FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRefsort descending ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany MapID < 2009 Post date
Revised HIA_Sasol Shondoni Conveyor Amendment Project A (REVISED) PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE SASOL SHONDONI CONVEYER AMENDMENT PROJECT ON THE EASTERN HIGHVELD IN THE MPUMALANGA PROVINCE HIA Phase 1 15/02/2013 Julius CC Pistorius JMA Consulting (Pty) Ltd 18/02/2013 - 08:21
Revised HIA_Wonderfontein Colliery A REVISED PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED WONDERFONTEIN COLLIERY NEAR BELFAST IN THE MPUMALANGA PROVINCE OF SOUTH AFRICA HIA Phase 1 01/02/2013 Julius CC Pistorius Zyntha Consulting (Pty) Ltd 20/02/2013 - 12:55
REVISED LETTER OF RECOMMENDATION FOR THE EXEMPTION OF A FULL PHASE 1 ARCHAEOLOGICAL HERITAGE IMPACT ASSESSMENT FOR PORTION 6, 10 AND 40 OF THE FARM T’ZOETGENEUGD 192 IN THE SUNDAY’S RIVER VALLEY LOCAL MUNICIPALITY A REVISED LETTER OF RECOMMENDATION (WITH CONDITIONS) FOR THE EXEMPTION OF A FULL PHASE 1 ARCHAEOLOGICAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION ANDOPERATION OF 6 BREEDER HOUSE FACILITIES ON A PORTION OF PORTION 6, 10 AND 40 OF THE FARM T’ZOETGENEUGD 192 IN THE SUNDAY’S RIVER VALLEY LOCAL MUNICIPALITY OF THE EASTERN CAPE PROVINCE HIA Letter of Exemption 31/01/2019 Johan Binneman Eastern Cape Heritage Consultants Public Process Consultants 09/12/2022 - 14:50
REVISED LETTER OF RECOMMENDATION FOR THE EXEMPTION OF A FULL PHASE 1 ARCHAEOLOGICAL HERITAGE IMPACT ASSESSMENT FOR PORTION 6, 10 AND 40 OF THE FARM T’ZOETGENEUGD 192 IN THE SUNDAY’S RIVER VALLEY LOCAL MUNICIPALITY A REVISED LETTER OF RECOMMENDATION (WITH CONDITIONS) FOR THE EXEMPTION OF A FULL PHASE 1 ARCHAEOLOGICAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION ANDOPERATION OF 6 BREEDER HOUSE FACILITIES ON A PORTION OF PORTION 6, 10 AND 40 OF THE FARM T’ZOETGENEUGD 192 IN THE SUNDAY’S RIVER VALLEY LOCAL MUNICIPALITY OF THE EASTERN CAPE PROVINCE HIA Letter of Exemption 31/01/2019 Johan Binneman Eastern Cape Heritage Consultants Public Process Consultants 13/02/2023 - 15:39
Revised Palaeontological Impact Assessment Revised Palaeontological Impact Assessment Palaeontological Specialist Reports 21/06/2021 Elize Butler Banzai Environmental (Pty) Ltd Savannah Environmental (Pty) Ltd 21/06/2021 - 18:56
Revised Palaeontological Impact Assessment Appendix I(1) - Palaeontological Impact Assessment Palaeontological Specialist Reports 21/06/2021 Elize Butler Banzai Environmental (Pty) Ltd Savannah Environmental (Pty) Ltd 21/06/2021 - 19:01
Revised Palaeontological Impact Assessment Appendix I(1) - Palaeontological Impact Assessment Palaeontological Specialist Reports 21/06/2021 Elize Butler Banzai Environmental (Pty) Ltd Savannah Environmental (Pty) Ltd 21/06/2021 - 19:53
Revised Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED PROSPECTING RIGHT APPLICATION WITHOUT BULK SAMPLING FOR THE PROSPECTING OF DIAMONDS (ALLUVIAL) NEAR BLOEMHOF ON PORTION 3 (PORTION 1) OF THE FARM BOSCHPAN 339, THE REMAINING EXTENT OF PORTION 8 (PORTION 1), PORTION 9 (PORTION 1) PORTION 10 (PORTION 1) AND PORTION 17 (PORTION 1) OF THE FARM PANFONTEIN 270, HIA Phase 1 18/02/2021 Johnny van Schalkwyk 18/02/2021 - 21:05
Revised Phase 1 Cultural Heritage Impact Assessment: Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED PROSPECTING RIGHT AREA AND MINING PERMIT AREA NEAR RITCHIE ON THE REMAINING EXTENT OF THE FARM ZANDHEUVEL 144, REGISTRATION DIVISION: KIMBERLEY, NORTHERN CAPE PROVINCE HIA Phase 1 14/02/2021 Johnny van Schalkwyk 16/02/2021 - 11:14
Revised PIA_Swazi Border Patrol Road Project PALAEONTOLOGICAL FIELD ASSESSMENT OF THE PROPOSED SWAZILAND-MOZAMBIQUE BORDER PATROL ROAD AND MOZAMBIQUE BARRIER STRUCTURE PIA Phase 1 15/11/2019 Elize Butler Banzai Environmental (Pty) Ltd Royal Haskoning DHV 14/04/2020 - 16:12
Revised Updated Site Management Plan Management, Monitoring and Evaluation of the Cradle of Humankind Fossil Sites Conservation Management Plan 01/01/2009 30/10/2014 - 10:50
RevisedAIA-KotuloTsatsi Revised Archaeological Impact Assessment Report for the proposed Kotulo Tsatsi CSP 3 Facility Archaeological Specialist Reports 03/08/2015 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 11/08/2015 - 17:12
Rezone and Sub-division of Sub 83 (of 43) of Lot WD No. 9734 Botha's Hill Proposed Land Sub-Division of Sub 83 (of 43) of Lot WD No. 9734, in extent 20, 7581 ha, Situated in the Botha’s Hill Health Committee Area, Port Natal-Ebhodwe Joint Services Board Area, Administrative District of Natal. eThekweni Metro, KwaZulu-Natal Heritage Scoping 17/03/2019 eThembeni Cultural Heritage eThembeni Cultural Heritage 17/03/2019 - 16:07
Rezoning ERF 8898/506 APPLICATION IN TERMS OF SECTION 2 OF THE SPATIAL PLANNING AND LANDUSE MANAGEMENT ACT, 2013, FOR THE REZONING OF ERF 8898, PORTION OF ERF 506, VRYBURG. 12/07/2016 Emendo Town and Regional Planning Emendo Town and Regional Planning Emendo Town and Regional Planning 02/05/2017 - 15:56
Rezoning ERF 8898/506 APPLICATION IN TERMS OF SECTION 2 OF THE SPATIAL PLANNING AND LANDUSE MANAGEMENT ACT, 2013, FOR THE REZONING OF ERF 8898, PORTION OF ERF 506, VRYBURG. 12/07/2016 Emendo Town and Regional Planning Emendo Town and Regional Planning Emendo Town and Regional Planning 02/05/2017 - 15:56
Rhino Andalusite Mine PV Solar Plant Development Palaeontological Impact Assessment: Phase 1: Field Study Rhino Andalusite Mine PV Solar Plant Development Palaeontological Impact Assessment: Phase 1: Field Study PIA Phase 1 30/05/2023 Dr. Heidi Fourie Dr Heidi Fourie Dr Heidi Fourie 06/10/2023 - 09:24
Rhino Hotel Rietfontein Rhino Hotel Rietfontein AIA Phase 1 16/06/2012 Thomas Huffman University of the Witwatersrand - Archaeological Resources Management 16/06/2012 - 14:33
RHINO OIL & GAS - SEIA - INSHORE LICENCE BLOCKS SCOPING AND ENVIRONMENTAL IMPACTASSESSMENT FOR PROPOSEDEXPLORATION ACTIVITIES IN VARIOUSINSHORE LICENCE BLOCKS OFF THESOUTH-WEST COAST OF SOUTH AFRICA 14/09/2015 - 14:44
Rhino Oil & Gas South Africa SCOPING AND ENVIRONMENTAL IMPACTASSESSMENT FOR PROPOSED OFFSHOREEXPLORATION ACTIVITIES IN LICENCEBLOCKS 3617 AND 3717 OFF THE SOUTHWESTCOAST OF SOUTH AFRICA Nicholas Arnott 14/09/2015 - 13:48
RHO1867_HIA HERITAGE IMPACT ASSESSMENT FOR RHODIUM REEF LIMITED PLATINUM OPERATION, 2430CC KENNEDYS VALE, DE GOEDEVERWATCHING 332 KT, LIMPOPO PROVINCE HIA Phase 1 16/04/2013 Johan Nel, Justin du Piesanie, Natasha Higgitt Digby Wells Environmental 16/04/2013 - 11:33
Rhone farm, Groot Drakenstein: Structural investigations of an 18th century outbuilding Rhone farm, Groot Drakenstein: Structural investigations of an 18th century outbuilding 01/01/2004 Hennie Vos ArCape CTS_3680 16/06/2012 - 14:33
Rhovan Phase I Updated HIA A second UPDATED PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR RHOVAN OPERATIONS IN THE CENTRAL BANKEVELD OF THE NORTH-WEST PROVINCE OF SOUTH AFRICA HIA Phase 1 06/09/2022 - 15:51
RHS- Heritage assessment-2021-02-15 Russel HS- Heritage assessment-2021-02-15 Heritage Scoping 15/02/2021 Lindsay Napier 26/10/2022 - 11:46
Richard Holgate SACAP Certification of registration Darren Gregory Scott Clifton DGSC Designs DGSC Designs 07/02/2023 - 16:37
Richards Bay CCPP_ASR (May'17) Archaeological Scoping Report for the Proposed Development of the Richards Bay Combined Cycle Power Plant (CCPP) and Associated Infrastructure on a Site Near Richards Bay, Kwazulu-Natal Province Archaeological Specialist Reports 17/05/2017 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 18/08/2017 - 15:44
Richards Bay CCPP_PIA Report (28.04.17) Palaeontological Impact Assessment of the Proposed Development of theRichards Bay Combined Cycle Power Plant (CCPP) and Associated Infrastructure on a Site Near Richards Bay, Kwazulu-Natal Province Palaeontological Specialist Reports 28/04/2017 Elize Butler Banzai Environmental (Pty) Ltd Savannah Environmental (Pty) Ltd 18/08/2017 - 15:41
Richards Bay Entrance - Exemption letter HIA Letter of Exemption Gavin Anderson KwaZulu-Natal Amafa and Research Institute Umlando: Archaeological Surveys & Heritage Management 06/12/2013 - 09:39
Richards Bay powership HIA FOR THE RICHARDS BAY POWERSHIP, RICHARDS BAY, KZN HIA Phase 1 06/11/2022 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Triplo4 Sustainable Solutions (Pty) Ltd 10/11/2022 - 09:22
Richards Bay Rising Mains HERITAGE SURVEY OF THE PROPOSED MEERENSEE AND BIRDSWOOD RISING MAINS, RICHARDS BAY, KWAZULU-NATAL HIA Phase 1 11/06/2019 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Exigent Engineering Consultants 30/07/2019 - 08:55
Richbay Vosloorus Heritage Assessment A REPORT ON AN ARCHAEOLOGICAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED RICHBAY FILLING PLANT, CLOSE TO VOSLOORUS, GAUTENG PROVINCE AIA Phase 1 22/11/2019 Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants WSP Environmental Pty Ltd - Johannesburg 05/07/2021 - 21:25
Richbay Vosloorys Palaeontological Assessment Richbay, Vosloorus Filling Plant - Impact Assessment: Phase 1: Field Study PIA Phase 1 14/02/2020 Heidi Fourie WSP Environmental Pty Ltd - Johannesburg 05/07/2021 - 21:27
Richmond Road excavation report Excavation / recovery of skeletal remains: Farm Dwars River 372 KT, Richmond Road Project Heritage Impact Assessment Specialist Reports 06/05/2021 Frans Roodt 06/05/2021 - 15:18
Riekerdam PHASE 1 HIA REPORT FOR THE PROPOSED CLEARANCE OF INDIGENOUS VEGETATION FOR THE DEVELOPMENT OF A NEW PIVOT POINT AND POULTRY HOUSES ON A PORTION OF RIEKERSDAM 109JP NEAR GROOT MARICO, NORTHWEST PROVINCE HIA Phase 1 02/03/2022 Anton Pelser A Pelser Archaeological Consulting AB Enviro Consult CC 24/03/2022 - 13:50
Riekersdam PHASE 1 HIA REPORT FOR THE PROPOSED CLEARANCE OF INDIGENOUS VEGETATION FOR THE DEVELOPMENT OF A NEW PIVOT POINT AND POULTRY HOUSES ON A PORTION OF RIEKERSDAM 109JP NEAR GROOT MARICO, NORTHWEST PROVINCE HIA Phase 1 14/03/2022 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING AB Enviro Consult CC 28/04/2022 - 14:27
Riekerts Laager, Siyabuswa, Mpumalanga Letter of recommendation for the exemption from a phase 1 archaeological and Heritage investigation for the proposed township establishment on portion 3 Riekerts Laager 165 JR Siyabuswa, Mpumalanga HIA Letter of Exemption 02/06/2014 Christine Van Wyk Rowe Adansonia Heritage Consultants Afrika Enviro & Biology 02/06/2014 - 09:51
Riemland Institution Development Proposed Riemland Institution development on Portion 4 of the Farm Bornst 107 LS, approximately 15 km north of Mogwadi, in the Makhado Local Municipality, Limpopo Province. HIA Phase 1 15/01/2016 Marko Hutten Tekplan Environmental 12/02/2016 - 11:18
RIETFONTEIN 107 BLOEMFONTEIN FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE PROPOSED 5HA ASPHALT PLANT AT PORTION 5, RIETFONTEIN 107, BLOEMSPRUIT, BLOEMFONTEIN Heritage Impact Assessment Specialist Reports 26/04/2015 Cobus Dreyer Nare Sereto Environment & Business Services Nare Sereto Environment & Business Services 27/05/2015 - 20:21
Rietfontein EA Amend HIA 10 dec13 A Report on a Heritage Impact Assessment for an amendment to the Proposed Eskom Rietfontein Pumps Lilo Line, Mpumalanga Province HIA Phase 1 31/10/2013 Anton van Vollenhoven Texture Environmental Consultants 19/12/2013 - 15:19
Rietfontein HIA Rietfontein Heritage Impact Assessment Report HIA Phase 1 01/06/2021 Anton Pelser 09/07/2021 - 10:21
Rietfontein Mixed-Use Development THE PROPOSED RAPID LAND RELEASE PROGRAMME FOR THE GAUTENG DEPARTMENT OF HUMAN SETTLEMENT: RIETFONTEIN SITE Heritage Impact Assessment Specialist Reports 14/02/2020 Cherene de Bruyn PGS Heritage (Pty) Ltd Department of Human Settlements (Provincial - Gauteng) 07/12/2020 - 17:04
Rietfontein Open Cast Coal Mine A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED UMCEBO RIETFONTEIN OPENCAST MINE NEAR MIDDELBURG IN THE MPUMALANGA PROVINCE AIA Phase 1 01/04/2012 Anton van Vollenhoven Archaetnos CC 28/06/2012 - 14:46
Rietfontein-Rietspruit Mixed Residential Development ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE DEMACATION OF RIETFONTEIN-REITSPRUIT MIXED RESIDENTIAL DEVELOPMENT ON FARMS RIETFONTEIN 152IR AND RIETSPRUIT 153 IR NEAR PALM RIDGE WITHIN EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE: GDARD Ref: Gaut (002/13-14/e0038) AIA Phase 1 17/06/2015 Ndivhuwo Eric Mathoho Millennium Heritage Group Naledzi Environmental Consultants 10/07/2015 - 10:35
Rietfontein-Rietspruit Mixed Residential Development ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE DEMACATION OF RIETFONTEIN-REITSPRUIT MIXED RESIDENTIAL DEVELOPMENT ON FARMS RIETFONTEIN 152IR AND RIETSPRUIT 153 IR NEAR PALM RIDGE WITHIN EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE: GDARD Ref: Gaut (002/13-14/e0038) AIA Phase 1 17/06/2015 Ndivhuwo Eric Mathoho Millennium Heritage Group Naledzi Environmental Consultants 10/07/2015 - 10:35
Rietfontein_NID Notification of Intent to Develop for the Rietfontein Prospecting EMP, Rietfontein 101IS, 2629AD Bethal, Mpumalanga Province Heritage Statement 16/10/2014 Natasha Higgitt Digby Wells Environmental 16/10/2014 - 12:44
Rietkloof Heritage Conservation Management Plan HERITAGE CONSERVATION MANAGEMENT PLAN for the approved Rietkloof WEF near Matjiesfontein in the Western Cape Conservation Management Plan 01/10/2021 Jenna Lavin CTS Heritage WSP Group Africa (Pty) Ltd 08/12/2021 - 06:40
Rietkloof Heritage Study UPDATED PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED RIETKLOOF WIND ENERGY FACILITY (WEF) SITUATED IN THE WITZENBURG LOCAL MUNICIPALITY AND LAINGSBURG LOCAL MUNICIPALITY, AND THE CAPE WINELANDS AND CENTRAL KAROO DISTRICT MUNICIPALITIES RESPECTIVELY. HIA Phase 1 31/10/2018 Celeste Booth Booth Heritage Consulting WSP Environmental Pty Ltd - Johannesburg 21/11/2018 - 09:42
Rietkloof Palaeontological Study PROPOSED RIETKLOOF WIND ENERGY FACILITY NEAR LAINGSBURG, LAINGSBURG LOCAL MUNICIPALITY, WESTERN CAPE PIA Phase 1 29/06/2018 John E Almond Natura Viva CC WSP Environmental Pty Ltd - Johannesburg 21/11/2018 - 09:48
Rietkloof Powerline Heritage Walkdown HERITAGE WALKDOWN REPORT for the approved Rietkloof WEF Grid Connection near Matjiesfontein in the Western Cape Heritage Study 29/09/2021 Jenna Lavin CTS Heritage WSP Group Africa (Pty) Ltd 08/12/2021 - 07:08
Rietkloof WEF Heritage Statement PART TWO AMENDMENT FOR THE APPROVED RIETKLOOF WEF NEAR MATJIESFONTEIN IN THE WESTERN CAPE Heritage Statement 10/11/2021 Jenna Lavin CTS Heritage WSP Group Africa (Pty) Ltd 08/12/2021 - 06:36
Rietkloof WEF Heritage Walkdown HERITAGE WALKDOWN REPORT for the approved Rietkloof WEF near Matjiesfontein in the Western Cape Heritage Study 29/09/2021 Jenna Lavin CTS Heritage WSP Group Africa (Pty) Ltd 08/12/2021 - 06:38

Pages

CSV
 
 

Search form