FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
HIA Tutwa PV amended Heritage Impact Assessment Report - Basic Assessment Phase: Proposed Establishment of the Tutwa Solar Energy Facility Located West of Upington on a Portion 4 of the Farm Narries 7, Northern Cape Province HIA Phase 1 07/05/2012 Stephan Gaigher G & A Heritage Savannah Environmental (Pty) Ltd 15/06/2012 - 11:36
Report on Content and Proposed Conservation of Archaeological Sites at Rowweklip Report on Content and Proposed Conservation of Archaeological Sites at Rowweklip Archaeological Permit Report 01/01/1985 Graham Avery Iziko: South African Museum 16/06/2012 - 14:33
HIA Scoping: construction of two 400kV transmission lines between Koeberg 2 and the Stikland substation, Cape Town Metro Scoping Heritage Impact Assessment for the construction of two 400kV transmission lines between Koeberg 2 and the Stikland substation, Cape Town Metro, Western Cape Heritage Scoping 23/10/2009 Timothy Hart ACO Associates CC Savannah Environmental (Pty) Ltd 24/07/2017 - 15:33
Proposed Ntunjambili BWSS Phase 1 Heritage Impact Assessment Report Proposed Ntunjambili Bulk Water Supply Pipeline Ward 1 and 2 Maphumulo Local Municipality, Ilembe District Municipality, KwaZulu-Natal 16/05/2018 Len van Schalkwyk eThembeni Cultural Heritage Black Cubans Consulting (PTY) Ltd 19/07/2018 - 16:53
9-2-235-0002-20050401-RARC The Documentation of Engravings on Driekuil Hill, Farm Driekuil 280 IP, Lichtenburg, North-West Province, South Africa: Phase 2 Mitigation Report Archaeological Permit Report 01/04/2005 Jeremy Hollmann Rock Art Research Institute 16/06/2012 - 14:39
Waterloo mitigation preliminary report PRELMINARY ARCHAEOLOGICAL MITIGATION REPORT, WATERLOO FARM: VRYBURG, NORTHWEST PROVINCE Archaeological Permit Report 28/09/2018 Jayson Orton ASHA Consulting(Pty) Ltd 13/10/2018 - 11:01
HIA Moripe Gardens Ext.2 HERITAGE IMPACT ASSESSMENT REPORT FOR THE FORMALISATION OF MORIPE GARDENS EXT.2 SITUATED ON THE REMAINDER OF PORTION 7 OF KAMEELRIVIER 160 JR FARM, UNDER DR JS MOROKA LOCAL MUNICIPALITY, MPUMALANGA PROVINCE HIA Phase 1 28/10/2021 Valerine Molo Great Warthog Geo-Envivornmental DR JS Moroka Local Municipality 28/10/2021 - 15:16
Archaeology Archaeological Impact Assessment Report AIA Phase 1 20/03/2016 Karen Van Ryneveld ArchaeoMaps ArchaeoMaps 13/04/2016 - 16:18
REPORT ON A PHASE 1 HERITAGE IMPACT ASSESSMENT FOR PROPOSED DEVELOPMENT AT 37 YOUNG AVENUE REPORT ON A PHASE 1 HERITAGE IMPACT ASSESSMENT FOR PROPOSED DEVELOPMENT AT 37 YOUNG AVENUE, PORTION 1 OF HOUGHTON ESTATE 56IR, HOUGHTON, GAUTENG - APAC020/34 HIA Phase 1 13/05/2020 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Mr. Johann Berger and Mrs Luisa Berger 21/07/2020 - 11:23
PIA Addendum Letter for the Revised layout of ICE for the authorised Bokpoort Solar Power Facility (Project DAO) near Groblershoop, Northern Cape Province Revised layout of ICE for the authorised Bokpoort Solar Power Facility (Project DAO) near Groblershoop, Northern Cape Province 22/11/2021 John E Almond Natura Viva CC ACWA Power Energy Africa (Pty) Ltd 19/01/2022 - 17:44
Senekal Fossil Trees: Interim Permit Report INTERIM PALAEONTOLOGICAL PERMIT REPORT Regarding Permit ID 76 SENEKAL SOLID WASTE FACILITY Senekal, Free State Province of South Africa, Farm:Townlands in the Setsoto Municipality within the Thabo Mofutsanyane District Municipality Palaeontological Permit Report 29/10/2013 Gideon Groenewald 29/10/2013 - 14:43
Phase 1 Heritage Impact Assessment & Report for the Walt Landgoed (Pty) Ltd A Phase 1 Heritage Impact Assessment & Report for the Walt Landgoed (Pty) Ltd Development on Portion 15 of the Farm Hartbeesfontein 638 IR near Villiers, Mpumalanga Province Heritage Impact Assessment Specialist Reports 17/09/2020 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING 22/09/2020 - 11:05
Desktop PIA: Grootpoort OHL Desktop Palaeontology Assessment: Proposed development of the Grootpoort OHL near Luckhoff in the Free State PIA Desktop 29/07/2021 Marion Bamford Environamics 03/08/2021 - 10:12
HIA Project 6: Stilfontein PV Heritage Impact Assessment Project 6: Stilfontein PV Stilfontein North West Province HIA Phase 1 21/02/2023 Jaco van der Walt Beyond Heritage SRK Consulting (Pty) Ltd - Western Cape 17/04/2023 - 10:57
NGCEBO WATER TREATMENT WORKS CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED NGCEBO WATER TREATMENT WORKS, LOCATED WITHIN THE MAPHUMULO LOCAL MUNICIPALITY Heritage Impact Assessment Specialist Reports 06/09/2013 Frans Prins Active Heritage CC Green Door Environmental 09/01/2014 - 09:18
Ngcobo wwtw HERITAGE SURVEY OF THE NGCOBO WWTW, EASTERN CAPE. HIA Phase 1 02/03/2015 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Coastal & Environmental Services - East London 05/03/2015 - 10:55
Pampoennek watching brief REPORT ON A WATCHING BRIEF DURING THE DEMOLUTION OF AN ANGLO-BOER WAR (1899-1902) BLOCHOUSE AT PAMPOENNEK, NORTHWEST PROVINCE Archaeological Monitoring 26/09/2017 Anton van Vollenhoven Archaetnos CC SANRAL 01/10/2017 - 09:03
RIETFONTEIN 107 BLOEMFONTEIN FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE PROPOSED 5HA ASPHALT PLANT AT PORTION 5, RIETFONTEIN 107, BLOEMSPRUIT, BLOEMFONTEIN Heritage Impact Assessment Specialist Reports 26/04/2015 Cobus Dreyer Nare Sereto Environment & Business Services Nare Sereto Environment & Business Services 27/05/2015 - 20:21
Seweweekspoort Pass HIA HERITAGE IMPACT ASSESSMENT FOR PROPOSED REMEDIAL WORKS TO THE SEWEWEEKSPOORT PASS, LAINGSBURG AND LADISMITH MAGISTERIAL DISTRICTS, WESTERN CAPE HIA Phase 1 12/10/2017 Jayson Orton ASHA Consulting(Pty) Ltd Hatch 08/12/2017 - 13:01
Wembezi B Housing Development Proposed Wembezi B Housing Development, Inkosi Langalibalele Local Municipality, KwaZulu-Natal HIA Phase 1 12/12/2018 Jean Beater JLB Consulting SPHE Consulting Services 23/01/2019 - 17:27
Lewende Woord THE PROPOSED LEWENDE WOORD DEVELOPMENT ON PORTION 123 OF PORTION 28 OF THE FARM VLAKFONTEIN 523JR, KUNGWINI LOCAL MUNICIPALITY, GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports 16/05/2016 Johnny Van Schalkwyk 27/06/2016 - 10:55
PIA LOE Leeuwkop Impala Mining Development – Palaeontological Impact Assessment PIA Desktop 02/08/2011 Bruce Rubidge Evolutionary Studies Institute Metago Environmental Engineers (Pty) Ltd 03/08/2012 - 15:53
Heritage Impact Assessment for Driefontien Heritage Impact Assessment report for Driefontien water supply scheme- excelsior. Heritage Impact Assessment Specialist Reports 16/04/2019 18/04/2019 - 15:29
HIA for Proposed Schoemanskloof R539 Improvement Project, Mpumalanga Heritage Impact Assessment required under Section 38(8) if the NHRA, 1999 (Act 25 of 1999) for the Proposed Schoemanskloof Route R539 Improvement Project, Mpumalanga HIA Phase 1 15/03/2022 Jaco van der Walt Beyond Heritage Prism Environmental Management Services cc 30/03/2022 - 11:22
REDESIGN OF TUYNHUYS PARKING LAYOUT PERMIT APPLICATION: REDESIGN OF TUYNHUYS PARKING LAYOUT 01/11/2022 Neche Ramjee - Lynch Department of Public Works 01/11/2022 - 13:06
Grooge Veldt 292 Phase 1 Archaeological impact assessment report on the farm Drooge Veldt 292, ~30 km West of Barkly West, Frances Baard District Municipality, Northern Cape Province. AIA Phase 1 14/07/2012 CJ Esterhuyse, D Visser SRK Consulting (Pty) Ltd - Pretoria Theta Mining (Pty) Ltd 06/12/2012 - 10:32
PROPOSED SOLAR PV PLANT AT ARMOEDE, NEAR MOKOPANE, LIMPOPO PROVINCE Heritage Impact Assessment PROPOSED SOLAR PV PLANT AT ARMOEDE, NEAR MOKOPANE, LIMPOPO PROVINCE: Heritage Impact Assessment Heritage Scoping 13/10/2020 Polke Birkholtz PGS Heritage (Pty) Ltd Aurecon - Head Office 16/11/2020 - 11:30
PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED BEVERLY SERVICE STATION ON ERF 1188, PORTION 0 IN BEVERLY EXTENSION 64, WITHIN THE CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE. HIA Phase 1 05/03/2022 Mokgadi's Environmental and Water Systems 03/06/2022 - 11:48
AIA_Melkvlei_PV_Webley_LE_Feb12 HERITAGE IMPACT ASSESSMENT: PROPOSED CONSTRUCTION OF THE MELKVLEI PHOTOVOLTAIC SOLAR ENERGY FACILITY, FRANCES BAARD DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE AIA Phase 1 28/02/2012 Lita Webley, Jayson Orton ACO Associates CC 16/06/2012 - 14:47
HIA The Rest 454 JT, Mbombela, Mpumalanga Phase 1 Archaeological and Heritage Impact Assessment on a portion of Portion 22 and Portion 23 and 24 and portions of Portion 278 and 279 of The Rest 454 JT in respect of proposed township establishment, Mbombela, Mpumalanga Province. HIA Phase 1 25/11/2019 Jean-Pierre Celliers Kudzala Antiquity Eco8 Environmental Planners 30/05/2023 - 11:24
Taung Skull heritage site- 02. upgrade existing ablution block- picnic site Gilbert Balinda Mashabane Rose Associates Independent Development Trust 11/03/2014 - 10:20
Serurubele HIA & PIA (2014) 05/02/2021 - 11:59
Desktop PIA Altina Solar PV near Orkney PALAEONTOLOGICAL DESKTOP ASSESSMENT - ALTINA 120 MW SOLAR PHOTOVOLTAIC PROJECT NEAR ORKNEY IN THE FREE STATE PIA Desktop 01/07/2022 Elize Butler Banzai Environmental (Pty) Ltd Nemai Consulting 04/07/2023 - 12:26
Heritage Impact Assessment - DBAR Specialist input for the impact assessment phase of the environmental impact assessment for the Paulputs CSP Project and Road Realignment of the MN73 road Near Pofadder 30/06/2016 David Morris McGregor Museum Savannah Environmental (Pty) Ltd 25/01/2017 - 12:41
R22 HIA and Desktop PIA Heritage Survey of the Proposed R22 Deviation, Hluhluwe, KZN Heritage Impact Assessment Specialist Reports 09/03/2017 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management SANRAL 20/03/2018 - 12:21
Heritage Report - Draft Scoping Report Timothy Hart ACO Associates CC Savannah Environmental (Pty) Ltd 09/09/2016 - 12:26
HIA; Borrow Pit - OP4963, Albertinia Heritage Impact Assessment for Expansion of an Existing Borrow Pit Located Along OP 4963 Near Albertinia in the Eden District Municipality, Western Cape. HIA Phase 1 29/10/2012 Madelon Tusenius Vidamemoria Heritage Consultants Aurecon South Africa (Pty) Ltd 21/05/2018 - 09:41
Heritage Impact Assessment FOR KHUMANI IRON ORE MINE NEW WATER RETURN DAM, PIPELINES AND WATER CONTAINMENT FACILITY, SISHEN, NORTHERN CAPE HERITAGE IMPACT ASSESSMENT FOR KHUMANI IRON ORE MINE NEW WATER RETURN DAM, PIPELINES AND WATER CONTAINMENT FACILITY, SISHEN, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 01/04/2019 Jaco van der Walt Heritage Contracts and Archaeological Consulting Envirogistics (Pty) Ltd 13/07/2019 - 03:14
Umqeku river bridge HIA desktop DESKTOP SURVEY OF THE UMQEKU LOW LEVEL BRIDGE: HIA Letter of Exemption 22/09/2016 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Jeffares & Green - Pietermaritzburg 27/10/2016 - 15:07
Thaba sione HIA HERITAGE SCOPING ASSESSMENT Proposed 10 MW Solar Photovoltaic farm, Thaba-sione, Northwest Province Version 1.0 DEA Reference: 14/12/16/3/3/1/500 Heritage Scoping 22/08/2012 Wouter Fourie PGS Heritage and Grave Relocation Consultants PGS Heritage and Grave Relocation Consultants 08/03/2013 - 09:28
Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED TOWNSHIP DEVELOPMENT ON PORTIONS 68 & 83 OF THE FARM HARTEBEESTPOORT 328JR Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED TOWNSHIP DEVELOPMENT ON PORTIONS 68 & 83 OF THE FARM HARTEBEESTPOORT 328JR, BRUMMERIA, PRETORIA, CITY OF TSHWANE METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE 30/09/2019 Johnny van Schalkwyk SPOOR Environmental Services (PTY) Ltd. 08/10/2019 - 16:53
SAHRIS CaseID 14758 - Expropriation Bill Notice SAHRIS CaseID 14758 - Expropriation Bill Notice Non Impact Assessment Related Reports 05/02/2021 Karen Van Ryneveld 05/02/2021 - 19:35
The Workshop, Durban, KwaZulu-Natal The Workshop, Durban, KwaZulu-Natal Heritage Study 25/05/2022 29/07/2022 - 17:29
Protea Ridge, Kommetjie HIA Heritage Impact Assessment: Proposed development of portion of Remainder of Farm 948, Kommetjie (Protea Ridge) HIA Phase 2 25/04/2013 Lize Malan Doug Jeffery Environmental Consultants 29/05/2013 - 10:16
Wilger 132KV Power Line Proposed Construction of the Wilger 132kV Power Line and the associated Switchyards on the Farm 267 Arriesfontein, Northern Cape Province Heritage Impact Assessment Specialist Reports 03/12/2013 Wouter Fourie PGS Heritage and Grave Relocation Consultants 16/05/2014 - 12:15
Barkley West PIA DESKTOP PALAEONTOLOGICAL IMPACT ASSESSMENT Proposed Township Barkly West, Dikgatlong Local Municipality, Northern Cape Province PIA Desktop 24/03/2021 Bruce Rubidge University of the Witwatersrand - Evolutionary Studies Institute Maxim Planning Solutions 25/03/2021 - 08:34
Springhaas Line 2 Palaeontological Impact Assessment Palaeontological Impact Assessment for the proposed Overhead Lines up to 275kV in Capacity from Springhaas Solar Facility 3 to Springhaas Collector Substation B, Near Dealesville, Bloemfontein, Free State PIA Desktop 25/07/2022 Marion Bamford Prof Marion Bamford ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 13:10
Palaeontological Impact Assessment Palaeontological Impact Assessment for the Potential Housing Development on Remainder of Remainder of Portion 46 and Portion 112 of the farm Leeuwpoort 113 IR, Gauteng Province PIA Desktop 28/02/2017 Johnny Van Schalkwyk, Marion Bamford 17/03/2017 - 07:29
St Faiths Substation Phase 1 Heritage Impact Assessment Report: Proposed St. Faiths 400/132 kV Sub-Station and Associated Power Lines, Port Shepstone, uMzumbe, Hibiscus Coast and Ezinqoleni Local Municipalities, Ugu District, KwaZulu-Natal HIA Phase 1 14/03/2014 Elizabeth Wahl eThembeni Cultural Heritage Eskom - SOU 06/08/2014 - 08:22
Heritage Report 1993 Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. HIA Phase 1 01/01/2014 Anton van Vollenhoven A.C. van Vollenhoven A.C. van Vollenhoven 08/05/2017 - 12:41

Pages

CSV
 
 

Search form