THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 17251 - 17300 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
9-2-042-0013-20020801-ACRM | Phase 1 Archaeological Impact Assessment Portion 1 of the Farm Hermanus Onrus River No. 542 Caledon | AIA Phase 1 | 01/08/2002 | Jonathan Kaplan | Agency for Cultural Resources Management | MAPID_01975 | 16/06/2012 - 14:35 | |
9-2-258-0005-20020501-NCHM | A Survey of Cultural Resources in the Proposed Nellmapius X5 Development, Pretoria District, Gauteng | AIA Phase 1 | 01/05/2002 | Johnny Van Schalkwyk | National Cultural History Museum | MAPID_00514 | 16/06/2012 - 14:40 | |
AIA_Koeel_Bay_Hart_TJ_Aug03 | Baseline Heritage Study of a Proposed Development at Koeel Bay, Chapman's Peak Drive, Hout Bay | AIA Phase 1 | 01/08/2003 | Timothy Hart, Harriet Clift | ACO Associates CC | MAPID_02790 | 16/06/2012 - 14:47 | |
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT - Sontule Citrus | A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF 144 HA OF CITRUS ORCHARDS AND ASSOCIATED INFRASTRUCTURE AS WELL AS THE CONSTRUCTION OF A DAM ON THE REMAINDER OF FARM 632 NEAR SUNLANDS, SUNDAYS RIVER VALLEY MUNICIPALITY, EASTERN CAPE PROVINCE | AIA Phase 1 | 03/12/2021 | Kobus Reichert, Johan Binneman | Eastern Cape Heritage Consultants | Public Process Consultants | 28/10/2022 - 14:55 | |
Phase 1 Cultural and Archaeological Heritage Assessment Specialist Study for the Proposed Road Upgrade From Gravel to Tarred Surface at Dzumeri Village | Phase 1 Cultural and Archaeological Heritage Assessment Specialist Study for the Proposed Road Upgrade From Gravel to Tarred Surface at Dzumeri Village | AIA Phase 1 | 12/01/2005 | McEdward Murimbika | Nzumbululo Heritage Solutions | 16/06/2012 - 14:33 | ||
AIA_Sesheng_Kathu_Residential_Philip_L_Aug09 | Heritage Impact Assessment (Phase 1) of an 130 Ha Area Intended for Residential Development in Sesheng, Kathu, Northern Cape Province | AIA Phase 1 | 07/08/2009 | C Koortzen | National Museum Bloemfontein - Archaeology Contracts Office | MAPID_03146 | 16/06/2012 - 14:50 | |
mining permit application on the farm vogelstruisnel 173JP | AIA Phase 1 | 29/03/2023 - 23:09 | ||||||
9-2-016-0007-20050401-ACO | A First Phase Archaeological Survey of Wilde Varkens Valley 48 | AIA Phase 1 | 01/04/2005 | Timothy Hart, Dave Halkett | ACO Associates CC | MAPID_01958 | 16/06/2012 - 14:34 | |
9-2-231-0007-20061204-AHCC | Cultural Heritage Resources Impact Assessment of Goudkoppie Klerksdorp North West Province | AIA Phase 1 | 04/12/2006 | Udo Kusel | African Heritage Consultants CC | MAPID_01730 | 16/06/2012 - 14:38 | |
AIA_Farm_527_Dalweiding_Webley_LE_Aug09 | Archaeological Impact Assessment: Dalsig Development on Portions 2, 3 & 4 of Farm 527 (Dalweiding), Paarl District, Western Cape | AIA Phase 1 | 01/08/2009 | Lita Webley | ACO Associates CC | MAPID_02679 | 16/06/2012 - 14:45 | |
Archaeological and Heritage Impact Assessment | PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT THE PROPOSED DEVELOPMENT OF A BATTERY ENERGY STORAGE SYSTEM (BESS) AND ASSOCIATED INFRASTRUCTURE AT THE CUPRUM SUBSTATION LOCATED WITHIN COPPERTON, NEAR THE TOWN OF PRIESKA, NORTHERN CAPE PROVINCE | AIA Phase 1 | 01/06/2021 | Trust Mlilo | Sativa Travel and Environmental Consultants | AECOM SA - Head Office | 15/08/2022 - 09:18 | |
9-2-611-0001-19990601-ACRM | Archaeological Study Road MR 6, Madlangempisi - Msahweni, Swaziland | AIA Phase 1 | 01/06/1999 | Jonathan Kaplan | Agency for Cultural Resources Management | 16/06/2012 - 14:42 | ||
Portion 8 of Olyvenkolk 187 Green Continent PV Facility | Archaeological Impact Assessment for the proposed Green Continent Partners 75 MW Photovoltaiv Electricity Generation Facility on Portion 8 of the Farm Olyvenkolk No. 187, Kenhardt, Northern Cape | AIA Phase 1 | 01/11/2012 | Jonathan Kaplan | Agency for Cultural Resources Management | Ecoimpact | 28/01/2013 - 10:28 | |
80 Strand St | 80 Strand St | AIA Phase 1 | 16/06/2012 | Martin Hall | 16/06/2012 - 08:54 | |||
9-2-253-0027-20061101-NHS | Archaeological Impact Assessment Study for the Proposed Construction of Electricity Distribution Powerlines, Limpopo Province | AIA Phase 1 | 01/11/2006 | McEdward Murimbika | Nzumbululo Heritage Solutions | MAPID_01478 | 16/06/2012 - 14:39 | |
AIA_Kameeldoorn_71-JS_Kruger_N_Apr07 | Seekoeigat Resort Kameeldoorn 71-JS | AIA Phase 1 | 01/04/2007 | Neels Kruger, Alexander Antonites | 16/06/2012 - 14:46 | |||
9-2-279-0006-20030501-ACHMC | Heritage Impact Assessment Study for Eskom's Proposed New Power Line on the Farms Driefontein 114 IT and Lettieskeus 105 IT near Chrissiesmeer, Mpumalanga | AIA Phase 1 | 01/05/2003 | Julius CC Pistorius | MAPID_01140 | 16/06/2012 - 14:41 | ||
AIA_van_dyksbaai_van_Pletzen-Vos_L_Sep09 | Phase 1 Archaeological Impact Assessment on a 1.4 Ha Area (Erven 1224, 1225 & 1226) van Dyksbaai, Overstrand Munisipality, Division Caledon, Western Cape | AIA Phase 1 | 10/09/2009 | Liezl van Pletzen-Vos | Pro-Active Archaeology | MAPID_02763 | 16/06/2012 - 14:51 | |
9-2-101-0003-19971201-ACO | An Archaeological Re-Assessment of Boundary Changes, Namakwa Sands Mining Area | AIA Phase 1 | 01/12/1997 | Timothy Hart | ACO Associates CC | MAPID_01872 | 16/06/2012 - 14:37 | |
AIA_CHDM_Regional_Scheme_5_Van_Ryneveld_K_Mar11 | WATER SUPPLY BACKLOG IN THE CHDM: REGIONAL SCHEME 5 (NEAR COFIMVABA), EASTERN CAPE, SOUTHAFRICA | AIA Phase 1 | 07/03/2011 | Karen Van Ryneveld | 16/06/2012 - 14:44 | |||
AIA Ward 46 Culvert-Road Link, EL, BCMM | A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED NEW LINK ROAD AND BOX CULVERT WITHIN WARD 46, EAST LONDON, BUFFALO CITY METROPOLITAN MUNICIPALITY, EASTERN CAPE PROVINCE. | AIA Phase 1 | 15/09/2020 | Celeste Booth | Booth Heritage Consulting | Sontinga Consulting Services , Buffalo City Metropolitan Municipality | 15/09/2020 - 15:01 | |
9-2-037-0001-20050601-McGM | Report on Geological and Archaeological Observations: Bulk Sampling and Alluvial Mining on the Farm Hospital 365, Prieska. Sandstraat Eksplorasie (Pty) Ltd | AIA Phase 1 | 01/06/2005 | Peter Beaumont | McGregor Museum | MAPID_00973 | 16/06/2012 - 14:35 | |
9-2-223-0006-20020601-CRMA | Heritage Impact Assessment for the Proposed Kwenele South Extension 2 on a Remainder of the Farm Boomplaats 200 IR in Gauteng, South Africa | AIA Phase 1 | 01/06/2002 | Polke Birkholtz | CRM Africa | MAPID_00582 | 16/06/2012 - 14:38 | |
AIA_Everest_South_Graves_Huffman_TN_May01 | Historic Graves at Everest South, Mpumalanga | AIA Phase 1 | 01/05/2001 | Thomas Huffman, MH Alex Schoeman | University of the Witwatersrand - Archaeological Resources Management | MAPID_00699 | 16/06/2012 - 14:45 | |
AIA FOR THE PROPOSED ZITHOBENI HEIGHTS BULK OUTFALL SEWER PROJECT IN THE CITY OF TSHWANE MUNICIPALITY, GAUTENG PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF DEMARACTED AREAS ON PORTIONS OF THE FARMS HONDSRIVIER 508JR & ROODEPOORT 504JR FOR THE PROPOSED ZITHOBENI HEIGHTS BULK OUTFALL SEWER PROJECT IN THE CITY OF TSHWANE MUNICIPALITY, GAUTENG PROVINCE | AIA Phase 1 | 17/07/2018 | Neels Kruger | Exigo Sustainability | SPOOR Environmental Services (PTY) Ltd. | 24/08/2018 - 10:00 | |
AIA Kyalami Corner, Gauteng Province | ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED KYALAMI CORNER BUSINESS DEVELOPMENT, GAUTENG PROVINCE | AIA Phase 1 | 30/06/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | LEAP - Lanscape Architect Environmental Planner | 15/09/2016 - 11:53 | |
Construction of an irrigation dam on the farm Esperado | PHASE 1 ARCHAEOLOGICAL / HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED LOUWS CREEK DAM PROJECT: CONSTRUCTION OF AN IRRIGATION DAM ON PORTIONS OF THE REMAINING EXTENT OF THE FARM ESPERADO 253JU AND PORTIONS 1 & 2 OF ESPERADO ANNEX 222JU, LOUW’S CREEK-KAAPMUIDEN AREA, MPUMALANGA PROVINCE | AIA Phase 1 | 13/11/2020 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Rhengu Environmental Services | 13/11/2020 - 12:33 | |
AIA_Road_Gansbaai_to_Bredasdorp_Hart_TJ_Jan05 | Phase 1 Heritage Impact Assessment of Upgrading the Road from Gansbaai to Bredasdorp Western Cape Province | AIA Phase 1 | 01/01/2005 | Timothy Hart | ACO Associates CC | MAPID_02807 | 16/06/2012 - 14:49 | |
9-2-060-0023-20031201-NONE | Archaeological Heritage Resources Assessment Plot 10 and Allied Areas of Portion 1 of Farm No. 1050 | AIA Phase 1 | 01/12/2003 | Royden Yates | MAPID_01865 | 16/06/2012 - 14:36 | ||
9-2-400-0001-20030501-ETCH | Cultural Heritage Assessment of the Proposed Eros-Grassridge 400 kV Transmission line, Eastern Cape and Kwazulu Natal, South Africa | AIA Phase 1 | 01/05/2003 | Len van Schalkwyk, Elizabeth Wahl | eThembeni Cultural Heritage | 16/06/2012 - 14:42 | ||
AIA_Mapungubwe_Tourism_Huffman_TN_Jun03 | Archaeological Assessment of Tourist Developments in the Mapungubwe Cultural Landscape | AIA Phase 1 | 01/06/2003 | Thomas Huffman | University of the Witwatersrand - Archaeological Resources Management | MAPID_00245 | 16/06/2012 - 14:47 | |
AIA FOR THE SANRAL NATIONAL ROUTE N11 UPGRADE, MPUMALANGA PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF AREAS DEMARACTED FOR THE SANRAL NATIONAL ROUTE N11 UPGRADE, BETWEEN SECTION 9 HENDRINA (KM 0.00) AND THE HENDRINA POWER STATION (KM18.56), MPUMALANGA PROVINCE | AIA Phase 1 | 04/09/2015 | Neels Kruger | Exigo3 Sustainability | EOH Coastal & Environmental Services (CES) - East London | 28/09/2015 - 13:27 | |
9-2-269-0017-20070701b-AI | Heritage Impact Assessment for the Proposed Muswubi Entertainment Centre: Tshatshingo Lodge at Tshidzivhe Village, Vhembe District, in the Limpopo Province | AIA Phase 1 | 01/07/2007 | Stephan Gaigher | Archaeo-Info | MAPID_00886 | 16/06/2012 - 14:40 | |
Development of two tented camps on the Songimvelo Nature Reserve | A Phase 1 AIA & HIA: Development of two tented camps at Songimvelo Nature Reserve on the farms Laaggenoeg 158IT & Onverwacht 733 IT, Eerstehoek, Mpumalanga | AIA Phase 1 | 27/11/2018 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | UmSinsi Environmental Specialists CC | 27/11/2018 - 14:33 | |
A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE KOOFONTEIN MINING RIGHTS APPLICATION | A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE KOOFONTEIN MINING RIGHTS APPLICATION ON VARIOUS PORTIONS OF THE FARMS KOOFONTEIN 265JQ & BOSCHFONTEIN 268JQ NEAR RUSTENBURG, NORTHWEST PROVINCE | AIA Phase 1 | 01/04/2021 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Red Kite Environmental Solutions (Pty) Ltd | 17/02/2022 - 13:39 | |
9-2-009-0001-20080328-AM | Phase 1 Archaeological Impact Assessment - the Albany Regional Water Supply Scheme, Eastern Cape, South Africa | AIA Phase 1 | 28/03/2008 | Karen Van Ryneveld | MAPID_02239 | 16/06/2012 - 14:33 | ||
AIA_Townlands_Pt_452_Fourie_W_Jun09 | Heritage Impact Assessment Lewende Woord Church development on Portion 452 (a portion of portion 39) of the farm Townlands of Lydenburg 31 Jt, Thaba Chweu, Mpumalanga Province. | AIA Phase 1 | 25/06/2009 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | 16/06/2012 - 14:50 | ||
Phase 1a AIA Extension of Electrical Grid Corridor Impofu Wind Farms | Phase 1a Archaeological Impact Assessment Proposed extension of the electrical grid corridor for the Impofu Wind Farms (East, West and North), between the Chatty and DEDISA Substations, Gqeberha (Port Elizabeth), Eastern Cape | AIA Phase 1 | 22/06/2021 | Peter Nilssen | CEN Integrated Environmental Management Unit | 03/07/2021 - 14:50 | ||
AIA_Nanescol_582_IQ_&_Rietspruit_583_IQ_Coetzee_FP_Mar08 | Cultural Heritage Survey of Portion 2 of the Farm Nanescol 582 IQ, Portions 61, 62 and 64 of the Farm Rietspruit 583 IQ, Vanderbijlpark District | AIA Phase 1 | 01/04/2008 | Francois P Coetzee | University of South Africa - Anthropology and Archaeology | MAPID_02392 | 16/06/2012 - 14:48 | |
9-2-026-0001-20080804-AM | Phase 1 Archaeological Impact Assessment: Proposed Pipeline, Portion of Farm 1008, Wintersrand, East London, Eastern Cape, South Africa | AIA Phase 1 | 04/08/2008 | Karen Van Ryneveld | ArchaeoMaps Archaeological Consultancy | Biotechnology and Environmental Specialist Consultancy CC | MAPID_02223 | 16/06/2012 - 14:34 |
9-2-252-0001-20020901-RRCRC | Archaeological Impact Assessment: Baphalaborwa Waste Disposal Landfill Site, Limpopo Province | AIA Phase 1 | 01/09/2002 | Frans Roodt | R & R Cultural Resource Consultants | MAPID_00265 | 16/06/2012 - 14:39 | |
AIA_HLUHLUWE-UMFOLOZI_CENTENARY_CENTRE_Anderson_G_Jun99 | ARCHAEOLOGICAL SURVEY OF THE DEVELOPMENT FOOTPRINT OF THE PROPOSED CENTENARY CENTRE, HLUHLUWE-UMFOLOZI PARK | AIA Phase 1 | 04/06/1999 | Gavin Anderson | KwaZulu Natal Museum | 16/06/2012 - 14:46 | ||
Archaeological Impact Assessment | Archaeological Impact AssessmentFor the proposed development of Erf 78 in Waltloo | AIA Phase 1 | 21/01/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | ENERWASTE SOLUTIONS (PTY) LTD | 03/02/2015 - 10:32 | |
AIA_Qwasha_Bridge_Anderson_G_May05 | The archaeological survey of the Qwasha Bridge & Associated Roads | AIA Phase 1 | 29/05/2005 | Gavin Anderson, L Anderson | Umlando: Archaeological Surveys & Heritage Management | MAPID_03356 | 16/06/2012 - 14:49 | |
9-2-262-0004-20060208-MPL | Heritage Scoping: Holding 16, Ruimsig Agricultural Holdings, Gauteng Province | AIA Phase 1 | 08/02/2006 | Wouter Fourie | Matakoma Heritage Consultants (Pty) Ltd | MAPID_00548 | 16/06/2012 - 14:40 | |
AIA_Lewende_Woord_Church_Fourie_W_Jun09 | Heritage Impact Assessment Lewende Woord Church Development on Portion 452 (a Portion of Portion 39) of the Farm Townlands of Lydenburg 31 JT, Thaba Chweu, Mpumalanga Province | AIA Phase 1 | 25/06/2009 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | MAPID_03168 | 16/06/2012 - 14:47 | |
9-2-303-0003-20080404-PAHS | First Phase Archaeological and Cultural Heritage Investigation of the Proposed Hlangana Groot Rivier Estate, Boshof, Free State | AIA Phase 1 | 04/04/2008 | Cobus Dreyer | MAPID_02181 | 16/06/2012 - 14:42 | ||
AIA_Zulti_North_and_Tisand_mining_Anderson_G_Jan04 | The archaeological survey of the Zulti North and Tisand mining | AIA Phase 1 | 01/01/2004 | Gavin Anderson, L Anderson | Umlando: Archaeological Surveys & Heritage Management | 16/06/2012 - 14:51 | ||
THE PROPOSED TOWNSHIP DEVELOPMENT IN DIBENG, NORTHERN CAPE PROVINCE | THE PROPOSED TOWNSHIP DEVELOPMENT IN DIBENG, NORTHERN CAPE PROVINCE | AIA Phase 1 | 05/05/2010 | Johnny Van Schalkwyk | Cultmatrix CC | 16/06/2012 - 14:33 | ||
9-2-209-0008-20030407-NCHM | Heritage Sites: Proposed Vosloorus Cultural Village | AIA Phase 1 | 07/04/2003 | Johnny Van Schalkwyk | National Cultural History Museum | MAPID_00572 | 16/06/2012 - 14:38 |