FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
Patensie PIA Palaeontological specialist assessment: combined field-based and desktop study PROPOSED MELKHOUT - PATENSIE 132 kV TRANSMISSION LINE PROJECT, HUMANSDORP & HANKEY MAGISTERIAL DISTRICTS, EASTERN CAPE. PIA Phase 1 01/05/2013 John E Almond Natura Viva CC GIBB Engineering & Science - Port Elizabeth 19/09/2013 - 13:13
Heritage Impact Assessment for the Relocation of the authorised Main Transmission Substation HERITAGE IMPACT ASSESSMENT: PART 2 AMENDMENT TO RELOCATE AN AUTHORISED MAIN TRANSMISSION SUBSTATION ON PORTION 7 OF HAMELKRAAL 16, LAINGSBURG MAGISTERIAL DISTRICT, WESTERN CAPE 06/07/2021 Jayson Orton ASHA Consulting(Pty) Ltd 11/07/2021 - 14:03
Heritage preconstruction walthrough report for Sutherland WEF PRE-CONSTRUCTION ARCHAEOLOGICAL SURVEY OF THE AUTHORISED 140MW SUTHERLAND WIND ENERGY FACILITY AND ASSOCIATED GRID CONNECTION INFRASTRUCTURE, NORTHERN & WESTERN CAPE PROVINCES Heritage Impact Assessment Specialist Reports 01/12/2022 Jayson Orton ASHA Consulting(Pty) Ltd ASHA Consulting(Pty) Ltd 15/12/2022 - 10:07
Copperton Borrow Pits HIA HERITAGE IMPACT ASSESSMENT FOR FOUR PROPOSED BORROW PITS ON REMAINDER OF FARM VOGELSTRUISBULT 104/1, PRIESKA MAGISTERIAL DISTRICT, NORTHERN CAPE HIA Phase 1 02/02/2015 Jayson Orton ASHA Consulting(Pty) Ltd EnviroSci Africa cc 06/02/2015 - 09:34
HIA REPORT SOVENTIX SOLAR PROJECT APAC01711 (004) REPORT ON A PHASE 1 HERITAGE ASSESSMENT FOR THE PROPOSED SOVENTIX SOLAR PV PROJECT ON VARIOUS FARMS, NEAR HANOVER, ENTHANJENI MUNICIPALITY, PIXLEY KA SEME DISTRICT, NORTHERN CAPE HIA Phase 1 05/05/2017 APELSER ARCHAEOLOGICAL CONSULTING 23/06/2017 - 09:28
VIA for the Padloper Solar PV Facility 1, NC VISUAL IMPACT ASSESSMENT REPORT: COMPILED TO PROVIDE INPUT FOR BASIC ASSESSMENTS FOR THE PROPOSEDDEVELOPMENT OF THE PADLOPER SOLAR PROJECTS 1 - 4, NEAR MURRAYSBURG IN THE NORTHERN AND WESTERN CAPE PROVINCES Visual Impact Assessment 31/08/2023 Kerry Schwartz SLR Consulting (South Africa) (Pty) Ltd African Clean Energy Developments (Pty) Ltd 27/09/2023 - 14:14
SWEP Phase 2 heritage report 1st phase H.I.A. of a proposed extension and upgrading at Sishen Mine, also known as phase two of the Sishen Western Expansion Project that is located on portions of Gamagara and Doornvlei, Northern Cape HIA Phase 1 02/11/2020 Sidney Miller 02/09/2021 - 13:47
Phase I Heritage Impact Assessment - Klipplaatdrift 399 KT Cultural Heritage Resources Impact Assessment for the proposed extension of the SAMREC Andalusite Mine at Klipplaatdrift, Krugerspost, Limpopo Province, South Africa. HIA Phase 1 16/03/2015 Sidney Miller African Heritage Consultants CC SAMREC (Pty) Ltd. 14/04/2015 - 07:59
Holsloot PIA Phase 1 Palaeontological Impact Assessment of a section of the farm Holsloot 47 near Prieska, NC Province. PIA Phase 1 03/03/2016 Lloyd Rossouw Eko Environmental 07/03/2016 - 13:09
HIA for a new dam in Amsterdam, Mpumalanga A Report on a Cultural Heritage Impact Assessment for a Proposed New Dam and Pipelines at Amsterdam, Mpumalanga Province. HIA Phase 1 19/05/2017 Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants AdiEnvironmental cc 21/08/2017 - 10:18
AIA[P1]-Erven 7540, 7541 & 7538, Kimberley, SPM, NC Phase 1 Archaeological Impact Assessment - 'Offer to Purchase' Property, Portions of Erf 7540, Erf 7541 and Erf 7538, Corner Quinn & Naude Streets, Kimberley, Sol Plaatje Municipality, Northern Cape AIA Phase 1 25/05/2016 Karen Van Ryneveld P&V Pillay Family Trust 25/05/2016 - 11:28
HIA PHASE I ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED PROSPECTING RIGHT AND BULK SAMPLING ACTIVITIES INCLUDINGTRENCHING ON THE REMAINDER OF THE FARM ST CLAIR NO: 148 DOUGLAS IN THE NORTHERN CAPE PROVINCE AIA Phase 1 11/10/2018 Trust Mlilo SAHRA Council Phuka Tsa Nong (Pty) Ltd 26/11/2018 - 17:32
Van Stadens Wind Energy Facility A phase 1 Archaeological Impact Assessment (AIA) for the proposed 20MW wind farm on three alternative sites: Erf 121, Driftsands (Site Alternative 1), Bushy Park Farm, Remainder of Erf 26, as well as portions 5, 6 and 7 thereof (Site Alternative 2) and Rietfontein Farm, Erf 594, Van Stadens East (Site Alternative 3), Nelson Mandela Metropolitan Municipality, Port Elizabeth, Eastern Cape Province AIA Phase 1 22/06/2012 Johan Binneman, Celeste Booth Albany Museum - Archaeology SRK Consulting (Pty) Ltd - Pretoria 22/06/2012 - 10:36
Mopye HIA PROPOSED UPGRADING OF AN EXISTING GRAVEL ROAD ON THE REM PORTION OF THE FARM MODJADJIS 424-LT, BOLUBEDU AREA, LIMPOPO PROVINCE HIA Phase 1 11/02/2019 Frans Roodt Shasa Heritage Consultants CC Polygon Environmental Planning CC 04/03/2019 - 12:44
Paul Roux Sewer Pipeline and Bridge HIA Phase 1 Heritage Impact Assessment for proposed new 1.5 km-long underground sewerage pipeline in Paul Roux, Thabo Mofutsanyane District Municipality, Free State Province. HIA Phase 1 16/02/2020 Lloyd Rossouw NSVT Consultants 21/08/2020 - 14:15
PIA for Prospecting on the Farm Gamolilo 72 near Kuruman, Northern Cape Province Palaeontological Impact Assessment for the proposed Gamolilom 72 Prospecting/Mining Rights Application, northwest of Kuruman, Northern Cape Province PIA Desktop 27/01/2020 Marion Bamford Prof Marion Bamford Thaya Trading Enterprise 28/02/2022 - 19:55
HIA De Aar Vetlaagte Revised ENNEX DEVELOPMENTS: PROPOSED ESTABLISHMENT OF A SOLAR ENERGY FACILITY NEAR DE AAR, NORTHERN CAPE PROVINCE Phase 1 Archaeological Impact Assessment Report HIA Phase 1 01/03/2012 Neels Kruger AGES (PTY) Ltd - Pretoria AGES (PTY) Ltd - Pretoria 08/10/2012 - 14:09
Phase 1 Heritage report for Shaft 18 complex PHASE I HERITAGE IMPACT ASSESSMENT FOR IMPALA PLATINUM LIMITED (IMPLATS) PROPOSED NEW SHAFT 18 COMPLEX IN THE RUSTENBURG (BAFOKENG) DISTRICT IN THE NORTH-WEST PROVINCE ( WITH AMENDMENTS TO THE SHAFT 18 COMPLEX IN ORDER TO AVOID SITES LIA03 AND SITE LIA04) HIA Phase 1 31/05/2013 Julius CC Pistorius Heritage Archaeologist & Consultant 21/11/2013 - 08:44
HIA Copper Mines Namakwaland HERITAGE IMPACT ASSESSMENT: PROPOSED REOPENING OF THREE COPPER MINES AT CONCORDIA, NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 04/11/2019 Jayson Orton ASHA Consulting(Pty) Ltd ASHA Consulting(Pty) Ltd 19/10/2020 - 09:18
Heritage Impact Assessment Cultural Heritage Impact Assessment: Phase 1 Investigation for the Proposed Prospecting Right Combined with Waste License Application to Prospect for Chrome Ore (Cr), LG & MG Seams Together with Platinum Group Metals (PGM) on a certain Portion of the Remaining Extent and a certain Portion of Portion 2 of the Farm Uitvalgrond 105 JQ, Rustenburg Local Municipality, Bojanala Platinum District Municipality North West Province HIA Phase 1 15/12/2022 Francois Coetzee Francois P Coetzee Milnex 189 CC 26/02/2023 - 18:52
Bomakoso PV Leeudoringstad, NW PROPOSED DEVELOPMENT OF A PHOTOVOLTAIC POWER PLANT ON A PORTION OF THE FARM MATJESSPRUIT 145HP, LEEUDORINGSTAD REGION, NORTH WEST PROVINCE AIA Phase 1 01/09/2013 Johnny Van Schalkwyk Bokamoso Energy (Pty) Ltd 19/02/2014 - 12:43
AIA NC30/5/1/3/2/11005MP PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR A PROPOSED MINING RIGHT APPLICATION ON THE FARM CROPWELL 384/1 BETWEEN KURUMAN AND KATHU, NORTHERN CAPE AIA Phase 1 21/04/2023 David Morris McGregor Museum McGregor Museum 25/04/2023 - 17:05
Nyala_AIA_Jun15 Archaeological Impact Assessment Report for the Proposed Harmony Gold NyalaPV Facility in Welk, Free State Province Archaeological Specialist Reports 17/06/2015 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 01/07/2015 - 15:30
Erf 2969, St Monica’s Home, Bo-Kaap, Cape Town. Heritage Statement 10/11/2017 Quahnita Samie Vidamemoria Vidamemoria 10/11/2017 - 18:39
Leeuwfontein Extension 4 Township Developmen and Formalisation HIA Report 05/08/2016 - 21:44
Archaeological Impact Assessment: Plot 31, Spitskop Smallholdings, Bloemfontein, Free State Province. Exemption from further Archaeological Impact Assessment: Plot 31, Spitskop Smallholdings, Bloemfontein, Free State Province. HIA Letter of Exemption 11/01/2018 Lloyd Rossouw Paleo Field Services Paleo Field Services 12/02/2018 - 21:35
Archaeological Impact Assessment - Draft EIA Buffels 2 31/08/2016 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 26/09/2016 - 13:31
Mining Permit PIA on Waterfall 133, Northern Cape PALAEONTOLOGICAL DESKTOP ASSESSMENT OF THE PROPOSED DIAMOND PERMIT APPLICATION NEAR KIMBERLEY, SOL PLAATJIES MUNICIPALITY, NORTHERN CAPE PIA Desktop 12/05/2019 Elize Butler Banzai Environmental (Pty) Ltd Thaya Trading Enterprise 29/05/2019 - 10:31
Palaeontological Opinion for the Revised layout of ICE for the authorised Bokpoort Solar Power Facility (Project DAO) near Groblershoop, Northern Cape Province Revised layout of ICE for the authorised Bokpoort Solar Power Facility (Project DAO) near Groblershoop, Northern Cape Province Palaeontological Specialist Reports 22/11/2021 John E Almond Natura Viva CC ACWA Power Energy Africa (Pty) Ltd 29/04/2022 - 14:53
Sannaspos Solar Farm - Palaeontological Report Proposed PIA for the PV solar energy facilities in Sannaspos, near Bloemfontein, Free State. DEA REF: 14/12/16/3/3/2/360 (Phase 1) DEA REF: 14/12/16/3/3/1/615 (Phase 2) 31/07/2012 Job M. Kibii University of the Witwatersrand - Institute for Human Evolution 01/02/2013 - 15:16
Phase 1 Heritage Impact Assessment Specialist Report BASIC ASSESSMENT PROPOSED N3 ROAD UPGRADES BETWEEN DURBAN AND CEDARA KWAZULU-NATAL HAMMARSDALE INTERCHANGE TO CATO RIDGE INTERCHANGE Phase 1 Heritage Impact Assessment Specialist Report Heritage Impact Assessment Specialist Reports 10/04/2019 Len van Schalkwyk eThembeni Cultural Heritage 27/08/2019 - 12:00
Paleontological Desktop Assessment PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR DE BEERS CONSOLIDATED MINES: PROPOSED DRILLING ON KLIPJES PAN 145 HOPETOWN DISTRICT IN THE NORTHERN CAPE PIA Desktop 24/01/2021 Elize Butler Banzai Environmental (Pty) Ltd De Beers Consolidated Mines (Pty) Ltd 18/12/2020 - 15:03
Proposed SANSA Space Operations at portion 8 of Farm Matjiesfontein Western Cape HIA: Proposed SANSA Space Operations at portion 8 of Farm Matjiesfontein Western Cape HIA Phase 1 Jenna Lavin CTS Heritage Coastal Environmental Services 30/06/2022 - 14:23
Paleo - Stormberg Renewable Desktop Palaeontological Heritage Impact Assessment Report on the Site of the Proposed Solar and Wind Energy Generation Facilities (Stormberg Project) to be location on various farms near Sterkstroom, Eastern Cape Province Heritage Impact Assessment Specialist Reports 04/06/2013 Barry Millsteed Savannah Environmental (Pty) Ltd 11/04/2014 - 10:42
Die ou pastorie: die wel en wee van 'n koloniale gebou: Dorpstraat 137, Stellenbosch Die ou pastorie: die wel en wee van 'n koloniale gebou: Dorpstraat 137, Stellenbosch AIA Phase 1 01/01/1992 Hennie Vos Stellenbosch Museum 16/06/2012 - 08:54
Bloemsmond Grid Visual Impact Assessment Visual Impact Assessment 07/10/2019 Stephen Stead Visual Resource Management Africa cc Cape Environmental Assessment Practitioners 04/03/2021 - 16:24
Heritage Impact Assessment Heritage Impact Assessment of Application for Prospecting Right for Iron Ore and Manganese Ore on the Remaining Extent of the Farm Gaylong 191, Portion 1 of the Farm Gayelong 191, Portion 2 of the Farm Gayelong 191 and Portion 3 of the Farm Gayelong 191, Kuruman District, Northern Cape Province HIA Phase 1 29/05/2023 Joseph Chikumbirike Pulafel 4D Consulting (Pty) Ltd 05/06/2023 - 09:24
XINA - Walk through Survey XINA Solar Thermal Facility - Specialist Input for the EIA Phase and EMP for the Proposed XINA Solar Thermal Facility, Pofadder, Northern Cape Archaeological Specialist Reports 30/05/2014 David Morris McGregor Museum Savannah Environmental (Pty) Ltd 26/06/2014 - 15:02
Background Information Document Background Information Document for the Proposed Isandlwana Heritage Development, Umzinyathi District Municipality, KwaZulu-Natal 26/06/2015 07/08/2015 - 15:55
Proposed expansion of an existing clay quarry near Delmas Heritage Impact Assessment for the proposed expansion of an existing clay quarry near Delmas HIA Phase 1 24/05/2016 Wouter Fourie PGS Heritage and Grave Relocation Consultants Jones & Wagener Engineering and Environmental Consultants 21/02/2017 - 20:29
Baseline Archaeological and Palaeontological Impact Assessment Madwaleni Hospital Access Road, Transkei Baseline Archaeological and Palaeontological Impact Assessment Madwaleni Hospital Access Road, Transkei AIA Phase 1 01/01/2008 Mary Patrick, John E Almond Cape Archaeological Survey CC 16/06/2012 - 08:54
Solar 1 HIA 18/07/2023 - 09:21
Retirement village on portions 11 & 12 of the farm Nooitgedacht 62, White River A Phase 1 AIA / HIA for the development of a lifestyle retirement village on portions 11 and 12 of the farm Nooitgedacht 62, White River, Mpumalanga Province AIA Phase 1 06/10/2015 Christine Van Wyk Rowe Adansonia Heritage Consultants Nkululeko Environment and Development Agency 06/10/2015 - 19:41
Auwal Masjid 39 Dorp Street Bo - Kaap Proposed Grade 2 declaration of Auwal Masjd Heritage Study 07/04/2017 Vidamemoria Heritage Consultants Heritage Western Cape Vidamemoria Heritage Consultants 07/04/2017 - 17:05
HERITAGE SCOPING ASSESSMENT FOR THE PROPOSED LC DE VILLIERS CULVERT UPGRADE PROJECT, PRETORIA, GAUTENG PROVINCE HERITAGE SCOPING ASSESSMENT FOR THE PROPOSED LC DE VILLIERS CULVERT UPGRADE PROJECT ON THE REMAINDER OF PORTION 0 OF THE FARM KOEDOESPOORT 456 JR, PRETORIA, TSHWANE MUNICIPAL AREA, GAUTENG PROVINCE HIA Letter of Exemption 15/09/2016 Neels Kruger Exigo Sustainability Exigo Sustainability 09/11/2016 - 15:48
HIA; Expansion of Existing Borrow Pit, DR01382, Cape Winelands Heritage Impact Assessment for Expansion of an Existing Borrow Pit Located Along DR01382 Approximately 5.5 km to the northeast of Montagu in Cape Winelands District Municipality, Western Cape. HIA Phase 1 29/08/2012 Quahnita Samie, John Almond Vidamemoria Heritage Consultants, Natura Viva CC Nadeson Consulting Services 12/06/2018 - 11:02
Bhokwe Village community sanitation project Bhokwe Village community sanitation project, Abaqulusi Local Municipality, KwaZulu-Natal HIA Phase 1 11/07/2019 Jean Beater JLB Consulting 1World Consultants (Pty) Ltd 27/08/2019 - 15:37
Gemsbok Substation to Big Tree Substation ARCHAEOLOGICAL IMPACTS ASSESSMENT PROCESS: PROPOSED NEW 132KV POWER LINE FROM GEMSBOK SUBSTATION TO BIG TREE SUBSTATION VIA THE KWAMHLANGA SUBSTATION, THEMBISILE HANI LOCAL MUNICIPALITY IN MPUMALNGA PROVINCE. AIA Phase 1 01/08/2012 Eric Ndivhuho Mathoho Vhufa Hashu Heritage Consultants Limpompo Water Initiative (PTY) Ltd 22/04/2013 - 11:47
DAG5603 - HIA Integrated Environmental Authorisation Process for the Proposed Dagsoom Twyfelaar Coal Mining Project near Ermelo, Mpumalanga: Heritage Impact Assessment HIA Phase 1 05/11/2019 Shannon Hardwick, Justin du Piesanie Digby Wells Environmental Dagsoom Coal Mining (Pty) Ltd 22/11/2019 - 14:21
Palaeontological Heritage Impact Assesment FULL PALAEONTOLOGICAL HERITAGE IMPACT ASSESSMENT REPORT ON THE SITE OF THE PROPOSED DEVELOPMENT OF 5 WIND TURBINES ON PORTIONS OF FARM 456 REM AND FARM 459 REM, NEAR HAGA-HAGA, EASTERN CAPE PROVINCE PIA Desktop 18/03/2020 Barry Millsteed BM Geological Services PGS Heritage (Pty) Ltd 24/08/2022 - 15:57