THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 17401 - 17450 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
Archaeological and cultural heritage impact assessment report for the proposed upgrade and construction of Qhozo access road. | Phase 1 Archaeological and cultural heritage impact assessment report for the proposed upgrade and construction, which entails installation of storm-water management system and crossings within Qhozo access road in Bergville within Okhahlamba Local Municipality of uThukela District Municipality in KwaZulu-Natal Province. | Heritage Impact Assessment Specialist Reports | 21/01/2019 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | Isolendalo Environmental Consulting | 18/02/2019 - 09:05 | |
HIA Proposed Development if Custodian Sites and Management Infrastructure | Cultural Heritage Assessment of the Proposed Development of Custodian Sites and Management Infrastructure within Lapalala Wilderness | Heritage Impact Assessment Specialist Reports | 16/11/2016 | Francois P Coetzee | NuLeaf Planning & Environmental | 09/03/2017 - 13:43 | ||
Keystone HIA | HERITAGE IMPACT ASSESSMENT OF BARTLETT RESIDENTIAL ESTATE PHASE 1, HAMMARSDALE, KWAZULU-NATAL, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 23/01/2013 | Len van Schalkwyk | eThembeni Cultural Heritage | Balanced Environment | 30/09/2013 - 08:34 | |
Addemdum: Vetlaagte Heritage | UKUQALA GRID CONNECTION PROJECT: CHANGES TO PROJECT COMPONENTS - Heritage Impacts | Heritage Impact Assessment Specialist Reports | 14/11/2022 | Jenna Lavin | CTS Heritage | Landscape Dynamics Environmental Consultants | 15/11/2022 - 11:10 | |
Heritage IAR - Lichtenburg 1 PV_Nov 2018 | Heritage Impact Assessment for the Development of the Lichtenburg 1 PV Solar Energy Facility and Associated Infrastructure on a Site Near Lichtenburg, North West Province. | Heritage Impact Assessment Specialist Reports | 14/11/2018 | CTS Heritage | Savannah Environmental (Pty) Ltd | 17/01/2019 - 10:01 | ||
Heritage Report | Heritage Impact Assessment Specialist Reports | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 25/01/2023 - 11:12 | |||
THE PROPOSED LOERIESFONTEIN BULK WATER SUPPLY PIPELINE AND RESERVOIR, LOERIESFONTEIN, NORTHERN CAPE | HERITAGE IMPACT ASSESSMENT: THE PROPOSED LOERIESFONTEIN BULK WATER SUPPLY PIPELINE AND RESERVOIR, LOERIESFONTEIN, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 30/06/2014 | Jonathan Kaplan | Agency for Cultural Resources Management | Enviroafrica CC | 28/10/2014 - 10:58 | |
CSP-Ferrum 400kV Power Line Project | Proposed Establishment of Several Electricity Distribution Lines within the Northern Cape Province | Heritage Impact Assessment Specialist Reports | 22/02/2011 | Stephan Gaigher | G & A Heritage | Zitholele Consulting | 05/12/2013 - 18:02 | |
Eskom power line Heritage Report | A Report on cultural heritage impact assessment for the proposed relocation of 3 x 400kV power lines at the Landau 3 Colliery, close to eMalahleni, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 15/05/2017 | Anton van Vollenhoven | Archaetnos CC | SRK Consulting (Pty) Ltd - Johannesburg | 06/04/2018 - 09:06 | |
Delmore Park Extension 7 Heritage Impact Assessment | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE DELMORE PARK, EXTENSION 7 DEVELOPMENT | Heritage Impact Assessment Specialist Reports | 03/09/2008 | Strategic Environmental Focus (Pty) Ltd - KwaZulu-Natal | Strategic Environmental Focus (Pty) Ltd - KwaZulu-Natal | 05/03/2014 - 09:03 | ||
WATER SUPPLY PIPELINE AND SEWEGE TREATMENT PLANT | WATER SUPPLY PIPELINEAND SEWEGE TREATMENT PLANT IN INGWAVUMA TOWN, JOZINI LOCAL MUNICIPALITY IN THE KWAZULU NATAL PROVINCE. | Heritage Impact Assessment Specialist Reports | 06/09/2013 | McEdward Murimbika | Nzumbululo Heritage Solutions | Enaq Consulting | 06/09/2013 - 12:10 | |
Proposed reclamation of the Marievale TSF | The proposed reclamation of the Marievale Tailings Storage Facilities in Ekurhuleni, Gauteng Province | Heritage Impact Assessment Specialist Reports | 06/03/2020 | Jennifer Kitto | PGS Heritage (Pty) Ltd | Kongiwe Environmental (Pty) Ltd | 02/04/2020 - 09:01 | |
ARCHAEOLOGICAL IMPACT ASSESSMENT | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE PROPOSED TOWNSHIP ESTABLISHMENT ON FARM BELLEVUE 74 LT AT KAWAYENI VILLAGE, MAKHADO LOCAL MUNICIPALITY, VHEMBE DISTRICT, LIMPOPO PROVINCE, SOUTH AFRICA. | Heritage Impact Assessment Specialist Reports | 03/04/2021 | Ndivhuho Eric Mathoho | 23/07/2021 - 12:59 | |||
Addendum: Proposed WEF situated on the Eastern plateau (south) near De Aar | Addendum: Proposed Wind Energy Facility situated on the Eastern plateau (South) near De Aar, Northern Cape Province. | Heritage Impact Assessment Specialist Reports | 01/06/2015 | Lita Webley, David Halkett | ACO Associates CC | Longyuan Mulilo De Aar 2 South (Pty) Ltd | 23/10/2015 - 13:26 | |
Ludeke Dam | DESKTOP HERITAGE SURVEY FOR THE LUDEKE DAM PIPE INSTALLATION, MBIZANA, EASTERN CAPE | Heritage Impact Assessment Specialist Reports | 01/08/2023 | Gavin Anderson, Alan Smith | Umlando: Archaeological Surveys & Heritage Management | Afzelia Environmental Consultants Pty Ltd | 03/08/2023 - 07:41 | |
HIA For Olifantsnek School | Heritage Impact Assessment for Olifantsnek School | Heritage Impact Assessment Specialist Reports | Prof. Anton van Vollenhoven | HydroScience | Archaetnos CC | 20/08/2020 - 04:56 | ||
Brookdale Assessment Centre Housing Heritage Impact Assessment Report | Brookdale Assessment Centre Housing Heritage Impact Assessment Report | Heritage Impact Assessment Specialist Reports | 28/06/2011 | eThembeni Cultural Heritage | 19/05/2017 - 14:19 | |||
Heritage Impact Assessment | Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 04/03/2021 | Cherene de Bruyn | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 04/03/2021 - 14:57 | |
IMPALA-MTUBATUBA 2ND 132KV POWERLINE AND 132KV LOOP-IN-LOOP-OUT AT NSELENI | A CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED ESTABLISHMENT OF +/- 56KM IMPALA-MTUBATUBA 2ND 132KV POWERLINE AND 132KV LOOP-IN-LOOP-OUT AT NSELENI 132/22KV SUBSTATION AND ESTABLISH A 2ND 132KV TEE LINE FROM THE EXISTING 1ST IMPALA-MTUBATUBA POWERLINE TO CREATE A LOOP-IN-LOOP-OUT ARRANGEMENT AT KWAMBONAMBI SUBSTATION | Heritage Impact Assessment Specialist Reports | 02/12/2015 | Frans Prins | Active Heritage CC | Ludloko Developments | 18/12/2015 - 15:33 | |
Zibulo North Shaft Project – 132KV Overhead Powerlines | Zibulo North Shaft Project – 132KV Overhead Powerlines | Heritage Impact Assessment Specialist Reports | 28/08/2023 | Jessica Angel | PGS Heritage (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 03/10/2023 - 13:21 | |
470328_Styldfrift TSF and associated infrastructure | HIA & Palaeo Assessment (Phase 1):Cultural Heritage Assessment for the Amendment to the Environmental Management Programme for the Proposed Tailings Storage Facility (TSF) and Associated Infrastructure at Royal Bafokeng Platinum Styldrift Mine Complex, Rustenburg Local Municipality, Bojanala District Municipality, North West Province | Heritage Impact Assessment Specialist Reports | 27/02/2015 | Francois Coetzee, Dr Heidi Fourie | 14/09/2015 - 11:59 | |||
New Lighthouse on ERF 335 | HERITAGE SPECIALIST REPORT CONDUCTED AS PART OF A BASIC ASSESSMENT FOR A PROPOSED NEW LIGHTHOUSE ON ERF 335, BEACH STREET, PORT NOLLOTH. | Heritage Impact Assessment Specialist Reports | 01/02/2013 | Timothy Hart | ACO Associates CC | Council for Scientific and Industrial Research | 20/02/2013 - 16:52 | |
COP3706_HBAR | Heritage Basic Assessment Report for the Basic Assessment Report: Environmental Authorisation Application in support of the Section 102 Amendment for the Copper Sunset Sand Mining Operation, near Sasolburg, Free State | Heritage Impact Assessment Specialist Reports | 27/11/2015 | Natasha Higgitt, Justin du Piesanie, Johan Nel | Digby Wells Environmental | Copper Sunset Sand (Pty) Ltd | 02/12/2015 - 11:16 | |
HIA Tau Gas Plant and its associated Infrastructure in Komatipoort | Archaeological and Heritage Impact Assessment Report for Proposed establishment of Tau Gas Plant and its associated Infrastructure in Komatipoort, Nkomazi Local Municipality in the Mpumalanga Province, South Africa | Heritage Impact Assessment Specialist Reports | 22/10/2020 | Mabuda Mmbudziseni Moses | Mulaifa Development Projects cc | Nsovo Environmental Consulting | 07/04/2021 - 11:09 | |
Paarde Valley PV2 OHPL Heritage Impact Assessment | HERITAGE IMPACT ASSESSMENT: PROPOSED 132 kV POWERLINE FOR PAARDE VALLEY PV2 AT DE AAR, DE AAR MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 16/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | Holland & Associates Environmental Consultants | 12/07/2022 - 15:12 | |
HERITAGE IMPACT ASSESSMENT: Of Scoping and Environmental Impact Assessment For the Proposed Development of the 300 MW Paulputs Solar PV Energy Facility on Konkoonsies 91/2/rem and 91/5 near Pofadder. | HERITAGE IMPACT ASSESSMENT: Scoping and Environmental Impact Assessment For the Proposed Development of the 300 MW Paulputs Solar PV Energy Facility on Konkoonsies 91/2/rem and 91/5 near Pofadder, in the Khaî-Ma Local Municipality (Kenhardt Magisterial District, Northern Cape Province). SAHRA Case Nos: 12580 (Paulputs PV1), 12581 (Paulputs PV2) & 12582 (Paulputs PV3) Required under Section 38 (8) of the National Heritage Resources Act (No. 25 of 1999). | Heritage Impact Assessment Specialist Reports | 21/01/2019 | Jayson Orton, John E Almond | South African Heritage Resources Agency | GAEA ENVIRO PTY LTD | 21/01/2019 - 15:32 | |
HIA Du Plessis PV1 | Heritage Impact Assessment for Multiple Proposed Solar Energy Facilities on Du Plessis Dam 179, De Aar, Northern Cape | Heritage Impact Assessment Specialist Reports | 10/07/2013 | Jayson Orton | ACO Associates CC | Aurecon - Cape Town | 23/03/2015 - 17:53 | |
Rietvlei Silica Mine Heritage Report | Heritage Assessment - Rietvle Silica Mine on Portions of the Farm Rietvlei 271 JQ, Rustenburg, North West Province | Heritage Impact Assessment Specialist Reports | 01/01/2015 | Wouter Fourie | Matakoma Heritage Consultants (Pty) Ltd | Department of Archaeology, University of the Witwatersrand | 04/09/2018 - 10:14 | |
HERITAGE IMPACT ASSESSMENT OF NGWADINI RESERVOIR | HERITAGE IMPACT ASSESSMENT OF NGWADINI RESERVOIR, UMKOMAZI RIVER CATCHMENT,KWAZULU-NATAL, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 11/07/2006 | eThembeni Cultural Heritage | WSP Environmental Pty Ltd - Durban | 09/12/2021 - 12:48 | ||
HDBR Heritage Report | HERITAGE IMPACT ASSESSMENT: FOR THE PROPOSED CONSTRUCTION OF THE 2 KM LONG HOLSDAM BARKLEY RIVER FARMERS 11KV POWERLINE | Heritage Impact Assessment Specialist Reports | 02/11/2022 | Jaco van der Walt | 1World Consultants (Pty) Ltd | 1World Consultants (Pty) Ltd | 03/11/2022 - 16:12 | |
De Rust PV1 HIA | Heritage Impact Assessment for the Proposed De Rust PV1 SEF | Heritage Impact Assessment Specialist Reports | 01/04/2023 | Jaco van der Walt | Beyond Heritage | Enviro-Insight CC | 09/06/2023 - 09:57 | |
HIA, proposed upgrade to stormwater facilities in Beaufort West | HERITAGE ASSESSMENT OF THE PROPOSED UPGRADE TO THE STORMWATER AND RETENTION FACILITIES AT BEAUFORT WEST, WESTERN CAPE | Heritage Impact Assessment Specialist Reports | 04/08/2011 | Lita Webley | ACO Associates CC | Kayad Consulting enginners | CTS_503083 | 09/04/2018 - 14:35 |
HIA: Lidgetton West, KZN | CULTURAL HERITAGE IMPACT ASSESSMENT OF RIETVALLEI FARM, KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | 01/10/2011 | Frans Prins | Active Heritage CC | Green Door Environmental | 06/03/2014 - 07:09 | |
DUT Ritson Rd Campus - Visual Impact Assessment | DUT Ritson Rd Campus - Visual Impact Assessment | Heritage Impact Assessment Specialist Reports | 20/06/2022 - 10:34 | |||||
HIA - KathuCSP PL | Heritage Impact Assessment for a Proposed 132 kV Power Line, Kuruman Magisterail District, Northern Cape | Heritage Impact Assessment Specialist Reports | 20/02/2015 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 02/03/2015 - 11:41 | |
Heritage Impact Assessment | SE2602_400kV MTS AppH - Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 03/09/2021 | Cherene de Bruyn | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 06/09/2021 - 09:45 | |
HIA DEIR | Heritage Impact Assessment Specialist Reports | 21/08/2012 | 13/12/2012 - 15:04 | |||||
Upilanga PV1 | Heritage Impact Assessment Specialist Reports | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 25/08/2020 - 22:09 | |||
HIA Greater Efaye | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED GREATER EFAYE PIPELINE AND RESERVOIRS UMSHWATHI LOCAL MUNICIPALITY, KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | 28/03/2017 | Frans Prins | Active Heritage CC | EnviroPro | 26/05/2017 - 10:39 | |
NID FOR A RESIDENTIAL TOWNSHIP ON PORTION 437 AND PORTION 502 OF THE FARM ROOSBOOM 1102GS, ALFRED DUMA LOCAL MUNICIPALITY, KWAZULU-NATAL PROVINCE | NOTIFICATION OF INTENT TO DEVELOP FOR A RESIDENTIAL TOWNSHIP ON PORTION 437 AND PORTION 502 OF THE FARM ROOSBOOM 1102GS, ALFRED DUMA LOCAL MUNICIPALITY, KWAZULU-NATAL PROVINCE | Heritage Impact Assessment Specialist Reports | 01/03/2019 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Eco Assessments | 20/03/2019 - 09:11 | |
Memel Township Development HIA | Phase 1 Palaeontological and Archaeological Impact Assessment of the proposed township extension at Zamani, Memel, Phumelela Local Municipality, Free State Province. | Heritage Impact Assessment Specialist Reports | 11/11/2013 | Lloyd Rossouw | Phethogo Consulting | CTS_164145 | 20/05/2014 - 14:37 | |
Integrated HIA: Klondike Echo SEF, Vryburg | PROPOSED DEVELOPMENT OF THE AMDA ECHO PV (SOLAR ENERGY FACILITY) ON REMAINING EXTENT OF THE FARM KLONDIKE NO 670, AND OVERHEAD POWER LINE GRID CONNECTION TO THE MOOKODI MTS SUB-STATION ACROSS THE REMAINDER OF ERF 506 AND REMAINDER OF THE FARM ROSENDAL 673, VRYBURG DISTRICT, NORTH WEST PROVINCE | Heritage Impact Assessment Specialist Reports | 15/09/2016 | Stefan de Kock | Perception Heritage Planning | Perception Heritage Planning | 16/09/2016 - 06:40 | |
Umdloti Bridge Heritage Report | FIRST PHASE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED UMDLOTI RIVER BRIDGE AND REALIGNMENT OF MAIN ROAD P713, NDWEDWE LOCAL MUNICIPALITY ACTIVE | Heritage Impact Assessment Specialist Reports | 03/12/2014 | Frans Prins | Active Heritage CC | 23/04/2015 - 09:24 | ||
Sendawo PV 1 Heritage Report | 75MW SOLAR PHOTOVOLTAIC (PV) ENERGY FACILITY – SENDAWO SOLAR 1 Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 26/05/2016 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | Sivest - Gauteng | 09/06/2016 - 11:32 | |
Cultural Heritage Assessment of a Portion of Portion 1 of the Farm Vischgat 467IR | Cultural Heritage Assessment of a Portion of Portion 1 of the Farm Vischgat 467IR, Sedibeng District Municipality, Midvaal Local Municipality, Gauteng | Heritage Impact Assessment Specialist Reports | 01/09/2013 | Francois P Coetzee | Umhlaba Environmental Consulting CC | 15/02/2018 - 12:33 | ||
HIA, erf 354, Piketberg | A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR ERF 354, PIKETBERG, WESTERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 01/05/2010 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | Bergrivier Municipality | CTS_503678 | 17/04/2018 - 17:13 |
38 & 38A Rose Street | Bo-Kaap Erf 142718 & 142719, 38 & 38A Rose Street | Heritage Impact Assessment Specialist Reports | 06/03/2019 | Dieter Bossow | Architects Associated | Architects Associated | 30/05/2019 - 09:41 | |
Heritage and Archaeological Specialist Report | Archaeological and Cultural Heritage Investigation for the Environmental and Social Impact Assessment (ESIA) for the Gamsberg Zinc Mine and Associated Infrastructure in the Northern Cape, South Africa | Heritage Impact Assessment Specialist Reports | David Morris | South African Heritage Resources Agency | Black Mountain Mining (PTY) LTD | 11/10/2017 - 12:38 | ||
HIA report Solar farm on Holmwood 315 – Blouberg | Phase 1 Heritage Impact Assessment Report. Proposed Solar Photovoltaic Facility Development on a Portion of The Farm Holmwood 315 MR, Blouberg Local Municipality, Capricorn District, Limpopo Province. | Heritage Impact Assessment Specialist Reports | 08/09/2022 | Frans Roodt | Envirosana Environmental Consultants | 08/09/2022 - 11:10 | ||
Maverick Trading 919 cc | Prospecting right application on all the portions of Klipfontein 442 IS, Drinkwater 443 IS and Kroomdraai 441 IS situated under magisterial district of Emerlo, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 13/04/2022 | 13/04/2022 - 17:28 |