FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
Phase 1 HIA Report D432 Road Re-alignment Phase 1 HIA report for the D432 Northern Bypass Road Re-alignment project location on Portion 4 and 39 of the Farm Hartebeestlaagte 325JS close to Phola, Province of Mpumalanga HIA Phase 1 20/03/2019 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING South32 SA Coal Holdings (Pty) Limited 25/11/2020 - 13:06
invest in Property Heritage Impact Assessment Phase I PHASE I ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED MINING RIGHT ON THE FARM VILJOENSHOF 1655 IN BOSHOF WITHIN THE JURISDICTION OF TOKOLOGO LOCAL MUNICIPALITY OF LEJWELEPUTSWA DISTRICT MUNICIPALITY, FREE STATE PROVINCE HIA Phase 1 10/11/2022 Alvord Nhundu Biomental Services (Pty) Ltd 12/04/2023 - 20:54
Palaeontological Exemption Letter - Gunstfontein SS & PL (Jul16) Recommended Exemption from further Palaeontological Studies: Proposed construction of the Gunstfontein switching station, 132kv overhead power line (single or double circuit) and ancillary infrastructure for the Gunstfontein wind farm near Sutherland, Northern Cape province Palaeontological Specialist Reports 08/06/2016 Banzai Environmental (Pty) Ltd Savannah Environmental (Pty) Ltd 21/07/2016 - 15:16
ERF 212 EDGLEYW DESKTOP HIA FOR THE PROPOSED SUBDIVISION OF ERF 212 EDGLEY, KZN Heritage Impact Assessment Specialist Reports 19/05/2023 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Private 25/05/2023 - 09:18
Eikehoff, Stellenbosch: Lotte 3/4 van die begrafplaas (1687 - 1717): Historiese en argeologiese ondersoek 2003 (Junie) Eikehoff, Stellenbosch: Lotte 3/4 van die begrafplaas (1687 - 1717): Historiese en argeologiese ondersoek 2003 (Junie) AIA Phase 1 01/01/2005 Hennie Vos ArCape 16/06/2012 - 08:54
SANRAL R61 Mudstone Borrow Pit, Engcobo, Eastern Cape Heritage Impact Assessment for the Proposed SANRAL R61 Section 6 Borrow Pit in the Engcobo Local Municipality, Chris Hani District Municipality of the Eastern Cape Province. AIA Phase 1 23/10/2017 EOH Coastal and Environmental Services 10/01/2018 - 13:16
HIA Siyanqoba Residential Development Proposed Residential Township Development of Siyanqoba Extensions of Farm Tweedam 337J.S, and the remaining extend of Farm 283 J.S, Emalahleni Local Municipality. HIA Phase 1 04/02/2014 Christine Van Wyk Rowe Adansonia Heritage Consultants Wandima Environmental Services cc 10/02/2014 - 09:22
Phase 1 Cultural Heritage Impact Assessment: Mimosa 61 Phase 1 Cultural Heritage Impact Assessment: PROSPECTING RIGHT OF DIAMOND ALLUVIAL AND DIAMOND GENERAL ON THE REMAINING EXTENT OF PORTION 23 OF THE FARM MIMOSA, NEAR SCHWEIZER-RENEKE, MAMUSA LOCAL MUNICIPALITY, NORTH WEST PROVINCE HIA Phase 1 03/04/2018 Johnny van Schalkwyk 09/04/2018 - 12:37
Wolmaransstad X20 HIA Phase 1 HIA Report for the proposed Wolmaransstad Extension 20 (Unit U) township development on a portion of the Remaining Extent of Portion 2 of the farm Wolmaransstad Town and Townlands 184 HO, Wolmaransstad, North West Province HIA Phase 1 01/07/2018 Anton Pelser A Pelser Archaeological Consulting Maxim Planning Solutions 13/05/2019 - 16:54
Phase 1 Eskom Pienaarsriver CNC HIA Study A Phase 1 Heritage Impact Assessment Study for Eskom's Proposed CNC in Pienaarsrivier in the Limpopo Province HIA Phase 1 20/09/2013 Julius CC Pistorius Texture Environmental Consultants 30/03/2014 - 17:52
Phase 1 Cultural Heritage Resources Impact Assessment Phase 1 Cultural Heritage Resources Impact Assessment for the expansion of the existing cemetery site on the remainder of portion 3 of the farm Sjambok Zijn Oude Kraal 258 JR Ga-Rankuwa Tshwane Gauteng HIA Phase 1 22/04/2015 Udo Kusel African Heritage Consultants CC Aurecon - Head Office 17/06/2015 - 09:46
DPD PV1 & 2 grid connection palaeo Palaeontological Impact Assessment for the proposed Du Plessis Dam Solar PV1 and Du Plessis Dam Solar PV2 Grid Connections, De Aar, Northern Cape Province PIA Phase 1 15/05/2022 Marion Bamford Prof Marion Bamford ASHA Consulting(Pty) Ltd 17/06/2022 - 00:17
Haarlem shipwreck. Final report on test excavations. Haarlem shipwreck. Final report on 2017 - 2018 test excavations. Archaeological Permit Report 01/08/2019 Bruno Werz African Institute for Marine and Underwater Research, Exploration and Education (AIMURE) African Institute for Marine and Underwater Research, Exploration and Education (AIMURE) 31/07/2019 - 16:10
Government Avenue Government Avenue Cape Town Heritage Statement 13/07/2015 Quahnita Samie Vidamemoria Heritage Consultants Vidamemoria Heritage Consultants 13/07/2015 - 10:34
Motivational Report for EA Amendment BADENHORST DAM SOLAR PV2 & PV3 FACILITIES ENVIRONMENTAL AUTHORISATION AMENDMENT: SPECIALIST IMPACT STATEMENT Heritage Statement 05/08/2020 John Gribble ACO Associates CC Landscape Dynamics Environmental Consultants 22/02/2021 - 16:20
ESKOM CUPRUM BESS: ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT THE PROPOSED DEVELOPMENT OF A BATTERY ENERGY STORAGE SYSTEM (BESS) AND ASSOCIATED INFRASTRUCTURE AT THE CUPRUM SUBSTATION LOCATED WITHIN COPPERTON, NEAR THE TOWN OF PRIESKA, NORTHERN CAPE PROVINCE AIA Phase 1 01/06/2021 Trust Mlilo Sativa Travel and Environmental Consultants AECOM SA - Head Office 10/08/2022 - 10:14
HIA Mainstream Pofadder Wind and Solar Scoping Heritage Impact Assessment for the Pofadder Wind and Solar Energy Facility, Kenhardt Magisterial District, Northern Cape HIA Phase 1 27/07/2012 Jayson Orton, Lita Webley ACO Associates CC Savannah Environmental (Pty) Ltd 24/08/2012 - 11:26
Integrated Heritage Impact Assessment: AMDA Strausheim Bravo SEF, Kenhardt PROPOSED DEVELOPMENT OF THE AMDA BRAVO PV (SOLAR ENERGY FACILITY) ON PORTION 1 OF N'ROUGAS ZUID NO 121, STRAUSSHEIM AS WELL AS OVERHEAD POWER LINE GRID CONNECTION TO THE ESKOM NIEUWEHOOP MTS SUB-STATION ACROSS PORTION 3 OF GEMSBOK BULT NO120, KENHARDT DISTRICT, NORTHERN CAPE PROVINCE Heritage Impact Assessment Specialist Reports 15/09/2016 Stefan de Kock Perception Heritage Planning Perception Heritage Planning 15/09/2016 - 20:39
Phase 1 HIA report for the proposed Klerksoord filling station Phase 1 HIA Klerksoord Filling Station HIA Phase 1 22/01/2021 Anton Pelser Bokamoso Landscape Architects and Environmental Consultants CC Bokamoso Landscape Architects and Environmental Consultants CC 06/04/2021 - 13:41
PDA Report Onderstepoort Solar 2 PV PALAEONTOLOGICAL IMPACT ASSESSMENT - PROPOSED 240MW ONDERSTEPOORT SOLAR 2 PHOTOVOLTAIC PROJECT NORTH WEST OF RUSTENBURG, NORTH WEST PROVINCE PIA Desktop 13/06/2023 Elize Butler Banzai Environmental (Pty) Ltd Nemai Consulting 03/07/2023 - 12:01
AIA_Loeriesfontein_Orlight_Power_Line_Webley_LE_May12 HERITAGE IMPACT ASSESSMENT: PROPOSED LOERIESFONTEIN PHOTO-VOLTAIC SOLAR POWER PLANT ON PORTION 5 OF THE FARM KLEIN ROOIBERG 227, NORTHERN CAPE PROVINCE AIA Phase 1 01/05/2012 Lita Webley, Dave Halkett ACO Associates CC 16/06/2012 - 14:47
AIA_Melkvlei_PV_Webley_LE_Feb12 HERITAGE IMPACT ASSESSMENT: PROPOSED CONSTRUCTION OF THE MELKVLEI PHOTOVOLTAIC SOLAR ENERGY FACILITY, FRANCES BAARD DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE AIA Phase 1 28/02/2012 Lita Webley, Jayson Orton ACO Associates CC 16/06/2012 - 14:47
HIA; Proposed Borrow Pit, Beaufort West Heritage Impact Assessment for a Proposed Borrow Pit Located along DR 2308 Approximately 40 km southwest of Beaufort West in the Central Karoo District Municipality, Western Cape. HIA Phase 1 25/04/2012 Quahnita Samie, Madelon Tusenius Vidamemoria Heritage Consultants, Natura Viva CC Aurecon South Africa (Pty) Ltd 29/05/2018 - 14:08
PROPOSED EXPANSION OF THE MAGDALENA COLLIER NEAR DUNDEE PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED EXPANSION OF THE MAGDALENA COLLIER NEAR DUNDEE HIA Phase 1 30/04/2014 Frans Prins Active Heritage CC GCS Water and Environmental Consultants - Durban 07/06/2014 - 07:27
DESKTOP PALAEONTOLOGICAL HERITAGE IMPACT ASSESSEMENT REPORT ON THE SITE OF THE PROPOSED BRONKHORSPRUIT RAIL SIDING REDEVELOPMENT PROJECT, NEAR BRONKHORSTSPRUIT, GAUTENG PROVINCE DESKTOP PALAEONTOLOGICAL HERITAGE IMPACT ASSESSEMENT REPORT ON THE SITE OF THE PROPOSED BRONKHORSPRUIT RAIL SIDING REDEVELOPMENT PROJECT, NEAR BRONKHORSTSPRUIT, GAUTENG PROVINCE PIA Desktop 16/07/2016 Barry Millsteed Heritage Contracts and Archaeological Consulting Zantow Environmental Consulting Services 08/02/2017 - 14:04
AIA; Erf 26 Castle Rock, Simon's Town Archaeological Impact Assessment (AIA) for erf 26, Castle Rock Simon’s Town AIA Phase 1 01/01/2011 Ute Seemann Ute A Seemann - Heritage Archaeologist and Heritage Consultant Khula Environmental Consultants 18/07/2018 - 11:16
STRAWBERRY FARM TOWNSHIP DEVELOPMENT A REPORT ON A HIA RELATED TO A GRAVE SITE RELOCATION PROJECT FOR THE STRAWBERRY FARM TOWNSHIP DEVELOPMENT LOCATED ON A PORTION (PTN 14) OF THE FARM OLIFANTSFONTEIN 402JR OLIFANTSFONTEIN/IRENE/CLAYVILLE AREA, GAUTENG - APAC018/43 Heritage Impact Assessment Specialist Reports 01/06/2018 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING M&T Development (Pty) Ltd 29/10/2019 - 15:23
Revised Burbreeze Pipeline PIA REVISED DESKTOP PALAEONTOLOGICAL ASSESSMENT FOR THE PROPOSED BURBREEZE PIPELINE PROJECT, TONGAAT, ETHEKWINI METROPOLITAN MUNICIPALITY, KWAZULU-NATAL PROVINCE. PIA Desktop 23/02/2017 Gideon Groenewald 1World Consultants (Pty) Ltd 1World Consultants (Pty) Ltd 03/04/2017 - 10:41
HIA Report Jacaranda Boardroom Heritage Impact Assessment in accordance to Section 27 (18) of NHRA 25 of 1999 for submission to SAHRA with Special Focus on Jacaranda Boardrooms upgrade of the Portions of the Farm Elandspoort 357- JR, Pretoria Heritage Impact Assessment Specialist Reports 21/02/2020 Judith Muindisi, Monika Lauferts le Roux Tsica Heritage Consultants National Department of Public Works 21/02/2020 - 09:56
PHASE 1 HIA DOORNRIVIER SOLAR 2 VIRGINIA PHASE 1 HIA PROPOSED DEVELOPMENT OF SOLAR PHOTOVOLTAIC (PV) FACILITY (DOORNRIVIER SOLAR 2) ON THE FARM, DOORNRIVIER 330 PORTION 5, VIRGINIA, MATJHABENG LOCAL MUNICIPALITY, LEJWELEPUTSWA DISTRICT MUNICIPALITY, FREE STATE PROVINCE HIA Phase 1 31/08/2022 Heidi Fivaz, Sky-Lee Fairhurst, Elize Butler UBIQUE HERITAGE CONSULTANTS Enviroafrica CC 30/09/2022 - 14:08
Makana Human settlement, Archaeology A letter of recommendations (with conditions) for the exemption of a full Phase 1 archaeological impact assessment for the proposed Makana Human Settlement project, Alicedale, Makana local municipality, Eastern Cape Province. AIA Phase 1 21/08/2012 Johan Binneman Eastern Cape Heritage Consultants Public Process Consultants 17/01/2013 - 10:25
Argent Siding AIA-003/14_15 Phase 1 Archaeological Impact Assessment for Environmental Assurance (Pty) Ltd on the area demarcated for the development of Argent Siding near Delmas, Mpumalanga. AIA Phase 1 01/11/2014 Tobias Coetzee Environmental Assurance 23/11/2015 - 13:27
Archaeological Impact Assessment for Belfast Resettlement Project Phase 1 Archaeological Impact Assessment for the Belfast Implementation Project: Resettlement Site, Mpumalanga Province AIA Phase 1 10/03/2016 JP Cilliers South African Heritage Resources Agency South African Heritage Resources Agency 28/10/2016 - 14:45
Palaeontological Heritage Assessment: Desktop Study Palaeontological Heritage Assessment: Desktop Study Proposed Dawid Kruiper Rest Camp and Picnic Sites at the Veertiende and Bedinkt Waterholes, Kalahari Gemsbok National Park / Kgalagadi Transfrontier Park, Northern Cape Province PIA Desktop 08/05/2021 08/06/2021 - 14:35
Preliminary Report on Chance Discoveries of Human Remains Preliminary Report on Chance Discoveries of Human Remains at Two Rivers Platinum Mine, October-November 2022 Archaeological Permit Report 16/11/2022 Edward Matenga Edward Matenga (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd 16/11/2022 - 11:02
PORTION 1 OF FARM 118, BARKLY WEST DISTRICT PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT REPORT ON A ~3.5 HA AREA, SOUTH-WEST OF THE GRASPAN HOMESTEAD, ON PORTION 1 OF FARM 118, LOCATED ~45 KM NORTH-EAST OF DANIËLSKUIL, BARKLY WEST MAGISTERIAL DISTRICT, NORTHERN CAPE PROVINCE. AIA Phase 1 22/02/2013 Peter Beaumont McGregor Museum De Beers Consolidated Mines - Kimberley Mines 04/04/2013 - 12:33
Alpha Saldanha Cement Project: Archaeological & Palaeontological Potential of Limestone Deposits Alpha Saldanha Cement Project: Archaeological & Palaeontological Potential of Limestone Deposits AIA Phase 1 01/01/1997 Graham Avery Iziko: South African Museum 16/06/2012 - 08:54
Boitumelo Heritage Impact Assessment 30/07/2021 - 09:54
Archaeological Scoping Report for Richtersveld Solar Project Baseline Scoping Archaeological Assessment for Proposed Richtersveld Solar Facility (Richersveld Sun Spot) AIA Desktop 10/10/2014 Timothy Hart Cape Environmental Assessment Practitioners 03/09/2014 - 13:10
Hendrina Leachate Dam LETTER FOR HIA EXEMPTION REQUEST: HENDRINA LEACHATE DAM, MPUMALANGA PROVINCE HIA Letter of Exemption 08/04/2018 Prof. Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants WSP Environmental Pty Ltd - Johannesburg 25/10/2021 - 15:28
HIA for Makushane Substation & lilo line 2013 Archaeological and Heritage Impact Assessment Report for Proposed Makushane Substation and ± 1km 132kv loop in and out powerline in Ba- Phalaborwa Local Municipality (Wards 1 and 2) of the Limpopo Province February 2013 HIA Phase 1 McEdward Murimbika Nzumbululo Heritage Solutions Shumani SHE Specialists 08/10/2018 - 13:51
HIA - Castle WEF Full Palaeontological Heritage Impact Assessment Report on a Portion of a Proposed Wind Energy Generation Facility (The Castle Project); This Being on the Eastern Extent of the Farm Knapdaar 8 near De Aar, Northern Cape Province Heritage Impact Assessment Specialist Reports 24/11/2014 Barry Millsteed Savannah Environmental (Pty) Ltd 01/12/2014 - 16:45
Heritage report Queenswood Extension 14 Cultural heritage impact assessment for THE PROPOSED TOWNSHIP ESTABLISHEMENT ON PART OF PORTION 69 OF THE FARM KOEDOESPOORT 325JR, CITY OF TSHWANE, GAUTENG PROVINCE HIA Phase 1 10/10/2016 J Paul van Wyk 15/05/2017 - 09:56
HIA: Equestrian & Country Estate - Meyer's Farm Cultural Heritage Survey of Proposed Agricultural Museum, Equestrian and Country Estate on a Part of Portion 106 IR of the Farm Klipriviersberg (Meyer's Farm), Gauteng Province Heritage Impact Assessment Specialist Reports Francois P Coetzee, Joanna Behrens 08/07/2020 - 09:49
PIA FOR THE CONSTRUCTION OF CULVERT 1 AND 2 ON ROAD L1526 Palaeontological Impact Assessment for the proposed two culverts on Road L1526, Bergville, Okhahlamba Local Municipality, KwaZulu Natal Province PIA Phase 1 20/03/2021 Marion Bamford Prof Marion Bamford Prof Marion Bamford 14/01/2022 - 13:13
Heritage IAR - Lichtenburg 2 PV_Nov 2018 Heritage Impact Assessment for the Development of the Lichtenburg 2 PV Solar Energy Facility and Associated Infrastructure on a Site Near Lichtenburg, North West Province. Heritage Impact Assessment Specialist Reports 15/11/2018 CTS Heritage Savannah Environmental (Pty) Ltd 17/01/2019 - 10:03
Dwaalboom Solar 2 - HIA 01/09/2023 - 14:54
HIA Scoping: construction of two 400kV transmission lines between Koeberg 2 and the Stikland substation, Cape Town Metro Scoping Heritage Impact Assessment for the construction of two 400kV transmission lines between Koeberg 2 and the Stikland substation, Cape Town Metro, Western Cape Heritage Scoping 23/10/2009 Timothy Hart ACO Associates CC Savannah Environmental (Pty) Ltd 24/07/2017 - 15:33
Heritage amendment letter: BESS Hoekplaas PV2 Heritage amendment letter: BESS Hoekplaas PV2 Heritage Statement 27/08/2020 ACO Associates CC 17/09/2020 - 14:22
Kutlwano Heritage Impact Assessment 30/07/2021 - 10:04