THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 17951 - 18000 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
THE PROPOSED KALAHARI-EAST BULK WATER SUPPLY SCHEME PHASE 1A ASKHAM TO PHILANDERSBRON, NORTHERN CAPE | THE PROPOSED KALAHARI-EAST BULK WATER SUPPLY SCHEME PHASE 1A ASKHAM TO PHILANDERSBRON, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 01/07/2014 | Jonathan Kaplan | Agency for Cultural Resources Management | Enviroafrica CC | 25/08/2014 - 10:45 | |
Heritage impact Assessment Sonbesie Solar Power Plant | The Cultural heritage impact assessment for the development of the proposed Sonbesie Solar Power Plant on a portion of the Farm Retreat 671IN, Vryburg Region, North West Province | Heritage Impact Assessment Specialist Reports | Johnny Van Schalkwyk | 04/03/2016 - 10:37 | ||||
VMC3049_Pamish_Magnetite_Project_NID | Environmental Authorisation for the Pamish Magnetite Project. Notification of Intent to Develop | Heritage Impact Assessment Specialist Reports | 11/03/2015 | Justin du Piesanie | Digby Wells Environmental | Pamish Investments No. 39 (Pty) Ltd | 11/03/2015 - 14:50 | |
HIA - Allepad PV Two (Feb'19) | Heritage Impact Assessment for the Proposed Development of Allepad PV Two, a solar PV facility and associated infrastructure on a site near Upington, in the Northern Cape Province | Heritage Impact Assessment Specialist Reports | 26/02/2019 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 27/02/2019 - 11:17 | |
HIA for Musina Landfill site | Heritage Impact Assessment for Musina Landfill Site, | Heritage Impact Assessment Specialist Reports | 04/08/2015 | Josephine Bothma | J van Schalkwyk | Chameleon Environmental | 21/11/2019 - 11:04 | |
Historical Artefacts Valuation Methodology Report Municipality of Walter Sisulu, Joe Gqabi District Aliwal North, Jamestown | Historical Artefacts1 Valuation Methodology Report Municipality of Walter Sisulu, Joe Gqabi District Aliwal North, Jamestown and Burgersdorp | Heritage Impact Assessment Specialist Reports | 25/08/2022 | Sibusiso Mnyanda | The Moon Rises Productions, Thompson Property Specialists | Thompson Property Specialists | 19/08/2022 - 10:24 | |
Specialist report for Heritage studies for rhenosterspruit farm | Rhenosterspruit Heritage Report | Heritage Impact Assessment Specialist Reports | 02/10/2018 | Rudolph Oosthuizen | ABS Africa | Vhembe Dongola National Park | 09/10/2018 - 12:20 | |
Heritage Impact Assessment for Ibisi Sewer Reticulation | Phase one Cultural Heritage Impact Assessment of the proposed Ibisi Sewer Reticulation, Umzimkhulu Local Municipality. | Heritage Impact Assessment Specialist Reports | 30/08/2019 | Frans Prins | Active Heritage CC | SAT Environmental Consultant | 21/10/2019 - 12:32 | |
HIA Report for Enyathi Mining Village | HERITAGE IMPACT ASSESSMENT REPORT FOR THE UPGRADING OF THE ENYATHI MINING VILLAGE, ABAQULUSI LOCAL MUNICIPALITY KZN | Heritage Impact Assessment Specialist Reports | 22/03/2021 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | K2M Environmental | 30/03/2021 - 12:57 | |
Heritage Impact Assessment - Mapleton | Heritage Impact Assessment Specialist Reports | 05/04/2017 | 10/12/2018 - 11:14 | |||||
Vryheid DBAR Heritage Report | Cultural Heritage Impact Assessment of the Proposed Coal Link Project, Vryheid Traction, KwaZulu-Natal. | Heritage Impact Assessment Specialist Reports | 21/02/2014 | Frans Prins | Active Heritage CC | Sivest - Gauteng | 14/04/2015 - 12:57 | |
Uitkoms DBAR Heritage Report | Cultural Heritage Impact Assessment Of The Proposed Uitkoms Antra, Coal-Link Project, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 21/02/2014 | Frans Prins | Active Heritage CC | Sivest - Gauteng | 14/04/2015 - 13:54 | |
FORMALISATION OF LETHLABILE INFORMAL SETTLEMENT | Notice of an application for environmental authorisation and heritage permit for the proposed formalisation of portion twenty-three of the Nietgedacht farm no 242JQ in the Northwest Province | Heritage Impact Assessment Specialist Reports | 06/05/2022 | Leonie Marais-Botes | Mpumalanga - Department of Agriculture, Rural Development, Land and Environmental Affairs | GKM Consulting PTY LTD | 06/05/2022 - 12:49 | |
HIA-Decomissioning of Stellenbosch landfill site | Heritage Impact Assessment for the Proposed Rehabilitation of the Stellenbosch landfill, Stellenbosch Magisterial District, Western Cape | Heritage Impact Assessment Specialist Reports | 20/10/2014 | Jayson Orton | ASHA Consulting(Pty) Ltd | 02/06/2017 - 15:20 | ||
HIA Vosloorus Ext 24, 41 and 43 | Heritage Impact Assessment for Proposed Township Development: Vosloorus Extension 24, Vosloorus Extension 41 and Vosloorus Ext 43, Boksburg Local Municipality, Ekurhuleni Metropolitan Municipality, Gauteng Province. | Heritage Impact Assessment Specialist Reports | 12/08/2014 | Polke Birkholtz | PGS Heritage and Grave Relocation Consultants | Enkanyini Projects | 29/08/2014 - 16:50 | |
Rooipunt Solar Thermal Power Park Power Line, Northern Cape | POWERLINES FOR PROPOSED ROOIPUNT SOLAR THERMAL POWER PARK PROJECT NEAR UPINGTON, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 22/05/2016 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | Sivest - Gauteng | 22/06/2016 - 08:08 | |
243 Currie Road | St Thomas Road Historical Impact Assessment | Heritage Impact Assessment Specialist Reports | 20/07/2012 | Deborah Whelan | 241 Currie Road (Pty) Ltd | 16/05/2013 - 17:57 | ||
Westgate Substation | PHASE 1 ARCHAEOLOGICAL/HERITAGE IMPACT ASSESSMENT FOR WESTGATE SUBSTATION EXTENSION IN THE KAKGISO AREA OF MOGALE CITY LOCAL MUNICIPALITY IN GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 30/03/2019 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Eskom - CROU | 01/10/2020 - 20:43 | |
Construction of gravel road in Msalvana Village Msinga | Proposed development of 1.6 km and upgrading of 4.0 km gravel road Ko-Gabela/Msalvana Village, Msinga LM Mzinyathi District DM, KwaZulu-Natal. | Heritage Impact Assessment Specialist Reports | 20/09/2017 | Len van Schalkwyk | eThembeni Cultural Heritage | Magalela & Associates (Pty) Ltd | 10/11/2017 - 16:13 | |
Heritage Assessment Of The Ncome Museum Complex, Nquthu/Ndundee, kwaZulu-Natal, South Africa. | Heritage Assessment Of The Ncome Museum Complex, Nquthu/Ndundee, kwaZulu-Natal, South Africa. | Heritage Impact Assessment Specialist Reports | 30/06/2006 | eThembeni Cultural Heritage | eThembeni Cultural Heritage | 16/03/2021 - 12:54 | ||
Rustenburg Pedestrian Bridge | The proposed development of a pedestrian bridge, Rustenburg Local Municipality, North West | Heritage Impact Assessment Specialist Reports | 15/11/2016 | 09/05/2017 - 17:28 | ||||
HIA East Coast Gas 400 Kv Power Lines Richards Bay | HIA for the proposed East Coast Gas 400 Kv Power Lines, Located In Richards Bay, Within The Umhlathuze Local Municipality In The King Cetshwayo District Municipality, KZN | Heritage Impact Assessment Specialist Reports | 20/05/2019 | Cherene de Bruyn | NGT ESHS Solutions | 08/07/2019 - 09:40 | ||
Old Bridge near Richmond | Heritage Impact Assessment for the old bridge on Krysfontein and Weltevreden 826, near Richmond | Heritage Impact Assessment Specialist Reports | 12/10/2013 | Deborah Whelan | Archaic Consulting | Umgeni Water | 07/11/2013 - 21:07 | |
Cultural heritage impact assessment | Cultural heritage impact assessment for THE DEVELOPMENT OF THE PROPOSED KAGISO SOLAR POWER PLANT ON THE REMAINING EXTENT OF THE FARM KAMEELAAR NO 315 REGISTRATION DIVISION KURUMAN, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 01/03/2016 | Johnny Van Schalkwyk | 30/05/2016 - 11:35 | |||
Bonizenzo Holdings PRA APAC02258 | A DESKTOP HERITAGE IMPACT ASSESSMENT REPORT FOR THE BONIZENZO HOLDINGS PROSPECTING RIGHTS APPLICATION ON PORTIONS 10, 21 & 24 OF ROODERAND 41JP AND THE REMAINING EXTENT OF PORTIONS 1 & 2 OF ROODERAND 902JP ZEERUST LOCAL MUNICIPALITY, NORTHWEST PROVINCE - APAC022/58 | Heritage Impact Assessment Specialist Reports | 23/06/2022 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Licebo Environmental and Mining (Pty) Ltd | 23/06/2022 - 12:38 | |
Shayamoya Heritage | HERITAGE SURVEY OF THE PROPOSED SHAYAMOYA HOUSING DEVELOPOMENT | Heritage Impact Assessment Specialist Reports | 11/11/2019 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | SiVEST SA (Pty) Ltd | 27/07/2021 - 01:56 | |
Mareesburg HIA | Heritage Impact Asessment on the Farm Mareesburg 8JT | Heritage Impact Assessment Specialist Reports | 25/05/2007 | Matakoma Heritage Consultants (Pty) Ltd | 07/03/2017 - 10:40 | |||
HIA, borrow pit (DR2196/14.75/R/50) extension on Saaiplaas 63, Clanwilliam Area | Heritage Impact Assessment: DR 2196 West Coast Clanwilliam – West Coast District Municipality, Western Cape | Heritage Impact Assessment Specialist Reports | 26/06/2013 | Vidamemoria Heritage Consultants | Nadeson Consulting Services | CTS_503749 | 18/04/2018 - 14:52 | |
Mahube Valley Storm Water Management Basic Assessment | Cultural Heritage Impact Assessment for the Mahube Valley Storm Water Management Pipes, Mamelodi Township | Heritage Impact Assessment Specialist Reports | 01/10/2014 | Johnny Van Schalkwyk | Envirolution Consulting (Pty) Ltd | Envirolution Consulting (Pty) Ltd | 05/11/2014 - 10:12 | |
KARREEBOSCH WEF PART 2 AMENDMENT HERITAGE | KARREEBOSCH WEF PART 2 AMENDMENT, FINAL LAYOUT & EMPR APPROVAL - HERITAGE | Heritage Impact Assessment Specialist Reports | 08/08/2022 | WSP | CTS Heritage | 23/08/2022 - 15:02 | ||
Heritage Report | Heritage Impact Assessment Specialist Reports | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 25/01/2023 - 11:12 | |||
Proposed reclamation of the Marievale TSF | The proposed reclamation of the Marievale Tailings Storage Facilities in Ekurhuleni, Gauteng Province | Heritage Impact Assessment Specialist Reports | 06/03/2020 | Jennifer Kitto | PGS Heritage (Pty) Ltd | Kongiwe Environmental (Pty) Ltd | 02/04/2020 - 09:01 | |
HIA | Cultural Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 17/12/2016 | Anton van Vollenhoven | 10/07/2017 - 15:16 | |||
Thembathina Heritage Report | PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED THEMBATINA MINING PROJECT AT UTRECHT, KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | 03/02/2021 | Frans Prins | Active Heritage CC | 07/07/2021 - 11:12 | ||
HIA, Borrow Pit, Divisional road 01721 (DR01721), Klaarstroom, Prince Albert | Heritage Impact Assessment submitted in terms of section 38(8) of the National Heritage Resources Act: Divisional Road 01721, Klaarstroom Prince Albert – Central Karoo District Municipality, Western Cape | Heritage Impact Assessment Specialist Reports | 25/04/2012 | Vidamemoria Heritage Consultants | Aurecon South Africa (Pty) Ltd | CTS_503285 | 11/04/2018 - 15:07 | |
HIA, P57, KZN | PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED THE UPGRADE OF THE P57 ROAD FROM EZINQOLENI TO THE MTAMVUNA RIVER BRIDGE, WITHIN THE EZINQOLENI LOCAL AND UGU DISTRICT MUNICIPALITIES, KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | Frans Prins | Active Heritage CC | Green Door Environmental | 19/10/2015 - 11:59 | ||
Leeuwbosch 2 Solar Plant Heritage Impact Report | DEVELOPMENT OF THE 9.9MW LEEUWBOSCH 1 SOLAR PV PLANT, 9.9MW LEEUWBOSCH 2 SOLAR PV PLANT AND ASSOCIATED INFRASTRUCTURE NEAR LEEUDORINGSTAD IN THE NORTH WEST PROVINCE Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 05/05/2021 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 18/06/2021 - 14:07 | |
Hyperion PV2 - HIA 27.03.19 | Heritage Impact Assessment:Proposed Hyperion Solar Development 2, Lyndoch 432/Rem, Kuruman Magisterial District, Northern Cape | Heritage Impact Assessment Specialist Reports | 27/03/2019 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 05/04/2019 - 09:20 | |
Vryburg Solar 3 Heritage Report | Cultural Heritage Impact Assessment for the Proposed Development of a 100 MW AC (115 MW DC) Solar Photovoltaic Facility (Vryburg Solar 3) and Associated 132kV Transmission Line near Vryburg, North West Province | Heritage Impact Assessment Specialist Reports | 03/08/2018 | J.A. van Schalkwyk | 16/08/2018 - 16:18 | |||
Heritage Impact Assessment for Du Plessis Dam | Heritage Impact Assessment Specialist Reports | 10/07/2013 | Jayson Orton | 12/11/2013 - 08:07 | ||||
HIA Camden I WEF 132kV Grid Connection | Heritage Impact Assessment for the proposed Camden I Wind Grid Connection, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 02/05/2022 | Jaco van der Walt | Beyond Heritage | WSP Group Africa (Pty) Ltd | 11/05/2023 - 14:34 | |
Xha! Boom Heritage Impact Assessment Report | !Xhaboom Wind Energy Facility (WEF) Heritage Impact Report | Heritage Impact Assessment Specialist Reports | 05/10/2017 | Wouter Fourie | PGS Heritage (Pty) Ltd | Sivest - Gauteng | 14/11/2017 - 09:51 | |
Ilanga Lethemba Heritage Impact Assessment Report | Ilanga Lethemba PV Solar Energy Facility | Heritage Impact Assessment Specialist Reports | 12/09/2011 | David Morris | Solar Capital | 16/11/2018 - 00:30 | ||
Dwarsrug BESS HIA | PROPOSED CONSTRUCTION AND OPERATION OF THE BATTERY ENERGY STORAGE SYSTEM (BESS) AND ASSOCIATED INFRASTRUCTURE FOR THE AUTHORISED DWARSRUG WIND ENERGY FACILITY, LOCATED NEAR LOERIESFONTEIN IN THE HANTAM LOCAL MUNICIPALITY, NAMAKWA DISTRICT IN THE NORTHERN CAPE PROVINCE OF SOUTH AFRICA. | Heritage Impact Assessment Specialist Reports | 04/11/2020 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 26/05/2021 - 16:56 | |
ABO Ujekamanzi MTS & LILO2 Heritage Impact Assessment | Proposed development of the Ujekamanzi Wind Energy Facility 2 LILO and MTS Infrastructure near Amersfoort, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 28/04/2023 | Jenna Lavin | CTS Heritage | SiVEST SA (Pty) Ltd | 20/06/2023 - 16:16 | |
Tiffany Expansion Heritage Impact Assessment | HIA OF PROPOSED TIFFANY SUPERMARKET EXPANSION, SALT ROCK, KZN | Heritage Impact Assessment Specialist Reports | 13/02/2023 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | SiVEST SA (Pty) Ltd | 22/08/2023 - 10:53 | |
Cultural Heritage - Anthropological Report | Cultural Heritage of the Madimatla Cave and Surrounding Area: An anthropological perspective | Heritage Impact Assessment Specialist Reports | 31/05/2014 | 12/11/2014 - 15:16 | ||||
HIA township establishment | Heritage Impact Assessment for the township establishment on the remainder of portion 1 of the farm Naturelle Lokasie 272 LS | Heritage Impact Assessment Specialist Reports | 27/11/2020 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | 11/05/2021 - 10:14 | ||
Heritage Impact Assessment | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED COAL MINING RIGHT APPLICATION AND ENVIRONMENTAL AUTHORISATION, ON PORTION 1 OF THE FARM ANNYSSPRUIT 140 HT AND THE REMAINING EXTENT OF THE FARM MOOIHOEK 168 HT LOCATED IN THE MAGISTERIAL DISTRICT OF PIET RETIEF, MPUMALANGA PROVINCE | Heritage Impact Assessment Specialist Reports | 06/08/2023 | 06/06/2023 - 19:16 | ||||
HIA | Heritage Impact Assessment Specialist Reports | 21/08/2012 | 13/12/2012 - 14:48 |