THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 16201 - 16250 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Tshikota Ext 3 HIA | PHASE 1 HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED TOWNSHIP ESTABLISHMENT OF 300 SITES ON REMAINDER OF PORTION 1 OF THE FARM NATURALLE LOKSASIEW 272 LS WITHIN MAKHADO LOCAL MUNICIPALITY OF VHEMBE DISTRICT, LIMPOPO PROVINCE. | HIA Phase 1 | 28/05/2021 | Richard Munyai | Vhufa Hashu Heritage Consultants | 25/11/2021 - 13:15 | |
Phase 1 Cultural Heritage Impact Assessment | PHASE 1 CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED MINING RIGHT APPLICATION FOR THE MINING OF DIAMONDS GENERAL (D) ON VARIOUS PORTIONS OF THE FARMS STERKFONTEIN 155, PUTFONTEIN 62, OMEGA 478, HOLGAT 63, WILDFONTEIN 201, LEEUWFONTEIN 64 AND FARM 533, REGISTRATION DIVISION: IP, DITSOBOTLA LOCAL MUNICIPALITY, NORTH WEST PROVINCE | HIA Phase 1 | 20/10/2021 | Johny | J A van Schalkwyk | Milnex | 26/11/2021 - 07:50 |
Paleontological Desktop Assessment | PALAEONTOLOGICAL DESKTOP ASSESSMENT: PROPOSED MINING RIGHT APPLICATION FOR TURNOVER TRADING (PTY) LTD - STERKFONTEIN 155, PUTFONTEIN 62, OMGEGA 478, HOLGAT 63, WILDFONTEIN 201, LEEUWFONTEIN 64 & FARM 533 DMRE REG: NW30/5/1/2/2/10186MR | PIA Desktop | 19/10/2021 | Elize Butler | Banzai Environmental (Pty) Ltd | Milnex | 26/11/2021 - 07:53 |
Heritage Screener: Checkers Coega | Desktop Heritage Screening Assessment for the proposed expansion of an existing Checkers Distribution Centre in an industrial area near Coega, Gqeberha | Heritage Scoping | 09/11/2021 | Jenna Lavin | CTS Heritage | PHS Consulting | 26/11/2021 - 09:19 |
Lot 2398 Scottburgh | Application for repair and renovation permit for the existing dilapidated dwelling structure on erf 2398 Scottburgh | Built Environment and Cultural Landscapes | 28/02/2022 | Roelof Petrus Meyer | TJ Architects South Coast (Pty) Ltd | TJ Architects South Coast (Pty) Ltd | 26/11/2021 - 10:22 |
HIA Harmony Reclamation Project | THE PROPOSED HARMONY FSS6 RECLAMATION PIPELINE, WELKOM, FREE STATE PROVINCE: HERITAGE IMPACT ASSESSMENT | Heritage Impact Assessment Specialist Reports | 28/10/2021 | Wouter Fourie | PGS Heritage (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 26/11/2021 - 12:15 |
HIA Harmony Reclamation Pipeline Project | THE PROPOSED HARMONY FSS6 RECLAMATION PIPELINE, WELKOM, FREE STATE PROVINCE: HERITAGE IMPACT ASSESSMENT | Heritage Impact Assessment Specialist Reports | 28/10/2021 | Wouter Fourie | PGS Heritage (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 26/11/2021 - 12:51 |
Amaoti housing | HIA DESKTOP FOR THE GREATER AMAOTI HOUSING DEVELOPMENT | HIA Letter of Exemption | Gavin Anderson, Alan Smith, Lindsay Napier | Umlando: Archaeological Surveys & Heritage Management | SiVEST - Durban | 28/11/2021 - 11:13 | |
PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF BAFOKENG-ARARAT 88KV POWERLINE. | PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF BAFOKENG-ARARAT 88KV POWERLINE. THE PROJECT FALLS UNDER RUSTENBURG LOCAL MUNICIPALITY IN THE NORTH WEST PROVINCE. | HIA Phase 1 | 30/08/2021 | Makhosazana Mngomezulu | Vungandze Projects | HUMBA ENVIRONMENTAL CONSULTANCY | 29/11/2021 - 11:09 |
Palaeontological Impact Assessment for the proposed Eskom Ararat-Bafokeng 88 kV powerline | Palaeontological Impact Assessment for the proposed Eskom Ararat-Bafokeng 88 kV powerline, Distribution Gemma Cluster, Northwest Province | PIA Desktop | 31/08/2021 | Marion Bamford | Prof Marion Bamford | HUMBA ENVIRONMENTAL CONSULTANCY | 29/11/2021 - 11:22 |
PIA for the Agrizone 2, Dube Trade Port | Palaeontological Impact Assessment to assess the proposed Agrizone 2, Dube Trade Port in KwaZulu Natal Province. | PIA Phase 1 | 18/11/2021 | Elize Butler | Banzai Environmental (Pty) Ltd | Raubex KZN (Pty) Ltd | 29/11/2021 - 11:40 |
Phase II Heritage Assessment Agrizone 2, KZN - Updated | Phase II Heritage Assessment of three heritage resources previously identified during the Heritage Impact Assessment (HIA) conducted for the development of the Dube Trade Port (DTP) AgriZone 2 development close to King Shaka International Airport in the Province of KwaZulu Natal. | HIA Phase 2 | 29/11/2021 | Wouter Fourie | PGS Heritage (Pty) Ltd | Raubex KZN (Pty) Ltd | 29/11/2021 - 13:03 |
Amaoti Heritage Impact Assessment | HIA DESKTOP FOR THE GREATER AMAOTI HOUSING DEVELOPMENT | Heritage Impact Assessment Specialist Reports | 07/11/2021 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | SiVEST SA (Pty) Ltd | 30/11/2021 - 12:33 |
rampietziezfontein 598LS LINE COSTRUCTION | project no: MGL436903755 length1274.32m line construction at Ga-Sechaba village(RAMPIETZIESFONTEIN 598 LS) Limpopo. impacted area coordinates are(transformer constructed from23°44'18.65387"S 29°08'34.22875"E) pole no CNG84/19 on the span plan attached. new poles will be erected at 23°44'00.76317"S 29°08'04.79675"E-CNG84/1. 23°44'00.71283"S 29°08'07.32863"E CNG84/2. none environmental,burial or heritage site will be impacted during the construction | Non Impact Assessment Related Reports | 19/11/2021 | 30/11/2021 - 13:25 | |||
Heritage Screening Assessment: 31 Barnsley Road | Desktop Heritage Screening Assessment for the Proposed extension of current waste treatment operations onto vacant industrial land located to the west of the current Alumicor premises located at 31 Barnsley Road, Camps Drift in Pietermaritzburg | HIA Letter of Exemption | 16/09/2021 | Jenna Lavin | CTS Heritage | 30/11/2021 - 13:37 | |
BBC 2019 -2020 excavation report | Report on the 2019-2020 archaeological excavations at Blombos Cave, southern Cape, South Africa and update on current research with regards to the Blombos site and materials. | Archaeological Specialist Reports | 30/11/2021 | 30/11/2021 - 14:56 | |||
HIA and PIA Reports | Tswalu 22kV Powerline HIA Reports | HIA Phase 1 | 04/11/2021 | Eskom - NOU | 01/12/2021 - 09:55 | ||
Investigation in to the presence of human remains Eland Platinum Mine | Investigation in to the presence of possible human remains – Northam Elands Open Cast Mine - Farm Elandsfontein 440 JQ, District of Brits, South Africa | Site Inspection Report | 19/10/2021 | Wouter Fourie | PGS Heritage (Pty) Ltd | Eland Platinum Mine | 01/12/2021 - 13:16 |
Investigation in to the presence of human remains Eland Platinum Mine | Investigation in to the presence of possible human remains – Northam Elands Open Cast Mine - Farm Elandsfontein 440 JQ, District of Brits, South Africa | Site Inspection Report | 19/10/2021 | Wouter Fourie | PGS Heritage (Pty) Ltd | Eland Platinum Mine | 01/12/2021 - 13:23 |
HIA for the Development of Erf 1327 and 1328 Strubensvallei Ext 24 | Heritage Impact Assessment for the Proposed development of Erf 1327 and Erf 1328, Strubensvallei Ext 24, City of Johannesburg | HIA Phase 1 | 10/06/2021 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Prism Environmental Management Services cc | 01/12/2021 - 14:13 |
HIA Desktop study for the Proposed Development for Tshwane Beef Value Chain Project at the Sizalo Bonsmara Farm. | Heritage Impact Assessment; a Desktop Study. Proposed Development for the Tshwane Beef Value Chain Project at the Sizalo Bonsmara Farm in the Rust De Winter Area on the Farm Leeukraal 184 JR, Portions 2,3,4,5,6,7,8,9,10& 11 within the jurisdiction of Tshwane Metropolitan Municipality, Gauteng Province. | Heritage Scoping | 01/12/2021 | Frans Roodt | Department of Agriculture, Land Reform and Rural Development | 02/12/2021 - 12:09 | |
Sizalo Bonsmara farm F PIA | Proposed development for Tshwane Beef Value Chain Project at the Sizalo Bonsmara Farm in Rust de Winter area on farm Leeukraal 184-JR portion(s) 2,3,4,5,6,7,8,9,10 and 11 within the jurisdiction of Tshwane Metropolitan Municipality, Gauteng Province. | PIA Phase 1 | 29/11/2021 | Dr. Heidi Fourie | Department of Agriculture, Land Reform and Rural Development | 02/12/2021 - 12:19 | |
PHASE 1 HIA REPORT FOR TOWNSHIP ESTABLISHMENT | PHASE 1 HIA REPORT FOR TOWNSHIP ESTABLISHMENT ON VARIOUS PORTIONS OF THE FARM NAAUWPOORT 335JS EMAHLAHLENI LOCAL MUNICIPALITY, MPUMALANGA | HIA Phase 1 | 30/06/2021 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | 02/12/2021 - 13:23 | |
Palaeontological Impact Assessment: Desktop Study | Township Establishment on Naauwpoort 335-JS eMalahleni Metropolitan Municipality, Nkangala District Municipality, Mpumalanga Province. Farm: Remainder Portion 25, Portion 562, 563, 564, 565 Naauwpoort 335-JS | PIA Desktop | 30/06/2021 | Dr. Heidi Fourie | APELSER ARCHAEOLOGICAL CONSULTING | 02/12/2021 - 13:26 | |
PIA phase 2 | Palaeontological Impact Assessment for the proposed Eskom West Rand Strengthening Project Phase 2 Pluto Substation to Westgate Substation, Gauteng Province | PIA Phase 2 | 11/09/2021 | Marion Bamford | SAHRA Council | Archaeological and Heritage Services Africa (Pty) Ltd | 02/12/2021 - 18:15 |
Paleontological Impact Assessment | Paleontological Impact Assessment for the proposed Hennops River Wedding and Conference Venue, Centurion, Gauteng Province GDARD Ref No: GAUT002/21-22/E2790 | PIA Phase 2 | 15/09/2021 | Marion Bamford | (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd | 02/12/2021 - 20:00 | |
Archaeological Impact Assessment | PHASE1: ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE PROPOSED HENNOPS WEDDING AND CONFERENCE CENTRE ON PORTION 200 OF THE FARM HENNOPS RIVIER NO 489 JQ, HENNOPS RIVER, CITY OF TSHWANE, GAUTENG PROVINCE, SOUTH AFRICA. | AIA Phase 1 | 02/08/2019 | Eric Mathoho | Millennium Heritage Group (PTY) LTD | 02/12/2021 - 20:10 | |
Golden Mole Mall - PTA east - Phase 1 AIA_v1 | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT For The Proposed Golden Mole Mall on Farm Portions 218 and 220 of the Farm Tweefontein 372 JR, Pretoria, Gauteng | AIA Phase 1 | 12/11/2021 | Tobias Coetzee | Tobias Coetzee | Eco Elementum (Pty) Ltd | 02/12/2021 - 21:06 |
Adams College Baseline Study | Adams College Baseline Study | Heritage Study | 14/11/2021 | Greenleaf Heritage and Planning Consultants | Greenleaf Heritage and Planning Consultants | 03/12/2021 - 05:35 | |
marikana portion 20 HIA | DRAFT PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) FOR THE PROPOSED DEVELOPMENT OF MANYATSENG PHASE 1, LADYBRAND IN THE FREE STATE PROVINCE | HIA Phase 1 | 05/03/2021 | Leonie Marais-Botes | Leonie Marais Heritage Practitioner | EnviroSynergy Consulting (Pty) Ltd | 03/12/2021 - 06:24 |
Heritage Management Plan for the Phase 1 Sammy Marx Development, Gauteng Province | Heritage Management Plan for the Phase 1 Sammy Marx Development, Gauteng Province | Conservation Management Plan | 05/10/2021 | Jaco van der Walt | Beyond Heritage | Exigent Environmental Management | 03/12/2021 - 10:58 |
Bon Espirange to Komsberg Heritage Study | Proposed establishment of 132kV powerline between Bon Espirange and the existing Komsberg Substation in the Western and Northern Cape | HIA Phase 1 | 22/11/2021 | Jenna Lavin | CTS Heritage | WSP Group Africa (Pty) Ltd | 03/12/2021 - 11:08 |
Dannhauser Cemetery HIA | PROPOSED CEMETERY FOR THE DANNHAUSER LOCAL MUNICIPALITY, KWAZULU-NATAL Phase 1 Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 31/05/2021 | Jean Beater | JLB Consulting | SiVEST SA (Pty) Ltd | 03/12/2021 - 12:08 |
Heritage Impact Assessment for the Proposed Pienaarsrivier Filling Station, North West Province | Heritage Impact Assessment for the Proposed Pienaarsrivier Filling Station, North West Province | HIA Phase 1 | 15/07/2021 | Jaco van der Walt | Beyond Heritage | Exigent Environmental Management | 03/12/2021 - 14:33 |
Swinton | SWINTON CAMPUS STORMWATER UPGRADE | HIA Letter of Exemption | 20/09/2021 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Hanslab (Pty) Ltd | 04/12/2021 - 11:56 |
Previous HIA undertaken | STATUS QUO REPORT FOR THE PROPOSED EXHUMATION AND REBURIAL OF HUMAN BURIALS IDENTIFIED DURING THE PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT STUDY FOR THE PROPOSED SEGORONG RE-DEVELOPMENT PROJECT IN GREATER TUBATSE MUNICIPALITY SEKHUKHUNE DISTRICT IN LIMPOPO PROVINCE, JUNE 2009 | Heritage Impact Assessment Specialist Reports | 01/06/2009 | Nzumbululo Heritage Solutions | 06/12/2021 - 20:30 | ||
Rietkloof WEF Heritage Statement | PART TWO AMENDMENT FOR THE APPROVED RIETKLOOF WEF NEAR MATJIESFONTEIN IN THE WESTERN CAPE | Heritage Statement | 10/11/2021 | Jenna Lavin | CTS Heritage | WSP Group Africa (Pty) Ltd | 08/12/2021 - 06:36 |
Rietkloof WEF Heritage Walkdown | HERITAGE WALKDOWN REPORT for the approved Rietkloof WEF near Matjiesfontein in the Western Cape | Heritage Study | 29/09/2021 | Jenna Lavin | CTS Heritage | WSP Group Africa (Pty) Ltd | 08/12/2021 - 06:38 |
Rietkloof Heritage Conservation Management Plan | HERITAGE CONSERVATION MANAGEMENT PLAN for the approved Rietkloof WEF near Matjiesfontein in the Western Cape | Conservation Management Plan | 01/10/2021 | Jenna Lavin | CTS Heritage | WSP Group Africa (Pty) Ltd | 08/12/2021 - 06:40 |
Rietkloof Powerline Heritage Walkdown | HERITAGE WALKDOWN REPORT for the approved Rietkloof WEF Grid Connection near Matjiesfontein in the Western Cape | Heritage Study | 29/09/2021 | Jenna Lavin | CTS Heritage | WSP Group Africa (Pty) Ltd | 08/12/2021 - 07:08 |
Thuthukani PIA | Palaeontological Impact Assessment for the proposed Lekwa Local Municipality Cemetery at Thuthukani, Mpumalanga Province | PIA Desktop | 08/08/2021 | Marion Bamford | Prof Marion Bamford | Prof Marion Bamford | 08/12/2021 - 09:53 |
HERITAGE IMPACT ASSESSMENT VENETIA MINE SOLAR | PHASE 1 HERITAGE IMPACT ASSESSMENT RELATING TO THE PROPOSED VENETIA MINE SOLAR PHOTO VOLTAIC (PV) FACILITY AND ASSOCIATED POWERLINE, MUSINA LOCAL MUNICIPALITY OF THE VHEMBE DISTRICT, LIMPOPO PROVINCE, SOUTH AFRICA. | HIA Phase 1 | Eric Ndivhuho Mathoho | Millennium Heritage Group (PTY) LTD | Millennium Heritage Group (PTY) LTD | 08/12/2021 - 14:12 | |
Mamatwan IRP Heritage Report | MAMATWAN MINE – CHANGES TO INFRASTRUCTURE LAYOUT AND ACTIVITIES, NEAR HOTAZEL, NORTHERN CAPE PROVINCE | HIA Phase 1 | 30/09/2021 | 09/12/2021 - 01:29 | |||
Phase 1 AIA: Proposed Office Buildings, Holland Street, Addo_July 2021 | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED OFFICE BUILDINGS ON ERF NO. 944 AND ERF NO. 945, HOLLAND STREET, ADDO, SUNDAYS RIVER LOCAL MUNICIPALITY, SARAH BAARTMAN DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE. | AIA Phase 1 | 31/07/2021 | Celeste Booth | Booth Heritage Consulting | Indwe Environmental Consulting | 09/12/2021 - 05:58 |
Heritage report Witteklip and Leeuwenfontein quarries | THE PROPOSED ESTABLISHMENT OF WITTEKLIP QUARRY ON PORTION 2 OF THE FARM WITTEKLIP 32, BEAUFORT WEST LOCAL MUNICIPALITY, CENTRAL KAROO DISTRICT MUNICIPALITY, WESTERN CAPE PROVINCE THE PROPOSED ESTABLISHMENT OF LEEUWENFONTEIN QUARRY ON PORTION 2 OF THE FARM LEEUWENFONTEIN 6, BEAUFORT WEST LOCAL MUNICIPALITY, CENTRAL KAROO DISTRICT MUNICIPALITY, WESTERN CAPE PROVINCE | HIA Phase 1 | 29/06/2021 | J van Schalkwyk | Department of Mineral Resources | Chameleon Environmental | 09/12/2021 - 12:11 |
HERITAGE IMPACT ASSESSMENT OF NGWADINI RESERVOIR | HERITAGE IMPACT ASSESSMENT OF NGWADINI RESERVOIR, UMKOMAZI RIVER CATCHMENT,KWAZULU-NATAL, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 11/07/2006 | eThembeni Cultural Heritage | WSP Environmental Pty Ltd - Durban | 09/12/2021 - 12:48 | |
HIA Letter of Exemption | Letter of exemption for the Low level crossing on the Mokolo River, Kaingo Private Nature Reserve | HIA Letter of Exemption | 26/11/2021 | Kudzala Antiquity | 09/12/2021 - 13:33 | ||
PIA Exemption Letter | Request for Exemption of any Palaeontological Impact Assessment for the proposed Kayingo low-water bridge, below Mokolo Dam, Farm Laurel 195, Limpopo Province. | HIA Letter of Exemption | 02/12/2021 | Marion Bamford | Palaeosciences Centre, University of the Witwatersrand | 09/12/2021 - 13:43 | |
HIA borrow pit N4 | Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED DEVELOPMENT OF A BORROW PIT ADJACENT TO THE N4, WEST OF MALELANE, NKOMAZI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE | HIA Phase 1 | 15/09/2021 | J van Schalkwyk | Department of Mineral Resources - Mpumalanga | Chameleon Environmental | 09/12/2021 - 17:14 |
Meyerton HIA | THE PROPOSED CONSTRUCTION OF THE R59 (P156/2) PEDESTRIAN BRIDGE LOCATED CLOSE TO SICELO TOWNSHIP, MEYERTON, WITHIN THE MIDVAAL LOCAL MUNICIPALITY, IN THE SEDIBENG DISTRICT MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 01/12/2021 | Roy Muroyi | Tsimba Archaeological Footprints (Pty) Ltd | Tsimba Archaeological Footprints (Pty) Ltd | 10/12/2021 - 07:21 |