FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
PIA Estcourt Hospital, KZN Palaeontological Impact Assessment for the proposed construction of a private and public Hospital in Estcourt, KwaZulu Natal Province PIA Phase 1 Marion Bamford University of the Witwatersrand - Evolutionary Studies Institute EnviroPro 22/10/2020 - 13:09
Heritage Impact Assessment A Report on a Heritage Impact Assessment for a Proposed Solar Plant and Infrastructure on the Farm Kipling, Black Rock Mining Operations, Close to Hotazel, Northern Cape Province Heritage Impact Assessment Specialist Reports 21/11/2022 Anton van Vollenhoven Archaetnos CC EScience Associates (Pty) Ltd 02/03/2023 - 07:13
AIA - Bosjesmansberg Center For the proposed Bosjesmansberg PV Center Solar Energy Facility, located close to Copperton in the Northern Cape. AIA Phase 1 20/12/2013 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 21/02/2014 - 12:04
Putfontein Daveyton HIA report Putfontein Daveyton Heritage Impact Assessment report 20/04/2015 - 10:40
Palaeontological Impact Assessment: Phase 1 Field Study Grootfontein Mine Proposed Mining of Clay, Sand and Coal Nigel and Springs District Municipality, Ekurhuleni Metropolitan Municipality, Gauteng Province Farm: Portion of Portion 85 of Grootfontein 165-IR and a Portion of the Remainder of Vogelstruisbult 127-IR Nigel Palaeontological Impact Assessment: Phase 1 Field Study PIA Phase 1 23/10/2017 Dr Heidi Fourie Dr Heidi Fourie Environmental Assurance 20/11/2017 - 11:08
Palmietkuilen 241 IR MRA HSR Heritage Scoping Report: Application for a Mining Right and Environmental Authorisation of the proposed Palmietkuilen Mining Project, Gauteng Province Heritage Scoping 18/08/2016 Justin du Piesanie, Johan Nel Digby Wells Environmental Anglo Operations (Pty) Ltd 18/08/2016 - 09:12
Randburg River Crossings HIA Phase 1 Cultural Heritage Impact Assessment for THE PROPOSED CONSTRUCTION OF RIVER CROSSINGS ALONG UNDERGROUND HV FEEDER CABLES IN RANDBURG, CITY OF JOHANNESBURG DISTRICT MUNICIPALITY, GAUTENG PROVINCE HIA Phase 1 15/12/2017 J.A. van Schalkwyk 20/02/2018 - 10:29
Exemption from further Heritage Impact Assessment: Rectification in terms of Section 24G for Residential Development in Loxton, Northern Cape Province. Exemption from further Heritage Impact Assessment: Rectification in terms of Section 24G for Residential Development in Loxton, Northern Cape Province. HIA Letter of Exemption 13/02/2019 Lloyd Rossouw Paleo Field Services Paleo Field Services 11/03/2019 - 12:21
Lycaste Sand Dump Heritage Statement for Lycaste Sand Dump AIA Desktop 01/02/2012 Guy Thomas, Johan Nel Digby Wells Environmental Ergo Mining (Pty) Ltd 23/10/2012 - 15:00
2016 Kleinkopje Pit 2A Extension PIA Phase 1 Palaeontological Heritage Impact Assessment Report on the site of the construction of a propose Haul Road, Proposed Extension of mining activities beneath 2A Pollution Control Dam and the site of a new Pollution Control Dam on Kleinkopje Colliery, Mpumalanga Province PIA Phase 1 22/09/2016 Barry Millsteed BM Geological Services Shangoni Management Services 30/09/2016 - 11:39
ECOLOGICAL ASSESSMENT REPORT ECOLOGICAL ASSESSMENT REPORT Synchroplex (Pty) Ltd Areachap Prospecting Operation 03/07/2019 Dr Elizabeth (Betsie) Milne Boscia Ecological Consulting 03/06/2019 - 15:58
DWARSLOOP TOWNSHIP ESTABLISHMENT PROPOSED TOSNHIP ESTABLISHMENT IN DWARSLOOP WITIHIN BUSHBUCK RIDGE LOCAL MUNICIPALITY IN MPUMALANGA Heritage Impact Assessment Specialist Reports 06/05/2022 Leonie Marais-Botes GKM Consulting PTY LTD Bushbuckridge Local Municipality 06/05/2022 - 13:10
Heritage Report for Merapi PV Solar Facility 361, 362, 363 & 364 Heritage Imapct Assessment Study for the Proposed PV Solar Energy Facilities, near Excelsior, Free State Province HIA Phase 1 Nkosinathi Godfrey Tomose PGS Heritage and Grave Relocation Consultants 08/02/2013 - 12:23
Archaeological Impact Assessment ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED VOORUITZIGT MINING INFRASTRUCTURE PROJECT ON A PORTION OF PORTION 1 OF THE FARM VOORUITZIGT 81, FRANCES BAARD DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE Archaeological Specialist Reports 29/01/2021 Neels Kruger, Dr. Heidi Fourie Exigo3 Sustainability Exigo3 Sustainability 12/01/2021 - 11:00
PIA Wag 'n Bietjie electrical infrastructure PIA Wag 'n Bietjie electrical infrastructure PIA Desktop 04/12/2021 Marion Bamford 10/07/2022 - 11:25
Parys Solar PV_Phase 1 Cultural Heritage Assessment Proposed Parys Up to 200MW Solar Photovoltaic (PV) and Battery Energy Storage System (BESS) Hybrid Project near the Town of Parys, Free State Province. HIA Phase 1 01/10/2022 JA VAN SCHALKWYK JA van Schalkwyk Heritage Consultant Nemai Consulting 03/05/2023 - 11:00
Mnyembane The Eucalyptus forestry projects proposed by V.V. Mnyembane (25ha), in respect of the same activity occurring in several locations in Driefontein 147ES Portion 3 farm in UMzimkhulu local Municipality within Sisonke District of Kwazulu Natal Province HIA Phase 1 08/08/2013 Gavin Whitelaw KwaZulu-Natal Amafa and Research Institute Shasa Heritage Consultants CC 14/04/2014 - 16:34
AIA FOR THE PROPOSED TWICKENHAM ROADS UPGRADE PROJECT IN THE STEELPOORT AREA, LIMPOPO PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED TWICKENHAM ROADS UPGRADE PROJECT IN THE STEELPOORT AREA, GREATER TUBATSE LOCAL MUNICIPALITY, LIMPOPO PROVINCE AIA Phase 1 18/07/2016 Neels Kruger Exigo Sustainability AGES (PTY) Ltd - Limpopo 13/12/2016 - 11:49
HERITAGE SCOPING STUDY FOR THE PROPOSED KATOLOSO MINERALS PROSPECTING RIGHT APPLICATION PROJECT IN THE NORTH WEST PROVINCE HERITAGE SCOPING STUDY (HS) OF DEMARACTED AREAS ON FARM ZWARTLAND 145 IP, REMAINING EXTENT, PORTIONS 1,2 AND 3 OF THE FARM HARTBEESLAAGTE 146IP, REMAINING EXTENT, PORTIONS 1,2,3,5,7,8,9, AND 11 OF THE FARM NOOITGEDACHT 131IP FOR THE PROPOSED KATOLOSO MINERALS PROSPECTING RIGHT APPLICATION PROJECT IN THE DR KENNETH KAUNDA DISTRICT MUNICIPALITY, NORTH WEST PROVINCE AIA Desktop 15/12/2020 Neels Kruger Neels Kruger EP3 Environmental 08/03/2021 - 20:17
Section 24G-PIA-Burlington Citrus Section 24G-PIA-Burlington Citrus Heritage Statement 07/06/2023 Elize Butler 07/06/2023 - 08:10
PROPOSED MIXED USE DEVELOPMENT IN KATHU, NORTHERN CAPE PROVINCE HERITAGE IMPACT ASSESSMENT PROPOSED MIXED USE DEVELOPMENT IN KATHU, NORTHERN CAPE PROVINCE Remainder & Portion 1 of the Farm Sims 462, Kuruman RD Heritage Impact Assessment Specialist Reports 30/06/2014 Jonathan Kaplan Agency for Cultural Resources Management Enviroafrica CC 03/07/2014 - 15:22
Proposed Infrastructure Development at the Goedehoop North Mini-Pit AIA Phase 1 14/07/2015 Jaco van der Walt Prism Environmental Management Services cc Jones & Wagener Engineering and Environmental Consultants 18/08/2015 - 12:02
AIA FOR THE PROPOSED KALKHEUVEL HOUSE DEVELOPMENT, GAUTENG PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED KALKHEUVEL HOUSE DEVELOPMENT, GAUTENG PROVINCE AIA Phase 1 21/07/2017 Jaco van der Walt Heritage Contracts and Archaeological Consulting Eco Assessments 01/03/2017 - 21:02
PIA Orange Grove Residential Development PALAEONTOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED ORANGE GROVE 3500 RESIDENTIAL DEVELOPMENT, BUFFALO CITY METROPOLITAN MUNICIPALITY EAST LONDON, EASTERN CAPE PROVINCE PIA Phase 1 27/05/2015 Elize Butler National Museum Bloemfontein NSVT Consultants 14/10/2015 - 19:54
HIA for Mthunzi Chicken Supplier Heritage Impact Assessment For the Proposed Mthunzi Chicken Supplier, Gauteng Province Heritage Impact Assessment Specialist Reports 20/11/2017 Jaco van der Walt Heritage Contracts and Archaeological Consulting Council for Scientific and Industrial Research 16/04/2018 - 12:36
HERITAGE SCOPING ASSESSMENT FOR THE PROPOSED LC DE VILLIERS CULVERT UPGRADE PROJECT, PRETORIA, GAUTENG PROVINCE HERITAGE SCOPING ASSESSMENT FOR THE PROPOSED LC DE VILLIERS CULVERT UPGRADE PROJECT ON THE REMAINDER OF PORTION 0 OF THE FARM KOEDOESPOORT 456 JR, PRETORIA, TSHWANE MUNICIPAL AREA, GAUTENG PROVINCE HIA Letter of Exemption 15/09/2016 Neels Kruger Exigo Sustainability Exigo Sustainability 09/11/2016 - 16:02
HIA; Proposed Development of Agricultural Land, Robertson HERITAGE IMPACT ASSESSMENT PROPOSED DEVELOPMENT OF AGRICULTURAL LAND ON PORTION 16 OF FARM 112 (KLIPBOS) ROBERTSON HIA Phase 1 01/11/2011 Jonathan Kaplan Agency for Cultural Resources Management BOLAND ENVIRO 15/06/2018 - 08:33
Esselen Park Residential Development Letter for HIA exemption request & Phase 1 Heritage Impact Assessment for the Esselen Park Residential Development HIA Letter of Exemption 30/07/2019 Prof. Anton van Vollenhoven Lokisa Environmental Consulting CC 05/09/2019 - 16:57
HIA for the establishment of 132kV loop-in and loop-out power line from the existing 132kV Jane Furse/Merensky power line to the proposed Grootboom Substation Phase 1 HIA for the proposed construction of 1X 20MVA 132/11kV Grootboom substation and + 5,5km 132kV Bersfort Loop In – Loop Out power line, within the jurisdiction of Greater Tubatse Local Municipality, Sekhukhune District, Limpopo Province. HIA Phase 1 29/04/2013 Julius CC Pistorius Mbofho Consulting and Project Managers 29/04/2013 - 15:57
HIA Van Zyl PR Heritage Impact Assessment for the proposed Van Zyl's Prospecting Application, Aggeneys Area, Namaqualand Magisterial District, Northern Cape Province. HIA Phase 1 05/11/2019 Jaco van der Walt Heritage Contracts and Archaeological Consulting Greenmined Environmental 03/12/2019 - 09:14
PIA Report Palaeontological Impact Assessment for the proposed Welgedacht Balloon Siding between Springs and Delmas, Gauteng Province Site Visit (Phase 2) Report For Elemental Sustainability 31 January 2021 revised Feb 2022 Prof Marion PIA Phase 1 31/01/2022 Marion Bamford 29/08/2022 - 15:57
Heritage Report - Moorreesburg WEF Heritage Scoping Assessment: Proposed Wind Energy Facility at Moorreesberg, Western Cape Province Heritage Scoping 29/10/2013 Timothy Hart ACO Associates CC Savannah Environmental (Pty) Ltd 08/07/2013 - 16:25
Expansion of Kempdale Dam Proposed expansion of Kempdale Dam, Kokstad, KwaZulu-Natal HIA Phase 1 15/04/2021 Jean Beater JLB Consulting EnviroPro 07/05/2021 - 11:38
Mierdam- Heritage- letter PART 1 ENVIRONMENTAL AUTHORISATION (EA) AMENDMENT PROCESS FOR EXTENDING THE VALIDITY OF THE EA BY AND ADDITIONAL 3 YEARS FOR THE AUTHORISED 75MW MIERDAM PHOTOVOLTAIC (PV) SOLAR ENERGY FACILITY (SEF), LOCATED NEAR PRIESKA IN THE SIYATHEMBA LOCAL MUNICIPALITY, PIXLEY KA SEME DISTRICT MUNICIPALITY IN THE NORTHERN CAPE PROVINCE OF SOUTH AFRICA – HERITAGE SPECIALIST OPINION Heritage Statement 14/10/2022 Wouter Fourie PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 21/10/2022 - 13:42
Old Mushroom Farm HIA & PIA HERITAGE IMPACT ASSESSMENT (INCLUDING PHASE 1 PIA) FOR THE PROPOSED ESTABLISHMENT OF RESIDENTIAL UNITS AND HOSPITALITY FACILITIES ON PORTION 3 OF THE FARM UMGETHU No. 14830 (THE OLD MUSHROOM FARM), WITHIN THE Dr. NKOSAZANA DLAMINI ZUMA LOCAL AND HARRY GWALA DISTRICT MUNICIPALITY, KARKLOOF, KWAZULU-NATAL HIA Phase 1 28/01/2023 Gary Trower Gary Trower Green Door Environmental 21/07/2023 - 09:38
Ngululu Resources_Heritage Impact Assessment Phase 1 REPORT ON A PHASE 1 HIA FOR A PROPOSED COAL MINE ON PORTIONS 26, 46 & 47 OF THE FARM DROOGENFONTEIN 242IR, DELMAS DISTRICT, MPUMALANGA HIA Phase 1 30/04/2014 Anton Pelser A Pelser Archaeological Consulting Shangoni Management Services 01/10/2014 - 14:23
PIA Kwaggafontein PALAEONTOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED DEVELOPMENT OF THE NEW OPEN CAST MINING OPERATIONS ON THE REMAINING PORTIONS OF 6, 7, 8 AND 10 OF THE FARM KWAGGAFONTEIN 8 IN THE ALBERT LUTHULI LOCAL MUNICIPALITY, GERT SIBANDE DISTRICT MUNICIPALITY, MPUMALANGA PROVINCE PIA Phase 1 03/04/2017 Elize Butler Banzai Environmental (Pty) Ltd PGS Heritage and Grave Relocation Consultants, Environmental Impact Management Services (Pty) Ltd 13/04/2017 - 09:56
Heritage Impact Assessment of Hlatshana Residential Development Pietermaritzburg Heritage Impact Assessment of Hlatshana Residential Development Pietermaritzburg, Kwa-Zulu Natal, South Africa HIA Phase 1 29/03/2009 eThembeni Cultural Heritage Afzelia Environmental Consultants Pty Ltd 08/06/2017 - 11:00
HIA Zuurwater 62 Boesmanland 75 MW PV 2602 DRAFT PHASE ONE INTEGRATED HERITAGE IMPACT ASSESSMENT COMPILED IN TERMS OF SECTION 38(8) OF THE NATIONAL HERITAGE RESOURCES ACT, 1999 (ACT 25 OF 1999) PROPOSED BOESMANLAND SOLAR FARM (75MW): PORTION (300HA) OF THE FARM ZUURWATER 62/6, NAMAQUALAND DISTRICT, NORTHERN CAPE PROVINCE 01/04/2012 Stefan de Kock Perception Heritage Planning Perception Heritage Planning 04/06/2012 - 09:02
Phase 1 Cultural and Archaeological Heritage Assessment Specialist Study Report for the Proposed Road Upgrade from Gravel to Tarred Surface at Ramokokastad Village in Moses Kotane Local Municipality, North West Province Phase 1 Cultural and Archaeological Heritage Assessment Specialist Study Report for the Proposed Road Upgrade from Gravel to Tarred Surface at Ramokokastad Village in Moses Kotane Local Municipality, North West Province AIA Phase 1 02/01/2006 McEdward Murimbika Nzumbululo Heritage Solutions 16/06/2012 - 14:33
AIA_Kees_Zyn_Doorns_Celliers_JP_Apr11 Phase 1 Archaeological Impact Assessment for Eco 8 Environmental Planners concerning the proposed development concerning the Cradle of Life and Safari Park on various portions of the farm Kees Zyn Doorns 708 JT, Mpumalanga Province AIA Phase 1 08/04/2011 Jean-Pierre Celliers Kudzala Antiquity 16/06/2012 - 14:46
Vryburg Solar 3 Palaeontological Report Palaeontological Impact Assessment for the proposed construction of three Solar Photovoltaic (PV) Facilities (i.e. Vryburg Solar 1, Vryburg Solar 2 and Vryburg Solar 3) and associated electrical infrastructure, near Vryburg, in the North-West Province Palaeontological Specialist Reports JF Durand 16/08/2018 - 16:26
HIA-Rippon Rippon Wind Farm, between Makanda and Somerset East, Eastern Cape Heritage Impact Assessment Specialist Reports 29/08/2021 Cherene de Bruyn PGS Heritage (Pty) Ltd Savannah Environmental (Pty) Ltd 10/09/2021 - 20:07
LETTER FOR EXEMPTION FOR A PHASE I HERITAGE IMPACT ASSESSMENT LETTER FOR EXEMPTION FOR A PHASE I HERITAGE IMPACT ASSESSMENT STUDY FOR THE BASIC ASSESSMENT, ENVIRONMENTAL MANAGEMENT PROGRAMME AND CLOSURE PLAN FOR THE CLOSURE OF THE INKOSI GREATER PROSPECTING RIGHT ON HARTEBEESTPOORT B 410 JQ NEAR BRITS IN THE NORTH WEST HIA Letter of Exemption 01/03/2020 Dr Julius CC Pistorius Dr Julius CC Pistorious Archaeologist and heritage Consultant SLR Consulting (Africa) 19/03/2020 - 08:37
Heritage Screener - Moriri PV (Great Karoo) Desktop Heritage Screening Assessment for the Proposed Moriri Solar PV Facility to be developed as part of the Great Karoo Renewable Energy Development near Richmond in the Northern Cape Heritage Scoping 01/09/2021 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 15/11/2021 - 17:17
Heritage Report - Blackwood Solar Energy Facility Proposed Blackwood Solar Energy Facility on Portion 1 of Pandamsfontein 1593, south east of Kimberley, in the Tokologo Local Municipality, Free State: Scoping phase Heritage Input Heritage Scoping 06/09/2013 David Morris McGregor Museum Savannah Environmental (Pty) Ltd 10/09/2013 - 10:13
AIA ON PORTIONS FOR THE PROPOSED NEW HOPE PEDESTRIAN WALKWAY PROJECT, BUFFALO CITY MUNICIPALITY, EASTERN CAPE PROVINCE AIA ON PORTIONS FOR THE PROPOSED NEW HOPE PEDESTRIAN WALKWAY PROJECT, BUFFALO CITY MUNICIPALITY, EASTERN CAPE PROVINCE AIA Phase 1 03/07/2020 Neels Kruger Exigo3 Sustainability ControLab South Africa (Pty) Ltd 05/08/2020 - 15:08
HIA for the Proposed SuperChicks Poultry Farm on Portion 68 of the Farm Kameelzynkraal No 547 Phase HIA for the proposed SuperChicks Poultry Farm on Portion 68 of the Farm Kameelzynkraal No 547 HIA Phase 1 30/06/2021 Nkosinathi Tomose MOKGOPE CONSULTING CC 30/06/2021 - 18:29
PROPOSED LETHABONG PROVINCIAL HOSPITAL DEVELOPMENT ON THE REMAINING EXTENT OF FARM QUAGGASFONTEIN ALIAS LAPDOORN 548 IQ, SEBOKENG, VEREENIGING. First phase heritage impact assessment for the LETHABONG HOUSING DEVELOPMENT (contract no 19080) in Sebokeng. HIA Phase 1 30/01/2023 Sidney Miller Sidney Miller 09/12/2022 - 10:23
Paleontology report for Du Plessis Dam Farm, De Aar Palaeontological Specialist Study: Combined desktop and field-based assessments for the proposed Photovoltaic (Solar) Energy Facilities on Du Plessis Dam Farm near De Aar, Northern Cape PIA Phase 1 10/07/2013 John E Almond Natura Viva CC Aurecon - Head Office 12/11/2013 - 15:20

Pages

CSV
 
 

Search form