THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 17851 - 17900 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
Springhaas LiLo 1 Heritage Impact Assessment | Heritage Impact Assessment: Proposed LiLo Connection from Springhaas Collector Substation A to the Beta/Hydra 400kV OHL within the proposed Springhaas grid connection near Dealesville in the Free State Province | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 12:11 | |
Springhaas LiLo 1 Palaeontological Impact Assessment | Palaeontological Impact Assessment for the proposed LiLo Connection from Springhaas Collector Substation A to the Beta/ Hydra 400kV Overhead Line, Near Dealesville, Bloemfontein, Free State | PIA Desktop | 25/07/2022 | Marion Bamford | Prof Marion Bamford | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 12:16 | |
Springhaas LiLo 2 Heritage Impact Assessment | Heritage Impact Assessment: Proposed LiLo Connection from Springhaas Collector Substation B to the Beta/Delphi 400kV OHL within the proposed Springhaas grid connection near Dealesville in the Free State Province | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 12:24 | |
Springhaas LiLo 2 Palaeontological Impact Assessment | Palaeontological Impact Assessment for the proposed LiLo Connection from Springhaas Collector Substation B to the Beta/ Delphi 400kV Overhead Line, Near Dealesville, Bloemfontein, Free State | PIA Desktop | 25/07/2022 | Marion Bamford | Prof Marion Bamford | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 12:29 | |
Springhaas Line 1 Heritage Impact Assessment | Heritage Impact Assessment: Proposed Powerlines from Springhaas Solar Facility 1 to Collector Substation B within the proposed Springhaas Grid Corridor near Dealesville in the Free State Province | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 12:40 | |
Springhaas Line 1 Palaeontological Impact Assessment | Palaeontological Impact Assessment for the proposed Overhead Lines up to 275kV in Capacity from Springhaas Solar Facility 1 to Springhaas Collector Substation B, Near Dealesville, Bloemfontein, Free State | PIA Desktop | 07/07/2022 | Marion Bamford | Prof Marion Bamford | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 12:50 | |
Springhaas Line 2 | Heritage Impact Assessment: Proposed Powerline Line 2 from Springhaas Solar Facility 3 to Collector Substation B within the proposed Springhaas grid connection near Dealesville in the Free State Province | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 13:07 | |
Springhaas Line 2 Palaeontological Impact Assessment | Palaeontological Impact Assessment for the proposed Overhead Lines up to 275kV in Capacity from Springhaas Solar Facility 3 to Springhaas Collector Substation B, Near Dealesville, Bloemfontein, Free State | PIA Desktop | 25/07/2022 | Marion Bamford | Prof Marion Bamford | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 13:10 | |
Springhaas Line 3 Heritage Impact Assessment | Heritage Impact Assessment: Proposed Powerlines from Springhaas Solar Facility 4 to Collector Substation A within the proposed Springhaas grid connection near Dealesville in the Free State Province | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 13:23 | |
Springhaas Line 3 Palaeontological Impact Assessment | Palaeontological Impact Assessment for the proposed Overhead Lines up to 275kV in Capacity from Springhaas Solar Facility 4 to Springhaas Collector Substation A, Near Dealesville, Bloemfontein, Free State | PIA Desktop | 25/07/2022 | Marion Bamford | Prof Marion Bamford | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 13:26 | |
Springhaas Line 4 Heritage Impact Assessment | Heritage Impact Assessment: Proposed Powerlines From Springhaas Solar Facility 5 To Collector Substation A within The Proposed Springhaas Grid Connection Corridor Near Dealesville In The Free State Province | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 14:00 | |
Springhaas Line 4 Palaeontological Impact Assessment | Palaeontological Impact Assessment for the proposed Overhead Lines up to 275kV in Capacity from Springhaas Solar Facility 5 to Springhaas Collector Substation A, Near Dealesville, Bloemfontein, Free State | PIA Desktop | 25/07/2022 | Marion Bamford | Prof Marion Bamford | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 14:05 | |
Springhaas Line 5 Heritage Impact Assessment | Heritage Impact Assessment: Proposed Powerlines From Springhaas Solar Facility 6 To Collector Substation B Within The Proposed Springhaas Grid Connection Corridor Near Dealesville In The Free State Province | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 14:44 | |
Springhaas Line 5 Palaeontological Impact Assessment | Palaeontological Impact Assessment for the proposed Overhead Lines up to 275kV in Capacity from Springhaas Solar Facility 6 to Springhaas Collector Substation B, Near Dealesville, Bloemfontein, Free State | PIA Desktop | 25/07/2022 | Marion Bamford | Prof Marion Bamford | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 14:48 | |
Springhaas Line 6 | Heritage Impact Assessment: Proposed Powerlines From Springhaas Solar Facility 8 To Collector Substation A Within The Proposed Springhaas Grid Connection Corridor Near Dealesville In The Free State Province | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 15:12 | |
Springhaas Line 6 Palaeontological Impact Assessment | Palaeontological Impact Assessment for the proposed Overhead Lines up to 275kV in Capacity from Springhaas Solar Facility 8 to Springhaas Collector Substation A, Near Dealesville, Bloemfontein, Free State | PIA Desktop | 25/07/2022 | Marion Bamford | Prof Marion Bamford | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 15:20 | |
Springhaas Line 7 Heritage Impact Assessment | Heritage Impact Assessment: Proposed Powerlines From Springhaas Solar Facility 9 To Collector Substation A Within The Proposed Springhaas Grid Connection Corridor Near Dealesville In The Free State Province | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 15:27 | |
Springhaas Line 7 Palaeontological Impact Assessment | Palaeontological Impact Assessment for the proposed Overhead Lines up to 275kV in Capacity from Springhaas Solar Facility 9 to Springhaas Collector Substation A, Near Dealesville, Bloemfontein, Free State | PIA Desktop | 25/07/2022 | Marion Bamford | Prof Marion Bamford | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 15:58 | |
Springhaas to Artemis Line 1 HIA | Heritage Impact Assessment: Proposed Powerline from Springhaas Collector Substation A to the Authorized Artemis Substation Near Dealesville, Free State | HIA Phase 2 | 28/12/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | GIBB Environmental | 31/01/2023 - 10:25 | |
Springhaas to Artemis Line 1 PIA | Palaeontological Impact Assessment for the proposed Overhead Powerline from Springhaas Collector Substation A to the Authorised Artemis Substation, Near Dealesville, Bloemfontein, Free State (Line 1) | PIA Phase 1 | 01/12/2022 | Marion Bamford | Prof Marion Bamford | GIBB Environmental (Pty) Ltd | 31/01/2023 - 10:31 | |
Springhaas to Artemis Line 2 HIA | HERITAGE IMPACT ASSESSMENT: PROPOSED POWERLINE FROM THE SPRINGHAAS COLLECTOR SUBSTATION B TO THE AUTHORISED ARTEMIS SUBSTATION NEAR DEALESVILLE, FREE STATE Heritage Impact Assessment: Proposed powerline from the Springhaas Collector Substation B to the authorised Artemis substation near Dealesville, Free State | HIA Phase 2 | 20/12/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | GIBB Environmental (Pty) Ltd | 31/01/2023 - 10:52 | |
Springhaas to Artemis Line 2 Palaeontological Impact Assessment | Palaeontological Impact Assessment for the proposed Overhead Powerline from Springhaas Collector Substation B to the Artemis Substation, Near Dealesville, Bloemfontein, Free State | PIA Desktop | 01/12/2022 | Marion Bamford | Prof Marion Bamford | GIBB Environmental (Pty) Ltd | 31/01/2023 - 10:56 | |
Springlake Siding | A Report on a Heritage Impact Assessment for the Proposed Springlake Railway Siding Close to Hattingspruit in the Kwa-Zulu-Natal Province | HIA Phase 1 | 01/05/2012 | Anton van Vollenhoven | KwaZulu-Natal - Department of Agriculture and Environmental Affairs | Shanduka Coal (Pty) Ltd | 29/04/2013 - 09:05 | |
Springtontein Wind Energy Facility - Heritage Report | Heritage Impact Assessment Report - Wind Energy Generation Facility near Springfontein in the Free State Province | Stephan Gaigher | G & A Heritage | 01/02/2013 - 14:34 | ||||
Springtontein Wind Energy Facility - Palaeontology Report | Proposed Wind and Solar Energy Facility at Springfontein, Free State - Desktop Report Palaeontology | JF Durand | G & A Heritage | 01/02/2013 - 14:43 | ||||
SptzkloofB 2013 | REPORT ON THE SECOND EXCAVATION SEASON AT SPITZKLOOF B 2013 | Archaeological Permit Report | 28/05/2014 | Genevieve Dewar | 28/05/2014 - 20:26 | |||
SRMO heritage | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED SALDANHA REGIONAL MARINE OUTFALL PROJECT, VREDENBURG MAGISTERIAL DISTRICT, WESTERN CAPE | HIA Phase 1 | 08/09/2014 | Jayson Orton | ASHA Consulting(Pty) Ltd | Council for Scientific and Industrial Research | 15/07/2015 - 09:08 | |
SRMO palaeo report | PALAEONTOLOGICAL IMPACT ASSESSMENT (Desktop Study) Proposed construction of a marine outfall pipeline and associated infrastructure in Danger Bay in the Saldanha Bay region, Western Cape, South Africa The Saldanha Regional Marine Outfall Project | PIA Desktop | 07/08/2014 | John Pether | Council for Scientific and Industrial Research | 15/07/2015 - 09:11 | ||
SRPM PV Heritage Final Scoping Report | Heritage Scoping | 23/04/2022 | Dr Julius CC Pistorius | Savannah Environmental (Pty) Ltd | 23/08/2022 - 14:25 | |||
SRPM PV Heritage Scoping Report (Draft) | SRPM PV Heritage Scoping Report (Draft) | Heritage Scoping | Dr Julius CC Pistorius | Savannah Environmental (Pty) Ltd | 20/06/2022 - 14:51 | |||
SRPM PV HSR | Appendix E - Heritage Scoping Report | Heritage Scoping | 17/06/2022 | Dr Julius CC Pistorius | Savannah Environmental (Pty) Ltd | 20/06/2022 - 13:28 | ||
SR_Hospital and Heritage Lifestyle Centre_Bfn | Heritage Scoping report for the proposed Hospital and Heritage Lifestyle Centre, Bloemfontein | Heritage Scoping | 10/05/2017 | Loudine Philip | DESTEA-Free State | Spatial Solutions Environmental Consultants | 12/05/2017 - 02:01 | |
SSS1 PV PLant HIA | HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED CONSTRUCTION OF THE SSS1 5MW SOLAR PHOTOVOLTAIC (PV) PLANT ON THE WESTERN PART OF PORTION 6 (PORTION OF PORTION 5) OF FARM SPES BONA 2355 NEAR BLOEMFONTEIN | Heritage Impact Assessment Specialist Reports | 03/12/2013 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | Sivest - Gauteng | 13/12/2013 - 11:47 | |
SSS2 PV Plant HIA | HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED CONSTRUCTION OF THE SSS1 5MW SOLAR PHOTOVOLTAIC (PV) PLANT ON THE WESTERN PART OF PORTION 6 (PORTION OF PORTION 5) OF FARM SPES BONA 2355 NEAR BLOEMFONTEIN | Heritage Impact Assessment Specialist Reports | 03/12/2013 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | Sivest - Gauteng | 13/12/2013 - 12:07 | |
SSV-PIA-Ikhephu Feedlot, Erf 1 Eliot, SLM, CHDM, Eastern Cape | SSV-PIA-Ikhephu Feedlot, Erf 1 Eliot, SLM, CHDM, Eastern Cape | PIA Desktop | 26/11/2022 | Elize Butler | 26/11/2022 - 22:22 | |||
St Anne's Convent, Umzinto | Request for Letter of No Objection Proposed Subdivision of the Remainder of Erf 328 at St Anne’s Convent, Umzinto Umdoni Local Municipality, Ugu DM, KwaZulu-Natal | Built Environment and Cultural Landscapes | 10/10/2016 | Len van Schalkwyk | eThembeni Cultural Heritage | Stott Milton and Conway Professional Land Surveyors | 23/10/2016 - 20:55 | |
St Anne’s Convent, Umzinto Revision of Erven and proposed land use | St Anne’s Convent, Umzinto Revision of Erven and proposed land use Proposed Subdivision of the Remainder of Erf 328 Umzinto Umdoni Local Municipality, Ugu DM, KwaZulu-Natal | Site Inspection Report | 28/02/2018 | Len van Schalkwyk | eThembeni Cultural Heritage | Stott Milton and Conway Professional Land Surveyors | 26/06/2018 - 07:03 | |
St Chads Preliminary Heritage Impact Assessment | St Chads Preliminary Heritage Impact Assessment | Heritage Study | 17/10/2023 | 26/10/2023 - 12:37 | ||||
St Chads Subsidised Housing project Preliminary Heritage Assessment | St Chads Subsidised Housing project Preliminary Heritage Assessment | Heritage Study | 17/10/2023 | 26/10/2023 - 11:41 | ||||
St Dominics Curro School | Historical and Architectural report: St Dominics Curro School, St Dominics Street, New castle | Heritage Statement | 29/07/2022 | Louis J Eksteen | Newcastle Municipality | Curro Holdings | 10/08/2022 - 09:45 | |
St Elmo 2138 Sorghum Malt | First Phase Archaeological & Heritage Investigation of the proposed Sorghum Malt Production Facilities on Portion 1 of St. Elmo 2138, Bainsvley, Bloemfontein | AIA Phase 1 | 10/03/2012 | Cobus Dreyer | Pr. Aracheologist/Heritage Specialist | H2ON Environmental | 07/08/2012 - 09:20 | |
St Elmo PIA | Letter of Recommendation for Exemption from further Palaeontological Studies at the Proposed Sorghum Malt Facility at St. Elmo, Bloemfontein, Free State | PIA Desktop | 07/08/2012 | Jennifer Botha | National Museum Bloemfontein - Karoo Palaeontology Department | H2ON Environmental | 07/08/2012 - 09:30 | |
St Faith Police Station | Phase 1 AIA/HIA for the proposed reestablishment of Saint Faiths Police Station within Umzumbe Local Municipality, Ugu District, KwaZulu Natal Province | Heritage Impact Assessment Specialist Reports | 03/07/2022 | Trust Mlilo | Integrated Specialist Services | Integrated Specialist Services | 16/08/2022 - 22:40 | |
St Faiths Substation | Phase 1 Heritage Impact Assessment Report: Proposed St. Faiths 400/132 kV Sub-Station and Associated Power Lines, Port Shepstone, uMzumbe, Hibiscus Coast and Ezinqoleni Local Municipalities, Ugu District, KwaZulu-Natal | HIA Phase 1 | 14/03/2014 | Elizabeth Wahl | eThembeni Cultural Heritage | Eskom - SOU | 06/08/2014 - 08:22 | |
St Faiths Substations and powerlines | Phase 1 Heritage Impact Assessment Report: Proposed St. Faiths 400/132 kV Sub-Station and Associated Power Lines, Port Shepstone, uMzumbe, Hibiscus Coast and Ezinqoleni Local Municipalities, Ugu District, KwaZulu-Natal | HIA Phase 1 | 14/03/2014 | Elizabeth Wahl | eThembeni Cultural Heritage | Eskom - ECOU | 13/11/2014 - 11:29 | |
St James | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF THE EMONDLO. ST JAMES AND LEKSAND SUBSTATION YARDS, INCLUDING THE RECONSTRUCTION OF THE EXISTING LEKSAND-ST JAMES 88/22kV POWERLINE AND THE CONSTRUCTION OF THE NEW EMONDLO-ST JAMES 88/22kV POWERLINE | Heritage Impact Assessment Specialist Reports | 26/04/2012 | Frans Prins | Active Heritage CC | Kerry Seppings Environmental Management | 11/09/2013 - 13:53 | |
ST JAMES/MAKHOSINI 88KV POWERLINE AND 20 MVA MAKHOSINI 88/22KV SUBSTATION | HERITAGE IMPACT ASSESSMENT OF THE PROPOSED ST JAMES/MAKHOSINI 88KV POWERLINE AND 20 MVA MAKHOSINI 88/22KV SUBSTATION, NORTHERN KWAZULU-NATAL | HIA Phase 1 | 15/05/2014 | Frans Prins | Active Heritage CC | Ludloko Developments | CTS_165987 | 07/06/2014 - 05:03 |
st phase heritage assessment of Rooifontein 1722, Kimberley district Northern Cape. | 1st phase heritage assessment of Rooifontein 1722, Kimberley district Northern Cape. | HIA Phase 1 | 30/08/2017 | Sidney Miller | Shangoni Management Services | 27/09/2017 - 09:08 | ||
St. Faiths Anglican Church. | PROPOSED ALTERATIONS AND ADDITIONS TO CHURCH AT 80 CARLISLE STREET, DURBAN. | Heritage Statement | 22/01/2014 | Rodney Harber | KwaZulu-Natal Amafa and Research Institute | Arch Urban Plan t/a Harber & Associates | 06/02/2014 - 13:55 | |
St. Monicas Home | Section 34 Application Demolition | 10/11/2017 | Quahnita Samie | Vidamemoria | Vidamemoria | 10/11/2017 - 18:18 |