THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 16801 - 16850 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Harmony Reclamation Pipeline PIA | Paleontological Impact Assessment for the Proposed Harmony Reclamation Pipeline Project. | PIA Desktop | 28/10/2021 | Elize Butler | PGS Heritage (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 19/01/2022 - 15:35 |
HIA Harmony Reclamation Project | THE PROPOSED HARMONY FSS6 RECLAMATION PIPELINE, WELKOM, FREE STATE PROVINCE: HERITAGE IMPACT ASSESSMENT | Heritage Impact Assessment Specialist Reports | 28/10/2021 | Wouter Fourie | PGS Heritage (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 26/11/2021 - 12:15 |
HIA Harmony Reclamation Pipeline Project | THE PROPOSED HARMONY FSS6 RECLAMATION PIPELINE, WELKOM, FREE STATE PROVINCE: HERITAGE IMPACT ASSESSMENT | Heritage Impact Assessment Specialist Reports | 28/10/2021 | Wouter Fourie | PGS Heritage (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 26/11/2021 - 12:51 |
Application for exemption from a Heritage Impact Assessment for the proposed reworking of backfilled Opencast Pits at Dwarsrivier Chrome Mine, Limpopo Province | Application for exemption from a Heritage Impact Assessment for the proposed reworking of backfilled Opencast Pits at Dwarsrivier Chrome Mine, Limpopo Province | HIA Letter of Exemption | 28/10/2021 | Jaco van der Walt | Beyond Heritage | Envirogistics (Pty) Ltd | 02/11/2021 - 12:09 |
Camden I H&A Heritage Scoping Report | HERITAGE SCOPING REPORT For the Proposed Camden I Green Hydrogen and Ammonia Facility, Mpumalanga Province, South Africa | Heritage Scoping | 29/10/2021 | Jaco van der Walt | Beyond Heritage | WSP Group Africa (Pty) Ltd | 08/03/2022 - 14:45 |
HIA report Beatrix DF-SMF 11kV interconnector | Heritage Impact Assessment for the Beatrix DF-SMF 11KV overhead powerline interconnector, Theunissen Free State | HIA Phase 2 | 29/10/2021 | Jaco van der Walt | Beyond Heritage | Eskom - FSOU | 20/12/2021 - 12:43 |
Camden II WEF Heritage Scoping Report | HERITAGE SCOPING REPORT For the Proposed Camden II Wind Energy Facility (up to 210MW), Mpumalanga Province, South Africa | Heritage Scoping | 29/10/2021 | Jaco van der Walt | Beyond Heritage | WSP Group Africa (Pty) Ltd | 09/03/2022 - 09:44 |
HIA report Beatrix DF-SMF 11kV interconnector | Heritage Impact Assessment for the Beatrix DF-SMF 11KV overhead powerline interconnector, Theunissen Free State | HIA Phase 2 | 29/10/2021 | Jaco van der Walt | Beyond Heritage | Eskom - FSOU | 20/12/2021 - 14:16 |
Palaeontological Impact Assessment for the Proposed Residential Township (Andeon X47), on Portion 183 (a Portion of Portion 179) of the Farm Zandfontein 317-JR, City of Tshwane, Gauteng Province | Palaeontological Impact Assessment for the Proposed Residential Township (Andeon X47), on Portion 183 (a Portion of Portion 179) of the Farm Zandfontein 317-JR, City of Tshwane, Gauteng Province | PIA Desktop | 29/10/2021 | Jaco van der Walt | Beyond Heritage | Isquare Environmental Planning and GIS | 31/03/2022 - 17:10 |
Bosveld Phosphates PIA 2022 | Bosveld Phosphates Paleaontology IA | PIA Desktop | 29/10/2021 | Bruce Rubidge | 20/07/2022 - 08:49 | ||
PIA desktop | PIA report Pampierstad 22 kV line | PIA Desktop | 29/10/2021 | 11/11/2021 - 11:20 | |||
Camden I WEF Heritage Scoping Report | HERITAGE SCOPING REPORT For the Proposed Camden I Wind Energy Facility (up to 210MW), Mpumalanga Province, South Africa | Heritage Scoping | 29/10/2021 | Jaco van der Walt | Beyond Heritage | WSP Group Africa (Pty) Ltd | 08/03/2022 - 12:33 |
PIA report | PIA report Pampierstad 22 kV line | PIA Desktop | 29/10/2021 | 11/11/2021 - 11:33 | |||
Camden 1 400kV Heritage Report | HERITAGE SCOPING REPORT For the Proposed Camden 1 up to 400kV Grid Connection and Collector substation, Mpumalanga Province, South Africa | Heritage Scoping | 29/10/2021 | Jaco van der Walt | Beyond Heritage | WSP Group Africa (Pty) Ltd | 08/03/2022 - 14:01 |
Camden 400KV Heritage Scoping Report | HERITAGE SCOPING REPORT For the Proposed Camden 1 up to 400kV Grid Connection and Collector substation, Mpumalanga Province, South Africa | Heritage Scoping | 29/10/2021 | Jaco van der Walt | Beyond Heritage | WSP Group Africa (Pty) Ltd | 08/03/2022 - 14:19 |
Phase 1 Heritage Impact Assessment for the proposed new Good Hope Solar PV facility near Dealesville, Free State Province. | Phase 1 Heritage Impact Assessment for the proposed new Good Hope Solar PV facility near Dealesville, Free State Province. A phase 1 Heritage Impact Assessment was carried out for the establishment of a proposed new solar PV facility on the farms Goede Hoop 1028, Epsom Downs 1216 and Gedenksrust 1029 near Dealesville in the Free State province. | Heritage Impact Assessment Specialist Reports | 30/10/2021 | Lloyd Rossouw | Exigent Engineering Consultants | 30/05/2022 - 21:26 | |
Phase 1 Heritage Impact Assessment for the proposed new Good Hope Solar PV facility near Dealesville, Free State Province. | A phase 1 Heritage Impact Assessment was carried out for the establishment of a proposed new solar PV facility on the farms Goede Hoop 1028, Epsom Downs 1216 and Gedenksrust 1029 near Dealesville in the Free State province. Good Hope 2 largely covers “degraded” farmland terrain (in the sense that it has either been ploughed or used for pasture or both in the past) and is partially underlain by Permian shales and siltstones of the Tierberg Formation (Ecca Group), that are covered by a well-developed and calcrete-rich aeolian sand overburden. There is no aboveground evidence of historically significant building structures older than 60 years, intact Stone Age archaeological remains, graves or material of cultural significance within the confines of the two development footprints. | HIA Phase 1 | 30/10/2021 | Lloyd Rossouw | Exigent Engineering Consultants | Ophiucus Energy (Pty) Ltd. | 30/05/2022 - 22:08 |
PIA report Manyeding Mothibistad 22 kV powerline | PIA report Manyeding Mothibistad 22 kV powerline | PIA Phase 1 | 30/10/2021 | 08/11/2021 - 10:16 | |||
Storm water Pipeline along Webster Street | Phase 1 heritage impact assessment (HIA) for the proposed Storm water Pipeline along Webster Street in Polokwane Local Municipality area, Capricorn District, Limpopo Province. | HIA Phase 1 | 31/10/2021 | Roy Muroyi | Tsimba Archaeological Footprints (Pty) Ltd | Nemai Consulting | 28/09/2021 - 20:09 |
Mvunyana River Bridge | Heritage Impact Assessment of the proposed construction of the Mvunyana River Bridge. | HIA Phase 1 | 31/10/2021 | Roy Muroyi | Tsimba Archaeological Footprints (Pty) Ltd | Hanslab (Pty) Ltd | 13/10/2021 - 08:46 |
Addendum to the 1st phase H.I.A. of a proposed upgrading and extension of the proposed storm-water management project | Addendum to the 1st phase H.I.A. of a proposed upgrading and extension of the proposed storm-water management project at Venetia Mine, Limpopo Province, South Africa For De Beers Consolidated Mines (Pty) Ltd. | HIA Phase 1 | 31/10/2021 | 15/11/2021 - 14:57 | |||
2nd Addendum to the 1st phase H.I.A. of a proposed upgrading and extension of the proposed storm-water management project | 2nd Addendum to the 1st phase H.I.A. of a proposed upgrading and extension of the proposed storm-water management project at Venetia Mine, Limpopo Province, South Africa For De Beers Consolidated Mines (Pty) Ltd. | 31/10/2021 | 15/11/2021 - 15:00 | ||||
2nd Addendum to the 1st phase H.I.A. of a proposed upgrading and extension of the proposed storm-water management project | 2nd Addendum to the 1st phase H.I.A. of a proposed upgrading and extension of the proposed storm-water management project at Venetia Mine, Limpopo Province, South Africa For De Beers Consolidated Mines (Pty) Ltd. | 31/10/2021 | 15/11/2021 - 15:04 | ||||
HIA for Thakadu SPP | Heritage Impact Assessment Report for Thakadu Solar Power Plant | 01/11/2021 | HCAC Heritage Consultants | Environamics | 07/01/2022 - 08:23 | ||
60 year permit requirement | Heritage letter/permit of exemption required to submit deviation plans to Council for approval | HIA Letter of Exemption | 01/11/2021 | 31/10/2021 - 12:21 | |||
A phase 1 HIA Report for the proposed Venetia Mine Solar PV Facility | HERITAGE IMPACT ASSESSMENT RELATING TO THE PROPOSED VENETIA MINE SOLAR PHOTO VOLTAIC (PV) FACILITY AND ASSOCIATED POWERLINE, MUSINA LOCAL MUNICIPALITY OF THE VHEMBE DISTRICT, LIMPOPO PROVINCE, SOUTH AFRICA. | HIA Phase 1 | 01/11/2021 | Mathoho Ndivhuho Eric | Millenium Heritage Group (Pty) Ltd | Millenium Heritage Group (Pty) Ltd | 23/11/2021 - 14:32 |
A phase 1 HIA Report for the proposed Venetia Mine Solar PV Facility | PHASE 1 HERITAGE IMPACT ASSESSMENT RELATING TO THE PROPOSED VENETIA MINE SOLAR PHOTO VOLTAIC (PV) FACILITY AND ASSOCIATED POWERLINE, MUSINA LOCAL MUNICIPALITY OF THE VHEMBE DISTRICT, LIMPOPO PROVINCE, SOUTH AFRICA. | HIA Phase 1 | 01/11/2021 | Eric Ndivhuho Mathoho | Millenium Heritage Group (Pty) Ltd | Millenium Heritage Group (Pty) Ltd | 23/11/2021 - 16:11 |
HIA Phase 1 - Vaalkants and Boshhoek | Phase 1 Archaeological and Heritage Impact Assessment Report f or the Prospecting Right Application And Environmental Authorisation In Order to Prospect For Coal Minerals On Portion 1, 2, 3 And 5 of Boschhoek 156 HU And Portions 3 And 4 of Vaalkrantz Farms, within Abaqulisi Local Municipality , Zululand District Municipality , KwaZulu Natal Province | HIA Phase 1 | 01/11/2021 | Muofhe Ravhura | Geoluken Consulting (Pty) Ltd | Mbviseni Sustainable Environmental Initiative | 20/01/2022 - 12:42 |
96 Jabu Ndlovu st-KZNMuseum-HIA | Heritage Impact Assessment of structures and proposed new Museum and archives at 96 Jabu Ndlovu street, Pietermaritzburg, KZN | HIA Phase 2 | 01/11/2021 | Lindsay Napier | Lindsay Napier Architect | Sakhisizwe Architects and Interiors | 11/07/2021 - 18:39 |
Proposed New City Hall Distributer Substation | PERMIT APPLICATION FOR A NEW ELECTRICAL DISTRIBUTER SUBSTATION FOR THE DURBAN CITY HALL - LOCATED AT 234/263 DR. PIXLEY KESAME STREET. | 02/11/2021 | Somakanthen Moghambaram Govender | Artek 4 Architects (KZN) CC | Artek 4 Architects (KZN) CC | 02/11/2021 - 14:42 | |
Proposed bulk water infrastructure (dams & weirs) on the farm Nosilla 27JU | Phase 1 AIA / HIA for proposed bulk water infrastructure (dams & weirs) on the farm Nosilla 27JU, White River, Hazyview, Mpumalanga Province | AIA Phase 1 | 02/11/2021 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Rhengu Environmental Services | 02/11/2021 - 19:48 |
34 Bishop Road, Windermere, Berea | Proposed alterations and remedial work to Erf 12714 (Erf R/1452 and 1/1452) , 34 Bishop Road, Windermere, Berea, Durban, Ethekwini, KwaZulu-Natal | Heritage Statement | 02/11/2021 | Gerhard Gustav Theron | 11/11/2021 - 09:12 | ||
Proposed New City Hall Distributer Substation | PERMIT APPLICATION FOR A NEW ELECTRICAL DISTRIBUTER SUBSTATION FOR THE DURBAN CITY HALL - LOCATED AT 234/263 DR. PIXLEY KESAME STREET | 02/11/2021 | Somakanthen Moghambaram Govender | Artek 4 Architects (KZN) CC | Artek 4 Architects (KZN) CC | 02/11/2021 - 12:03 | |
HIA report Manyeding Mothibistad 22 kV powerline | HIA report Manyeding Mothibistad 22 kV powerline | HIA Phase 1 | 03/11/2021 | 08/11/2021 - 10:13 | |||
Heritage Impact Assessment - Proposed integrated residential development, Komatipoort | HIA Phase 1 | 03/11/2021 | Christine Van Wyk Rowe | South African Heritage Resources Agency | Adansonia Heritage Consultants | 13/12/2021 - 13:27 | |
HIA Report for the 33kV/132kV substation and associated infrastructure for the Sutherland & Rietrug WEFs | HERITAGE IMPACT ASSESSMENT: PROPOSED 33KV/132KV SUBSTATION, 132KV POWERLINE WITH A 132KV SWITCHING STATION AND ASSOCIATED INFRASTRUCTURE FOR THE SUTHERLAND AND RIETRUG WIND ENERGY FACILITIES, SUTHERLAND MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 04/11/2021 | Jayson Orton | ASHA Consulting(Pty) Ltd | 15/11/2021 - 09:18 | |
HIA and PIA Reports | Tswalu 22kV Powerline HIA Reports | HIA Phase 1 | 04/11/2021 | Eskom - NOU | 01/12/2021 - 09:55 | ||
HIA Report Sutherland & Rietrug WEF Grid Infrastructure | HERITAGE IMPACT ASSESSMENT: PROPOSED 33KV/132KV SUBSTATION, 132KV POWERLINE WITH A 132KV SWITCHING STATION AND ASSOCIATED INFRASTRUCTURE FOR THE SUTHERLAND AND RIETRUG WIND ENERGY FACILITIES, SUTHERLAND MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 04/11/2021 | Jayson Orton | ASHA Consulting(Pty) Ltd | 15/11/2021 - 08:26 | |
Proposed Letter of Exemption construction of a telecommunication mast on the Farm Klipheuwel 291 | ARCHAEOLOGICAL HERITAGE: PROPOSED LETTER OF EXEMPTION FROM FURTHER SPECIALIST STUDIES & MITIGATION. PROPOSED CONSTRUCTION OF A 35M HIGH TELECOMMUNCATION MAST ON PORTION 62 OF THE FARM KLIPHEUVEL 291, JOUBERTINIA RD, SARAH BAARTMAN DISTRICT MUNICIPALITY, EASTERN CAPE | HIA Letter of Exemption | 05/11/2021 | Alan Smith | Enviroafrica CC | 05/11/2021 - 15:16 | |
DUT Heritage Impact Assessment Report | HIA report for Ritson Campus - New Innovation Hub, Health Science, Lecture Venues, Arts and Design Buildings | Heritage Scoping | 05/11/2021 | George Kunje | Ukuza Consulting (Pty) Ltd | Durban University of Technology | 03/03/2022 - 13:28 |
Amaoti Heritage Impact Assessment | HIA DESKTOP FOR THE GREATER AMAOTI HOUSING DEVELOPMENT | Heritage Impact Assessment Specialist Reports | 07/11/2021 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | SiVEST SA (Pty) Ltd | 30/11/2021 - 12:33 |
PIA for the proposed new 33kV/132kV substation & associated infrastructure for the Sutherland & Rietrug WEFs | PROPOSED NEW 132KV POWERLINE, 132KV SWITCHING STATION WITH A 33KV/132KV SUBSTATION AND RELATED INFRASTRUCTURE FOR THE AUTHORISED SUTHERLAND CLUSTER WIND ENERGY FACILITIES ON THE REMAINING EXTENT OF NOOITGEDACHT FARM 148, SUTHERLAND MAGISTERIAL DISTRICT, NORTHERN CAPE PROVINCE | Palaeontological Specialist Reports | 08/11/2021 | John Almond | Natura Viva CC | 15/11/2021 - 09:21 | |
HIA report | Heritage Impact Assessment for the Pampierstad 22Kv Powerline, Northern Cape Province | Heritage Impact Assessment Specialist Reports | 08/11/2021 | 11/11/2021 - 11:26 | |||
HIA report | Heritage Impact Assessment for the Pampierstad 22Kv Powerline, Northern Cape Province | Heritage Impact Assessment Specialist Reports | 08/11/2021 | 11/11/2021 - 11:36 | |||
PIA for the Proposed new grid infrastructure for the Sutherland & Rietrug WEFs | PROPOSED NEW 132KV POWERLINE, 132KV SWITCHING STATION WITH A 33KV/132KV SUBSTATION AND RELATED INFRASTRUCTURE FOR THE AUTHORISED SUTHERLAND CLUSTER WIND ENERGY FACILITIES ON THE REMAINING EXTENT OF NOOITGEDACHT FARM 148, SUTHERLAND MAGISTERIAL DISTRICT, NORTHERN CAPE PROVINCE | Palaeontological Specialist Reports | 08/11/2021 | John Almond | Natura Viva CC | 15/11/2021 - 08:29 | |
HIA PROPOSED 132KV/400KV ON-SITE MAIN TRANSMISSION SUBSTATION (MTS) AND ASSOCIATED INFRASTRUCTURE | HERITAGE IMPACT ASSESSMENT: PROPOSED 132KV/400KV ON-SITE MAIN TRANSMISSION SUBSTATION (MTS) AND ASSOCIATED INFRASTRUCTURE NEAR DEALESVILLE, BOSHOF MAGISTERIAL DISTRICT, FREE STATE Required under Section 38(8) of the National Heritage Resources Act (No. 25 of 1999) as part of a Heritage Impact Assessment. | Heritage Impact Assessment Specialist Reports | 09/11/2021 | Jayson Orton | ASHA Consulting(Pty) Ltd | SLR Consulting (South Africa) (Pty) Ltd | 23/11/2021 - 10:27 |
HIA - PROPOSED 132KV/400KV ON-SITE MAIN TRANSMISSION SUBSTATION (MTS) AND ASSOCIATED INFRASTRUCTURE | HERITAGE IMPACT ASSESSMENT: PROPOSED 132KV/400KV ON-SITE MAIN TRANSMISSION SUBSTATION (MTS) AND ASSOCIATED INFRASTRUCTURE NEAR DEALESVILLE, BOSHOF MAGISTERIAL DISTRICT, FREE STATE Required under Section 38(8) of the National Heritage Resources Act (No. 25 of 1999) as part of a Heritage Impact Assessment. | Archaeological Specialist Reports | 09/11/2021 | Jayson Orton | ASHA Consulting(Pty) Ltd | SLR Consulting (South Africa) (Pty) Ltd | 23/11/2021 - 10:47 |
Proposed Masterplan at DUT- Ph2 HIA Revised | Proposed Masterplan at Durban University of Technology : Phase 2-Heritage Impact Assessment of Structures | HIA Phase 2 | 09/11/2021 | Lindsay Napier | Lindsay Napier Architect | Durban University of Technology | 13/07/2021 - 20:34 |
HIA & PIA for 33kV Powerline, Free State | HERITAGE & PALAEO IMPACT ASSESSMENT: PROPOSED 33 kV POWERLINE NEAR DEALESVILLE, BOSHOF MAGISTERIAL DISTRICT, FREE STATE (2 separate reports) Required under Section 38(8) of the National Heritage Resources Act (No. 25 of 1999) as part of a Heritage Impact Assessment. | Heritage Impact Assessment Specialist Reports | 09/11/2021 | Jayson Orton, Elize Butler | ASHA Consulting(Pty) Ltd, Banzai Environmental (Pty) Ltd | SLR Consulting (South Africa) (Pty) Ltd | 23/11/2021 - 11:16 |
Heritage Screener: Checkers Coega | Desktop Heritage Screening Assessment for the proposed expansion of an existing Checkers Distribution Centre in an industrial area near Coega, Gqeberha | Heritage Scoping | 09/11/2021 | Jenna Lavin | CTS Heritage | PHS Consulting | 26/11/2021 - 09:19 |