THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 17701 - 17750 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
HIA Greenfield Sites Tower | Phase 1 Cultural Heritage Impact Assessment: THE TRANSNET COAL LINK TELECOMMUNICATION PROJECT – CONSTRUCTION OF THE GREENFIELDS RS TOWERS, ZULULAND AND UTHUNGULU DISTRICT MUNICIPALITIES, KWAZULU-NATAL PROVINCE | HIA Phase 1 | 31/05/2023 | J van Schalkwyk | 30/06/2023 - 10:28 | ||
Heritage Impact Assessment - DBAR | Specialist input for the impact assessment phase of the environmental impact assessment for the Paulputs CSP Project and Road Realignment of the MN73 road Near Pofadder | 30/06/2016 | David Morris | McGregor Museum | Savannah Environmental (Pty) Ltd | 25/01/2017 - 12:39 | |
Heritage Statement and Notification of Intent to Develop for the Harwar Colliery | Heritage Statement for the Harwar Colliery | Heritage Statement | 07/03/2013 | Shahzaadee Karodia Khan, Justin du Piesanie, Johan Nel | Digby Wells Environmental | Msobo Coal | 07/03/2013 - 12:27 |
HISTORICALHOMESTEADHaverklip265IR | THE ARCHITECTURAL DOCUMENTATION OF A HISTORICAL HOMESTEAD LOCATED ON PORTION 5 OF HAVERKLIP 265 IR NEAR DELMAS, MPUMALANGA | Archaeological Specialist Reports | 31/01/2013 | Sidney Miller | Jones & Wagener Engineering and Environmental Consultants | 18/07/2013 - 12:00 | |
PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR TORNOWIZE MINING RIGHT | PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR MINING RIGHT APPLICATION PORTION 7 & 20 (EXCLUDING PORTION 26) OF THE FARM LEEUWFONTEIN 48 IS LOCATED WITHIN THE STEVE TSHWETE LOCAL MUNICIPALITYUNDER THE MIDDLEBURG MAGISTERIAL DISTRICT IN MPUMALANGA PROVINCE | HIA Phase 1 | 30/08/2023 | 29/08/2023 - 12:09 | |||
Exemption of Phase 1 Heritage Impact Assessment for Plot 17 Grasland, Bloemfontein, Free State Province | Exemption of Phase 1 Heritage Impact Assessment for Plot 17 Grasland, Bloemfontein, Free State Province | HIA Letter of Exemption | 09/06/2016 | Lloyd Rossouw | National Museum Bloemfontein | 27/07/2016 - 11:55 | |
HIA Protea Ridge, Kommetjie | Heritage Impact Assessment, Proposed Development of Portion of Remainder of Farm 948, Kommetjie (Protea Ridge) | HIA Phase 2 | 25/04/2013 | Lize Malan | Doug Jeffery Environmental Consultants | 29/05/2013 - 09:51 | |
AIA - FARM LOMBARD’S POST 289 | A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED MINING RIGHT APPLICATION FOR THE MINING OF DOLOMITE, LIMESTONE, SAND (GENERAL), STONE AGGREGATE, GRAVEL AND SAND ON PORTIONS OF PORTION 17 AND THE REMAINDER OF THE FARM LOMBARD’S POST 289, BATHURST, EASTERN CAPE PROVINCE. | AIA Phase 1 | 01/07/2013 | Celeste Booth, Amy van Wenzel, Abenicia Henderson | Albany Museum - Archaeology | Algoa Consulting mining Engineers CC (ACME) | 19/09/2013 - 10:05 |
REINFORCEMENT OF SALT ROCK SEA WALL | Proposed Reconstruction of the Seawall in front of the Salt Rock Hotel, Salt Rock, KZN | Heritage Scoping | 15/03/2010 | Albert van Jaarsveld | 20/03/2018 - 08:36 | ||
Heritage Screener: Rondavel PV | Desktop Heritage Screening Assessment for the Proposed development of the Rondavel Solar Energy Facilities near Kroonstad, Free State Province | Heritage Scoping | 20/11/2020 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 20/11/2020 - 17:08 |
Heritage Impact Assessment For The Proposed Township Development On Portions 106, 107, 108, 109 Elandsfontein Extension, Located Within The Midvaal Local Municipality, Gauteng Province. | Heritage Impact Assessment For The Proposed Township Development On Portions 106, 107, 108, 109 Elandsfontein Extension, Located Within The Midvaal Local Municipality, Gauteng Province. | 14/02/2023 | Jaco van der Walt | Beyond Heritage | Vaalplan Town and Regional Planners | 04/04/2023 - 14:05 | |
RBM Zulti North 2014 | The Archaeological Surveys and Excavations of the Zulti North Mining Lease | AIA Phase 3 | 01/02/2015 | Gavin Anderson, Louise Anderson | Richards Bay Minerals | 18/03/2015 - 17:18 | |
PIA | 22/05/2023 - 18:39 | ||||||
Pampoennek watching brief | REPORT ON A WATCHING BRIEF DURING THE DEMOLUTION OF AN ANGLO-BOER WAR (1899-1902) BLOCHOUSE AT PAMPOENNEK, NORTHWEST PROVINCE | Archaeological Monitoring | 26/09/2017 | Anton van Vollenhoven | Archaetnos CC | SANRAL | 01/10/2017 - 13:21 |
Effluent evaporation ponds, Louterwater | Heritage Screener for the proposed effluent evaporation ponds, Louterwater, Eastern Cape | Heritage Scoping | 16/05/2016 | Mariagrazia Galimberti | CTS Heritage | SRK Consulting (South Africa) (Pty) Ltd - PLZ | 17/05/2016 - 11:30 |
Heritage Scoping Report | Proposed 45 km 132kv power line from the proposed 132kv feeder bay at Gingindlovu Substation to the proposed 132/22kv Mbongolwane Substation KwaZulu-Natal, South Africa | Heritage Scoping | 28/02/2017 | Len van Schalkwyk | eThembeni Cultural Heritage | KwaZulu-Natal Amafa and Research Institute | 11/12/2017 - 10:24 |
Vardocube - AIA letter | RE: Vardocube Project Northern Cape Province | HIA Letter of Exemption | 12/12/2018 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | 28/01/2019 - 10:15 | |
AIA_Kees_Zyn_Doorns_Celliers_JP_Apr11 | Phase 1 Archaeological Impact Assessment for Eco 8 Environmental Planners concerning the proposed development concerning the Cradle of Life and Safari Park on various portions of the farm Kees Zyn Doorns 708 JT, Mpumalanga Province | AIA Phase 1 | 08/04/2011 | Jean-Pierre Celliers | Kudzala Antiquity | 16/06/2012 - 14:46 | |
HIA for proposed pump station facility, Heuwelsig, Bloemfontein | Heritage Impact Assessment of a proposed new pump station facility and associated pipeline in Heuwelsig, Bloemfontein, Free State Province | HIA Phase 1 | 21/11/2015 | Lloyd Rossouw | National Museum Bloemfontein | 05/11/2015 - 12:29 | |
Cultural Landscape Report: Poortjie Wes SEF | Cultural Landscape Assessment In terms of Section 38(8) of the NHRA for a Proposed development of the Poortjie Renewable Energy Facility Solar PV Projects near Beaufort West in the Western Cape | Heritage Study | Sarah Winter, Wendy Wilson | Savannah Environmental (Pty) Ltd | 14/06/2022 - 09:24 | ||
A REPORT ON THE ARCHAEOLOGICAL INVESTIGATION | A REPORT ON THE ARCHAEOLOGICAL INVESTIGATION OF LATE IRON AGE STONE WALLED SITES IMPACTED ON BY THE ESKOM STEELPOORT-TUBATSE SWITHCHING STATION LOCATED ON PORTION 5 OF THE FARM LUIPERSHOEK 149JS, NEAR STEELPOORT, LIMPOPO APAC013/78 | Archaeological Permit Report | 15/01/2014 | Anton Pelser | A Pelser Archaeological Consulting | Savannah Environmental (Pty) Ltd | 04/02/2014 - 21:20 |
Paleontology Report for the Impofu Grid Connection | Grid Connections for the proposed Impofu North, Impofu West & Impofu East Wind Farms near Humansdorp, Eastern Cape | Archaeological Specialist Reports | 01/08/2019 | John E Almond | Natura Viva CC | 22/04/2019 - 13:34 | |
Heritage Walkthrough - Garob WEF | Heritage Walkthrough for the Proposed Construction of the Garob WEF on Portion 5 of the Farm Nels Poortje 103, Copperton, NC Province | Heritage Impact Assessment Specialist Reports | 15/10/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | 15/01/2016 - 09:38 | |
NID & RfE: MGC Prospecting Right Application | Prospecting Right Application, portions of the farm Heuvelfontein 215 JR, Mpumalanga. Notification of Intent to Develop and Request for Exemption | HIA Letter of Exemption | 17/02/2021 | Johan Nel | Die Erfenisstigting | Amber Earth (Pty) Ltd | 17/02/2021 - 14:01 |
Phase 1 HIA | REPORT ON A PHASE 1 HERITAGE ASSESSMENT FOR THE PROPOSED SOVENTIX SOLAR PV PROJECT ON VARIOUS FARMS, NEAR HANOVER, ENTHANJENI MUNICIPALITY, PIXLEY KA SEME DISTRICT, NORTHERN CAPE | HIA Phase 1 | 01/03/2017 | Anton Pelser | 08/08/2022 - 14:17 | ||
Mamatwan AIA-13_14/024 | Archaeological Impact Assessment for the proposed Mamatwan Manganese Mine | AIA Phase 1 | 02/09/2013 | Tobias Coetzee | Environmental Assurance | Mamatwan Manganese (Pty) Ltd | 26/03/2014 - 09:49 |
Boschmanspoort Colliery HIA | Boschmanspoort Colliery - Mining Right Application on Portion 24 and 31 of the farm Boschmanspoort, Steve Tshwete Municipality, Hendrina, Mpumalanga Province | HIA Phase 1 | 30/01/2015 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | GEM Science | 12/06/2015 - 09:41 |
EIA 446PR - Paleontological Desktop Study | THE PROSPECTING RIGHT APPLICATION COMBINED WITH A WASTE LICENCE APPLICATION OF AAA MINING CC FOR THE PROSPECTING OF DIAMONDS ALLUVIAL, DIAMONDS IN KIMBERLITE, DIAMONDS GENERAL & DIAMONDS ON THE REMAINING EXTENT OF THE FARM KAMEELDRIFT 285, REGISTRATION DIVISION: HOPETOWN, NORTHERN CAPE PROVINCE. (NC30/5/1/1/2/12632PR) | PIA Desktop | 24/03/2021 | Elize Butler | Banzai Environmental (Pty) Ltd | Milnex | 31/03/2021 - 13:03 |
Mooivlei Solar 2 PV HIA Report | PROPOSED 240MW MOOIVLEI SOLAR 2 PHOTOVOLTAIC PROJECT WEST OF KROONSTAD, FREE STATE PROVINCE - HERITAGE IMPACT ASSESSMENT | HIA Phase 1 | 31/05/2023 | Jennifer Kitto | Nitai Consulting | Nemai Consulting | 30/06/2023 - 13:01 |
Heritage Impact Assessment - DBAR | Specialist input for the impact assessment phase of the environmental impact assessment for the Paulputs CSP Project and Road Realignment of the MN73 road Near Pofadder | 30/06/2016 | David Morris | McGregor Museum | Savannah Environmental (Pty) Ltd | 25/01/2017 - 12:42 | |
Vele Colliery | PROPOSED VELE COLLIERY WEIPE VHEMBE DISTRICT MUNICIPALITY: LIMPOPO | AIA Phase 1 | 01/04/2012 | Frans Roodt | R & R Cultural Resource Consultants | Jacana Environmental cc | 11/03/2013 - 09:43 |
JAW2291_Heritage_Statement_Dragline_Relocation | HERITAGE STATEMENT FOR ATCOM AND TWEEFONTEIN DRAGLINE RELOCATION PROJECT | Heritage Statement | 17/07/2013 | Natasha Higgitt | Digby Wells Environmental | Jones & Wagener Engineering and Environmental Consultants | 19/07/2013 - 13:37 |
First phase archaeological and cultural heritage assessment | First phase archaeological and cultural heritage assessment of the proposed Vididex development of portions 43/44/45 of the farm 272. Orania. Northern Cape Province. | HIA Phase 1 | 01/06/2022 | H Opperman | 30/08/2023 - 13:57 | ||
HIA Erksin Farm, Winterton, KZN | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED CULTIVATION OF 70 HECTARES OF ARABLE LAND AND THE EXPANSION OF AN EXISTING DAM ON PORTION 3 OF 1919, ERSKINE FARM, IN CATHKIN (NEAR WINTERTON), KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | Frans Prins | Active Heritage CC | Green Door Environmental | 28/07/2016 - 15:46 | |
AIA for the Proposed Upgrade of Boshof Combined School | Phase 1 Archaeological Impact Assessment for the Proposed Upgrade of Boshof Combined School. Tokolong Local Municipality, Lejweleputswa District, Free State Province | AIA Phase 1 | 28/05/2013 | Munyadziwa Magoma | BoPhelo Environmental Consultant and GIS Specialist | BoPhelo Environmental Consultant and GIS Specialist | 29/05/2013 - 16:41 |
CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH AT HAMMANSKRAAL GAUTENG PROVINCE | CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH AT HAMMANSKRAAL GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 22/05/2013 | Udo Kusel | African Heritage Consultants CC | SPOOR Environmental Services (PTY) Ltd. | 19/09/2013 - 17:55 |
Selati HIA | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF UPMARKET TOURISM ACCOMMODATION ON THE SELATI RAILWAY BRIDGE, SKUKUZA, KRUGER NATIONAL PARK, MPUMALANGA PROVINCE | HIA Phase 1 | 08/03/2018 | Anton van Vollenhoven | Archaetnos CC | Kruger Selati (Pty) Ltd | 21/03/2018 - 06:42 |
KWADUKUZA CREMATORIUM | KWADUKUZA CREMATORIUM | HIA Letter of Exemption | 07/07/2016 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Triplo4 Sustainable Solutions (Pty) Ltd | 22/09/2016 - 20:32 |
HIA for Mayfield x 52 | Heritage Impact Assessment for the Proposed New Township Development : Mayfield Extension 52, Ekurhuleni Metropolitan Municipality, Gauteng Province | Stephan Gaigher | 17/02/2020 - 11:00 | ||||
Umqeku river bridge HIA desktop | DESKTOP SURVEY OF THE UMQEKU LOW LEVEL BRIDGE: | HIA Letter of Exemption | 22/09/2016 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Jeffares & Green - Pietermaritzburg | 27/10/2016 - 15:08 |
Ecological & Wetland Assessment Report for Annesley Salt (Pty) Ltd | Ecological & Wetland Assessment Report for Annesley Salt (Pty) Ltd on Remainder of the Farm Annesley 338 | 16/08/2019 | Dr Elizabeth (Betsie) Milne | Boscia Ecological Consulting | 16/07/2019 - 11:02 | ||
Desktop PIA - Kenhardt PV Transmission Lines | Basic Assessment for the proposed transmission lines connecting the Kenhardt Solar Photovoltaic Facilities PV 1, PV 2 and PV 3 on Onder Rugzeer Farm 168 to the Nieuwehoop Substation on Gemsbok Bult 120, north-east of Kenhardt, Northern Cape Province | PIA Desktop | 03/03/2016 | John Almond | Natura Viva CC | Council for Scientific and Industrial Research | 16/03/2016 - 12:39 |
Unilever HIA | A REPORT ON A BASIC HERITAGE ASSESSMENT FOR THE PROPOSED SOVENTIX 3.6MWp SOLAR PV FACILITY ON 3.8HA OF THE PROPERTY OF UNILEVER BOKSBURG, CITY OF EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG | Heritage Study | 15/10/2021 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | APELSER ARCHAEOLOGICAL CONSULTING | 19/10/2021 - 12:36 |
1513 SARNIA ROAD, BELLAIR | Affidavit by owner of Property | Built Environment and Cultural Landscapes | 26/09/2022 | 26/09/2022 - 16:26 | |||
Mngazi Heritage Impact Assessment | Heritage Impact Assessment Mngazi River Bridge: SANRAL proposal for new access roads, bridge and stormwater channels | Heritage Impact Assessment Specialist Reports | 01/04/2014 | Jenny Bennie | 04/06/2014 - 10:46 | ||
HIA Matlosana AgriHub | HERITAGE ASSESSMENT STUDY FOR THE PROPOSED KLERKSDORP AGRIPARK WITHIN THE REMAINDER OF PORTION 1, TOWNLANDS OF KLERKSDORP 424 IN THE CITY OF MATLOSANA LOCAL MUNICIPALITY UNDER KENNETH KAUNDA DISTRICT MUNICIPALITY, NORTH WEST PROVINCE. | HIA Phase 1 | 01/10/2018 | Richard Munyai | Vhufa Hashu Heritage Consultancy CC | Vhufa Hashu Heritage Consultancy CC | 09/10/2019 - 17:50 |
Ndlambe Bulk Water Palaeontology | Phase 1 Palaeontological Impact Assessment of a proposed water pipeline between Cannon Rocks and Kenton-on-Sea and between Cannon Rocks and Alexandria, EC Province. | PIA Phase 1 | Lloyd Rossouw | Coastal & Environmental Services - East London | 06/09/2012 - 15:22 | ||
Palaeontological Impact Assessment: Desktop Study | Proposed Clearance of Indigenous Vegetation for Cultivation on Various Farms, Near Bloemhof Dam, Tswelopele Free State Province Tswelopele Local Municipality, Lejweleputswa District, Free State Province. Farms: Satara 1475, Portion 1 and 2 Glen Dover 886, Daeraad 1486 Palaeontological Impact Assessment: Desktop Study | PIA Desktop | 30/05/2021 | Dr. Heidi Fourie | Dr Heidi Fourie | Bioblue Environmental Sustainability | 04/06/2021 - 09:13 |
Heritage Draft Scoping Report Loxton WEF 1 | Heritage Scoping | 07/11/2022 | 15/11/2022 - 11:37 | ||||
Klipspruit South NID | Notification of Intent to Develop for Environmental Authorisation for the Klipspruit South Project | Heritage Statement | 29/08/2014 | Justin du Piesanie | Digby Wells Environmental | BHP Billiton Energy Coal South Africa | 29/08/2014 - 12:54 |