THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 17401 - 17450 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Rustenburg 272JQ AIA | Archaeological Impact Assessment: Proposed Rustenburg Extension 30 Township Establishment on the Remaining Extent of Portion 1 of the farm Town and Townlands of Rustenburg 272-JQ, Rustenburg Local Municipality, North West Province | AIA Phase 1 | 02/11/2015 | Neels Kruger | 07/10/2016 - 12:28 | ||
Interim Report for archaeological mitigation on sites in Phase 1 of Block L - N'Komati Anthracite | Interim Report for archaeological mitigation on sites in Phase 1 of Block L archaeological mitigation on sites NKM21/3, NKM21/4, NKM21/7, NKM21/10, NKM21/11, NKM21/15, NKM21/16, NKM21/18 and NKM21/24 for the Nkomati Anthracite Mine, Nkomazi Local Municipality, in the Ehlanzeni District Municipality, Mpumalanga Province | Archaeological Permit Report | 19/09/2023 | Henk Steyn, Marko Hutten, Wouter Fourie, Lauren Solomon, Nicholas Fletcher | PGS Heritage (Pty) Ltd | Nkomati Anthracite Mine | 19/09/2023 - 09:27 |
SITE SENSITIVITY VERIFICATION REPORT: PALAEONTOLOGICAL HERITAGE | PROPOSED SONNEBLOM PHOTOVOLTAIC SOLAR ENERGY FACILITY NEAR BLOEMFONTEIN, MANGAUNG METROPOLITAN MUNICIPALITY, FREE STATE PROVINCE | PIA Phase 1 | 11/08/2021 | John Almond | Department of Environmental Affairs | Subsolar Energy | 13/08/2021 - 10:40 |
HIA: Kiara PV 5 | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed development of the Kiara PV 5 Facility and Associated Infrastructure, North West Province | HIA Phase 1 | 22/07/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 08/02/2023 - 11:20 |
TOP 35 Test Excavation Mitigation Report | TOP 35 Test Excavation Mitigation Report - Report on the test excavation of 16 possible graves Tweefontein Operations. Test Excavation on the Farm Tweefontein 13 IS, near Ogies, Mpumalanga | BGG Phase 3 | 15/11/2016 | Henk Steyn, Lineree de Jager | PGS Heritage and Grave Relocation Consultants | Glencore Operations South Africa (Pty) Ltd | 15/11/2016 - 09:00 |
HIA: Majuba Coal Gasification | HERITAGE ASSESSMENT REPORT FOR THE UNDERGROUND COAL GASIFICATION PROJECT AND ASSOCIATED INFRASTRUCTURE IN SUPPORT OF CO-FIRING OF GAS AT THE MAJUBA POWER STATION, AMERSFOORT, MPUMALANGA | HIA Phase 1 | 01/12/2012 | Johnny Van Schalkwyk | Royal Haskoning DHV | 05/11/2013 - 15:26 | |
SAMANCOR CHROME: LWALA OPEN CAST MINE LIMPOPO PROVINCE | Phase 1 Heritage Impact Assessment Samancor Chrome: Lwala Open Cast Mine Limpopo Province. | HIA Phase 1 | 30/01/2003 | Frans Roodt | 12/02/2019 - 22:45 | ||
Marburg bulk water pipeline replacement | Marburg bulk water pipeline replacement project, Ugu District Municipality, KwaZulu-Natal | HIA Phase 1 | 07/01/2022 | Jean Beater | JLB Consulting | Wallace and Green | 07/02/2022 - 09:10 |
Thabazimbi Ext 69 AIA | ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED THABAZIMBI EXT 69 DEVELOPMENT, LIMPOPO PROVINCE | AIA Phase 1 | 14/01/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Tekplan Environmental | 19/04/2017 - 08:22 |
HIA for proposed Richtersveld Sunspot Solar Energy Power Plant | Heritage Impact Assessment for proposed Richtersveld Sunspot Solar Energy Power Plant, at Portion 10 (Arris) of Farm 2 Korridor Wes, Namakwaland, Northern Cape. | HIA Phase 1 | 02/02/2015 | Stephen Townsend | Richtersveld Sunspot (Pty) Ltd. | 17/03/2015 - 11:18 | |
Wesselsrust Farm House | Historical Significance: Built in 1906 for / by J J Uys who is believed to have been part of the famous Uys family who resided in the proximity. It is further believed that the occupier was related to Gen Lafras Uys who was in command of the Utrecht Commando during the Anglo Boer War and who probably resided on the adjacent farm known as Bruwersrus. Additional information will follow after consultation wirh the local Museum curator and a previous farm owner who resides in Vryheid. Architectural significance: Built with dressed sand stone and blue hard rock external walls. Urban Setting: GPS coordinates - 273826S and 302838E | 10/05/2013 | Russellstone Group represented by Russell du Preez | 10/05/2013 - 21:57 | |||
Mamitwa Heritage Phase 1 | PROPOSED CULTIVATION AND ESTABLISHMENT OF ASSOCIATED INFRASTRUCTURE ON THE REMAINING EXTENT OF THE FARM MAMITWASKOP 462 LT, NEAR NKAMBAKO VILLAGE, GREATER TZANEEN MUNICIPALITY, LIMPOPO PROVINCE | HIA Phase 1 | Liesl Stegmann | 05/10/2020 - 10:06 | |||
Maverick Trading 919 cc | Prospecting right application on all the portions of Klipfontein 442 IS, Drinkwater 443 IS and Kroomdraai 441 IS situated under magisterial district of Emerlo, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 13/04/2022 | 13/04/2022 - 17:28 | |||
Dros-Heritage Report June 2017 | HERITAGE REPORT JUNE 2017 HWC CASE NO.: 16090506HB0907M ADDENDUM TO HERITAGE STATEMENT: REVISED DEVELOPMENT PROPOSALS: ERF 5357 C/O ALEXANDER AND BIRD STREET STELLENBOSCH: PROPOSED DROSTDY DEVELOPMENT | Heritage Statement | 13/06/2017 | 13/06/2017 - 14:59 | |||
N10 section 4 Palaeontology | Palaeontological impact assessment for Proposed upgrade of the N10 section 4, immediately north of Cradock | PIA Phase 1 | 01/06/2012 | Robert Gess | Rob Gess Consulting | SRK Consulting (Pty) Ltd - Pretoria | 16/07/2012 - 16:28 |
A PHASE I HERITAGE IMPACT ASSESSMENT | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR ANGLO OPERATIONS LIMITED GREENSIDE COLLIERY’S NEW DISCARD FACILITY NEAR EMAHLALENI ON THE EASTERN HIGHVELD IN THE MPUMALANGA PROVINCE | HIA Phase 1 | 11/01/2015 | 08/06/2015 - 13:22 | |||
Heritage Assessment - Ilanga CSP Tower 1 | Archaeological Impact Assessment Report for the Proposed Establishment of the Ilanga Tower 1 Project, near Upington, NC Province | Heritage Impact Assessment Specialist Reports | 13/04/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 22/04/2016 - 18:45 |
PIA Report | PIA FOR THE PROPOSED VODACOM PTY LTD 22 KV POWERLINE, DINGLETON, GAMAGARA LOCAL MUNICIPALITY, NORTHERN CAPE | PIA Desktop | 26/11/2020 - 11:32 | ||||
Heritage walk-down for the approved Doornhoek 2 PV Facility and Associated Infrastructure, Klerksdorp, North West Province. | Heritage walk-down for the approved Doornhoek 2 PV Facility and Associated Infrastructure, Klerksdorp, North West Province. | Heritage Impact Assessment Specialist Reports | 14/03/2023 | Jaco van der Walt | Beyond Heritage | 13/04/2023 - 16:17 | |
DESKTOP INDEPENDENT HIA REVIEW AND ADDENDUM - LESEDI POWER COMPANY | DESKTOP INDEPENDENT REVIEW AND ADDENDUM DOCUMENT WITH HERITAGE IMPACT ASSESSMENT FOR THE ENVIRONMENTAL AUTHORISATION AMENDMENT APPLICATION FOR THE 75 MW HUMANSRUS PHOTOVOLTAIC (PV) 1 SOLAR POWER FACILITY (REFERRED TO AS LESEDI POWER COMPANY), NORTHERN CAPE | AIA Desktop | Anton Pelser | EARTHnSKY Environmental | 25/05/2023 - 09:50 | ||
PROPOSED NEW TRAIN REPEATER HIGH SITE WITHIN THE GREENPOINT LIGHTHOUSE SITE | PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED NEW TRAIN REPEATER HIGH SITE WITHIN THE GREENPOINT LIGHTHOUSE SITE IN PORT SHEPSTONE, KWAZULU NATAL PROVINCE. | HIA Phase 1 | 27/01/2014 | Makhosazana Mngomezulu | 27/01/2014 - 11:45 | ||
PHASE 1 HIA REPORT, BLAAUWSKOP SETTLEMENT LOW-COST HOUSING DEVELOPMENT, NORTHERN CAPE | PROPOSED FORMALISATION OF BLAAUWSKOP SETTLEMENT LOW-COST HOUSING DEVELOPMENT ON PORTION 30 OF FARM BLAAUWSKOP NO. 36, BLAAUWSKOP SETTLEMENT, KENHARDT ROAD, KAI !GARIB LOCAL MUNICIPALITY, Z.F. MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE. | HIA Phase 1 | 12/03/2019 | Jan Engelbrecht, Heidi Fivaz, Elize Butler | UBIQUE HERITAGE CONSULTANTS , Banzai Environmental (Pty) Ltd | Enviroafrica CC | 13/05/2019 - 17:45 |
Archaeological Impact Assessment, Bram Fischer Airport Boulevard Precint | A DESKTOP ARCHAEOLOGICAL IMPACT ASSESSMENT OF THE BOULEVARD PRECINCT, BRAM FISCHER AIRPORT, BLOEMFONTEIN | AIA Desktop | 01/11/2013 | Dave Halkett | ACO Associates CC | Vidamemoria Heritage Consultants, Airports Company South Africa | 20/03/2014 - 13:50 |
Heritage Impact Assessment for the proposed Ilima Coal Company Kranspan Project | Heritage Impact Assessment for the proposed Ilima Coal Company Kranspan Project | HIA Phase 1 | 24/04/2019 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | ABS Africa | 02/08/2019 - 12:18 |
HIA Du Plessis Dam PV1 and PV2 GRID CONNECTION | HERITAGE IMPACT ASSESSMENT: PROPOSED 132 kV POWERLINES FOR DU PLESSIS DAM PV1 & PV2 AT DE AAR, DE AAR MAGISTERIAL DISTRICT, NORTHERN CAPE | HIA Phase 1 | 24/04/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | Landscape Dynamics - Cape Town | 17/06/2022 - 09:37 |
North Wharf Table Bay | North Wharf Table Bay | AIA Phase 1 | 16/06/2012 | Martin Hall | 16/06/2012 - 08:54 | ||
STRUWIG DAM HIA | HERITAGE IMPACT ASSESSMENT OF THE PROPOSED STRUWIG DAM | HIA Phase 1 | 15/07/2017 | Frans Prins | Active Heritage CC | Enviroedge | 11/08/2017 - 10:44 |
HIA for Amsterdam Township Development | Cultural heritage impact assessment for THE PROPOSED DEVELOPMENT ON PORTION 11 OF THE FARM AMSTERDAM 408IT, MKHONDO LOCAL MUNICIPALITY | Heritage Scoping | 31/05/2016 | Johnny Van Schalkwyk | 20/07/2016 - 16:09 | ||
Heritage Impact Statement (C6- Heritage) | BADENHORST DAM SOLAR PV2 & PV3 FACILITIES ENVIRONMENTAL AUTHORISATION AMENDMENT: SPECIALIST IMPACT STATEMENT | Heritage Statement | 05/08/2020 | John Gribble | ACO Associates CC | Landscape Dynamics Environmental Consultants | 22/02/2021 - 18:49 |
GGV Amendment HIA Report | HIA Report for new incline shafts and P53-1 Road Alignment Development Goedgevonden Colliery, Near Ogies Mpumalanga | Heritage Impact Assessment Specialist Reports | 01/03/2022 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Jacana Environmental cc | 11/08/2022 - 09:19 |
Upgrade and realignment of M30 Umbumbulu Road | Proposed upgrade and realignment of the Umbumbulu M30 road, eThekwini Metropolitan Municipality, KwaZulu-Natal | HIA Phase 1 | 28/08/2017 | Jean Beater | JLB Consulting | Kerry Seppings Environmental Management | 02/11/2017 - 11:20 |
HIA Tau Gas Plant and its associated Infrastructure in Komatipoort | Archaeological and Heritage Impact Assessment Report for Proposed establishment of Tau Gas Plant and its associated Infrastructure in Komatipoort, Nkomazi Local Municipality in the Mpumalanga Province, South Africa | Heritage Impact Assessment Specialist Reports | 22/10/2020 | Mabuda Mmbudziseni Moses | Mulaifa Development Projects cc | Nsovo Environmental Consulting | 07/04/2021 - 11:09 |
Leeuwspruit Solar 2 PV HIA Report | PROPOSED 300MW LEEUSPRUIT SOLAR 2 PHOTOVOLTAIC PROJECT SOUTH OF KROONSTAD, FREE STATE PROVINCE - HERITAGE IMPACT ASSESSMENT | HIA Phase 1 | 12/06/2023 | Jennifer Kitto | Nitai Consulting | Nemai Consulting | 03/07/2023 - 16:33 |
Motivation and Report for AMAFA 177 Marine Drive | Motivation and Report for AMAFA 177 Marine Drive | Heritage Study | 20/10/2023 | 20/10/2023 - 10:44 | |||
SptzkloofB 2013 | REPORT ON THE SECOND EXCAVATION SEASON AT SPITZKLOOF B 2013 | Archaeological Permit Report | 28/05/2014 | Genevieve Dewar | 28/05/2014 - 20:26 | ||
Malekane Bridge and upgrades | 30/10/2019 - 15:45 | ||||||
Phase 1 Impact Assessment on Holding 117 Princess Agricultural Holdings In Roodepoort, Gauteng | Phase 1 Heritage Impact Assessment on Holding 117 Princess Agricultural Holdings In Roodepoort, Gauteng | HIA Phase 1 | 06/08/2014 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Hunter Theron Inc. Town and Regional Planners | 25/08/2014 - 10:35 |
HIA FOR THE PROPOSED UPGRADING OF AN ANGLO BOER WAR BLOCKHOUSE, WARRENTON, NORTHERN CAPE PROVINCE | HERITAGE IMPACT ASSESSMENT ON A PORTION OF WARRENTON ERF 1 FOR THE PROPOSED UPGRADING OF AN ANGLO BOER WAR BLOCKHOUSE, WARRENTON, NORTHERN CAPE PROVINCE | AIA Phase 1 | 01/05/2016 | Neels Kruger | Exigo Sustainability | Frances Baard District Municipality | 15/09/2016 - 09:17 |
PHASE 1 HIA REPORT GROOVLEI SEWER PUMP STATION & LINE | PHASE 1 HIA REPORT FOR THE PROPOSED NEW GROOTVLEI SEWER PUMP STATION AND LINE LOCATED IN STRUBENVALE, SPRINGS, GAUTENG ON A PORTION OF THE FARM GROOTVLEI 124IR - APAC019/115. | HIA Phase 1 | 01/11/2019 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Vulcano Engineering & Environmental Consulting | 21/02/2020 - 14:06 |
Proposed Development of Lingfield Equestrian Estate | Heritage Scoping Report Proposed Development of Lingfield Equestrian Estate Portion 101 of the Farm Moller 14243 Summerveld. eThekwini Metropolitan Municipality, Outer West. KwaZulu Natal | Heritage Scoping | 28/07/2022 | Len van Schalkwyk | eThembeni Cultural Heritage | 03/10/2022 - 07:11 | |
Qamata Feed Mill HIA | Phase 1 Heritage Impact Assessment of a proposed re-utilization of an existing mill in Qamata, EC Province. | HIA Phase 1 | 15/01/2018 | Lloyd Rossouw | Paleo Field Services | Enviroworks | 25/01/2018 - 14:55 |
Palaeontological impact Sunnyside 2620, Bloemfontein | PALAEONTOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED TOWNSHIP ESTABLISHMENT ON THE REMAINDER OF PORTION 6 AND 7 OF THE FARM SUNNYSIDE 2620, BLOEMFONTEIN, MANGAUNG METROPOLITAN MUNICIPALITY, FREE STATE | Palaeontological Specialist Reports | 22/10/2015 | Elize Butler | National Museum Bloemfontein | 17/11/2015 - 08:29 | |
HIA Nababeep 134 | DESKTOP HERITAGE IMPACT ASSESSMENT: PROPOSED PROSPECTING ON VARIOUS PORTIONS OF FARM NABABEEP 134 AND PLOT 2086, OKIEP, NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE | AIA Desktop | 07/06/2021 | Jayson Orton | ASHA Consulting(Pty) Ltd | ASHA Consulting(Pty) Ltd | 09/06/2021 - 08:15 |
Ngxwabangu WEF PIA | Ngxwabangu Wind Energy Facility Paleontological Impact Assessment | PIA Phase 1 | 31/10/2022 | John Almond | Natura Viva CC | EDF Renewables (Pty) Ltd | 16/11/2022 - 14:45 |
TOWNSHIP ESTABLISHMENT STEENBOKPAN - LIMPOPO | PHASE 1 - HERITAGE IMPACT ASSESSMENT REPORT | Heritage Impact Assessment Specialist Reports | 01/02/2009 | Frans Roodt | R & R Cultural Resource Consultants | Tekplan Environmental | 07/06/2013 - 11:49 |
AIA; Proposed Extension of a Borrow Pit, Waterkloof 1092 | ARCHAEOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF A BORROW PIT ON WATERKLOOF 1092 NEAR MAMRE, WEST COAST DISTRICT MUNICIPALITY, WESTERN CAPE | AIA Phase 1 | 01/03/2013 | Madelon Tusenius | Natura Viva CC | Nadeson Consulting Services | 03/07/2018 - 12:24 |
Loftus Park: Electrical Substation Cultural Heritage Survey | Cultural Heritage Survey of the Loftus Power Substation, Clydesdale, Pretoria, Tshwane Metropolitan Municipality, Gauteng | Significance Report | 01/10/2012 | Francois P Coetzee | Abland (Pty) Ltd | 11/08/2013 - 13:25 | |
HIA for the proposed Kwathema To Grundlingh WWTW Bulk Outfall Sewer Capital Project Implementation near Nigel | Heritage impact assessment (HIA) for the proposed Kwathema To Grundlingh WWTW Bulk Outfall Sewer Capital Project Implementation near Nigel, within the Ekurhuleni Metropolitan Municipality, Gauteng Province, South Africa. | Heritage Impact Assessment Specialist Reports | 26/09/2018 | Cherene de Bruyn | Muny Consultants | 09/10/2018 - 13:59 | |
PIA - Ogies South | Palaeontological Impact Assessment for the proposed coalmine on Ogies South Portion 1/5, Mpumalanga Province | PIA Phase 2 | 15/10/2021 | Marion Bamford | 26/10/2021 - 14:27 | ||
Palaeontological desktop study of a proposed new Borrow Pit on the farm Droogegrond 169 JR near Bela Bela, Limpopo Province. | Palaeontological desktop study of a proposed new Borrow Pit on the farm Droogegrond 169 JR near Bela Bela, Limpopo Province. | PIA Desktop | 13/02/2017 | Lloyd Rossouw | Tekplan Environmental | 14/02/2017 - 10:06 |