THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 17851 - 17900 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Carmel 3 - HIA | 24/02/2023 - 12:47 | ||||||
Carmel 3 - PIA | 24/02/2023 - 12:48 | ||||||
Carmel 3 PIA | 24/02/2023 - 13:01 | ||||||
EXX6885_Belfast_GRP_Close-Out_Report | Exxaro Coal Mpumalanga (Pty) Ltd Belfast Coal Mine Grave Relocation. Grave Relocation Close-out Report. | BGG Phase 2 | Muofhe Ravhura, Johan Nel | Digby Wells Environmental | Exxaro Coal Mpumalanga (Pty) Ltd | 24/02/2023 - 14:24 | |
Enslaved people's diet in Cape Town | A dietary assessment of colonial Cape Town’s enslaved population | Archaeological Permit Report | 07/01/2021 | Linda Mbeki, Lisette Kootker | 24/02/2023 - 16:11 | ||
SunCentral Cluster 1 Additional Activities Heritage Scoping Report | A HERITAGE SCOPING REPORT IMPACT ASSESSMENT RELATED TO THE DEVELOPMENT OF THE SUN CENTRAL1, 300 MW, SOLAR PV FACILITY ADDITIONAL ACTIVITIES ON VARIOUS FARM PORTIONS BETWEEN DE AAR & HANOVER, EMTHANJENI LOCAL MUNICIPALITY, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE, SOUTH AFRICA | Heritage Scoping | 24/02/2023 | Anton Pelser | A Pelser Archaeological Consulting | 24/02/2023 - 16:11 | |
PIA desktop report | Palaeontological Impact Assessment for the proposed Paradise-Fondwe 132kV powerline, Limpopo Province | PIA Desktop | 24/02/2023 | Prof Marion Bamford | Prof Marion Bamford | Setala Environmental | 26/02/2023 - 18:50 |
Heritage Impact Assessment | Cultural Heritage Impact Assessment: Phase 1 Investigation for the Proposed Prospecting Right Combined with Waste License Application to Prospect for Chrome Ore (Cr), LG & MG Seams Together with Platinum Group Metals (PGM) on a certain Portion of the Remaining Extent and a certain Portion of Portion 2 of the Farm Uitvalgrond 105 JQ, Rustenburg Local Municipality, Bojanala Platinum District Municipality North West Province | HIA Phase 1 | 15/12/2022 | Francois Coetzee | Francois P Coetzee | Milnex 189 CC | 26/02/2023 - 18:52 |
Paleontological Exemption letter | PROSPECTING RIGHT COMBINED WITH A WASTE LICENCE APPLICATION TO PROSPECT FOR CHROME ORE (CR), LG & MG SEAMS TOGETHER WITH PLATINUM GROUP METALS (PGM), NEAR RUSTENBURG ON A CERTAIN PORTION OF THE REMAINING EXTENT, A CERTAIN PORTION OF PORTION 1 & A CERTAIN PORTION OF PORTION 2 OF THE FARM UITVALGROND 105, REGISTRATION DIVISION JQ, NORTH WEST PROVINCE. THE PROPERTY IS LOCATED APPROXIMATELY 18KM NORTH WEST OF RUSTENBURG. NW30/5/1/3/3/2/1/13418PR | Palaeontological Specialist Reports | 15/12/2022 | Elize Butler | BANZAI ENVIRONMENTAL (PTY) LTD. | Milnex 189 CC | 26/02/2023 - 18:54 |
Carmel 3 - HIA | 27/02/2023 - 10:34 | ||||||
Carmel 3 - PIA | 27/02/2023 - 10:35 | ||||||
Karreebosch Letter Feb 2023 | Letter re: FINAL WALKDOWN REPORT FOR THE APPROVED KARREEBOSCH WEF NEAR SUTHERLAND | Heritage Impact Assessment Specialist Reports | 21/02/2023 | Jenna Lavin | CTS Heritage | G7 Energies (Pty) Ltd | 27/02/2023 - 10:38 |
Varkenslaagte - HIA | 27/02/2023 - 10:48 | ||||||
Varkenslaagte - PIA | 27/02/2023 - 10:49 | ||||||
Turffontein - HIA | 27/02/2023 - 10:53 | ||||||
Turffontein - PIA | 27/02/2023 - 10:54 | ||||||
Kwhezi - HIA | 27/02/2023 - 10:58 | ||||||
Khwezi - PIA | 27/02/2023 - 10:59 | ||||||
Proposed Precast Concrete Manufacturing Facility on Remainder of Portion 3 of Farm 854, Jeffreys Bay | Letter of recommendation (with conditions) for the exemption of a full Phase Archaeological Impact Assessment for the proposed development of a precast concrete manufacturing facility on the Remainder of Portion 3 of the Farm 854 near Jeffreys Bay, Kouga Local Municipality, Eastern Cape Province | HIA Letter of Exemption | 28/02/2023 | Kobus Reichert | Eastern Cape Heritage Consultants | Habitat Link Consulting (Pty) Ltd | 27/02/2023 - 11:25 |
A LETTER OF RECOMMENDATION (WITH CONDITIONS) FOR THE EXEMPTION | A LETTER OF RECOMMENDATION (WITH CONDITIONS) FOR THE EXEMPTION OF A FULL PHASE 1 ARCHAEOLOGICAL HERITAGE IMPACT ASSESSMENT FOR A PROPOSED BUSINESS (1) DEVELOPMENT ON ERF 4033 IN FAIRVIEW, GQEBERHA (PORT ELIZABETH), NELSON MANDELA BAY MUNICIPALITY, EASTERN CAPE PROVINCE | HIA Letter of Exemption | 27/02/2023 | Kobus Reichert | 27/02/2023 - 11:33 | ||
Karreebosch Letter February 2023 | FINAL WALKDOWN REPORT FOR THE APPROVED KARREEBOSCH WEF NEAR SUTHERLAND SAHRIS CASE 19361 | Heritage Impact Assessment Specialist Reports | 21/02/2023 | Jenna Lavin | CTS Heritage | G7 Energies (Pty) Ltd | 27/02/2023 - 12:26 |
Phase 1 Mooiplaats 367-JR Advance Projects | Cultural Heritage Resources Impact Assessment of Remainder 13 and Portion 287 - 296 of the farm Mooiplaats 367-JR Tshwane Gauteng | HIA Phase 1 | 28/08/2007 | Udo Kusel | African Heritage Consultants CC | Platinum Mile Investments 542 (Pty) Ltd | 27/02/2023 - 13:11 |
Salvokop Ext 5 Railway Tracks Significance Statement | Statement on the Heritage Significance of Old Railway Tracks Unearthed During the Earthworks Done for the Development of Salvokop Ext 5, City of Tshwane, Gauteng Province | Significance Report | 20/02/2023 | Johnny Van Schalkwyk | SPOOR Environmental Services (PTY) Ltd. | 27/02/2023 - 14:34 | |
Heritage Impact Assessment Report for Su Casa Burial Estate | Heritage Report for the proposed Su Casa Burial Estate on the Remaining Extent of Portion 10 (a portion of Portion 9) of the Farm Doornrug 302 JS, within Emalahleni Local Municipality in the Mpumalanga Province | HIA Phase 1 | 25/02/2022 | 27/02/2023 - 15:13 | |||
Palaeontological Impact Assessment for the proposed Su Casa Cemetery | Palaentological Impact Assessment Report for the proposed Su Casa Burial Estate on the Remaining Extent of Portion 10 (a portion of Portion 9) of the Farm Doornrug 302 JS, within Emalahleni Local Municipality in the Mpumalanga Province | PIA Desktop | 20/02/2022 | 27/02/2023 - 15:17 | |||
HIA Bultfontein 107 JR | AMENDED REPORT FOR A PHASE 1 HIA FOR PROPOSED TOWNSHIP DEVELOPMENT ON THE REMAINDER OF THE FARM BULTFONTEIN 107JR NEAR SOSHANGUVE, GREATER TSHWANE MUNICIPAL AREA, GAUTENG | HIA Phase 1 | 03/02/2023 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Setala Environmental | 27/02/2023 - 21:08 |
Heritage Screener: Ukuqala Solar PV facility | Desktop Heritage Screening Assessment for the Proposed extension of the validity of the EAs of two authorised solar PV facilities on Portion D and Portion E (and now called the Ukuqala Solar PV facility) within the Vetlaagte Farm near De Aar | Heritage Scoping | 28/02/2023 | Jenna Lavin | CTS Heritage | Landscape Dynamics - Cape Town | 01/03/2023 - 08:36 |
HIA Gamma Gridline Corridor | HERITAGE IMPACT ASSESSMENT: PROPOSED GAMMA GRIDLINE CORRIDOR, WESTERN AND NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 05/01/2023 | Jayson Orton | ASHA Consulting(Pty) Ltd | Red Cap Hoogland 1 (Pty) Ltd | 01/03/2023 - 14:34 |
Palaeontological Study Gamma Gridline | Palaeontological Heritage PROPOSED GAMMA 400 kV GRIDLINE PROJECT | Palaeontological Specialist Reports | 15/10/2023 | John Almond | Natura Viva CC | Red Cap Hoogland 1 (Pty) Ltd | 01/03/2023 - 14:40 |
PEC7505 - Iphiva Substation Reassessment DSR - App C (Heritage) | Heritage Scoping Report: Environmental Impact Assessment Process for the Proposed Iphiva 400/132 kV Substation, KwaZulu-Natal | Heritage Scoping | 31/01/2023 | Shannon Hardwick, Nokubonga Dlamini | Digby Wells Environmental | SiVEST SA (Pty) Ltd | 01/03/2023 - 15:19 |
Heritage Impact Assessment | A Report on a Heritage Impact Assessment for a Proposed Solar Plant and Infrastructure on the Farm Kipling, Black Rock Mining Operations, Close to Hotazel, Northern Cape Province | Heritage Impact Assessment Specialist Reports | 21/11/2022 | Anton van Vollenhoven | Archaetnos CC | EScience Associates (Pty) Ltd | 02/03/2023 - 07:13 |
Paleontological Desktop Assessment | ESTABLISHMENT OF BLACK ROCK SOLAR PV FACILITY, HOTAZEL, NORTHEN CAPE PROVINCE | PIA Desktop | 20/12/2022 | Elize Butler | Banzai Environmental (Pty) Ltd | EScience Associates (Pty) Ltd | 02/03/2023 - 07:16 |
Boschendal S27 Deli Extension | Boschendal Waenhuis Alterations and Additions to Deli-Cafe: draft for comment | BE & CL Phase 1 | 02/03/2023 | Mike Scurr, Katie Smuts | Rennie Scurr Adendorff | Boschendal (Pty) Ltd | 02/03/2023 - 10:36 |
Prospecting Right on Goedehoop 169 HT | PROSPECTING RIGHT AND ENVIRONMENTAL AUTHORISATION APPLICATION FOR THE PURPOSE OF PROSPECTING FOR Pseudocoal and Torbanite oil/shale ON ALL PORTIONS OF THE FARM GOEDEHOOP 169 HT, SITUATED UNDER THE MAGISTERIAL DISTRICT OF MKHONDO, MPUMALANGA PROVINCE. | HIA Phase 1 | 02/03/2023 - 12:27 | ||||
PALAEONTOLOGICAL DESKTOP ASSESSMENT | PALAEONTOLOGICAL DESKTOP ASSESSMENT: S24G PROCESS:CONSTRUCTION AND INFILLING OF WATERCOURSE ON TIEGERPOORT FARM, GAUTENG | PIA Desktop | 14/12/2022 | Elize Butler | Banzai Environmental (Pty) Ltd | 02/03/2023 - 13:32 | |
University of Zululand Heritage Impact Assessment | Heritage Impact Assessment Submitted in terms of Section 41(1)(c)(i) of the KwaZulu Natal AMAFA and Research Institute Act No. 5 of 2018, for the Proposed Densification and Upgrades to the University of Zululand Main Campus, Empangeni, KwaZulu Natal. | HIA Phase 2 | 28/02/2023 | Department of Higher Education and Training | 02/03/2023 - 14:47 | ||
Request for Exemption of any Palaeontological Impact Assessment for the proposed development of a filling station and associated infrastructure along the R25 in Bronkhorstspruit | Request for Exemption of any Palaeontological Impact Assessment for the proposed development of a filling station and associated infrastructure along the R25 in Bronkhorstspruit, within the City of Tshwane Metropolitan Municipality in the Gauteng Province. SAHRA Case ID: 20509 | PIA Desktop | 28/02/2023 | 03/03/2023 - 10:39 | |||
Heritage Report - R504 Section 4 | Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED UPGRADING OF SECTION 4 OF ROAD R504, LEEUDORINGSTAD (KM 0.00) TO THE VAAL RIVER BRIDGE (KM 24.1), MAQUASSI HILLS LOCAL MUNICIPALITY, NORTH WEST PROVINCE | HIA Phase 1 | 14/10/2020 | Johnny van Schalkwyk | SAHRA Council | Chameleon Environmental | 03/03/2023 - 14:32 |
PIA 11005MP | Palaeontological Impact Assessment for the proposed Mining Right on Farm Cropwell 384/1 Between Kuruman and Kathu Northern Cape Province | Palaeontological Specialist Reports | 29/01/2023 | Marion Bamford | Prof Marion Bamford | Prof Marion Bamford | 03/03/2023 - 16:59 |
Desktop Palaeontological Impact Assessment | Desktop Palaeontological Impact Assessment of Application for Prospecting Right for Cobalt, Diamond, Gold, Iron, Manganese, Platinum Group Metals and Zinc on Portion 32, Remaining Extent of Portion 59 and Portion 116 of the Farm 703, Hotazel, Kuruman District, Northern Cape Province | PIA Desktop | 06/03/2023 | Joseph Chikumbirike | Pulafel 4D Consulting (Pty) Ltd | 06/03/2023 - 09:31 | |
Heritage Impact Assessment | Heritage Impact Assessment for the proposed Prospecting Right Application and Environmental Authorisation for prospecting activities on Portion 32, Remaining Extent of Portion 59 and Portion 116 of the Farm 703, near Santoy, Northern Cape Province | HIA Phase 1 | 06/03/2023 | Joseph Chikumbirike | Pulafel 4D Consulting (Pty) Ltd | 06/03/2023 - 09:35 | |
Heritage Impact Assessment | HERITAGE IMPACT ASSESSMENT: PROPOSED MURA 1-4 PV FACILITIES, WESTERN CAPE AND NORTHERN CAPE | HIA Phase 1 | 15/12/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | WSP Group Africa (Pty) Ltd | 06/03/2023 - 13:08 |
Heritage Impact Assessment | HERITAGE IMPACT ASSESSMENT: PROPOSED MURA 1-4 PV FACILITIES, WESTERN CAPE AND NORTHERN CAPE | HIA Phase 1 | 15/12/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | WSP Group Africa (Pty) Ltd | 06/03/2023 - 13:11 |
Heritage Impact Assessment for Mura 1-4 PV | HERITAGE IMPACT ASSESSMENT: PROPOSED MURA 1-4 PV FACILITIES, BEAUFORT WEST MAGISTERIAL DISTRICT, WESTERN CAPE AND VICTORIA WEST MAGISTERIAL DISTRICT, NORTHERN CAPE | HIA Phase 1 | 15/12/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | WSP Group Africa (Pty) Ltd | 06/03/2023 - 15:23 |
Heritage Impact Assessment for Mura EGI | HERITAGE IMPACT ASSESSMENT: PROPOSED MURA ELECTRICAL GRID INFRASTRUCTURE, BEAUFORT WEST MAGISTERIAL DISTRICT, WESTERN CAPE AND VICTORIA WEST MAGISTERIAL DISTRICT, NORTHERN CAPE | HIA Phase 1 | 15/12/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | WSP Group Africa (Pty) Ltd | 06/03/2023 - 16:30 |
Congella Power Station (Old Smokey) | Congella Power Station (Old Smokey) | Significance Report | 24/02/2023 | Nick Proome, Gert Bester | Elphick Proome Architects | 07/03/2023 - 09:38 | |
Congella Power Station (Old Smokey) | Congella Power Station (Old Smokey) Heritage Report | Built Environment and Cultural Landscapes | 24/02/2023 | Nick Proome, Gert Bester | Elphick Proome Architects | 07/03/2023 - 10:32 | |
50MW Khauta eNyane Heritage Assessment | 50MW Khauta eNyane Heritage Assessment_Final | Heritage Impact Assessment Specialist Reports | 01/08/2022 | Jonathan Kaplan | Agency for Cultural Resources Management | Enviroworks | 07/03/2023 - 15:13 |
165MW Khauta Heritage Assessment | ARCHAEOLOGICAL HERITAGE IMPACT ASSESSMENT PROPOSED DEVELOPMENT OF A 165 MW PHOTOVOLTAIC SOLAR FARM ON PORTION 0 OF THE FARM KOPJE ALLEEN NO. 81 AND PORTION 1 OF THE FARM KOPJE ALLEEN NO. 81, KHAUTA NORTH SOLAR PV FACILITY NEAR RIEBEECKSTAD, MATJHABENG LOCAL MUNICIPALITY FREE STATE PROVINCE | Heritage Impact Assessment Specialist Reports | 01/08/2022 | Jonathan Kaplan | Agency for Cultural Resources Management | Enviroworks | 07/03/2023 - 15:42 |
38 I1 110MW Khauta South Heritage Assessment_Final | ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED DEVELOPMENT OF A 110 MW SOLAR PHOTOVOLTAIC (PV) FACILITY ON PORTION 9 OF THE FARM COMMANDANTS PAN NO. 382, FARM TAFEL BAAI NO. 413, AND PORTION 12 OF THE FARM NOOIT GEDACHT NO. 74, KHAUTA SOUTH SOLAR PV FACILITY NEAR RIEBEECKSTAD, MATJHABENG LOCAL MUNICIPALITY, FREE STATE PROVINCE | Heritage Impact Assessment Specialist Reports | 01/08/2022 | Jonathan Kaplan | Agency for Cultural Resources Management | Enviroworks | 07/03/2023 - 15:54 |