THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 17351 - 17400 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
Phase 1 Heritage study | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED LAKE UMUZI SOUTH BANK EXTENSION IN SECUNDA IN THE MPUMALANGA PROVINCE | HIA Phase 1 | 12/05/2015 | Julius CC Pistorius | Dr Julius CC Pistorious Archaeologist and heritage Consultant | 19/05/2015 - 10:20 | ||
Proposed KiPower 400kV loop-in and loop-out transmission lines to connect the KiPower IPP to the national grid | A phase I Heritage Impact Assessment (HIA) study for the proposed KiPower 400kV loop-in and loop-out transmission lines to connect the KiPower IPP to the national grid on the eastern Highveld in the Mpumalanga province | HIA Phase 1 | 12/05/2016 | Julius CC Pistorius | Dr Julius CC Pistorious Archaeologist and heritage Consultant | Jones & Wagener Engineering and Environmental Consultants | 19/05/2016 - 15:03 | |
Middelburg R575 Re-alignment | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED DEVIATION OF ROAD 575 (P127-2) NEAR MIDDELBURG) ON THE EASTERN HIGHVELD IN THE MPUMALANGA PROVINCE | Heritage Impact Assessment Specialist Reports | 13/09/2013 | Julius CC Pistorius | 28/11/2013 - 09:37 | |||
Heritage Impact Assessment- Akanani Mining | A Phase I Heritage Impact Assessment (HIA) Study for the proposed Akanani Mining (Pty) Ltd project near Mokopane in the Limpopo Province | HIA Phase 1 | 01/03/2020 | Dr Julius CC Pistorius | 11/05/2021 - 15:40 | |||
9-2-236-0002-20060301-ACHMC | A Phase I Heritage Impact Assessment (HIA) Study For the Lannex North Open Cape Archaeological Survey CCt Mine on the Farm Grootboom 336 KT in the Mpumalanga Province of South Africa | AIA Phase 1 | 01/03/2006 | Julius CC Pistorius | MAPID_01151 | 16/06/2012 - 14:39 | ||
EVRAZ Vametco | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE EVRAZ VAMETCO OPERATION NEAR MMAKAU AND MADIBENG IN THE BANKEVELD IN THE NORTH-WEST PROVINCE. & Palaeontological Scoping Report – Proposed EVRAZ Vametco Operation - May 2014 | HIA Phase 1 | 20/08/2012 | Julius CC Pistorius | 08/07/2014 - 16:28 | |||
AIA_Grootboom_335_KT_Pistorius_JCC_Mar06 | A Phase I Heritage Impact Assessment (HIA) Study For the Annex Conservation Open Cape Archaeological Survey CCt Mine on the Farm Annex Grootboom 335 KT in the Mpumalanga Province of South Africa | AIA Phase 1 | 01/03/2006 | Julius CC Pistorius | MAPID_01149 | 16/06/2012 - 14:45 | ||
Pase 1 HIA study for proposed Mafube Road Realignment | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED MAFUBE LIFE X ROAD REALIGNMENT PROJECT NEAR BELFAST IN THE MPUMALANGA PROVINCE | Heritage Study | 13/11/2017 | Dr Julius CC Pistorious Archaeologist and heritage Consultant | Golder Associates Africa (Pty) Ltd | 19/03/2018 - 10:08 | ||
A PHASE I HERITAGE IMPACT ASSESSMENT | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED LANDAU COLLIERY NAVIGATION SECTION UMLALAZI SOUTH BLOCK EXTENSION PROJECT NEAR EMAHLALENI (WITBANK) ON THE EASTERN HIGHVELD IN THE MPUMALANGA PROVINCE | HIA Phase 1 | 15/05/2015 | 08/06/2015 - 14:27 | ||||
PHASE I (HIA) PROPOSED CONSTRUCTION OF DEWATERING INFRASTRUCTURE AND A DECANT WATER PIPELINE | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR TAUNG GOLD (SECUNDA) (PROPRIETARY) LIMITED (TAUNG GOLD’S) PROPOSED CONSTRUCTION OF DEWATERING INFRASTRUCTURE AND A DECANT WATER PIPELINE NEAR SECUNDA ON THE EASTERN HIGHVELD IN THE MPUMALANGA PROVINCE | HIA Phase 1 | 30/04/2014 | Julius CC Pistorius | 03/09/2014 - 12:52 | |||
HIA for the Proposed Extension of the Klipfontein Section of Middelburg Mine | A Phase I Heritage Impact Assessment (HIA) Study for South32 SA Coal Holdings (Pty) Limited’s (South32 CSA) Proposed Extension of Opencast Operations and Associated Closure of a Section of the D253 Provincial Road at The Klipfontein Section of the Middelburg Mine on the Eastern Highveld in the Mpumalanga Province | HIA Phase 1 | 27/02/2015 | Julius CC Pistorius | Dr Julius CC Pistorious Archaeologist and heritage Consultant | Jones & Wagener Engineering and Environmental Consultants | 03/03/2016 - 10:12 | |
HIA_Sasol Shondoni Project | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR SASOL MINING’S PROPOSED SHONDONI PROJECT AND FOR BLOCK 8 ON THE EASTERN HIGHVELD IN THE MPUMALANGA PROVINCE OF SOUTH AFRICA | HIA Phase 1 | 01/08/2010 | Julius CC Pistorius | JMA Consulting (Pty) Ltd | 11/02/2013 - 10:48 | ||
HIA_Sasol Borrow Pits | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR SASOL MINING’S PROPOSED BORROW PITS ON THE EASTERN HIGHVELD IN THE MPUMALANGA PROVINCE | HIA Phase 1 | 01/02/2013 | Julius CC Pistorius | JMA Consulting (Pty) Ltd | 14/03/2013 - 08:25 | ||
HIA_Schietfontein_437JQ_Eland_Platinum_Mines_Pistorius_JCC_Mar10 | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR PORTIONS 13 AND 14 OF THE FARM SCHIETFONTEIN 437JQ FOR ELAND PLATINUM MINES (PTY) LTD (ELAND MINES) NEAR MADIBENG IN THE NORTH-WEST PROVINCE | HIA Phase 1 | 01/03/2010 | Julius CC Pistorius | 16/06/2012 - 14:52 | |||
A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR MARULA PLATINUM’S PROPOSED NEW MINE INFRASTRUCTURE IN THE STEELPOORT VALLLEY LIMPOPO PROVINCE | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR MARULA PLATINUM’S PROPOSED NEW MINE INFRASTRUCTURE IN THE STEELPOORT VALLLEY LIMPOPO PROVINCE | Heritage Impact Assessment Specialist Reports | Dr Julius CC Pistorius | 26/04/2022 - 09:48 | ||||
Shaft 16 Waste Rock Dump Expansion Project | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR IMPALA PLATINUM LIMITED’S (IMPALA) PROPOSED OPEN CAST PIT8C AND THE EXPANSION OF THE SHAFT 16 WASTE ROCK DUMP IN THE NORTH-WEST PROVINCE | HIA Phase 1 | 01/07/2012 | Julius CC Pistorius | Impala Platinum Limited | 25/03/2013 - 09:53 | ||
AIA_Impala_tailings_and_pit_AIA_Pistorius_JCC_Apr11 | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR IMPALA PLATINUM LIMITED'S (IMPALA) PROPOSED NEW TAILINGS FACILITY AND OPEN Cape Archaeological Survey CCT MINING AREAS IN THE RUSTENBURG (BAFOKENG) DISTRICT OF THE NORTH-WEST PROVINCE | AIA Phase 1 | 30/04/2011 | Julius CC Pistorius | 16/06/2012 - 14:46 | |||
HIA_132kv from Mamatshekele and Uitkyk to Naledi | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR ESKOM’S PROPOSED UITKYK SUBSTATION AND FOR THE PROPOSED 132kV POWER LINES BETWEEN THE MAMATSHEKELE AND PROPOSED UITKYK SUBSTATIONS AND BETWEEN THE PROPOSED UITKYK SUBSTATION AND THE NALEDI SUBSTATION IN THE LIMPOPO PROVINCE OF SOUTH AFRICA | HIA Phase 1 | 01/11/2012 | Julius CC Pistorius | Eskom - NOU | 12/02/2013 - 09:19 | ||
Nkwe_HIA Phase 1 | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR ESKOM’S PROPOSED NKWE PROJECT IN THE STEELPOORT VALLEY IN THE LIMPOPO PROVINCE | HIA Phase 1 | 01/06/2015 | Julius CC Pistorius | 29/04/2016 - 09:50 | |||
VICTOR SWITCHING STATION AND 132kV POWER LINE | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR ESKOM’S PROPOSED NEW VICTOR SWITCHING STATION AND 132kV POWER LINE IN THE GREATER TUBATSE LOCAL MUNICIPALITY IN THE STEELPOORT VALLEY IN THE LIMPOPO PROVINCE | Archaeological Specialist Reports | 12/07/2013 | Julius CC Pistorius | Nzumbululo Heritage Solutions | Nzumbululo Heritage Solutions | 12/07/2013 - 15:43 | |
VICTOR SWITCHING STATION AND 132kV POWER LINE | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR ESKOM’S PROPOSED NEW VICTOR SWITCHING STATION AND 132kV POWER LINE IN THE GREATER TUBATSE LOCAL MUNICIPALITY IN THE STEELPOORT VALLEY IN THE LIMPOPO PROVINCE | HIA Phase 1 | 16/07/2013 | Julius CC Pistorius | Nzumbululo Heritage Solutions | Nzumbululo Heritage Solutions | 16/07/2013 - 11:14 | |
Establishment of 30km 66kV power line between Chloe and Gilead | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR ESKOM’S PROPOSED NEW 66kV POWER LINES RUNNING BETWEEN THE POLOKWANE AND CHLOE SUBSTATIONS AND BETWEEN THE CHLOE AND GILEAD SUBSTATIONS AS WELL AS A T-OFF TO THE MOLETSI SUBSTATION IN THE LIMPOPO PROVINCE OF SOUTH AFRICA | HIA Phase 1 | 26/04/2013 | Julius CC Pistorius | 26/04/2013 - 11:45 | |||
AKANANI POWER LINE | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR ESKOM’S PROPOSED CONSTRUCTION OF 2X132kV POWER LINES FROM BORUTHO MAIN TRANSMISSION SUBSTATION TO THE PROPOSED AKANANI SUBSTATION IN THE LIMPOPO PROVINCE | HIA Phase 1 | 18/11/2015 | Julius Pistorius | DIGES Group | 17/01/2017 - 12:44 | ||
HIA - Eskom Delareyville | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR ESKOM’S PROPOSED CONSTRUCTION OF 132KV POWER LINES BETWEEN THE DELAREYVILLE SUBSTATION AND THE PROPOSED NEW KOPELA AND PHAHAMENG SUBSTATIONS IN THE NORTH WEST PROVINCE | Heritage Impact Assessment Specialist Reports | 01/07/2014 | Julius CC Pistorius | SRK Consulting (Pty) Ltd - Pretoria | 28/07/2014 - 12:16 | ||
HIA - Eskom Delareyville | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR ESKOM’S PROPOSED CONSTRUCTION OF 132KV POWER LINES BETWEEN THE DELAREYVILLE SUBSTATION AND THE PROPOSED NEW KOPELA AND PHAHAMENG SUBSTATIONS IN THE NORTH WEST PROVINCE | Heritage Statement | 01/07/2014 | Julius CC Pistorius | SRK Consulting (Pty) Ltd - Pretoria | 28/07/2014 - 12:30 | ||
HIA FOR TSHATANE 132 KV POWER LINES | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR ESKOM’S PROPOSED 132kV POWER LINES BETWEEN THE PROPOSED TSHATANE AND LESEGO SUBSTATIONS AND BETWEEN THE PROPOSED TSHATANE SUBSTATION AND THE EXISTING JANE FURSE SUBSTATION IN THE LIMPOPO PROVINCE OF SOUTH AFRICA | HIA Phase 1 | 22/11/2013 | Julius CC Pistorius | Dynamic Integrated Geo-Environmental Services cc | 27/06/2013 - 13:04 | ||
A Phase I heritage Impact Assessment (HIA) study for Eskom's proposed Skeerpoort Lomond Project near the Hartebeespoort Dam in the North West Province of South Africa | A Phase I heritage Impact Assessment (HIA) study for Eskom's proposed Skeerpoort Lomond Project near the Hartebeespoort Dam in the North West Province of South Africa | HIA Phase 1 | 11/01/2009 | Julius CC Pistorius | 16/06/2012 - 08:54 | |||
AIA_Matimba_-Marang_Eskom_Pistorius_JCC_Feb07 | A Phase I Heritage Impact Assessment (HIA) Study for Eskom's Proposed New 400 kV Power Line Route Between the Matimba B Power Station and the Marang Substation near Rustenburg | AIA Phase 1 | 01/02/2007 | Julius CC Pistorius | MAPID_01184 | 16/06/2012 - 14:47 | ||
9-2-263-0003-20070501-ACHMC | A Phase I Heritage Impact Assessment (HIA) Study for Eskom's Proposed New 3X88 kV Power Lines Between the Marang Substation and Impala Platinum's Shaft 16 in the North West Province of South Africa | AIA Phase 1 | 01/05/2007 | Julius CC Pistorius | MAPID_01185 | 16/06/2012 - 14:40 | ||
A Phase I heritage Impact Assessment (HIA) Study for Eskom's proposed Madibeng Project near Madibeng in the Central Bankeveld of the North West Province of South Africa | A Phase I heritage Impact Assessment (HIA) Study for Eskom's proposed Madibeng Project near Madibeng in the Central Bankeveld of the North West Province of South Africa | HIA Phase 1 | 11/01/2009 | Julius CC Pistorius | 16/06/2012 - 08:54 | |||
HIA Batlhako Chrome Mine | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR CHROME MINING ACTIVITIES ON VARIOUS PORTIONS OF THE FARMS GROENFONTEIN 138JP, VLAKFONTEIN 163JP AND VOGELSTRUISNEK 174JP WEST OF THE PILANESBERG IN THE NORTH-WEST PROVINCE OF SOUTH AFRICA | HIA Phase 1 | 01/05/2012 | Julius CC Pistorius | Heritage Archaeologist & Consultant | Golder Associates | 15/08/2012 - 10:22 | |
2016 Kleinkopje Pit 2A Extension Phase 1 HIA | A Phase I Heritage Impact Assessment (HIA) Study for Anglo Operations (Pty) Ltd (Kleinkopje Colliery) proposed Pit 2A Extension Project near Emalahleni in Mpumalanga Province | HIA Phase 1 | 01/08/2016 | Julius CC Pistorius | Dr Julius CC Pistorious Archaeologist and heritage Consultant | Shangoni Management Services | 30/09/2016 - 11:19 | |
KiPower pipeline HIA | A Phase I Heritage Impact Assessment (HIA) Study for a proposed raw water supply pipeline for KiPower (Pty) Ltd near Delmas on the highveld and eastern highveld in the Gauteng and Mpumalanga provinces of South Africa | HIA Phase 1 | 22/10/2013 | Julius CC Pistorius | Private | Jones & Wagener Engineering and Environmental Consultants | 11/08/2014 - 08:25 | |
AIA_Gem_Valley_Pistorius_JCC_Dec06 | A Phase I Heritage Impact Assessment (HIA) Study for a Proposed New Township on Various Portions of the Farms Franspoort 332 JR and Leeuwfontein 299 JR in the Gauteng Province of South Africa | AIA Phase 1 | 01/12/2006 | Julius CC Pistorius | MAPID_01251 | 16/06/2012 - 14:45 | ||
AIA_exempt_UMK_Powerline_Pistorius_JCC_Mar09 | A Phase I Heritage Impact Assessment (HIA) Study for a Proposed New Power Line for the United Manganese of Kalahari (UMK) Mine near Hotazel in the Northern Cape Province of South Africa | HIA Letter of Exemption | 01/04/2008 | Julius CC Pistorius | MAPID_02444 | 16/06/2012 - 14:45 | ||
A Phase I Heritage Impact Assessment (HIA) Study for a proposed 600MW Power Plant and associated infrastructure for Kipower (Pty) Ltd | A Phase I Heritage Impact Assessment (HIA) Study for a proposed 600MW Power Plant and associated infrastructure for Kipower (Pty) Ltd near Delmas on the Eastern Highveld in the Mpumalanga Province Of South Africa | HIA Phase 1 | 09/07/2012 | Julius CC Pistorius | Dr Julius CC Pistorious Archaeologist and heritage Consultant | Jones & Wagener Engineering and Environmental Consultants | 30/03/2015 - 10:13 | |
HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR GREENSIDE COLLIERY’S THANDEKA SHAFT AND OVERHEAD POWER LINE PROJECT | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR GREENSIDE COLLIERY’S THANDEKA SHAFT AND OVERHEAD POWER LINE PROJECT NEAR EMAHLALENI (WITBANK) ON THE EASTERN HIGHVELD IN THE MPUMALANGA PROVINCE | HIA Phase 1 | 01/01/2015 | 18/08/2015 - 09:18 | ||||
A PHASE I HERITAGE IMPACT ASSESSMENT | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR ANGLO OPERATIONS LIMITED GREENSIDE COLLIERY’S NEW DISCARD FACILITY NEAR EMAHLALENI ON THE EASTERN HIGHVELD IN THE MPUMALANGA PROVINCE | HIA Phase 1 | 11/01/2015 | 08/06/2015 - 13:22 | ||||
HIA - Siyanda Chrome Smelting Company | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR SIYANDA CHROME SMELTING COMPANY’S (SCSC) PROPOSED FERROCHROME SMELTER NEAR NORTHAM IN THE LIMPOPO PROVINCE | HIA Phase 1 | 01/08/2016 | Julius CC Pistorius | 04/11/2016 - 17:26 | |||
HIA 22kv powerline Bushbuckridge | A PHASE I CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF A NEW 6.656 KILOMETRE POWER LINE TO SUPPLY ALEXANDRIA IN THE BUSHBUCKRIDGE AREA MPUMALANGA PROVINCE | HIA Phase 1 | 23/06/2014 | Udo Kusel | African Heritage Consultants CC | Eskom - NOU | 03/07/2014 - 09:27 | |
AIA_Boksburg_Lake_Wetland_Pelser_AJ_Nov11 | A Phase I Archaeological Impact Assessment for the rehabilitation of the Boksburg Lake Downstream Wetland in Boksburg, Gauteng Province. | AIA Phase 1 | 01/11/2011 | Anton Pelser | Archaetnos CC | 16/06/2012 - 14:43 | ||
Booysendal South Expansion Phase 1 Archaeological and Heritage IA | A PHASE I ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR BOOYSENSDAL SOUTH EXPANSION ENVIRONMENTAL AUTHORISATIONS | AIA Phase 1 | 22/06/2017 | Julius CC Pistorius | Dr Julius CC Pistorious Archaeologist and heritage Consultant | 11/07/2017 - 10:56 | ||
9-2-111-0086-19930801-ACO | A Phase 2A Archaeological Investigation of the Old Administration Block and Foreman's House Albion Springs, Rondebosch | AIA Phase 1 | 01/08/1993 | Timothy Hart, Dave Halkett | ACO Associates CC | MAPID_01452 | 16/06/2012 - 14:37 | |
AIA_Verkeerdepan_Extention_Pistorius_JCC_Sep10 | A Phase 2 Heritage Impact Assessment (HIA) Study for the proposed Verkeerdepan Extention coa mine near Carolina on the eastern Highveld in the Mpumalanga Province | AIA Phase 1 | 01/09/2010 | Julius CC Pistorius | Xstrata Coal South Africa | 16/06/2012 - 14:51 | ||
Architectural Report_Wonderfontein Colliery | A phase 2 architectural documentation of two farmyards on the farm Wonderfontein 428 JS district Belfast, Mpumalanga Province. | Significance Report | 01/03/2013 | Sidney Miller | 10/05/2013 - 13:03 | |||
PIA Study Loskop Quarry Estcourt KwaZulu Natal | A Phase 1 Palaeontological Impact Assessment Study for the Proposed Loskop Quarry Re-mining Project, Estcourt, KwaZulu Natal Province | PIA Phase 1 | 28/05/2013 | Nonhlanhla Vilakazi | Evolutionary Studies Institute | ENPROCON (Pty) Ltd | 04/09/2013 - 12:37 | |
Ohrigstad Bar Final HIA Phiring-Blye River | A phase 1 HIA Study for Eskom's proposed new 22kV power line between the Phiring Substation and the Blyde River near Ohrigstad in the Mpumalanga Province | HIA Phase 1 | 15/05/2013 | Julius CC Pistorius | Texture Environmental Consultants | 29/06/2014 - 15:50 | ||
Phase 1 Eskom Pienaarsriver CNC HIA Study | A Phase 1 HIA Study for Eskom's Proposed CNC in Pienaarsrivier in the Limpopo Province | HIA Phase 1 | 13/09/2013 | Julius CC Pistorius | Texture Environmental Consultants | 18/03/2014 - 12:50 | ||
A Phase I HIA study for Eskoms proposed new 132kV power line between Gompies and DWAF02 and between Chromore and DWAF03 Substations | A PHASE 1 HIA STUDY FOR ESKOM'S PROPOSED 132kV POWER LINES BETWEEN THE GOMPIES AND DWAF02 SUBSTATION AND BETWEEN THE CHROMORE AND DWAF03 SUBSTATION ON THE EDGE OF THE SPRINGBOKFLATS, LIMPOPO PROVINCE | HIA Phase 1 | 30/11/2012 | Julius CC Pistorius | Eskom - NOU | 12/03/2013 - 20:27 | ||
Pienaars River CNC HIA Study | A Phase 1 HIA Study for Eskom's Poposed CNC in Pienaarsriver in the Limpopo Province | HIA Phase 1 | 20/09/2013 | Julius CC Pistorius | Texture Environmental Consultants | 18/03/2014 - 12:04 |