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED NIGEL BULK WATER PIPELINE PHASE 2 PROJECT IN THE NIGEL AREA OF THE EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | AIA Phase 1 | 09/05/2019 | Neels Kruger | Exigo Sustainability | Lamela Consulting (Pty) Ltd | 20/05/2019 - 08:24 |
AIA FOR THE PROPOSED NDABAKAZI INTERCHANGE UPGRADE PROJECT IN THE BUTTERWORTH AREA, EASTERN CAPE PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED NDABAKAZI INTERCHANGE UPGRADE PROJECT IN THE BUTTERWORTH AREA OF THE AMATHOLE DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE | AIA Phase 1 | 10/12/2018 | Neels Kruger | Exigo Sustainability | Coastal & Environmental Services - East London | 20/01/2019 - 21:50 |
AIA For the proposed Mine on De Roodepoort 435, IS, Mpumalanga Province | Archaeological Impact Assessment For the proposed Mine on De Roodepoort 435, IS, Mpumalanga Province | AIA Phase 1 | 31/10/2013 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Greenmined Environmental | 20/12/2013 - 22:14 |
AIA For the proposed Midridge Park Ext. 25 Township Development, Midrand, Gauteng | Archaeological Impact Assessment For the proposed Midridge Park Ext. 25 Township Development, Midrand, Gauteng | AIA Phase 1 | 16/04/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Prism Environmental Management Services cc | 15/07/2015 - 11:45 |
AIA FOR THE PROPOSED LYLEVELD NORTH WASTE ROCK DUMP EXPANSION AND LYLEVELD SOUTH HAUL ROAD EXTENSION PROJECT, SISHEN MINE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF AREAS DEMARACTED FOR THE PROPOSED LYLEVELD NORTH WASTE ROCK DUMP EXPANSION AND LYLEVELD SOUTH HAUL ROAD EXTENSION PROJECT, SISHEN MINE, NORTHERN CAPE PROVINCE | AIA Phase 1 | 05/04/2015 | Neels Kruger | Exigo3 Sustainability | Kumba Iron Ore | 26/06/2015 - 11:07 |
AIA FOR THE PROPOSED KYA SANDS EXTENSION 104 PROJECT, GAUTENG | AIA FOR THE PROPOSED KYA SANDS EXTENSION 104 PROJECT, GAUTENG | AIA Phase 1 | 24/06/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Terra Pacis Environmental (Pty) Ltd | 21/07/2016 - 09:36 |
AIA FOR THE PROPOSED KRANSKLOOF DAM AND AGRICULTURAL LANDS DEVELOPMENT ON THE FARM KRANSKLOOF 218 KR, LIMPOPO PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED KRANSKLOOF DAM AND AGRICULTURAL LANDS DEVELOPMENT ON PORTION 1 OF THE FARM KRANSKLOOF 218 KR, WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | AIA Phase 1 | 28/07/2016 | Neels Kruger | Exigo Sustainability | Ecolead Environmental Solutions | 25/01/2017 - 10:40 |
AIA FOR THE PROPOSED KOMATIPOORT FUEL AND RETAIL DEVELOPMENT, NKOMAZI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF DEMARACTED AREAS ON PORTION 49 OF THE FARM KOMATIPOORT TOWNLANDS 182JU FOR THE PROPOSED KOMATIPOORT FUEL AND RETAIL DEVELOPMENT, NKOMAZI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE | AIA Phase 1 | 01/02/2016 | Neels Kruger | Exigo Sustainability | Ganeloman (PTY) LTD | 18/05/2016 - 15:39 |
AIA FOR THE PROPOSED KA XIKWAMBANA FILLING STATION, LIMPOPO PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED KA XIKWAMBANA FILLING STATION, LIMPOPO PROVINCE | AIA Phase 1 | 07/02/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Tekplan Environmental | 23/01/2018 - 12:35 |
AIA for the proposed K60, Gauteng | ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF THE K60 ROAD BETWEEN MAXWELL DRIVE AND WOODMEAD DRIVE (R55), GAUTENG PROVINCE | AIA Phase 1 | 03/10/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | LEAP - Lanscape Architect Environmental Planner | 10/10/2016 - 21:27 |
AIA for the proposed K148, Vosloorus, Gauteng. | ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED K148 ROAD DEVELOPMENT, VOSLOORUS, GAUTENG PROVINCE | AIA Phase 1 | 29/07/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Envirolution Consulting (Pty) Ltd | 30/07/2016 - 14:00 |
AIA FOR THE PROPOSED JOE KLOPPER DAM DEVELOPMENT PROJECT IN THE WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON A PORTION OF THE FARM DOORNSPRUIT 215KQ FOR THE PROPOSED JOE KLOPPER DAM DEVELOPMENT PROJECT IN THE WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | AIA Phase 1 | 20/10/2020 | Neels Kruger | Neels Kruger | SPOOR Environmental Services (PTY) Ltd. | 29/03/2021 - 14:44 |
AIA FOR THE PROPOSED HIGH ENERGY FUEL PLANT AND RAILWAY SIDING, SISHEN IRON ORE MINE, NORTHERN CAPE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF DEMARCATED SURFACE PORTIONS ON THE FARMS SACHA 468 AND WOON 469 FOR THE PROPOSED HIGH ENERGY FUEL PLANT AND RAILWAY SIDING, SISHEN IRON ORE MINE, JOHN TAOLO GAETSEWE DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | AIA Phase 1 | 31/01/2014 | Neels Kruger | AGES (PTY) Ltd - Pretoria | Kumba Iron Ore | 05/08/2014 - 11:48 |
AIA FOR THE PROPOSED GREENGATE EXT 70 RESIDENTIAL DEVELOPMENT | ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED GREENGATE EXT 70 RESIDENTIAL DEVELOPMENT, GAUTENG PROVINCE | AIA Phase 1 | 16/09/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Prism Environmental Management Services cc | 11/11/2017 - 09:29 |
AIA FOR THE PROPOSED GOLDI CHICKEN WATER SUPPLY PIPELINE PROJECT, LEKWA LOCAL MUNICIPALITY, MPUMALANGA PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON STANDERTON TOWNLANDS FOR THE PROPOSED GOLDI CHICKEN WATER SUPPLY PIPELINE PROJECT, LEKWA LOCAL MUNICIPALITY, MPUMALANGA PROVINCE | AIA Phase 1 | 25/03/2021 | Neels Kruger | Exigo Sustainability | Exigo Sustainability | 31/08/2021 - 09:34 |
AIA FOR THE PROPOSED GLEN DOUGLAS DOLOMITE BURNING PLANT, MEYERTON, GAUTENG PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF PORTIONS OF THE FARMS WITKOPPIES 373 IR, FARM SLANGFONTEIN 372 IR AND ERF 303 OF HIGHBURY TOWNSHIP FOR THE PROPOSED GLEN DOUGLAS DOLOMITE BURNING PLANT, MEYERTON, GAUTENG PROVINCE | AIA Phase 1 | 31/07/2014 | Neels Kruger | AGES (PTY) Ltd - Pretoria | 29/09/2014 - 22:09 | |
AIA FOR THE PROPOSED GANSPAN-PAN WETLAND RESERVE DEVELOPMENT, FRANCES BAARD DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON ERF 357 OF VAALHARTS SETTLEMENT B FOR THE PROPOSED GANSPAN-PAN WETLAND RESERVE DEVELOPMENT, FRANCES BAARD DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | AIA Phase 1 | 26/08/2019 | Neels Kruger | Exigo Sustainability | Coastal & Environmental Services - East London | 08/10/2019 - 21:36 |
AIA FOR THE PROPOSED ESTABLISHMENT OF WAREHOUSES ON POMONA AGRICULTURAL HOLDINGS, EKURHULENI MUNICIPALITY, GAUTENG PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED ESTABLISHMENT OF WAREHOUSES ON HOLDINGS 122, 123, 124 AND PORTION 1 OF HOLDING 281, POMONA AGRICULTURAL HOLDINGS, POMONA, EKURHULENI MUNICIPALITY, GAUTENG PROVINCE | AIA Phase 1 | 06/11/2017 | Neels Kruger | Exigo Sustainability | Interdesign Landscape Architects | 09/11/2017 - 10:16 |
AIA FOR THE PROPOSED ESKOM MHINGA ROUTE DEVIATION PROJECT, VHEMBE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON MAHINGAS 258MT, MAHINGA'S EXTENSION 259MT, TSHIKUNDU 262MT, PAGELEE 274MT AND KLUSTER 293MT FOR THE PROPOSED ESKOM MHINGA ROUTE DEVIATION PROJECT, VHEMBE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | AIA Phase 1 | 20/01/2021 | Neels Kruger | Exigo Sustainability | Kantey & Templer Consulting Engineers | 20/09/2021 - 10:51 |
AIA FOR THE PROPOSED ENNERDALE X6 RESIDENTIAL DEVELOPMENT, GAUTENG PROVINCE | AIA FOR THE PROPOSED ENNERDALE X6 RESIDENTIAL DEVELOPMENT, GAUTENG PROVINCE | AIA Phase 1 | 31/10/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | LEAP - Lanscape Architect Environmental Planner | 21/02/2017 - 11:37 |
AIA FOR THE PROPOSED ENNERDALE X6 RESIDENTIAL DEVELOPMENT, GAUTENG PROVINCE | AIA FOR THE PROPOSED ENNERDALE X6 RESIDENTIAL DEVELOPMENT, GAUTENG PROVINCE | AIA Phase 1 | 31/10/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | LEAP - Lanscape Architect Environmental Planner | 21/02/2017 - 11:37 |
AIA FOR THE PROPOSED EENDUIN SOLAR PARK, ACCESS ROADS AND POWER LINE SIYANDA DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF AREAS DEMARACTED FOR THE PROPOSED PHOTOVOLTAIC POWER PLANT (EENDUIN SOLAR PARK, ACCESS ROADS AND POWER LINE), KAI GARIB LOCAL MUNICIPALITY, SIYANDA DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | AIA Phase 1 | 02/02/2015 | Neels Kruger | Exigo3 Sustainability | Albebaran SA (Pty) Ltd. | 29/07/2015 - 14:43 |
AIA FOR THE PROPOSED EAST SOLAR PARK,JOHN TAOLO GAETSEWE DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED EAST SOLAR PARK AND ACCESS ROAD, JOE MOROLONG LOCAL MUNICIPALITY, JOHN TAOLO GAETSEWE DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | AIA Phase 1 | 30/09/2014 | Neels Kruger | Exigo3 Sustainability | Osalus Energy (Pty) Ltd | 29/07/2015 - 11:16 |